Rotary excavating hole-forming cast-in-place pile operation platform

By designing the lowering and fixing mechanism of the rotary-drilled cast-in-place pile operating platform, the problem of heavy crane workload and the inability to fix the steel cage ducts was solved, achieving the effect of reducing the crane workload and improving the efficiency of welding and splicing.

CN221798450UActive Publication Date: 2024-10-01ANHUI TIANLING CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420349441.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-10-01
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

The existing rotary-drilled cast-in-place cast-in-place pile operating platform requires a crane to be lifted and lowered repeatedly during the lowering process, which increases the cost of the crane and the stay time at the construction site. Moreover, the steel cage and conduit cannot be fixedly supported after being placed in the hole, affecting welding. and practicality of splicing.

Method used

A rotary-drilled cast-in-place pile operating platform is designed, which includes a base plate, a support rod, a lowering mechanism and a fixing mechanism. The connecting plate and fixed plate are driven by the electric push rod and connecting rod to move, fixing and supporting the steel cage and conduit, and reducing the need for cranes. workload, and position support rebar cages and conduits within the holes for welding and splicing.

Benefits of technology

It reduces the crane's workload and construction time, improves the efficiency of fixing and splicing steel cages and conduits, and reduces construction risks and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798450U_ABST
    Figure CN221798450U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of rotary excavating hole-forming pouring construction, in particular to a rotary excavating hole-forming pouring pile operation platform which comprises a bottom plate, a supporting rod is fixed to the upper surface of the bottom plate, a top plate is fixed to the other end of the supporting rod, and a lowering mechanism used for lowering a reinforcement cage and a guide pipe is arranged on the top plate. A fixing mechanism facilitating supporting and fixing of a reinforcement cage and a guide pipe is arranged on the bottom plate, a first feeding hole is formed in the upper surface of the top plate, and a second feeding hole is formed in the upper surface of the bottom plate. According to the rotary digging hole-forming cast-in-place pile operation platform, through cooperation of a second electric push rod, a second connecting rod can be driven to move, so that a first fixing plate is driven to move, a reinforcement cage and the top end of a guide pipe are fixed, through cooperation of a first electric push rod, a first connecting rod can be driven to move, and thus a connecting plate is driven to move; therefore, the fixed reinforcement cage and the guide pipe are driven to be lowered, and the workload of a crane is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of rotary drilling and hole pouring construction, in particular to a rotary drilling and hole pouring pile operating platform. Background Art

[0002] Rotary drilling is carried out under the condition of mud wall protection. The turntable or power head on the rotary drilling rig drives the retractable drill rod and the drill bit at the bottom of the drill rod to rotate, and the cutting tools on the bottom end and side opening of the drill bucket are used to cut the rock and soil. At the same time, the cut rock and soil enter the drill bucket from the opening. After the drill bucket is filled with drill cuttings, the drill bit is lifted to the hole mouth through the retractable drill rod, the bottom is automatically opened and the soil is unloaded, and then the drill bucket is lowered to the bottom of the hole to continue drilling. This process is repeated until the designed hole depth is reached.

[0003] For example, a Chinese utility model patent announcement number (CN209082480U) discloses a rotary bored pile operating platform, which includes a support frame and a workbench; one end of the support frame is in contact with the ground, and the other end is connected to the workbench, and the workbench is set up above the rotary bored hole; a lowering port, a fixing assembly and a hanging member are provided on the workbench, and the lowering port and the rotary bored hole are located on the same straight line for the passage of a steel cage and a conduit; the fixing assembly is located around the upper part of the lowering port for temporary fixation of the steel cage and the conduit; the hanging member is located around the lower part of the lowering port for hanging and fixing the steel cage. This utility model solves the problem that the ground around the rotary bored hole is prone to water accumulation, muddy and slippery, so that the operator can stand directly on the ground. When the steel cage is docked for a long time around the rotary drilled hole, there is a risk of operators falling into the hole and slipping, which poses a great safety hazard. In addition, since there is a requirement for the lowering depth of the conduit (50 cm from the bottom of the hole) to ensure the sediment thickness required for the secondary hole cleaning, the crane needs to be repeatedly lifted and lowered during the lowering process, thereby increasing the construction workload of the crane. At the same time, the time for secondary hole cleaning is about 1 hour, so the crane needs to be occupied for a long time, increasing the cost of using the crane. At the same time, it will also increase the stay and working time of the crane at the construction site, thereby increasing the amount of cross-operation with other mobile equipment at the construction site, resulting in reduced operation efficiency and increased operation risks.

