Coking device and coking system
By utilizing the design of preheated air pipes and flue gas drop holes in the coking device, the coking efficiency and production efficiency are improved, the problem of low coking efficiency in the box-type coal coking process is solved, and an efficient coking process is achieved.
Patent Information
- Application Number
- CN202420204748.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-26
AI Technical Summary
The coking efficiency in the box-type coal coking process is low, resulting in low production efficiency.
A coking device is designed, including a coal supporting base and a coking box. The heat generated by the mixed combustion of raw coal gas and air is transferred to the coking box through a preheated air pipe. The air is preheated to improve the coking efficiency, and the flue gas is dropped through the coking box. The holes discharge high-temperature flue gas into the flue, forming negative pressure to suck in external air, reducing maintenance of mechanical equipment.
It improves the thermal efficiency and production efficiency of the coking device, shortens the coking time, and reduces the maintenance workload of mechanical equipment.
Smart Images

Figure CN221797379U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of coking, in particular to a coking device and a coking system. Background Art
[0002] Coking refers to the process of heating coking coal to about 1000℃ (high temperature dry distillation) in an airtight condition to produce coke, coke oven gas and other coking chemical products through thermal decomposition and coking. In the related technology, the box-type briquette coking process used has the problem of low coking efficiency. Utility Model Content
[0003] The purpose of the embodiment of the utility model is to provide a coking device and a coking system to improve the coking efficiency of the box-type coking device. The specific technical solution is as follows:
[0004] The embodiment of the first aspect of the present application proposes a coking device, which includes a coal supporting base and a coking box. The coking box cover is arranged above the coal supporting base, and together with the coal supporting base, it forms a coking space, and the two are detachably connected; the coking box includes a furnace cover, a side wall and at least one preheating air pipe arranged on the side wall; the side wall is annular and located between the coal supporting base and the furnace cover; the furnace cover is arranged at the upper opening of the side wall, and the coal supporting base is arranged at the lower opening of the side wall; the preheating air pipe includes a preheating section, at least one air inlet end and at least one air outlet end; the preheating section connects the air inlet end and the air outlet end, and is embedded in the inside of the side wall; the air inlet end extends in a direction away from the coking box and extends to the outside of the coking box; the air outlet end extends toward the inside of the coking box and is connected to the coking space; the coal supporting base is used to place coal cakes, and a plurality of flue gas descending holes are provided on the coal supporting base to connect the coking space with the flue.
[0005] In some embodiments of the present application, the side wall includes: a side wall shell and a side wall lining;
[0006] The side wall lining is fixedly arranged on the inner side of the side wall shell and covers the inner wall of the side wall shell;
[0007] The preheating section of the preheating air pipe is embedded in the side wall lining; the air inlet end extends to the outside of the side wall shell; the air outlet end extends toward the inside of the coking box and is connected to the coking space.
[0008] In some embodiments of the present application, the air outlet end of the preheated air pipe is located within the side wall lining;
[0009] A connecting hole connecting the gas outlet end and the coking space is provided on the inner wall of the side wall lining.
[0010] In some embodiments of the present application, the preheating section of the preheating air pipe is arranged in a U shape.
[0011] In some embodiments of the present application, the number of the air inlet end and the air outlet end are both one, and are arranged at the upper end of the preheating section, and the air inlet end and the air outlet end are located on the same horizontal line; or, the preheating air pipe has one air inlet end and at least two air outlet ends; wherein, one air inlet end and two air outlet ends are both arranged at the upper end of the preheating section and are located on the same horizontal line; the remaining air outlet ends are symmetrically distributed on the preheating section.
[0012] In some embodiments of the present application, the number of the preheated air pipes is multiple;
[0013] The plurality of preheating air pipes are arranged at intervals, and the air inlet ends of the plurality of preheating air pipes are all located on the same horizontal line.
[0014] In some embodiments of the present application, the air inlet end of the preheated air pipe has a first air inlet formed at its free end, and a second air inlet formed at its side;
[0015] The air inlet end of the preheating air pipe is provided with an air inlet regulating member, which is sleeved on the outside of the air inlet end and slidably connected to the air inlet end to cover or expose the second air inlet port.
[0016] In some embodiments of the present application, a brick supporting plate for supporting the side wall lining is provided on the inner wall of the side wall shell;
[0017] The side wall lining is arranged on the brick supporting plate and is built of a plurality of first refractory bricks;
[0018] The connection hole is formed by opening a through hole in one of the first refractory bricks, or by splicing two adjacent first refractory bricks.
