Pulling and closing device for underwater butt joint of box culvert

By arranging embedded parts and steel wire ropes on the top of the box culvert, combined with the winch and pulley block, the difficulty and cost problems of underwater docking construction of the box culvert are solved, and efficient and safe docking of the box culvert is achieved.

CN221798448UActive Publication Date: 2024-10-01NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420253524.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-10-01
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

The existing underwater docking construction of box culverts is difficult due to the constraints of the construction environment. Frequent failures of hydraulic cylinders and electronic control systems result in docking errors and damage, which increases construction costs and difficulty.

Method used

Design a pulling device that includes embedded parts, the first steel wire rope and the first winch. The embedded parts are connected to the steel wire rope. The winch is used to wind up the wire rope to pull the box culvert to be placed close to the placed box culvert. Combined with the pulley group and the shackle and other components to simplify the structure and realize the underwater docking of box culverts.

Benefits of technology

It realizes the underwater docking of box culverts, simplifies the overall structure, improves the reliability and efficiency of docking, reduces construction costs, and reduces the risk of damage during docking.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798448U_ABST
    Figure CN221798448U_ABST
Patent Text Reader

Abstract

The utility model relates to a pulling and closing device for underwater butt joint of box culverts, which belongs to the technical field of box culvert butt joint and is used for mutually butting a box culvert to be placed and a placed box culvert. The pulling device comprises an embedded part, a first steel wire rope and a first winch; the embedded part is arranged at the top of the box culvert to be placed; the first steel wire rope is connected with the embedded part; the first winch is installed on the workboat and connected with the end, away from the embedded part, of the first steel wire rope. The first winch winds the first steel wire rope so that the first steel wire rope can pull the to-be-placed box culvert to move close to the placed box culvert. According to the pulling and closing device for underwater butt joint of the box culvert, the embedded part is arranged at the top of the box culvert to be placed, the first steel wire rope is arranged to be connected with the embedded part, the first steel wire rope is wound through the first winch, and therefore the box culvert to be placed is pulled in the direction close to the placed box culvert; therefore, butt joint of the to-be-placed box culvert and the placed box culvert is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of box culvert docking, and in particular relates to a pulling and closing device for underwater docking of box culverts. Background Art

[0002] A box culvert is a hydraulic engineering structure that crosses obstacles such as rivers and roads. It is made of cast iron, prestressed concrete or reinforced concrete. In daily life or urban construction, box culverts are often used to build overpasses, tunnels, underpasses of rivers or roads, etc., to ensure smooth traffic in natural waterways and artificial buildings.

[0003] At present, most box culverts are made of prefabricated concrete. During construction, multiple prefabricated box culverts are spliced ​​together to form a water diversion channel to facilitate water flow through the internal cavity of the box culvert. In the prior art, hydraulic cylinders, electronic control systems and other components are usually set up to pull the box culvert to be placed toward the already placed box culvert so that the box culvert to be placed can be docked with the already placed box culvert. In some underwater constructions, due to the limitations of the construction environment, it is difficult to dock the box culverts, and the requirements for components such as hydraulic cylinders and electronic control systems are more stringent. Not only does it increase the cost of underwater docking construction of box culverts, but also failures of components such as hydraulic cylinders and electronic control systems will affect the construction. It is easy to produce errors or collisions when docking box culverts, resulting in poor docking between box culverts or collision damage to the ends of the box culverts.

[0004] Therefore, designing a pulling and closing device that facilitates the underwater docking of box culverts is of great significance to the underwater docking construction of box culverts. Utility Model Content

[0005] In view of the deficiencies existing in the related art, the utility model provides a pulling and closing device for underwater docking of box culverts, so as to simplify the overall structure of the pulling and closing device and facilitate the underwater docking of box culverts.

[0006] The utility model provides a pulling and closing device for underwater docking of box culverts, which is used to dock a box culvert to be placed with a box culvert that has been placed; the pulling and closing device comprises:

[0007] Embedded parts, which are arranged on the top of the box culvert to be placed;

[0008] A first steel wire rope connected to the embedded part;

[0009] A first winch is installed on the construction vessel, and the first winch is connected to an end of the first steel wire rope away from the embedded part;

[0010] The first winch reels in the first steel wire rope so that the first steel wire rope pulls the box culvert to be placed to move closer to the placed box culvert until the box culvert to be placed and the placed box culvert are butted against each other.

