Docking block structure suitable for beam arch deck
By designing a detachable base and a dock structure of uniform specifications, combined with sandboxes and piers, the problem of uniformity of the height of the floating dock's central beam arch and the transverse docking of semi-submersible ships was solved, and the reduction of dock specifications and the Increased flexibility to meet docking needs in different directions.
Patent Information
- Application Number
- CN202420343192.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The existing floating docks have a single type and specification of dock piers, which makes it difficult to meet the special needs of beam arches and transverse docking maintenance of semi-submersible ships. As a result, the height of the dock piers is difficult to unify and the number of specifications is too large.
A docking pier structure suitable for beam arch decks is designed. It adopts a detachable base and docking piers of uniform specifications, connected by bolts and nuts, and combined with sandboxes and piers to achieve flexible adjustment of the height of the docking piers and reduce the specifications and quantity.
It realizes the unified specifications of docking pier types when there are beam arches and semi-submersible platforms for transverse docking, reduces the docking pier specifications and quantity, meets the needs of docking in different directions, and ensures the uniformity and flexibility of docking pier heights. sex.
Smart Images

Figure CN221794857U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a dock pier structure suitable for a beam arch deck and belongs to the field of ship or floating dock design and construction. Background Art
[0002] Dock piers are widely used on floating docks to support docked ships. The dock piers transfer the load of the docked ship to the hull structure of the floating dock. Most of the floating docks currently in use have straight decks without beam arches, or the docked ship only docks along the longitudinal direction of the floating dock (such as Figure 1 As shown in the figure, the docking direction is single, so the dock pier type and specification of each floating dock are single, and the side piers are of uniform specifications. The side piers can be moved at will according to the needs of the docking ship to meet the docking ship's needs. When the deck of the floating dock is equipped with beam arches for drainage and the docking ship needs to dock horizontally (such as Figure 2 , Figure 3 , Figure 4 As shown in the figure, different docking methods are needed to accommodate ships entering the dock transversely. When the beam arch is taken into consideration, it is difficult to unify the height of the docking piers at each pier location, and the number of docking piers of different specifications will be very large (such as Figure 5 , Figure 6 In order to solve this problem, it is necessary to design a dock pier whose type can avoid excessive dock pier specifications and quantity as much as possible and can adapt to the needs of pier placement when the beam arch and the docking ship enter the dock from different directions.
[0003] At present, the commonly used dock types on large floating docks are as follows: Figure 5 , Figure 6 As shown, it is composed of pier wood 1, sandbox 2, and dock pier 3 (steel pier). The height of dock pier 3 is fixed, and the height can be fine-tuned through the sandbox. The specifications of dock pier 3 on each conventional beamless arch floating dock are basically uniform. When adjusting the pier layout method, since the specifications of each dock pier are consistent, each dock pier 3 can be adjusted to the required position as needed.
[0004] When there is a beam arch on the floating dock deck, there is a large difference in the transverse height of the deck, that is, the height of the middle deck from the baseline is high, and the height decreases towards the sides. The height difference between the middle and the lowest point on both sides is as high as 300mm; and some special floating docks have the need for semi-submersible platforms to dock horizontally, which makes the pier layout method very different from that of conventional ships. Figure 5 , Figure 6 The conventional dock pier form with uniform specifications shown is difficult to meet the needs of special floating docks with beam arches and semi-submersible vessels that need to be repaired laterally. Summary of the invention
[0005] The technical problem to be solved by the utility model is: how to make the conventional dock pier with uniform type and specification meet the needs of a special floating dock with beam arches and a semi-submersible ship transversely docked for maintenance.
[0006] In order to solve the above technical problems, the technical solution of the utility model is to provide a dock structure suitable for a beam-arch deck, which is characterized by comprising a detachable dock base, on which a dock of uniform specifications is detachably connected, a sand box is fixed on the dock, and pier wood is fixed on the sand box.