[0019] In some embodiments of the present application, the coal supporting base comprises: a plurality of placement areas and a plurality of opening areas; the plurality of placement areas and the plurality of opening areas are alternately arranged along a first direction;
[0020] The first direction is the length direction or width direction of the coking device;
[0021] The placement area is used to place coal cakes;
[0022] The multiple smoke descending holes are evenly arranged in the multiple opening areas.
[0023] The embodiment of the second aspect of the present application provides a coking system, the coking system comprising a coking device, a flue and a gas driving device according to any embodiment of the first aspect;
[0024] The coking device is arranged at the smoke inlet of the flue, and the smoke descending hole of the coking device is connected with the flue and the coking space;
[0025] The gas driving device is arranged at the smoke outlet of the flue, and is used to drive the smoke in the coking box to enter the flue, so that a negative pressure is formed inside the coking box, so that the air outside the coking box is sucked into the coking space through the air inlet end of the preheating air pipe.
[0026] The coking device of the embodiment of the present application includes a coal supporting base and a coking box. The coal supporting base is used to place coal cakes. The coking box cover is arranged above the coal supporting base and together with the coal supporting base, it forms a coking space. The preheating section of the preheating air pipe connects the air inlet end and the air outlet end, and is embedded in the inner side wall of the coking box. The air inlet end extends to the outside of the coking box, and the air outlet end is connected to the coking space to achieve the connection between the coking space and the outside of the coking box, so that the air outside the coking box can enter the coking space through the preheating air pipe. In the coking process, a large amount of raw coal gas will be precipitated from the coal cakes. The raw coal gas is mixed and burned with the air entering the coking space through the preheating air pipe to generate a large amount of heat to complete the coking; the high-temperature flue gas generated in the coking process can be discharged into the flue through the flue gas downhole on the coal supporting base. During the coking process, the heat generated by the mixed combustion of raw gas and air will be transferred to the coking box. The preheating section of the preheating air pipe is embedded in the side wall of the coking box, so that the air is heated by the coking box in the process of entering the coking space through the preheating air pipe. That is, the heat generated by the combustion of raw gas is used to preheat the air, so that the temperature of the air entering the coking space is increased. The combustion efficiency of the preheated air and raw gas is higher, thereby improving the thermal efficiency of the coking device, shortening the coking time, and further improving production efficiency.
[0027] The coking system of the embodiment of the present application includes a coking device, a flue and a gas driving device according to any embodiment of the first aspect. During the coking process, the gas driving device can drive the flue gas in the coking box into the flue, so that a negative pressure is formed inside the coking box, and air can be naturally sucked in, and then the air outside the coking box is sucked into the coking space through the air inlet of the preheating air pipe. No mechanical equipment operation is required, and no complex control system is required, which greatly reduces the work of mechanical equipment maintenance; the heat generated by the mixed combustion of raw gas and air will be transferred to the coking box, and the preheating section of the preheating air pipe is embedded in the side wall of the coking box, so that the air is heated by the coking box in the process of entering the coking space through the preheating air pipe, that is, the heat generated by the combustion of raw gas is used to preheat the air, so that the temperature of the air entering the coking space is increased, and the combustion efficiency of the preheated air and raw gas is higher, thereby improving the thermal efficiency of the coking device, shortening the coking time, and thus improving production efficiency.
[0028] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0030] Figure 1 This is a schematic structural diagram of a coking device according to a first embodiment of the present application;
[0031] Figure 2 for Figure 1 AA section view;
[0032] Figure 3 for Figure 1 BB cross-sectional view;
[0033] Figure 4 for Figure 2 CC section view;
[0034] Figure 5 A diagram showing the connection relationship between the first refractory brick, the side wall shell and the brick supporting plate in the first embodiment of the present application;
[0035] Figure 6 This is a schematic diagram of the structure of the connection hole in the first embodiment of the present application;
[0036] Figure 7 It is a partial enlarged schematic diagram of the air inlet end in the first embodiment of the present application;
[0037] Figure 8 This is a schematic structural diagram of a coal supporting base in the first embodiment of the present application;
[0038] Fig. 9 for Figure 8 A cross-sectional view in the height direction of the coking device;
[0039] Fig.10 for Figure 8 DD cross-sectional view;
[0040] Fig.11 This is a schematic structural diagram of a coal supporting base in an embodiment of the present application;
[0041] Fig.12 This is a structural schematic diagram of a coking device according to a second embodiment of the present application;
[0042] Fig.13 This is a schematic structural diagram of a coking device according to a third embodiment of the present application;
[0043] Fig.14 This is a connection diagram of the coking system of an embodiment of the present application.
