Building material conveying and hoisting equipment
By designing building materials conveying and lifting equipment, and using longitudinal and transverse moving components and winches to efficiently transport real stone paint, the problem of low real stone paint handling efficiency in the existing technology has been solved, and fast and efficient cargo lowering and position adjustment have been achieved.
Patent Information
- Application Number
- CN202422075123.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-08-27
AI Technical Summary
Existing lifting equipment has low efficiency when transporting real stone paint required for high-rise buildings, and manual handling consumes a lot of manpower and time. Especially for large quantities of real stone paint, the efficiency of the spreader is not high.
A building materials conveying and lifting equipment is designed, including a movable base, a transverse moving component, a longitudinal moving component and a winch. The hanger component is moved to the upper side of the real stone paint bucket through the longitudinal moving component, and the winch is used to lift and move the real stone paint bucket, and The position is adjusted by moving the components laterally and combined with the electric push rod to quickly detach the handle to improve handling efficiency.
It achieves efficient handling of real stone paint, reduces manual labor consumption, improves handling efficiency, and quickly detaches from the hanger assembly through the electric push rod, further improving operating efficiency.
Smart Images

Figure CN221796827U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of lifting mechanical equipment, in particular to a building material conveying and lifting equipment. Background Art
[0002] High-rise buildings require a large amount of real stone paint, which is mostly packed in barrels. After the truck delivers the real stone paint to the construction site, it is usually carried to the ground by hand. This process is very labor-intensive and time-consuming, and the truck compartment has a certain height, which further increases the difficulty of manual handling.
[0003] The common machines used to transport goods are forklifts and slings. However, forklifts cannot transport goods that are not placed on pallets. Although using slings to transport real stone paint can save labor and physical strength, the efficiency is very slow because slings are mainly used for vertical transportation of heavy objects. For a large number of real stone paints, the efficiency of using slings to transport them is very low. Utility Model Content
[0004] The purpose of the utility model is to provide a building material conveying and lifting equipment in order to solve the above-mentioned problems, as described below.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] The utility model provides a building material conveying and lifting equipment, comprising a mobile base, on which a lateral moving component, two door frames and a longitudinal moving component are arranged, the lateral moving component cooperates with the two door frames to drive the longitudinal moving component to move in a straight line, a winch is fixed on the moving end of the longitudinal moving component, the winch has at least two steel ropes, and a hanger component is fixed on the steel rope of the winch, and the hanger component can carry multiple barrels of materials at the same time.
[0007] By using the above-mentioned building material conveying and lifting equipment, the hanger assembly is moved to the upper side of the real stone paint bucket through the longitudinal moving assembly, the handle of the real stone paint bucket is hung on the hanger assembly, the hanger assembly and the real stone paint are lifted by the winch, and then the winch, the hanger assembly and the real stone paint are moved to the other side by the longitudinal moving assembly, and the hanger assembly is driven to move back and forth by the longitudinal moving assembly, so that the real stone paint on the truck can be transported to the ground one by one;
[0008] When a large amount of real stone paint is accumulated on the ground, the horizontal moving component is coordinated with the two door frames to adjust the position of the longitudinal moving component to place the real stone paint to other locations.
[0009] Preferably, the mobile base comprises a base, a plurality of universal wheels are arranged at the bottom of the base, and handles are arranged at the four corners of the base.
[0010] Preferably, a bearing seat is fixed on the base, and a rotating shaft is rotatably arranged on the bearing seat, a second handle and a mounting frame are respectively fixed to the upper and lower ends of the rotating shaft, a hub motor is rotatably arranged on the mounting frame, and a tire is arranged on the surface of the hub motor.
[0011] Preferably, the lateral movement assembly includes a guide rod and a second screw, the guide rod is fixed on the base, the second screw is rotatably set on the base, a second motor is fixed on the base for rotating the second screw, one of the two door frames is slidably set on the guide rod, and the other door frame is threadedly connected to the second screw, and the longitudinal movement assembly is fixed on the two door frames.
[0012] Preferably, the door frame is provided with rollers, and the rollers are in contact with the upper side of the base.
[0013] Preferably, the longitudinal moving component includes a slide rail, which is fixed on two door frames, a slider is slidably arranged in the slide rail, a winch is fixed on the slider, a screw 1 is rotatably arranged in the slide rail, and the slider is threadedly connected to the screw 1, and a motor 1 is fixed on the slide rail for rotating the screw 1.
[0014] Preferably, a bracket is fixed on the door frame, and two inclined ropes are fixed on the upper end of the bracket, and ends of the two inclined ropes that are away from each other are respectively fixed to both sides of the slide rail.
[0015] Preferably, the hanger assembly includes a connecting plate, which is fixed to the steel rope of the winch, and a plurality of fixed rods are obliquely and slidably arranged on the connecting plate, and two electric push rods are arranged on the connecting plate, and a movable plate is fixed between the movable ends of the two electric push rods, the fixed rod is fixed to the movable plate, and the extension direction of the electric push rod is parallel to the length direction of the fixed rod.