[0007] Preferably, the detachable base of the dock is a rectangular frame structure, the long side of the detachable base of the dock is along the horizontal direction of the floating dock, and the size of the detachable base of the dock matches the size of the dock.
[0008] Preferably, the detachable dock base is a rectangular frame structure, the long side of the detachable dock base is along the longitudinal direction of the floating dock, and the size of the detachable dock base matches the size of the dock.
[0009] Preferably, it is characterized in that the detachable base of the dock is fastened to the dock by bolts and nuts.
[0010] Preferably, the surface of the detachable dock base is composed of a plurality of panels forming an upper surface frame structure, a plurality of ribs are provided at the lower part of the upper surface frame structure, a bottom plate is provided under the detachable dock base, and the plurality of ribs are fixed on the bottom plate.
[0011] Preferably, the distance between two adjacent ribs is the same.
[0012] Preferably, the upper surface frame structure includes a first panel, a second panel, a third panel, a fourth panel, a fifth panel and a sixth panel. The third panel and the fourth panel are cut at both ends and are welded and fixed to the first panel and the second panel respectively.
[0013] Preferably, the lower part of the upper surface frame structure of the detachable base of the dock pier includes a first rib plate, a second rib plate, a third rib plate, a fourth rib plate, a fifth rib plate, a sixth rib plate, a seventh rib plate, an eighth rib plate, a ninth rib plate, and a tenth rib plate at a certain distance from each other, the upper end of the first rib plate is welded to the sixth panel, the upper end of the eighth rib plate is welded to the third panel, the fourth panel, and the fifth panel, the upper end of the sixth rib plate is welded to the third panel and the first panel and the second panel, the upper end of the seventh rib plate is welded to the fourth panel, the first panel, and the second panel, and the upper ends of the second rib plate, the third rib plate, the fourth rib plate, and the fifth rib plate are welded to the first panel, the second panel, and the fifth panel.
[0014] Preferably, the bottom plate is welded to the lower ends of the first rib plate, the second rib plate, the third rib plate, the fourth rib plate, the fifth rib plate, the sixth rib plate, the seventh rib plate and the eighth rib plate respectively.
[0015] Preferably, the height of the first rib plate is taken as a reference height, and the heights of other rib plates are determined according to the height of the deck beam arch.
[0016] The utility model adopts a detachable dock structure, which can adapt to docking ships with beam arches and semi-submersible platforms that need to dock horizontally, and the dock type can avoid too many dock specifications and quantities as much as possible. The utility model divides the dock into an upper dock with uniform specifications and a lower detachable dock base. When conventional ships and semi-submersible ships enter and exit the dock from the bow and stern of the floating dock, and when the semi-submersible ships dock horizontally from the floating dock, the dock specifications on the beam arch floating dock can be greatly reduced. It only needs to set several specifications of detachable dock bases and connect them with the upper dock with uniform specifications through bolts, so as to meet the needs of various ship types for horizontal and longitudinal docking when the deck has beam arches. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is the layout diagram of a common ship after longitudinal docking;
[0018] Figure 2 This is the layout diagram of the semi-submersible vessel after longitudinal docking;
[0019] Figure 3 This is the layout diagram of the semi-submersible vessel after docking horizontally;
[0020] Figure 4 The schematic diagram of dock pier height when beam arch exists (taking the longitudinal docking of ordinary ship as an example);
[0021] Figure 5 It is a schematic diagram of a conventional dock type;
[0022] Figure 6 for Figure 5 Side view of
[0023] Figure 7 This is a schematic diagram of adding a detachable dock base under a conventional dock (the long side of the dock is along the horizontal direction of the floating dock);
[0024] Figure 8 for Figure 7 Side view of
[0025] Fig. 9 This is a schematic diagram of the connection between the detachable base of the dock pier and the steel pier;
[0026] Fig.10 The schematic diagram of the detachable base of the dock pier (the long side of the dock pier is arranged transversely along the floating dock);
[0027] Fig.11 for Fig.10 AA section view;
[0028] Fig.12 for Fig.10 BB cross-sectional view;
[0029] Fig.13A dock with a detachable base is added under the conventional dock (the long side of the dock extends longitudinally along the floating dock);
[0030] Fig.14 for Fig.13 Side view of
[0031] Fig.15 This is a schematic diagram of a semi-submersible vessel entering the dock transversely from a floating dock;
[0032] Fig.16 This is a schematic diagram of the connection between the detachable base of the dock pier and the steel pier;
[0033] Fig.17 The schematic diagram of the detachable base of the dock pier (the long side of the dock pier is arranged longitudinally along the floating dock);
[0034] Fig.18 for Fig.17 AA section view;
[0035] Fig.19 for Fig.17 BB cross-sectional view. DETAILED DESCRIPTION
[0036] In order to make the present invention more obvious and easy to understand, preferred embodiments are described in detail as follows in conjunction with the accompanying drawings.