[0044] Description of reference numerals:
[0045] Coking device 10; hanging ear structure 11; flue 20; gas driving device 30; coal cake 40; coal supporting base 100; metal base 110; bottom plate 111; strip through hole 1111; side plate 112; limit plate 113; third refractory brick assembly 120; third refractory brick 121; protruding structure 122; recessed structure 123; second through hole 124; second casting 130; step structure 131; flue gas descending hole 101; placement area AA; opening area BB; strip step hole 102; Coke box 200; furnace cover 210; furnace cover shell 211; furnace cover lining 212; first casting 2121; second refractory brick 2122; fixing rod 213; side wall 220; side wall shell 221; side wall lining 222; first refractory brick 2221; connecting hole 2222; brick supporting plate 223; preheating air pipe 230; preheating section 231; air inlet end 232; first air inlet port 2321; second air inlet port 2322; air outlet end 233; air inlet regulating member 234; sand sealing layer 240. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field based on this application belong to the scope of protection of the utility model.
[0047] The box-type briquette coking process used in the related art has a low coking efficiency. In order to solve this technical problem, the present application proposes a coking device and a coking system.
[0048] like Figures 1 to 4 As shown, Figure 1 This is a structural schematic diagram of a coking device 10 according to a first embodiment of the present application. Figure 2 for Figure 1 AA section view, Figure 3 for Figure 1 BB cross-sectional view, Figure 4 for Figure 2 The CC cross-sectional view of the embodiment of the first aspect of the present application proposes a coking device 10, which includes a coal supporting base 100 and a coking box 200. Specifically, the coking box 200 is covered above the coal supporting base 100, and together with the coal supporting base 100, it forms a coking space, and the two are detachably connected; the coking box 200 includes a furnace cover 210, a side wall 220 and at least one preheating air pipe 230 arranged on the side wall 220; the side wall 220 is annular and is located between the coal supporting base 100 and the furnace cover 210; the furnace cover 210 is covered at the upper opening of the side wall 220, and the coal supporting base 100 is arranged at the lower opening of the side wall 220; the preheating air pipe 230 The coking chamber 220 comprises a preheating section 231, at least one air inlet end 232 and at least one air outlet end 233; the preheating section 231 is connected to the air inlet end 232 and the air outlet end 233, and is embedded in the inside of the side wall 220; the air inlet end 232 extends in a direction away from the coking box 200 and extends to the outside of the coking box 200; the air outlet end 233 extends toward the inside of the coking box 200 and is connected to the coking space; the coal supporting base 100 is used to place the coal cakes 40, and a plurality of smoke descending holes ( Figures 1 to 4 not shown) so that the coking space and the flue ( Figures 1 to 4 Not shown) connected.
[0049] The coking device 10 of the embodiment of the present application includes a coal supporting base 100 and a coking box 200. The coal supporting base 100 is used to place coal cakes 40. The coking box 200 is covered above the coal supporting base 100 and forms a coking space together with the coal supporting base 100. The preheating section 231 of the preheating air pipe 230 connects the air inlet end 232 and the air outlet end 233, and is embedded in the inside of the side wall 220 of the coking box 200. The air inlet end 232 extends to the outside of the coking box 200, and the air outlet end 233 is connected to the coking space to achieve the communication between the coking space and the outside of the coking box 200, so that the air outside the coking box 200 can enter the coking space through the preheating air pipe 230. During the coking process, the coal cake 40 will precipitate a large amount of raw coal gas, which will be mixed and burned with the air entering the coking space through the preheating air pipe 230 to generate a large amount of heat and complete the coking process; the high-temperature flue gas generated during the coking process can be discharged into the flue through the flue gas descending hole 101 on the coal supporting base 100. During the coking process, the heat generated by the mixed combustion of raw coal gas and air will be transferred to the coking box 200, and the preheating section 231 of the preheating air pipe 230 is embedded in the side wall 220 of the coking box 200, so that the air is heated by the coking box 200 during the process of entering the coking space through the preheating air pipe 230, that is, the heat generated by the combustion of raw coal gas is used to preheat the air, so that the temperature of the air entering the coking space is increased, and the combustion efficiency of the preheated air and raw coal gas is higher, thereby improving the thermal efficiency of the coking device 10, shortening the coking time, and further improving the production efficiency.
[0050] In addition, a plurality of coking devices 10 can be arranged in a coking system, and each coking device 10 is independent of each other and does not affect each other. The air intake of a single coking device 10 does not affect other coking devices 10, and the production method is more flexible and simple.
[0051] In the first embodiment of the present application, Figures 1 to 4 As shown, the furnace cover 210, the side wall 220 and the side of the coal supporting base 100 are all provided with a lifting ear structure 11 for cooperating with a lifting device (not shown in the figure). The coking box 200 and the coal supporting base 100 can be lifted, and the position of the coking device 10 can be set as needed during the production process, which has higher production flexibility.