[0004] However, this patent can only fix the top of the steel cage and the conduit, and a crane is still needed during the lowering process. In addition, there is no fixed structure at the mouth of the hole drilled by rotary drilling, so that the steel cage and the conduit cannot be fixed and supported after being placed in the hole, which is inconvenient for welding and splicing multiple sections of steel cage and conduit, affecting practicality. Utility Model Content

[0005] In view of the deficiencies in the prior art, the utility model provides an operating platform for rotary bored cast-in-place piles, which has the advantages of convenient welding and splicing of multiple sections of steel cages and conduits, and solves the problem that only the top ends of the steel cages and conduits can be fixed, a crane is still needed during the lowering process, and no fixed structure is provided at the mouth of the rotary bored hole, so that the steel cages and conduits cannot be fixed and supported after being placed in the hole, which makes it inconvenient to weld and splice multiple sections of steel cages and conduits, affecting practicality.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a rotary bored pile operation platform, comprising a bottom plate, a support rod is fixed to the upper surface of the bottom plate, a top plate is fixed to the other end of the support rod, a lowering mechanism for lowering a steel cage and a conduit is provided on the top plate, a fixing mechanism for supporting and fixing the steel cage and the conduit is provided on the bottom plate, a first feed hole is opened on the upper surface of the top plate, and a second feed hole is opened on the upper surface of the bottom plate;

[0007] The lowering mechanism includes a lowering member, a connecting plate, and two first fixing members. The connecting plate is fixed to the lowering member. The lowering member is arranged on the upper surface of the bottom plate and is used to drive the connecting plate to be lowered. The two first fixing members are both arranged on the connecting plate and are symmetrically distributed about the central axis of the connecting plate. They are used to fix the top end of the steel cage and the conduit during lowering. A third feeding hole is opened on the upper surface of the connecting plate.

[0008] The beneficial effect of adopting the above further solution is that it is easy to fix the steel cage and the conduit lifted by the crane, thereby reducing the workload of the crane.

[0009] Furthermore, the first feed hole and the second feed hole are located in corresponding positions and have matching inner diameters.

[0010] The beneficial effect of adopting the above further solution is that it is easy to put the steel cage and the conduit into the rotary drilled hole from the first feed hole through the second feed hole.

[0011] Furthermore, the lowering member includes two first electric push rods and two first connecting rods, the two first electric push rods are fixed to the upper surface of the top plate, and are symmetrically distributed about the central axis of the top plate, one end of the two first connecting rods are respectively fixed to the output shafts of the two first electric push rods, and the other ends of the two first connecting rods are fixed to the upper surface of the connecting plate.

[0012] The beneficial effect of adopting the above further solution is to reduce the workload of the crane.

[0013] Furthermore, the first fixing member includes a second electric push rod, a second connecting rod, a first fixing plate, a mounting block, and a spring. The second electric push rod is fixed to the left side of the connecting plate, one end of the second connecting rod is fixed to the output shaft of the second electric push rod, the other end of the second connecting rod passes through and extends to the interior of the third feed hole, and the outer side of the second connecting rod is slidably connected to the first fixing plate, the mounting block is fixed to the outer side of the second connecting rod, and a spring is fixed between the right side of the mounting block and the outer side of the first fixing plate.

[0014] The beneficial effect of adopting the above further solution is that the connecting plate can drive the fixed steel cage and the conduit to move when being lowered, so that the steel cage and the conduit are lowered into the rotary drilled hole.