[0016] The beneficial effects are:
[0017] 1. Move the hanger assembly to the upper side of the real stone paint barrel through the longitudinal moving assembly, hang the handle of the real stone paint on the hanger assembly, lift the hanger assembly and the real stone paint through the winch, drive the winch, the hanger assembly and the real stone paint to move to the other side through the longitudinal moving assembly, and drive the hanger assembly to move back and forth through the longitudinal moving assembly, so that the real stone paint on the truck can be moved to the ground one by one. The position of the longitudinal moving assembly can be adjusted by cooperating with the two door frames through the transverse moving assembly to adjust the position of the longitudinal moving assembly, so as to adjust the position of the real stone paint;
[0018] 2. Move the movable plate through the electric push rod, and drive the fixed rod to move through the movable plate, so that the fixed rod is separated from the handle of the real stone paint bucket. In this way, the hanger assembly can be quickly separated from the handle of the real stone paint bucket, thereby improving the handling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 This is a front view structural schematic diagram of the utility model;
[0021] Figure 2 It is a three-dimensional structural schematic diagram of the utility model;
[0022] Figure 3 This is a schematic diagram of the three-dimensional structure of the longitudinal moving component of the utility model;
[0023] Figure 4 It is a three-dimensional structural schematic diagram of the hanger assembly of the utility model.
[0024] The following are the descriptions of the reference numerals:
[0025] 1. Mobile base; 2. Lateral moving assembly; 3. Door frame; 4. Longitudinal moving assembly; 5. Winch; 6. Hanger assembly; 7. Connecting plate; 8. Movable plate; 9. Fixed rod; 10. Electric push rod; 11. Slide rail; 12. Slider; 13. Screw 1; 14. Base; 15. Guide rod; 16. Screw 2; 17. Universal wheel; 18. Handle 1; 19. Roller; 20. Handle 2; 21. Motor 1; 22. Bracket; 23. Oblique rope; 24. Mounting frame; 25. Hub motor; 26. Tire; 27. Rotating shaft; 28. Motor 2. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.
[0027] See also Figure 1-Figure 4As shown, the utility model provides a building material conveying and lifting equipment, including a mobile base 1, on which a transverse moving component 2, two door frames 3 and a longitudinal moving component 4 are arranged, and the transverse moving component 2 cooperates with the two door frames 3 to drive the longitudinal moving component 4 to move in a straight line, and a winch 5 is fixed on the moving end of the longitudinal moving component 4, the winch 5 has at least two steel ropes, and a hanger component 6 is fixed on the steel rope of the winch 5, and the hanger component 6 can simultaneously mount multiple barrels of materials.
[0028] As an optional embodiment, the mobile base 1 includes a base 14, a plurality of universal wheels 17 are arranged at the bottom of the base 14, and handles 18 are arranged at the four corners of the base 14, and the handles 18 are arranged to facilitate moving the base 14.
[0029] A bearing seat is fixed on the base 14, and a rotating shaft 27 is rotatably arranged on the bearing seat, a handle 20 and a mounting frame 24 are respectively fixed at the upper and lower ends of the rotating shaft 27, a hub motor 25 is rotatably arranged on the mounting frame 24, and a tire 26 is arranged on the surface of the hub motor 25;
[0030] The wheel hub motor 25 can be rotated by the cooperation between the handle 20 and the rotating shaft 27 , and the wheel hub motor 25 drives the tire 26 to rotate, so that the base 14 can be assisted when moving.
[0031] The lateral moving assembly 2 includes a guide rod 15 and a second lead screw 16, the guide rod 15 is fixed on the base 14, the second lead screw 16 is rotatably arranged on the base 14, a second motor 28 is fixed on the base 14 for rotating the second lead screw 16, one of the two door frames 3 is slidably arranged on the guide rod 15, the other door frame 3 is threadedly connected to the second lead screw 16, and the longitudinal moving assembly 4 is fixed on the two door frames 3;
[0032] The second motor 28 drives the second screw 16 to rotate, and the second screw 16 cooperates with the guide rod 15 and the two door frames 3 to drive the longitudinal moving component 4 to move.
[0033] The door frame 3 is provided with a roller 19 , which contacts the upper side of the base 14 , and is used to support the door frame 3 .
[0034] The longitudinal moving component 4 includes a slide rail 11, which is fixed on the two door frames 3. A slider 12 is slidably arranged in the slide rail 11, and a winch 5 is fixed on the slider 12. A screw 13 is rotatably arranged in the slide rail 11, and the slider 12 is threadedly connected to the screw 13. A motor 21 is fixed on the slide rail 11 for rotating the screw 13. The screw 13 is driven to rotate by the motor 21. The screw 13 cooperates with the slide rail 11 to drive the slider 12 to move. The moving direction of the slider 12 is perpendicular to the moving direction of the transverse moving component 2.
[0035] A bracket 22 is fixed on the door frame 3, and two inclined ropes 23 are fixed on the upper end of the bracket 22. The ends of the two inclined ropes 23 that are away from each other are respectively fixed to the two sides of the slide rail 11. The inclined ropes 23 cooperate with the bracket 22 to support the slide rail 11.
