Pier column steel bar integral prefabrication tool
Through the overall prefabricated tooling of pier column steel bars and the use of welded structures and positioning beams, the problems of main bar installation deviation and safety hazards in traditional construction are solved, efficient and standardized pier column steel bar installation is achieved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202420262198.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-02
AI Technical Summary
In the construction of traditional highway cross-line pier columns, there are problems such as vertical deviation of main bars, non-standard cross-sectional dimensions, difficulty in installing stirrups and serious safety hazards, which cannot meet the construction period requirements.
The overall prefabricated tooling of pier column steel bars is used, including columns, positioning beams, connecting columns, support channel steel and positioning steel bars. T-shaped legs and rectangular holes are formed by welding, and 12-shaped I-beams are used as positioning beams to achieve the specification of the steel frame. Installation and safety improvements.
It reduces potential safety hazards during the installation process of pier steel bars, improves construction efficiency, and ensures the drawing design specification requirements of the steel skeleton.
Smart Images

Figure CN221790903U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of highway overpass bridge pier construction, in particular to a pier steel bar integral prefabricated tooling. Background Art
[0002] The traditional construction method of municipal engineering highway overpass piers is to first process semi-finished steel bars in the steel bar processing plant according to the drawings, then transport them to the construction site, use cranes and column scaffolding erected on site to cooperate with manual on-site binding, and then install the formwork for concrete pouring. Since there is no standard for manual on-site installation, there will be deviations in verticality during the installation of the main reinforcement, non-standard cross-sectional dimensions, difficulty in installing stirrups, and uneven spacing between stirrups. These problems may affect the final protective layer of the pier column steel bars, which does not meet the design and specification requirements of the drawings. In addition, when the traditional on-site binding method of pier columns encounters a high height of the pier column, workers have to work at high altitude for a long time, which has great safety hazards and low efficiency, and cannot meet the project's construction period requirements.
[0003] To this end, we propose an integral prefabricated tooling for pier column reinforcement. Utility Model Content
[0004] The utility model aims to provide a pier column reinforcement integral prefabrication tool to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prefabricated tooling for pier column reinforcement as a whole, comprising: a pier column reinforcement as a whole, a column and a positioning beam, connecting columns are symmetrically placed on both sides of the pier column reinforcement as a whole, supporting channel steels are symmetrically fixedly connected on both sides of the bottom end of the connecting column, the connecting column and the two supporting channel steels form T-shaped legs, the top of the connecting column is fixedly connected to the column, two rectangular holes are respectively provided on the column, and a single tooling is formed after the T-shaped legs fix the column, a positioning beam and positioning steel bars are inserted between the rectangular holes on the two single toolings, the positioning steel bars are inserted into the interior of the positioning beam, the positioning steel bars are in an arc shape, and are frictionally connected to the single tooling.
[0006] Preferably, the length of the column is 3 meters, and a rectangular hole is opened at 1.4 meters and 2.4 meters respectively.
[0007] Preferably, square timbers are symmetrically fixedly connected to both sides of the top end of the positioning beam via iron wires.
[0008] Preferably, a stabilizing block is fixedly connected to one side of the T-shaped leg.
[0009] Preferably, the connecting column is a 0.5-meter-long 16a-type channel steel, and the supporting channel steel is a 1-meter-long 16a-type channel steel.
[0010] Preferably, the column is a 3-meter-long 16a-type channel steel.
[0011] Preferably, the positioning beam is a Type 12 I-beam.
[0012] Preferably, the connecting columns, supporting channel steels, columns and positioning beams are all made of hot-rolled steel sections.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] Utilize a 1-meter-long 16a channel steel, a 0.5-meter-long 16a channel steel, a 3-meter-long 16a channel steel and a No. 12 I-beam, weld the 1-meter channel steel and the 0.5-meter channel steel into a T shape and weld them to one end of the 2-meter channel steel as a leg to form a single tooling, open an 80x125-meter rectangular hole at 1.4 meters and 2.4 meters high of the 2-meter channel steel, pass the No. 12 I-beam between the holes of the same height of two single tools to form a positioning beam, and then form a complete pier column reinforcement overall prefabricated tooling from two such overall tools, which greatly reduces the potential safety hazards of the pier column reinforcement during the production and installation process, improves the efficiency and also meets the design requirements of the drawing specifications of the pier column reinforcement skeleton. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the overall partial cross-sectional structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the cross-sectional structure of the temperature uniformity regulating device of the utility model;
[0017] Figure 3 It is a schematic diagram of the structure of two rectangular holes on the column of the utility model.