[0052] During the production process, the stacker places the coal cakes 40 formed by the press on the coal supporting base 100, and the coal transport and coke receiving flatbed truck transports the coal cakes 40 and the coal supporting base 100 to the coke oven area under the traction of the tractor. The gantry crane (hoisting equipment) places the coal supporting base 100 and the coal cakes 40 on the coking position, and then the coking box 200 is covered on the coal supporting base 100. Using the waste heat of the lining bricks inside the box, the coal cakes 40 precipitate a large amount of raw coal gas, which is mixed and burned with the air entering from the preheating air pipe 230 to complete the coking process. The heat generated by the combustion preheats the air in the preheating air pipe 230. The coal cakes 40 are refined into coke through a high-temperature dry distillation cycle in the coking device 10. The high-temperature flue gas generated by the combustion of raw coal gas enters the main flue through the branch flue 20 of the coking position, and then enters the waste heat boiler (not shown in the figure) for heat exchange, and the generated steam can be used for power generation.
[0053] It is understandable that the coking box 200 can be preheated before coking so that the raw gas can be precipitated faster to improve the coking efficiency. Specifically, the coking box 200 can be placed in an oven to be preheated; or the residual heat left in the coking box 200 after the last coking can be used.
[0054] It should be noted that the first direction and the second direction in the embodiment of the present application are perpendicular to each other. The first direction is the length direction of the coking device 10, and the second direction corresponds to the width direction of the coking device 10. The first direction is the width direction of the coking device 10, and the second direction corresponds to the length direction of the coking box 200. Figure 2 As shown, in the first embodiment of the present application, the first direction is the length direction of the coking device 10 , and the second direction is the width direction of the coking device 10 .
[0055] In the first embodiment of the present application, Figure 4As shown, the side wall 220 of the coking box 200 includes a side wall shell 221 and a side wall lining 222; the side wall lining 222 is fixedly arranged on the inner side of the side wall shell 221 and covers the inner wall of the side wall shell 221; the preheating section 231 of the preheating air pipe 230 is embedded in the side wall lining 222; the air inlet end 232 extends to the outside of the side wall shell 221; the air outlet end 233 extends toward the inside of the coking box 200 and communicates with the coking space. The side wall lining 222 is arranged inside the side wall shell 221, and the preheating section 231 of the preheating air pipe 230 is embedded in the side wall lining 222, and the side wall lining 222 has a protective effect on the side wall shell 221 and the preheating air pipe 230. Specifically, the side wall lining 222 can be made of refractory material; the side wall shell 221 can be made of metal; and the preheating air pipe 230 can be made of steel, preferably stainless steel. Since the temperature of the coking process is very high, the side wall lining 222 is prepared with refractory materials, which can effectively protect the preheating air pipe 230 and the side wall shell 221.
[0056] In the first embodiment of the present application, Figure 4 As shown, the air outlet 233 of the preheating air pipe 230 is located in the side wall lining 222; a connecting hole 2222 for connecting the air outlet 233 and the coking space is provided on the inner wall of the side wall lining 222. The preheating air pipe 230 is directly placed in the environment of raw gas and air combustion, which will cause loss. The preheating air pipe 230 is arranged in the side wall lining 222, and the side wall lining 222 has a protective effect on the air outlet 233, which is conducive to extending the life of the preheating air pipe 230.
[0057] Furthermore, if Figure 5 and Figure 6 As shown, Figure 5 This is a connection diagram of the first refractory brick 2221, the side wall shell 221 and the brick supporting plate 223 in the first embodiment of the present application. Figure 6 This is a schematic diagram of the structure of the connection hole 2222 in the first embodiment of the present application. The inner wall of the side wall shell 221 is provided with a supporting brick plate 223 for supporting the side wall lining 222; the side wall lining 222 is arranged on the supporting brick plate 223 and is made of a plurality of first refractory bricks 2221; the connection hole 2222 is formed by splicing two adjacent first refractory bricks 2221. The refractory bricks not only have good high temperature resistance, but also have good heat storage performance, which can not only protect the side wall shell 221 and the preheating air pipe 230, but also can efficiently preheat the air and improve the thermal efficiency of the coking device 10.
[0058] In some other embodiments of the present application, the connection hole 2222 may also be formed by opening a through hole in a first refractory brick 2221, and the present application does not limit this.