[0037] Example 1
[0038] The utility model provides a dock pier structure suitable for beam arch decks, such as Figure 7-Figure 12 As shown, it comprises a detachable dock base 5, to which a dock 3 of uniform specifications is detachably connected, a sandbox 2 is fixed on the dock 3, and a pier wood 1 is fixed on the sandbox 2.
[0039] The detachable dock base 5 is a rectangular frame structure, the long side of the detachable dock base 5 is along the horizontal direction of the floating dock, and the size of the detachable dock base 5 matches the size of the dock 3.
[0040] The surface of the detachable dock base 5 is composed of a first panel 501, a second panel 502, a third panel 503, a fourth panel 504, a fifth panel 505, and a sixth panel 506 to form an upper surface frame structure. Cutouts are opened at both ends of the third panel 503 and the fourth panel 504, and are welded and fixed to the first panel 501 and the second panel 502, respectively. The lower part of the panel of the detachable dock base 5 (i.e., the lower part of the upper surface frame structure) is composed of a first rib plate 508, a second rib plate 509, a third rib plate 510, a fourth rib plate 511, a fifth rib plate 512, a sixth rib plate 513, a seventh rib plate 514, an eighth rib plate 515, a ninth rib plate 516, and a tenth rib plate 517, which are spaced a certain distance apart. The upper end of the first rib plate 508 is welded to the sixth panel 506, the upper end of the eighth rib plate 515 is welded to the third panel 503, the fourth panel 504, and the fifth panel 505, the upper end of the sixth rib plate 513 is welded to the third panel 503 and the first panel 501 and the second panel 502, the upper end of the seventh rib plate 514 is welded to the fourth panel 504, the first panel 501, and the second panel 502, and the upper ends of the second rib plate 509, the third rib plate 510, the fourth rib plate 511, and the fifth rib plate 512 are welded to the first panel 501, the second panel 502, and the fifth panel 505. The bottom plate 518 is provided under the detachable base 5 of the dock, and the bottom plate 518 is welded to the lower ends of the first rib plate 508, the second rib plate 509, the third rib plate 510, the fourth rib plate 511, the fifth rib plate 512, the sixth rib plate 513, the seventh rib plate 514, and the eighth rib plate 515 respectively. The panel, the rib plate, and the bottom plate constitute the base structure. Among them, the height of the first rib plate 508 is taken as the reference height h, and the heights of the second rib plate 509, the third rib plate 510, the fourth rib plate 511, the fifth rib plate 512, the sixth rib plate 513, the seventh rib plate 514, and the eighth rib plate 515 are determined according to the height of the deck beam arch 6.
[0041] The detachable base 5 of the dock is connected to the dock 3 by a plurality of bolts and nuts 4 .
[0042] When conventional ships and semi-submersible ships enter and exit the dock from the front and rear of the floating dock and land on the dock, the long sides of the dock piers are arranged horizontally along the floating dock. Due to the deck beam arch 6 on the deck, the heights of the dock piers are different when the dock piers are arranged. The utility model can ensure the uniform specifications of the steel dock pier body (i.e., steel pier) on the upper part of the base by adding detachable dock pier bases 5 of different heights arranged horizontally on the long sides under the conventional dock piers. The heights of the detachable bases 5 of adjacent dock piers are as consistent as possible, and the overall dock pier height is fine-tuned by adjusting the height of the sand in the sandbox 2.