[0011] The technical solution is to set an embedded part on the top of the box culvert to be placed, and set a first steel wire rope to connect with the embedded part, and use a first winch to reel in the first steel wire rope to pull the box culvert to be placed toward the direction close to the placed box culvert, thereby achieving the docking of the box culvert to be placed with the placed box culvert.

[0012] In some of the embodiments, a pulley block is further included, and the pulley block is arranged on the installed box culvert; the pulley block interacts with the first steel wire rope to change the tension direction of the first steel wire rope.

[0013] The technical solution provides a pulley block and utilizes the pulley block to change the pulling direction of the first steel wire rope, so as to facilitate the first steel wire rope to pull the box culvert to be placed to move.

[0014] In some of the embodiments, the pulley block is a fixed pulley, and the pulley block is installed at one end of the already placed box culvert close to the box culvert to be placed.

[0015] In some of the embodiments, the placed box culvert is provided with a mounting member, the mounting member is arranged on the top of the placed box culvert, and the pulley block is installed on the mounting member.

[0016] The technical solution provides a mounting piece on the top of the installed box culvert, and uses the mounting piece to install the pulley block, so as to facilitate the installation of the pulley block on the installed box culvert.

[0017] In some of the embodiments, after the box culvert to be placed is docked with the already placed box culvert, the embedded parts on the top of the box culvert to be placed become the installation parts required for docking with the next box culvert to be placed.

[0018] This technical solution can reduce the number of components on the top of the box culvert, improve resource utilization and construction efficiency, and reduce construction costs by converting the embedded parts into installation parts after the box culvert is placed.

[0019] In some of the embodiments, the embedded parts are provided in plurality, and the plurality of embedded parts are evenly arranged on the top of the box culvert to be placed and are located at one end of the box culvert to be placed close to the already placed box culvert.

[0020] The technical solution prevents stress concentration on the top of the box culvert to be placed by arranging a plurality of embedded parts on the top of the box culvert to be placed, so that the box culvert to be placed is subjected to uniform force.

[0021] In some of the embodiments, one end of the first steel wire rope connected to the embedded component is connected with a shackle, and the first steel wire rope is connected to the embedded component through the shackle.

[0022] The technical solution provides a shackle so that the first steel wire rope is connected to the embedded component through the shackle, thereby facilitating the connection between the first steel wire rope and the embedded component.

[0023] In some of the embodiments, a connecting piece is further provided on the top of the box culvert to be placed, to which a second steel wire rope is connected, and an end of the second steel wire rope away from the connecting piece is connected to a second winch, which is installed on a crane ship. The second winch releases the second steel wire rope to allow the box culvert to be placed to sink into the bottom bed.

[0024] In some of the embodiments, one end of the second steel wire rope connected to the connecting piece is connected with a shackle, and the second steel wire rope is connected to the connecting piece through the shackle.

[0025] In some of the embodiments, after the box culvert is placed and sunk into the underwater base bed, the connector becomes an embedded part required for docking the box culvert.

[0026] This technical solution makes the connector a pre-embedded part required for the connection of the box culvert to be placed after the box culvert to be placed is sunk into the bottom bed. By making the connector a pre-embedded part after the box culvert to be placed is sunk into the bottom bed, the number of parts can be saved, resource utilization and construction efficiency can be improved, and construction costs can also be reduced.

[0027] Based on the above technical scheme, the pulling and closing device for underwater docking of the box culvert in the embodiment of the utility model can realize the pulling and closing docking of the box culvert underwater, and has a simple overall structure, convenient operation, good docking effect, and little damage to the box culvert. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0029] Figure 1 It is a structural schematic diagram of an embodiment of a pulling and closing device for underwater docking of box culverts according to the utility model;

[0030] Figure 2 This is a schematic structural diagram of an embodiment of a pulling and closing device for underwater docking of a box culvert according to the utility model, in which a construction vessel pulls a box culvert to be placed through a first steel wire rope.