[0059] In the first embodiment of the present application, Figure 4As shown, the preheating section 231 of the preheating air pipe 230 is arranged perpendicular to the coal supporting base 100; the air inlet end 232 and the air outlet end 233 are arranged parallel to the coal supporting base 100 and perpendicular to the preheating section 231. Such an arrangement facilitates processing and helps improve production efficiency.
[0060] In some other embodiments of the present application, the preheating section 231 of the preheating air pipe 230 may also be arranged parallel to the coal supporting base 100, or inclined thereto, and the present application does not limit this.
[0061] In the first embodiment of the present application, Figures 1 to 4 As shown, the preheating section 231 of the preheating air pipe 230 is arranged in a U shape; the number of the air inlet end 232 and the air outlet end 233 are both one, and are arranged at the upper end of the preheating section 231, and the air inlet end 232 and the air outlet end 233 are located on the same horizontal line. The U-shaped design can increase the path of air preheating, making the air preheating more uniform; the air inlet end 232 and the air outlet end 233 are located on the same horizontal line, which is convenient for processing.
[0062] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, there are multiple preheating air pipes 230; the multiple preheating air pipes 230 are arranged at intervals, and the air inlet ends 232 of the multiple preheating air pipes 230 are all located on the same horizontal line. Providing multiple preheating air pipes 230 can increase the amount of air preheated per unit time, so that the amount of preheating air entering the coking space is increased, thereby further improving the coking efficiency.
[0063] like Figure 2 As shown, the number of preheating air pipes 230 is 12, which can be respectively arranged on two opposite sides of the coking box 200 and symmetrically arranged.
[0064] In the first embodiment of the present application, Figure 4 and Figure 7 As shown, Figure 7 This is a partially enlarged schematic diagram of the air inlet end 232 in the first embodiment of the present application. The air inlet end 232 of the preheating air pipe 230 has a first air inlet 2321 formed at its free end and a second air inlet 2322 formed at its side. The air inlet end 232 of the preheating air pipe 230 is provided with an air inlet adjustment member 234, which is sleeved on the outside of the air inlet end 232 and slidably connected to the air inlet end 232 to cover or expose the second air inlet 2322. The air inlet adjustment member 234 can cover or expose the second air inlet 2322. By adjusting the area of the second air inlet 2322 covered by the air inlet adjustment member 234, the air intake amount can be adjusted, which is convenient for controlling the coking speed. Specifically, the air inlet adjustment member 234 can be a metal tube.
[0065] In the first embodiment of the present application, Figure 1 and Figure 3 As shown, the furnace cover 210 includes a furnace cover outer shell 211 and a furnace cover lining 212; the furnace cover lining 212 is fixedly arranged on the inner side of the furnace cover outer shell 211 and covers the inner wall of the furnace cover outer shell 211. The furnace cover lining 212 protects the furnace cover outer shell 211.
[0066] Specifically, Figure 4 As shown, the furnace cover 210 is arranged above the side wall 220, and the junction between the two can be sealed with sand to form a sand sealing layer 240. The furnace cover lining 212, the side wall lining 222 and the sand sealing layer 240 jointly cover the furnace cover shell 211 and the side wall shell 221, so that the furnace cover shell 211 and the side wall shell 221 are separated from the coking space, thereby providing good protection for the furnace cover shell 211 and the side wall shell 221.
[0067] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, the furnace cover lining 212 includes a first casting 2121 and a plurality of second refractory bricks 2122; the first casting 2121 is arranged on the inner side of the furnace cover outer shell 211 and covers the inner wall of the furnace cover outer shell 211; the middle area of the surface of the first casting 2121 away from the furnace cover outer shell 211 is recessed toward the furnace cover outer shell 211 to form a mounting groove; a plurality of second refractory bricks 2122 are arranged in the mounting groove; a plurality of second refractory bricks 2122 are arranged in a matrix of m rows and n columns; two adjacent second refractory bricks 2122 in the same column are arranged in contact; the second refractory bricks 2122 in two adjacent columns are arranged at intervals.
[0068] In the first embodiment of the present application, Figure 1 and Figure 2 As shown, a plurality of spaced apart fixing rods 213 are provided on the furnace cover shell 211, the fixing rods 213 extend along the second direction, and both ends of the fixing rods 213 are fixedly connected to the furnace cover shell 211; the number of the fixing rods 213 is n; a first through hole is provided on the second refractory brick 2122; each fixing rod 213 passes through the first through holes of the m second refractory bricks 2122 located in the same row in sequence.