[0015] Furthermore, the fixing mechanism includes four support members and two second fixing members. The four support members are all arranged on the base plate and are symmetrically distributed around the central axis of the base plate, and are used to support and position the steel cage. The two second fixing members are all arranged on the base plate and are symmetrically distributed around the central axis of the base plate, and are used to fix the top end of the lowered guide tube.

[0016] The beneficial effect of adopting the above further solution is that it is convenient to fix the top ends of the steel cage and the conduit placed in the rotary drilled hole, so as to weld and splice the steel cage and the conduit.

[0017] Furthermore, the support member includes a sliding rod and a support plate. A first sliding opening is opened on the left side of the base plate. The support plate is slidably connected to the inner side of the first sliding opening. The two ends of the sliding rod are respectively fixed to the front and rear inner walls of the first sliding opening. A second sliding opening is opened on the front side of the support plate, and the sliding rod is located on the inner side of the second sliding opening.

[0018] The beneficial effect of adopting the above further solution is that the top end of the steel cage entering the rotary drilled hole can be positioned and supported so as to facilitate welding of the next section of the steel cage.

[0019] Furthermore, the second fixing member includes a third electric push rod, a third connecting rod, a second fixing plate, and a rubber pad. The third electric push rod is fixed to the upper surface of the base plate, one end of the third connecting rod is fixed to the output shaft of the third electric push rod, the other end of the third connecting rod is fixed to the outer side of the second fixing plate, and the rubber pad is fixed to the inner side of the second fixing plate.

[0020] The beneficial effect of adopting the above further solution is that the top end of the conduit entering the rotary drilled hole is fixed so as to splice the next section of the conduit.

[0021] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0022] 1. The rotary bored pile operation platform can drive the second connecting rod to move through the cooperation of the second electric push rod, thereby driving the first fixing plate to move, so as to fix the top of the steel cage and the conduit. The first electric push rod can drive the first connecting rod to move, thereby driving the connecting plate to move, so as to drive the fixed steel cage and conduit to be lowered, so that the steel cage and conduit are placed inside the rotary bored hole, reducing the workload of the crane.

[0023] 2. The rotary bored pile operation platform can slide in the first sliding opening through the cooperation of the support plate, so that after the top of the steel cage is placed in the rotary bored hole, the support plate can be extended to position and support the steel cage so as to be welded with the next section of the steel cage. Through the cooperation of the third electric push rod, the third connecting rod can be driven to move, thereby driving the second fixed plate to move, so as to fix the top of the lowered conduit and facilitate splicing with the next section of the conduit. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the structure of the utility model;

[0025] Figure 2 This is a schematic diagram of the lowering mechanism of the utility model;

[0026] Figure 3 This is a schematic diagram of the fixing mechanism of the utility model;

[0027] Figure 4 This is a schematic diagram of the second fixing member of the utility model.

[0028] In the figure: 1. bottom plate; 2. support rod; 3. top plate; 4. lowering mechanism; 41. lowering member; 411. first electric push rod; 412. first connecting rod; 42. connecting plate; 43. first fixing member; 431. second electric push rod; 432. second connecting rod; 433. first fixing plate; 434. mounting block; 435. spring; 44. third feeding hole; 5. fixing mechanism; 51. support member; 511. sliding rod; 512. support plate; 514. first sliding mouth; 515. second sliding mouth; 52. second fixing member; 521. third electric push rod; 522. third connecting rod; 523. second fixing plate; 524. rubber pad; 6. first feeding hole; 7. second feeding hole. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] See also Figure 1 A rotary bored pile operation platform in this embodiment includes a bottom plate 1, a support rod 2 is fixed to the upper surface of the bottom plate 1, a top plate 3 is fixed to the other end of the support rod 2, the number of the support rods 2 is four, and they are evenly distributed at the four corners of the lower surface of the top plate 3, a lowering mechanism 4 for lowering a steel cage and a conduit is provided on the top plate 3, which is convenient for fixing the steel cage and the conduit lifted by the crane and reducing the workload of the crane, a fixing mechanism 5 for supporting and fixing the steel cage and the conduit is provided on the bottom plate 1, which is convenient for fixing the top end of the steel cage and the conduit placed in the rotary bored hole, so as to weld and splice the steel cage and the conduit, a first feed hole 6 is opened on the upper surface of the top plate 3, and a second feed hole 7 is opened on the upper surface of the bottom plate 1.