[0043] When a conventional ship enters the dock and sets up a pier (such as Figure 1 As shown in FIG. 1 , the long side of the dock pier is arranged transversely along the floating dock. Only two detachable dock pier bases 5 of different heights need to be provided on the whole ship to be connected with the upper dock pier 3 to ensure that the overall dock pier height of the whole ship is uniform. Fig. 9 shown.
[0044] Example 2
[0045] The utility model provides a dock pier structure suitable for beam arch decks, such as Figure 13-Figure 19 As shown, it comprises a detachable dock base 5, to which a dock 3 of uniform specifications is detachably connected, a sandbox 2 is fixed on the dock 3, and a pier wood 1 is fixed on the sandbox 2.
[0046] The detachable dock base 5 is a rectangular frame structure, the long side of the detachable dock base 5 is along the longitudinal direction of the floating dock, and the size of the detachable dock base 5 matches the size of the dock 3.
[0047] The surface of the detachable dock base 5 is composed of a first panel 501, a second panel 502, a third panel 503, a fourth panel 504, a fifth panel 505, and a sixth panel 506 to form an upper surface frame structure. Cutouts are opened at both ends of the third panel 503 and the fourth panel 504 to be welded and fixed to the first panel 501 and the second panel 502, respectively. The lower part of the panel of the detachable base 5 of the dock pier (i.e., the lower part of the upper surface frame structure) is composed of a first rib plate 508, a second rib plate 509, a third rib plate 510, a fourth rib plate 511, a fifth rib plate 512, a sixth rib plate 513, a seventh rib plate 514, an eighth rib plate 515, a ninth rib plate 516, and a tenth rib plate 517, which are spaced a certain distance apart. The upper end of the first rib plate 508 is welded to the sixth panel 506, the upper end of the eighth rib plate 515 is welded to the third panel 503, the fourth panel 504, and the fifth panel 505, the upper end of the sixth rib plate 513 is welded to the third panel 503 and the first panel 501 and the second panel 502, the upper end of the seventh rib plate 514 is welded to the fourth panel 504, the first panel 501, and the second panel 502, and the upper ends of the second rib plate 509, the third rib plate 510, the fourth rib plate 511, and the fifth rib plate 512 are welded to the first panel 501, the second panel 502, and the fifth panel 505. The bottom plate 518 is provided under the detachable base 5 of the dock, and the bottom plate 518 is respectively welded to the lower ends of the first rib plate 508, the second rib plate 509, the third rib plate 510, the fourth rib plate 511, the fifth rib plate 512, the sixth rib plate 513, the seventh rib plate 514, and the eighth rib plate 515. The panel, the rib plate, and the bottom plate constitute the base structure. The height of the first rib plate 508 is taken as the reference height h, and the heights (h1, h2) of the second rib plate 509 and the third rib plate 510 are determined according to the height of the deck beam arch 6.
[0048] The detachable base 5 of the dock is connected to the dock 3 by a plurality of bolts and nuts 4 .
[0049] When the dock wall of the floating dock is removed, and the semi-submersible vessel enters and exits the dock horizontally from the floating dock and lands on the pier, the long side of the dock pier is along the longitudinal direction of the floating dock. Since there is a deck beam arch 6 on the deck, the height of the dock piers is different when the piers are arranged, and since the long sides of the dock piers are arranged longitudinally, the dock pier form is different from the horizontally arranged dock piers. In order to reduce the specifications of the dock piers, below the steel pier body with uniform specifications, a dock pier detachable base 5 with different heights arranged longitudinally on the long sides is added, and the height of the adjacent dock pier detachable bases 5 is as uniform as possible, and the overall dock pier height is kept consistent by fine-tuning the height of the sandbox 2.