[0036] The hanger assembly 6 includes a connecting plate 7, which is fixed to the steel rope of the winch 5, and a plurality of fixing rods 9 are obliquely and slidably arranged on the connecting plate 7, and two electric push rods 10 are arranged on the connecting plate 7, and a movable plate 8 is fixed between the movable ends of the two electric push rods 10, and the fixing rods 9 are fixed to the movable plate 8, and the telescopic direction of the electric push rods 10 is parallel to the length direction of the fixing rods 9;
[0037] The angle between the fixed rod 9 and the connecting plate 7 is used to mount the handle of the real stone paint bucket. After the real stone paint bucket is moved to the ground, the movable plate 8 is moved by the electric push rod 10, and the fixed rod 9 is driven by the movable plate 8 to move, so that the fixed rod 9 is separated from the handle of the real stone paint bucket, so that the hanger assembly 6 can be quickly separated from the handle of the real stone paint bucket.
[0038] With the above structure, the hanger assembly 6 is moved to the upper side of the real stone paint bucket by the longitudinal moving assembly 4, the handle of the real stone paint bucket is hung on the hanger assembly 6, the hanger assembly 6 and the real stone paint bucket are lifted by the winch 5, and then the winch 5, the hanger assembly 6 and the real stone paint are moved to the other side by the longitudinal moving assembly 4, and the hanger assembly 6 is driven to move back and forth by the longitudinal moving assembly 4, so that the real stone paint on the truck can be carried to the ground one by one;
[0039] When a large amount of real stone paint is accumulated on the ground, the horizontal moving component 2 cooperates with the two door frames 3 to adjust the position of the longitudinal moving component 4 to place the real stone paint to other positions.
[0040] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A building material conveying and lifting equipment, characterized in that: The mobile base (1) comprises a transverse moving assembly (2), two door frames (3) and a longitudinal moving assembly (4), the transverse moving assembly (2) cooperates with the two door frames (3) to drive the longitudinal moving assembly (4) to move along a straight line, a winch (5) is fixed on the moving end of the longitudinal moving assembly (4), the winch (5) has at least two steel ropes, and a hanger assembly (6) is fixed on the steel rope of the winch (5), and the hanger assembly (6) can simultaneously carry multiple barrels of materials; The hanger assembly (6) comprises a connecting plate (7), the connecting plate (7) being fixed to a steel rope of a winch (5), a plurality of fixing rods (9) being obliquely and slidably arranged on the connecting plate (7), two electric push rods (10) being arranged on the connecting plate (7), a movable plate (8) being fixed between movable ends of the two electric push rods (10), the fixing rods (9) being fixed to the movable plate (8), and the telescopic direction of the electric push rods (10) being parallel to the length direction of the fixing rods (9).
2. The building material conveying and lifting equipment according to claim 1, characterized in that: The mobile base (1) comprises a base (14), a plurality of universal wheels (17) are arranged at the bottom of the base (14), and handles (18) are arranged at the four corners of the base (14).
3. The building material conveying and lifting equipment according to claim 2 is characterized in that: A bearing seat is fixed on the base (14), and a rotating shaft (27) is rotatably arranged on the bearing seat. A second handle (20) and a mounting frame (24) are respectively fixed to the upper and lower ends of the rotating shaft (27). A wheel hub motor (25) is rotatably arranged on the mounting frame (24), and a tire (26) is arranged on the surface of the wheel hub motor (25).
4. The building material conveying and lifting equipment according to claim 2 is characterized in that: The transverse moving assembly (2) comprises a guide rod (15) and a second lead screw (16), wherein the guide rod (15) is fixed on a base (14), the second lead screw (16) is rotatably arranged on the base (14), a second motor (28) is fixed on the base (14) for rotating the second lead screw (16), one of the two door frames (3) is slidably arranged on the guide rod (15), and the other door frame (3) is threadedly connected to the second lead screw (16), and the longitudinal moving assembly (4) is fixed on the two door frames (3).
5. The building material conveying and lifting equipment according to claim 4 is characterized in that: The door frame (3) is provided with a roller (19), and the roller (19) is in contact with the upper side of the base (14).
6. The building material conveying and lifting equipment according to claim 1, characterized in that: The longitudinal moving assembly (4) comprises a slide rail (11), the slide rail (11) being fixed on two door frames (3), a slider (12) being slidably arranged in the slide rail (11), a winch (5) being fixed on the slider (12), a lead screw (13) being rotatably arranged in the slide rail (11), the slider (12) being threadedly connected to the lead screw (13), and a motor (21) being fixed on the slide rail (11) for rotating the lead screw (13).
7. The building material conveying and lifting equipment according to claim 6, characterized in that: A bracket (22) is fixed on the door frame (3), and two inclined ropes (23) are fixed on the upper end of the bracket (22), and ends of the two inclined ropes (23) that are away from each other are respectively fixed to two sides of the slide rail (11).