[0031] In this embodiment, the positions of the first feed hole 6 and the second feed hole 7 correspond to each other, and the inner diameters are adapted to each other, so as to facilitate placing the steel cage and the conduit from the first feed hole 6 through the second feed hole 7 into the rotary drilled hole.

[0032] See also Figure 2 In order to facilitate the fixation of the steel cage and the conduit lifted by the crane and reduce the workload of the crane, the lowering mechanism 4 in this embodiment includes a lowering member 41, a connecting plate 42, and two first fixing members 43. The connecting plate 42 is fixed to the lowering member 41. The lowering member 41 is arranged on the upper surface of the bottom plate 1, and is used to drive the connecting plate 42 to be lowered, so as to reduce the workload of the crane. The two first fixing members 43 are both arranged on the connecting plate 42 and are symmetrically distributed about the central axis of the connecting plate 42. They are used to fix the top of the steel cage and the conduit during lowering, so that the connecting plate 42 can drive the fixed steel cage and the conduit to move during lowering, so that the steel cage and the conduit are lowered into the rotary drilled hole. A third feeding hole 44 is opened on the upper surface of the connecting plate 42.

[0033] In this embodiment, the lowering member 41 includes two first electric push rods 411 and two first connecting rods 412. The two first electric push rods 411 are fixed to the upper surface of the top plate 3 and are symmetrically distributed about the central axis of the top plate 3. One end of the two first connecting rods 412 are respectively fixed to the output shafts of the two first electric push rods 411. The output shaft of the first electric push rod 411 drives the first connecting rod 412 to move, and the first connecting rod 412 drives the connecting plate 42 to move. The other ends of the two first connecting rods 412 are fixed to the upper surface of the connecting plate 42. The first fixing member 43 includes a second electric push rod 431, a second connecting rod 432, a first fixing plate 433, a mounting block 434, and a spring 435. The second electric push rod 431 is fixed to the left side of the connecting plate 42, one end of the second connecting rod 432 is fixed to the output shaft of the second electric push rod 431, and the output shaft of the second electric push rod 431 drives the second connecting rod 431 to move. The connecting rod 432 moves, and the other end of the second connecting rod 432 passes through and extends to the inside of the third feed hole 44, and the outer side of the second connecting rod 432 is slidably connected with the first fixing plate 433, the mounting block 434 is fixed to the outer side of the second connecting rod 432, and a spring 435 is fixed between the right side of the mounting block 434 and the outer side of the first fixing plate 433, and the second connecting rod 432 drives the mounting block 434 and the spring 435 to move, so that the first fixing plate 433 is also driven to move. When fixing the steel cage, after the first fixing plate 433 is fitted with the outer side of the steel coil cage, the second connecting rod 432 continues to be moved, so that the second connecting rod 432 is inserted from the gap of the steel coil cage, thereby fixing the steel cage. When fixing the conduit, the first fixing plate 433 is directly fitted with the outer side of the conduit, and the movement of the connecting plate 42 drives the fixed steel cage and the conduit to move, so that the steel cage and the conduit are placed in the rotary drilled hole through the second feed hole 7.