[0069] In the first embodiment of the present application, Figure 8 As shown, Figure 8This is a structural diagram of the coal supporting base 100 in the first embodiment of the present application. The coal supporting base 100 includes multiple placement areas AA and multiple opening areas BB; the multiple placement areas AA and the multiple opening areas BB are alternately arranged along the first direction; the placement area AA is used to place the coal cakes 40; and multiple flue gas descending holes 101 are evenly opened in the multiple opening areas BB. With such an arrangement, the flue gas can be evenly descended into the flue, and the raw coal gas generated by the coal cakes 40 can also be evenly released into the coking space, so that the combustion between the raw coal gas and the air is more even, which is conducive to improving production efficiency.
[0070] In the first embodiment of the present application, Figures 8 to 11 As shown, Fig. 9 for Figure 8 A cross-sectional view in the height direction of the coking device 10, Fig.10 for Figure 8 DD cross-sectional view, Fig.11 The structure diagram of the coal supporting base 100 in the embodiment of the present application is shown in FIG. The coal supporting base 100 includes a metal base 110, a plurality of third refractory brick assemblies 120 and a plurality of second castings 130; the metal base 110 includes a bottom plate 111 and a side plate 112 arranged around the bottom plate 111, and the bottom plate 111 and the side plate 112 together constitute a receiving space; a plurality of third refractory brick assemblies 120 and a plurality of second castings 130 are arranged in the receiving space; a plurality of second castings 130 are arranged in a one-to-one correspondence with a plurality of placement areas AA; a plurality of third refractory brick assemblies 120 are arranged in a one-to-one correspondence with a plurality of opening areas BB; and a flue gas descending hole 101 penetrates the third refractory brick assembly 120 and the bottom plate 111 of the metal base 110. Specifically, the third refractory brick assembly 120 and the second casting 130 can isolate the bottom plate 111 of the metal base 110 from the coking space, thereby protecting the metal bottom plate 111 and extending the life of the coal supporting base 100.
[0071] In the first embodiment of the present application, Figure 8 As shown, two adjacent second castings 130 are arranged at intervals; the third refractory brick assembly 120 includes a plurality of third refractory bricks 121 arranged in a row in sequence along the first direction; the third refractory brick assembly 120 is embedded between two adjacent second castings 130. The embedded arrangement is simple to install and the third refractory brick assembly 120 is easy to replace.
[0072] Specifically, Fig.10 As shown, a step structure 131 is formed at the upper edge of the second casting 130 on one side close to the third refractory brick assembly 120; the step structures 131 of two adjacent second castings 130 are arranged opposite to each other to form a strip-shaped step hole 102; the upper end of the third refractory brick assembly 120 protrudes toward the direction close to the second casting 130 to form a protruding structure 122; the protruding structure 122 is embedded in the strip-shaped step hole 102.
[0073] In the first embodiment of the present application, Fig.11 As shown, the metal base 110 has two side plates 112 disposed opposite to each other in the second direction, and a limiting plate 113 is formed on each of the two side plates 112; the third refractory brick assembly 120 has groove structures (not shown in the figure) formed at both ends in the second direction; and the limiting plate 113 is inserted into the groove structure. The limiting plate 113 can limit the movement of the third refractory brick assembly 120 in the second direction, so that the connection reliability is higher.
[0074] In the first embodiment of the present application, Figure 8 , Fig.10 and Fig.11 As shown, a concave structure 123 is formed on the side wall 220 of the third refractory brick 121, and the concave structures 123 of two adjacent third refractory bricks 121 are arranged opposite to each other to form a second through hole 124; a plurality of strip through holes 1111 are arranged on the bottom plate 111 of the metal base 110; the plurality of strip through holes 1111 and the plurality of opening areas BB are arranged one by one; the plurality of second through holes 124 on the same third refractory brick assembly 120 are arranged corresponding to the same strip through hole 1111 to form a smoke descending hole 101. The method of combining two adjacent third refractory bricks 121 to form the second through hole 124 has high operational flexibility.
[0075] The first casting 2121 and the second casting 130 in the embodiment of the present application can be prepared by a castable, preferably a refractory castable, which is a mixture of refractory aggregate, a binder and an additive, which is mixed with water (or a liquid binder) to form a mud material that can be constructed by pouring.
[0076] The coking device 10 of the second embodiment of the present application is different from the coking device 10 of the first embodiment of the present application in that the number and the arrangement position of the air outlet ends 233 of the preheating air pipes 230 are different. Fig.12 As shown, Fig.12 This is a structural schematic diagram of the coking device 10 of the second embodiment of the present application. The preheating section 231 of the preheating air pipe 230 is arranged in a U shape; the preheating air pipe 230 has an air inlet end 232 and at least two air outlet ends 233; wherein, one air inlet end 232 and two air outlet ends 233 are arranged at the upper end of the preheating section 231 and are located on the same horizontal line; the remaining air outlet ends 233 are symmetrically distributed on the preheating section 231. The U-shaped design can increase the path of air preheating, making the air preheating more uniform; the multiple air outlet ends 233 are arranged in this way, so that the preheated air enters the coking space in sections, making the airflow distribution in the height direction of the coking device 10 more reasonable, and the high-direction heating more reasonable and uniform.