[0050] like Fig.15 As shown in FIG. 1 , the semi-submersible vessel is docked transversely from the floating dock and the dock piers are arranged with the long sides of the dock piers arranged longitudinally along the floating dock. At this time, only four detachable dock pier bases 5 with different heights need to be provided to ensure that the overall dock pier height of the whole vessel is uniform, such as Fig.16 shown.
Claims
1. A dock pier structure suitable for a beam arch deck, characterized in that: The invention comprises a detachable dock base (5), a dock (3) of uniform specifications is detachably connected to the detachable dock base (5), a sandbox (2) is fixed on the dock (3), and a pier wood (1) is fixed on the sandbox (2).
2. A dock pier structure suitable for a beam arch deck as claimed in claim 1, characterized in that: The detachable dock base (5) is a rectangular frame structure, the long side of the detachable dock base (5) is along the horizontal direction of the floating dock, and the size of the detachable dock base (5) matches the size of the dock (3).
3. A dock pier structure suitable for a beam arch deck as claimed in claim 1, characterized in that: The detachable dock base (5) is a rectangular frame structure, the long side of the detachable dock base (5) is along the longitudinal direction of the floating dock, and the size of the detachable dock base (5) matches the size of the dock (3).
4. A dock pier structure suitable for a beam arch deck as claimed in claim 2 or 3, characterized in that: The detachable dock base (5) is fastened to the dock (3) by bolts and nuts (4).
5. A dock pier structure suitable for a beam arch deck as claimed in claim 2 or 3, characterized in that: The surface of the detachable dock base (5) is composed of a plurality of panels forming an upper surface frame structure, a plurality of ribs are provided at the lower part of the upper surface frame structure, a bottom plate (518) is provided below the detachable dock base (5), and the plurality of ribs are fixed on the bottom plate (518).
6. A dock pier structure suitable for a beam arch deck as claimed in claim 5, characterized in that: The distance between two adjacent rib plates is the same.
7. A dock pier structure suitable for a beam arch deck as claimed in claim 5, characterized in that: The upper surface frame structure includes a first panel (501), a second panel (502), a third panel (503), a fourth panel (504), a fifth panel (505), and a sixth panel (506). The third panel (503) and the fourth panel (504) are cut at both ends and are welded and fixed to the first panel (501) and the second panel (502) respectively.
8. A dock pier structure suitable for a beam arch deck as claimed in claim 7, characterized in that: The lower part of the upper surface frame structure of the dock detachable base (5) comprises a first rib plate (508), a second rib plate (509), a third rib plate (510), a fourth rib plate (511), a fifth rib plate (512), a sixth rib plate (513), a seventh rib plate (514), an eighth rib plate (515), a ninth rib plate (516), and a tenth rib plate (517) which are spaced a certain distance apart. The upper end of the first rib plate (508) is welded to the sixth panel (506), and the upper end of the eighth rib plate (515) is welded to the third panel (503), the fourth panel (514), the eighth rib plate (515), the ninth rib plate (516), and the tenth rib plate (517). The upper end of the sixth rib plate (513) is welded to the third panel (503) and the first panel (501) and the second panel (502); the upper end of the seventh rib plate (514) is welded to the fourth panel (504), the first panel (501) and the second panel (502); the upper end of the second rib plate (509), the third rib plate (510), the fourth rib plate (511) and the fifth rib plate (512) are welded to the first panel (501), the second panel (502) and the fifth panel (505).
9. A dock pier structure suitable for a beam arch deck as claimed in claim 8, characterized in that: The bottom plate (518) is respectively welded to the lower ends of the first rib plate (508), the second rib plate (509), the third rib plate (510), the fourth rib plate (511), the fifth rib plate (512), the sixth rib plate (513), the seventh rib plate (514), and the eighth rib plate (515).
10. A dock pier structure suitable for a beam arch deck as claimed in claim 8, characterized in that: The height of the first rib plate (508) is used as a reference height, and the heights of other rib plates are determined according to the height of the deck beam arch (6).