[0031] In the figure:

[0032] 1. Construction ship; 2. Crane ship; 3. Water surface; 4. Installed box culvert; 5. Box culvert to be installed; 6. Underwater base bed; 7. Embedded parts; 8. Second steel wire rope; 9. First steel wire rope; 10. Installation parts; 11. Pulley block. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0034] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0035] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features.

[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] As attached Figure 1 and Figure 2 As shown, in an illustrative embodiment of a pulling and closing device for underwater docking of a box culvert of the utility model, the pulling and closing device for underwater docking of a box culvert is used to dock the box culvert to be placed with the box culvert that has been placed; the pulling and closing device includes an embedded part 7, a first steel wire rope 9 and a first winch; the embedded part 7 is arranged on the top of the box culvert 5 to be placed; the first steel wire rope 9 is connected to the embedded part 7; the first winch is installed on the construction ship 1, and the first winch is connected to the end of the first steel wire rope 9 away from the embedded part 7; the first winch reels the first steel wire rope 9, so that the first steel wire rope 9 pulls the box culvert 5 to be placed to move towards the direction close to the placed box culvert 4 until the box culvert 5 to be placed is docked with the placed box culvert 4.

[0038] In the above-mentioned pulling and closing device for underwater docking of box culverts, an embedded part 7 is arranged on the top of the box culvert 5 to be placed, and a first steel wire rope 9 is arranged to be connected to the embedded part 7. The first steel wire rope 9 is wound up by a first winch to pull the box culvert 5 to be placed toward the direction close to the placed box culvert 4, thereby achieving docking of the box culvert 5 to be placed with the placed box culvert 4.

[0039] It should be noted that when the first winch reels in the first steel wire rope 9, the construction vessel 1 is anchored on the water surface 3 so that the position of the construction vessel 1 on the water surface 3 is roughly fixed, thereby ensuring the reliability of the docking of the box culvert 5 to be placed with the already placed box culvert 4, and preventing the construction vessel 1 from moving arbitrarily on the water surface 3 and causing a large error in the movement distance of the box culvert 5 to be placed. If the moving distance of the box culvert 5 to be placed is too large, it is easy to cause the force when the two are docked to be too large and damage the box culvert; if the moving distance of the box culvert 5 to be placed is too small, it is easy to cause the box culvert 5 to be placed and the already placed box culvert 4 to fail to fully contact each other and produce a gap.

[0040] It should also be noted that, in some embodiments, the construction vessel 1 is an anchor boat equipped with an anchor machine. When the box culvert 5 to be placed is docked with the already placed box culvert 4, the construction vessel 1 is anchored to the water surface 3 by dropping anchor, and the anchor of the anchor machine is in contact with the bottom bed 6 to prevent the construction vessel 1 from moving freely on the water surface 3.

[0041] In addition, it should be noted that in actual construction, the construction vessel 1 is usually moored on the water surface 3 above the already placed box culvert 4 to facilitate pulling and moving the box culvert 5 to be placed.

[0042] In order to prevent stress concentration on the box culvert 5 to be placed, a plurality of embedded parts 7 are provided, and the plurality of embedded parts 7 are evenly arranged on the top of the box culvert 5 to be placed and located at one end of the box culvert 5 to be placed close to the already placed box culvert 4, so that the pulling force of the first steel wire rope 9 on the box culvert 5 to be placed can be evenly distributed to the plurality of embedded parts 7, avoiding stress concentration that causes the embedded parts 7 to separate from the box culvert 5 to be placed, thereby increasing the reliability of the first steel wire rope 9 pulling the box culvert 5 to be placed toward the already placed box culvert 4.

[0043] In order to facilitate the connection between the first steel wire rope 9 and the embedded component 7, a shackle is connected to one end of the first steel wire rope 9 connected to the embedded component 7, and the first steel wire rope 9 is connected to the embedded component 7 through the shackle.

[0044] It should be noted that the shackle is a common technical means in this field and will not be described in detail here.

[0045] Since the first winch is installed on the construction ship 1, the construction ship 1 is located on the water surface 3, and the box culvert 5 to be placed is located on the underwater base bed 6, and the box culvert 5 to be placed moves horizontally toward the placed box culvert 4. Therefore, in this embodiment, a pulley block 11 is also included. The pulley block 11 is arranged on the placed box culvert 4. The pulley block 11 interacts with the first steel wire rope 9 to change the tension direction of the first steel wire rope 9, thereby facilitating the first winch to pull the box culvert 5 to be placed to move through the first steel wire rope 9.