[0077] The coking device 10 of the third embodiment of the present application is different from the coking device 10 of the first embodiment of the present application in that the preheating air pipe 230 is arranged differently. Fig.13 As shown, Fig.13 This is a schematic diagram of the structure of the coking device 10 of the third embodiment of the present application. The preheating section 231 of the preheating air pipe 230 is arranged in a U shape, and the air inlet end 232 and the air outlet end 233 are arranged on one side of the preheating section 231. The air inlet end 232 and the air outlet end 233 are located on the same vertical line. The U-shaped design can increase the path of air preheating, making the air preheating more uniform; the air inlet end 232 and the air outlet end 233 are located on the same vertical line, which is convenient for processing. Fig.13 In the embodiment shown, six preheating air pipes 230 are provided on one side, and six preheating air pipes 230 are also provided on the opposite side; the upper row of preheating air pipes 230 and the lower row of preheating air pipes 230 are arranged in opposite directions. In some other embodiments of the present application, the arrangement direction of all preheating air pipes 230 on a single side can also be consistent, and the present application does not limit this.
[0078] It is understandable that in some other implementations of the present application, the preheating section 231 may also be in other shapes such as a straight line, an S shape, etc., and may be arranged perpendicular to the coal supporting base 100, parallel to the coal supporting base 100, or inclined, and the present application does not limit this.
[0079] like Fig.14 As shown, Fig.14 The connection relationship diagram of the coking system of the embodiment of the present application is provided. The embodiment of the second aspect of the present application provides a coking system, which includes a coking device 10, a flue 20 and a gas driving device 30 of any embodiment of the first aspect; the coking device 10 is arranged at the smoke inlet of the flue 20, and the flue gas descending hole 101 of the coking device 10 connects the flue 20 and the coking space; the gas driving device 30 is arranged at the smoke outlet of the flue 20, and is used to drive the flue gas in the coking box 200 into the flue 20, so that a negative pressure is formed inside the coking box 200, so that the air outside the coking box 200 is sucked into the coking space through the air inlet end 232 of the preheating air pipe 230. Specifically, the gas driving device 30 can be an induced draft fan.
[0080] The coking system of the embodiment of the present application comprises a coking device 10, a flue 20 and a gas driving device 30 of any embodiment of the first aspect. During the coking process, the gas driving device 30 can drive the flue gas in the coking box 200 into the flue 20, so that a negative pressure is formed inside the coking box 200, and air can be naturally sucked in, and then the air outside the coking box 200 is sucked into the coking space through the air inlet of the preheating air pipe 230. No mechanical equipment operation is required, and no complex control system is required, which greatly reduces the work of mechanical equipment maintenance; the raw gas is mixed with air The heat generated by the combined combustion will be transferred to the coking box 200. The preheating section 231 of the preheating air pipe 230 is embedded in the inside of the side wall 220 of the coking box 200, so that the air is heated by the coking box 200 in the process of entering the coking space through the preheating air pipe 230. That is, the heat generated by the combustion of the raw gas is used to preheat the air, so that the temperature of the air entering the coking space is increased, and the combustion efficiency of the preheated air and the raw gas is higher, thereby improving the thermal efficiency of the coking device 10, shortening the coking time, and further improving the production efficiency.
[0081] The coking process of the coking system of the embodiment of the present application is as follows: a stacker (not shown in the figure) places the coal cakes 40 formed by a press on a coal supporting base 100, a coal transport and coke receiving flatbed truck (not shown in the figure) transports the coal supporting base 100 with the coal cakes 40 to the coke oven area under the traction of a tractor (not shown in the figure), a gantry crane (not shown in the figure) lifts the coal supporting base 100 with the coal cakes 40 to the coking position, and then the coking box 200 is covered on the coal supporting base 100, and the waste heat of the lining bricks inside the coking box 200 is used to make the coal cakes 40 precipitate a large amount of raw coal gas, which comes into contact with the preheated air entering from the preheated air pipe 230, and the raw coal gas burns. The heat generated by the combustion heats the coal cakes 40, and the coal cakes 40 are refined into coke through a coking cycle of high-temperature dry distillation in the coking device 10.
[0082] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention are included in the protection scope of the present invention.