[0034] See also Figure 3-4 In order to facilitate the fixation of the top of the steel cage and the conduit placed in the rotary drilled hole so as to weld and splice the steel cage and the conduit, the fixing mechanism 5 in this embodiment includes four support members 51 and two second fixing members 52. The four support members 51 are all arranged on the bottom plate 1 and are symmetrically distributed with the center axis of the bottom plate 1. They are used to support and position the steel cage so that the top of the steel cage entering the rotary drilled hole can be positioned and supported so as to weld the next section of the steel cage. The two second fixing members 52 are all arranged on the bottom plate 1 and are symmetrically distributed with the center axis of the bottom plate 1. They are used to fix the top of the conduit after lowering and fix the top of the conduit entering the rotary drilled hole so as to splice the next section of the conduit.

[0035] In this embodiment, the support member 51 includes a sliding rod 511 and a support plate 512. A first sliding opening 514 is provided on the left side of the bottom plate 1. The support plate 512 is slidably connected to the inner side of the first sliding opening 514. The support plate 512 is moved in the first sliding opening 514 to be inserted into the gap of the steel cage to position and support the steel cage. The two ends of the sliding rod 511 are respectively fixed to the inner walls of the front and rear sides of the first sliding opening 514. A second sliding opening 515 is provided on the front side of the support plate 512. The sliding rod 511 is located on the inner side of the second sliding opening 515. The second sliding opening 515 moves on the outer side of the sliding rod 511 to limit the moving range of the support plate 512. The second fixing member 52 includes a third electric push rod 521, The third connecting rod 522, the second fixed plate 523, the rubber pad 524, and the third electric push rod 521 are fixed to the upper surface of the base plate 1, one end of the third connecting rod 522 is fixed to the output shaft of the third electric push rod 521, the output shaft of the third electric push rod 521 drives the third connecting rod 522 to move, the other end of the third connecting rod 522 is fixed to the outer side of the second fixed plate 523, the third connecting rod 522 drives the second fixed plate 523 to move, the second fixed plate 523 passes through the gap of the steel cage and fixes the top of the conduit after being lowered to facilitate the splicing of the conduit, the rubber pad 524 is fixed to the inner side of the second fixed plate 523, the friction between the second fixed plate 523 and the conduit is increased, and the stability of the conduit fixation is improved.

[0036] The working principle of the above embodiment is:

[0037] (1) First, the steel cage is hoisted into the first feed hole 6 by a crane until the top of the steel cage is moved to the height position of the connecting plate 42. At this time, the second electric push rod 431 is opened, and the output shaft of the second electric push rod 431 drives the second connecting rod 432 to move, and the second connecting rod 432 drives the mounting block 434 and the spring 435 to move, so that the first fixing plate 433 is also driven to move. After the first fixing plate 433 is fitted with the outer side of the steel coil cage, the second connecting rod 432 is continued to be moved, so that the second connecting rod 432 is inserted from the gap of the steel coil cage, thereby fixing the steel cage. Then, the first electric push rod 411 is opened, and the output shaft of the first electric push rod 411 drives the first connecting rod 412 to move, and the first connecting rod 412 drives the connecting plate 42 to move, and the connecting plate 42 drives the fixed steel cage to move, so that the steel cage passes through the second feed hole 7 and is placed in the rotary drilled hole.

[0038] (2) After the steel cage enters the rotary drilled hole, the support plate 512 is moved in the first slide 514 so that the support plate 512 is inserted into the gap of the steel cage to position and support the steel cage. Then, the connecting plate 42 is moved back to the initial position and the next section of the steel cage is fixed. The bottom end of the next section of the steel cage is moved to the position of the top end of the previous section of the steel cage, so that the staff can weld the two sections of the steel cage together. The welded steel cage is lowered again. The above steps are repeated to weld multiple sections of the steel cage. After the steel cage is installed, the first fixing plate 433 is driven by the second electric push rod 431 to fix the conduit, and the conduit is lowered into the rotary drilled hole in the same manner. At this time, the third electric push rod 521 is opened, and the output shaft of the third electric push rod 521 drives the third connecting rod 522 to move, and the third connecting rod 522 drives the second fixing plate 523 to move. The second fixing plate 523 passes through the gap of the steel cage and fixes the top end of the conduit after being lowered, so as to facilitate the splicing of the conduit.