[0046] In some embodiments, the pulley block 11 is a fixed pulley that can change the direction of force. The pulley block 11 is installed at one end of the box culvert 4 that has been placed and is close to the box culvert 5 to be placed.

[0047] In other embodiments, the construction vessel 1 is also equipped with a fixed pulley, and the first steel wire rope 9 passes through the fixed pulley on the construction vessel 1 and the pulley block 11 placed on the top of the box culvert 4 in sequence and then is connected to the embedded part 7.

[0048] In order to facilitate the installation of the pulley block 11 , a mounting member 10 is provided on the top of the placed box culvert 4 . The mounting member 10 is arranged on the top of the placed box culvert 4 , and the pulley block 11 is installed on the mounting member 10 .

[0049] In some embodiments, the mounting member 10 is an embedded member 7. When the box culvert 5 to be placed is docked with the already placed box culvert 4, the box culvert 5 to be placed becomes the already placed box culvert 4. When the next box culvert 5 to be placed is docked, the embedded member 7 on the top of the box culvert 5 to be placed becomes the mounting member 10 required for docking the next box culvert 5 to be placed. By converting the embedded member 7 into the mounting member 10 after the box culvert is placed, the number of components can be reduced, resource utilization and construction efficiency can be improved, and construction costs can also be reduced.

[0050] In actual application, the box culvert 5 to be placed is transported to an appropriate position by a crane vessel 2. The crane vessel 2 is equipped with a second winch. The second winch is connected to a second steel wire rope 8. The second steel wire rope 8 is connected to the box culvert 5 to be placed. The second winch releases the second steel wire rope 8 to sink the box culvert 5 to be placed into the underwater base bed 6.

[0051] In order to facilitate the connection between the second steel wire rope 8 and the box culvert 5 to be placed, a connecting piece is further provided on the top of the box culvert 5 to be placed, and the second steel wire rope 8 is connected to the connecting piece.

[0052] In some embodiments, the connector is an embedded part 7, and after the box culvert 5 to be placed is sunk in the bottom bed 6, the connector becomes the embedded part 7 required for docking the box culvert 5 to be placed. By making the connector an embedded part 7 after the box culvert 5 to be placed is sunk in the bottom bed 6, the number of components can be saved, resource utilization and construction efficiency can be improved, and construction costs can also be reduced.

[0053] In some embodiments, in order to ensure that the box culvert 5 to be placed is subjected to uniform force during the process of sinking the bottom base bed 6, connecting pieces are correspondingly provided at the two ends of the top of the box culvert 5 to be placed, and the second steel wire rope 8 is connected to the connecting pieces at the two ends of the top of the box culvert 5 to be placed, so that the box culvert 5 to be placed is subjected to uniform force.

[0054] In other embodiments, the connecting piece at the top of the box culvert 5 to be placed away from one end of the already placed box culvert 4 is a mounting piece 10, so as to install a pulley block 11 when the next box culvert 5 to be placed is docked.

[0055] In order to facilitate the connection between the second steel wire rope 8 and the connecting piece, a shackle is connected to one end of the second steel wire rope 8 connected to the connecting piece, and the second steel wire rope 8 is connected to the connecting piece through the shackle to facilitate the connection between the second steel wire rope 8 and the connecting piece.

[0056] It should be noted that, in actual application, a measurement and control system is also provided between the box culvert 5 to be placed and the already placed box culvert 4 to monitor whether the box culvert 5 to be placed is docked with the already placed box culvert 4 to ensure the docking effect of the box culvert 5 to be placed and the already placed box culvert 4.

[0057] It should also be noted that the measurement and control system can be a distance sensor for real-time detection of the distance between the box culvert 5 to be placed and the already placed box culvert 4, or it can be a pressure sensor for real-time detection of the pressure between the box culvert 5 to be placed and the already placed box culvert 4, and even can be used to manually observe with the naked eye whether the box culvert to be placed and the already placed box culvert 4 are docked; the measurement and control system can monitor the docking status between the box culvert 5 to be placed and the already placed box culvert 4 by using conventional technical means in the field, which will not be repeated here.