Claims
1. A coking device, characterized in that: include: A coal supporting base (100) and a coking box (200); The coking box (200) is disposed above the coal supporting base (100) and together with the coal supporting base (100) forms a coking space, and the two are detachably connected; The coking box (200) comprises a furnace cover (210), a side wall (220), and at least one preheating air pipe (230) arranged on the side wall (220); The side wall (220) is annular and is located between the coal supporting base (100) and the furnace cover (210); the furnace cover (210) is arranged at the upper opening of the side wall (220), and the coal supporting base (100) is arranged at the lower opening of the side wall (220); The preheating air pipe (230) comprises a preheating section (231), at least one air inlet end (232) and at least one air outlet end (233); the preheating section (231) connects the air inlet end (232) and the air outlet end (233), and is embedded in the interior of the side wall (220); the air inlet end (232) extends in a direction away from the coking box (200) and extends to the outside of the coking box (200); the air outlet end (233) extends toward the interior of the coking box (200) and is in communication with the coking space; The coal supporting base (100) is used to place coal cakes (40), and a plurality of smoke descending holes (101) are provided on the coal supporting base (100) so as to connect the coking space with the flue (20).
2. The coking device according to claim 1, characterized in that: The side wall (220) comprises: a side wall shell (221) and a side wall lining (222); The side wall lining (222) is fixedly arranged on the inner side of the side wall shell (221) and covers the inner wall of the side wall shell (221); The preheating section (231) of the preheating air pipe (230) is embedded in the side wall lining (222); the air inlet end (232) extends to the outside of the side wall shell (221); the air outlet end (233) extends toward the inside of the coking box (200) and is connected to the coking space.
3. The coking device according to claim 2, characterized in that: The air outlet end (233) of the preheated air pipe (230) is located inside the side wall lining (222); A connecting hole (2222) connecting the gas outlet end (233) and the coking space is provided on the inner wall of the side wall lining (222).
4. The coking device according to claim 1, characterized in that: The preheating section (231) of the preheating air pipe (230) is arranged in a U shape.
5. The coking device according to claim 4, characterized in that: The number of the air inlet end (232) and the air outlet end (233) is one, and they are arranged at the upper end of the preheating section (231), and the air inlet end (232) and the air outlet end (233) are located on the same horizontal line; or, the preheating air pipe (230) has one air inlet end (232) and at least two air outlet ends (233); wherein one air inlet end (232) and two air outlet ends (233) are both arranged at the upper end of the preheating section (231) and are located on the same horizontal line; and the remaining air outlet ends (233) are symmetrically distributed on the preheating section (231).
6. The coking device according to claim 5, characterized in that: The number of the preheating air pipes (230) is multiple; The plurality of preheating air pipes (230) are arranged at intervals, and the air inlet ends (232) of the plurality of preheating air pipes (230) are all located on the same horizontal line.
7. The coking device according to claim 2, characterized in that: The air inlet end (232) of the preheating air pipe (230) has a first air inlet (2321) formed at its free end, and a second air inlet (2322) formed at its side; The air inlet end (232) of the preheating air pipe (230) is provided with an air inlet adjustment member (234), and the air inlet adjustment member (234) is sleeved on the outside of the air inlet end (232) and is slidably connected to the air inlet end (232) to cover or expose the second air inlet port (2322).
8. The coking device according to claim 3, characterized in that: A brick supporting plate (223) for supporting the side wall lining (222) is provided on the inner wall of the side wall shell (221); The side wall lining (222) is arranged on the brick supporting plate (223) and is built of a plurality of first refractory bricks (2221); The connection hole (2222) is formed by opening a through hole in one of the first refractory bricks (2221), or by splicing two adjacent first refractory bricks (2221).
9. The coking device according to any one of claims 1 to 8, characterized in that: The coal supporting base (100) comprises: a plurality of placement areas (AA) and a plurality of opening areas (BB); the plurality of placement areas (AA) and the plurality of opening areas (BB) are alternately arranged along a first direction; The first direction is the length direction or width direction of the coking device; The placement area (AA) is used to place coal cakes (40); The multiple smoke descending holes (101) are evenly arranged in the multiple opening areas (BB).
10. A coking system, characterized in that: The coking system comprises: a coking device according to any one of claims 1 to 9, a flue (20) and a gas driving device (30); The coking device is arranged at the smoke inlet of the flue (20), and the smoke descending hole (101) of the coking device is connected with the flue (20) and the coking space; The gas driving device (30) is arranged at the smoke outlet of the flue (20) to drive the smoke in the coking box (200) to enter the flue (20), so that a negative pressure is formed inside the coking box (200), so that the air outside the coking box (200) is sucked into the coking space through the air inlet end (232) of the preheating air pipe (230).