Claims

1. A rotary bored pile operation platform, comprising a bottom plate (1), characterized in that: A support rod (2) is fixed to the upper surface of the bottom plate (1), a top plate (3) is fixed to the other end of the support rod (2), a lowering mechanism (4) for lowering the steel cage and the conduit is provided on the top plate (3), a fixing mechanism (5) for supporting and fixing the steel cage and the conduit is provided on the bottom plate (1), a first feed hole (6) is provided on the upper surface of the top plate (3), and a second feed hole (7) is provided on the upper surface of the bottom plate (1); The lowering mechanism (4) comprises a lowering member (41), a connecting plate (42), and two first fixing members (43); the connecting plate (42) is fixed to the lowering member (41); the lowering member (41) is arranged on the upper surface of the bottom plate (1) and is used to drive the connecting plate (42) to be lowered; the two first fixing members (43) are both arranged on the connecting plate (42) and are symmetrically distributed about the central axis of the connecting plate (42) and are used to fix the top end of the steel cage and the conduit when lowering; and a third feeding hole (44) is provided on the upper surface of the connecting plate (42).

2. The rotary bored pile operation platform according to claim 1, characterized in that: The first feed hole (6) and the second feed hole (7) are located in corresponding positions and have matching inner diameters.

3. The rotary bored pile operation platform according to claim 1, characterized in that: The lowering member (41) comprises two first electric push rods (411) and two first connecting rods (412); the two first electric push rods (411) are fixed to the upper surface of the top plate (3) and are symmetrically distributed about the central axis of the top plate (3); one end of the two first connecting rods (412) are respectively fixed to the output shafts of the two first electric push rods (411); and the other ends of the two first connecting rods (412) are fixed to the upper surface of the connecting plate (42).

4. The rotary bored pile operation platform according to claim 1, characterized in that: The first fixing member (43) comprises a second electric push rod (431), a second connecting rod (432), a first fixing plate (433), a mounting block (434), and a spring (435); the second electric push rod (431) is fixed to the left side of the connecting plate (42); one end of the second connecting rod (432) is fixed to the output shaft of the second electric push rod (431); the other end of the second connecting rod (432) passes through and extends to the inside of the third feed hole (44); the outer side of the second connecting rod (432) is slidably connected to the first fixing plate (433); the mounting block (434) is fixed to the outer side of the second connecting rod (432); and a spring (435) is fixed between the right side of the mounting block (434) and the outer side of the first fixing plate (433).

5. The rotary bored pile operation platform according to claim 1, characterized in that: The fixing mechanism (5) comprises four support members (51) and two second fixing members (52); the four support members (51) are all arranged on the bottom plate (1) and are symmetrically distributed about the central axis of the bottom plate (1) for supporting and positioning the steel cage; the two second fixing members (52) are all arranged on the bottom plate (1) and are symmetrically distributed about the central axis of the bottom plate (1) for fixing the top end of the guide tube after lowering.

6. The rotary bored pile operation platform according to claim 5, characterized in that: The support member (51) comprises a sliding rod (511) and a supporting plate (512); a first sliding opening (514) is provided on the left side of the bottom plate (1); the supporting plate (512) is slidably connected to the inner side of the first sliding opening (514); two ends of the sliding rod (511) are respectively fixed to the inner walls of the front and rear sides of the first sliding opening (514); a second sliding opening (515) is provided on the front side of the supporting plate (512); and the sliding rod (511) is located on the inner side of the second sliding opening (515).

7. The rotary bored pile operation platform according to claim 5, characterized in that: The second fixing member (52) comprises a third electric push rod (521), a third connecting rod (522), a second fixing plate (523), and a rubber pad (524); the third electric push rod (521) is fixed to the upper surface of the base plate (1); one end of the third connecting rod (522) is fixed to the output shaft of the third electric push rod (521); the other end of the third connecting rod (522) is fixed to the outer side of the second fixing plate (523); and the rubber pad (524) is fixed to the inner side of the second fixing plate (523).