[0058] The working principle of the above-mentioned pulling and closing device for underwater docking of box culverts is as follows: the crane ship 2 transports the box culvert 5 to be placed to the designated position, the second winch releases the second steel wire rope 8, so that the box culvert 5 to be placed is sunk to the bottom bed 6, the construction ship 1 anchors the construction ship 1 on the water surface 3, the end of the first steel wire rope 9 away from the first winch is connected to the pulley block 11 and the embedded part 7 on the top of the box culvert 5 to be placed, and then the first winch reels the first steel wire rope 9, so that the first steel wire rope 9 pulls the box culvert 5 to be placed toward the direction of the placed box culvert 4 until the box culvert 5 to be placed is docked with the placed box culvert 4. After the box culvert 5 to be placed is docked with the placed box culvert 4, the connection between the first steel wire rope 9 and the pulley block 11 and the embedded part 7 is released, the pulley block 11 is disassembled, and the first winch continues to reel in the first steel wire rope 9 until the first steel wire rope 9 is reeled into the construction ship 1.

[0059] The above-mentioned pulling and closing device for underwater docking of box culverts can realize the pulling and closing docking of box culverts underwater, and has a simple overall structure, convenient operation, good docking effect, and little damage to the box culvert; and the pulley block 11, the first wire rope 9 and other components can be recycled.

[0060] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0061] The above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the utility model can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the utility model, which should be included in the scope of the technical solution for which protection is requested in the utility model.

Claims

1. A pulling and closing device for underwater docking of box culverts, used for docking a box culvert to be placed with an already placed box culvert; characterized in that: The pulling and closing device comprises: Embedded parts, which are arranged on the top of the box culvert to be placed; a first steel wire rope connected to the embedded component; A first hoist is installed on the construction vessel, and the first hoist is connected to an end of the first steel wire rope away from the embedded part; The first hoist reels in the first steel wire rope so that the first steel wire rope pulls the box culvert to be placed to move closer to the placed box culvert until the box culvert to be placed is butted against the placed box culvert.

2. The pulling and closing device for underwater docking of box culverts according to claim 1 is characterized in that: It also includes a pulley block, which is arranged on the placed box culvert; the pulley block interacts with the first steel wire rope to change the tension direction of the first steel wire rope.

3. The pulling and closing device for underwater docking of box culverts according to claim 2 is characterized in that: The pulley block is a fixed pulley, and the pulley block is installed at one end of the placed box culvert close to the box culvert to be placed.

4. The pulling and closing device for underwater docking of box culverts according to claim 3 is characterized in that: The placed box culvert is provided with a mounting member, the mounting member is arranged on the top of the placed box culvert, and the pulley block is installed on the mounting member.

5. The pulling and closing device for underwater docking of box culverts according to claim 4 is characterized in that: After the box culvert to be placed is butted against the already placed box culvert, the embedded parts on the top of the box culvert to be placed become the installation parts required for the next box culvert to be placed to be butted against.

6. The pulling and closing device for underwater docking of box culverts according to claim 1 is characterized in that: The embedded parts are provided in plurality, and the plurality of embedded parts are evenly arranged on the top of the box culvert to be placed and are located at one end of the box culvert to be placed close to the placed box culvert.

7. The pulling and closing device for underwater docking of box culverts according to claim 1 is characterized in that: One end of the first steel wire rope connected to the embedded component is connected with a shackle, and the first steel wire rope is connected to the embedded component through the shackle.

8. The pulling and closing device for underwater docking of box culverts according to claim 1, characterized in that: A connecting piece is also provided on the top of the box culvert to be placed, and the connecting piece is connected to a second steel wire rope. The end of the second steel wire rope away from the connecting piece is connected to a second winch, and the second winch is installed on a crane ship. The second winch releases the second steel wire rope to sink the box culvert to be placed into the bottom bed.

9. The pulling and closing device for underwater docking of box culverts according to claim 8, characterized in that: One end of the second steel wire rope connected to the connecting piece is connected with a shackle, and the second steel wire rope is connected to the connecting piece through the shackle.

10. The pulling and closing device for underwater docking of box culverts according to claim 8, characterized in that: After the box culvert to be placed is sunk into the underwater base bed, the connecting piece becomes the embedded piece required for connecting with the box culvert to be placed.