[0018] In the figure: 1. Pier column reinforcement as a whole; 2. Connecting column; 3. Support channel steel; 4. Column; 5. Rectangular hole; 6. Positioning beam; 7. Positioning steel bar; 8. Square timber; 9. Stabilizing block. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-3As shown, a pier column reinforcement overall prefabricated tooling includes: a pier column reinforcement overall 1, a column 4 and a positioning beam 6, a connecting column 2 is symmetrically placed on both sides of the pier column reinforcement overall 1, a supporting channel steel 3 is symmetrically fixedly connected to the bottom end of the connecting column 2 on both sides, the connecting column 2 and the two supporting channel steels 3 form a T-shaped leg, the top of the connecting column 2 is fixedly connected to the column 4, and two rectangular holes 5 are respectively provided on the column 4. After the T-shaped leg fixes the column 4, a single tooling is formed, and a positioning beam 6 and a positioning steel bar 7 are inserted between the rectangular holes 5 on the two single tools, and the positioning steel bar 7 is inserted inside the positioning beam 6. 7 is in an arc shape and is frictionally connected with a single tooling. The length of the column 4 is 3 meters. The rectangular holes 5 are opened at 1.4 meters and 2.4 meters respectively. The top of the positioning beam 6 is symmetrically fixedly connected with square wood 8 on both sides by wire. One side of the T-shaped leg is fixedly connected with a stabilizing block 9. The connecting column 2 is a 0.5-meter-long 16a-type channel steel, the supporting channel steel 3 is a 1-meter-long 16a-type channel steel, the column 4 is a 3-meter-long 16a-type channel steel, the positioning beam 6 is a 12-type I-beam, and the connecting column 2, the supporting channel steel 3, the column 4 and the positioning beam 6 are all composed of hot-rolled steel.
[0021] Working principle:
[0022] Utilize a 1-meter-long 16a channel steel (supporting channel steel 3), a 0.5-meter-long 16a channel steel (connecting column 2), a 3-meter-long 16a channel steel (column 4) and a No. 12 I-beam (positioning beam 6), weld the 1-meter channel steel (supporting channel steel 3) and the 0.5-meter channel steel (connecting column 2) into a T-shape and weld them to one end of the 2-meter channel steel (column 2) as a leg to form a single tooling, open a 80x125-meter rectangular hole at 1.4 meters and 2.4 meters high of the 2-meter channel steel (column 2), pass the No. 12 I-beam (positioning beam 6) between the holes of the same height of the two single tools to form a positioning beam 6, and then form a complete pier column steel bar overall 1 prefabricated tooling by two such overall tools, which greatly reduces the potential safety hazards of the pier column steel bars during the production and installation process, improves the efficiency and also meets the design requirements of the drawing specifications of the pier column steel bar skeleton.
[0023] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pier column steel bar integral prefabrication tool, characterized in that: include: A pier column reinforcement body (1), connecting columns (2) are symmetrically placed on both sides of the pier column reinforcement body (1), supporting channel steels (3) are symmetrically fixedly connected to both sides of the bottom ends of the connecting columns (2), and the connecting columns (2) and the two supporting channel steels (3) form T-shaped legs; The top of the connecting column (2) is fixedly connected to the column (4), and two rectangular holes (5) are respectively provided on the column (4). After the column (4) is fixed by the T-shaped legs, a single tooling is formed; A positioning beam (6) is inserted between the rectangular holes (5) on the two individual toolings, and a positioning steel bar (7) is inserted inside the positioning beam (6). The positioning steel bar (7) is in an arc shape and is frictionally connected to the individual toolings.
2. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: The length of the column (4) is 3 meters, and the rectangular holes (5) are respectively opened at 1.4 meters and 2.4 meters.
3. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: Square timbers (8) are symmetrically connected to both sides of the top end of the positioning beam (6) via iron wires.
4. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: A stabilizing block (9) is fixedly connected to one side of the T-shaped leg.
5. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: The connecting column (2) is a 0.5-meter-long 16a-type channel steel, and the supporting channel steel (3) is a 1-meter-long 16a-type channel steel.
6. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: The column (4) is a 3-meter-long 16a-type channel steel.
7. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: The positioning beam (6) is a 12-type I-beam.
8. The pier column reinforcement integral prefabrication tool according to claim 1, characterized in that: The connecting column (2), the supporting channel steel (3), the upright column (4) and the positioning beam (6) are all made of hot-rolled steel.