Fastening device for construction and installation of water conservancy pipeline
By designing a fastening device for water conservancy pipeline construction and installation, using a rotating block and screw system to drive the buckle ring and extrusion plate to close, the problem that the bracket fastening structure in the existing technology cannot meet the installation of multi-specification pipes has been solved, and multi-specification pipe installation has been realized. Stable clamping of pipes and simplified operation.
Patent Information
- Application Number
- CN202420251283.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-01
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-01
AI Technical Summary
During pipeline construction in existing water conservancy projects, a single bracket fastening structure cannot meet the installation of pipelines of multiple specifications and sizes, and the connection of accessories is complicated and the operation is cumbersome.
A fastening device for water conservancy pipeline construction and installation is designed, including a mounting base plate, a rotating block, a fixed through hole, a top horizontal groove, a fastening ring, an extrusion plate and a screw. The rotating block drives the transmission screw and the bottom clamping block. The movement drives the buckle ring to close, and combined with the extrusion fixing structure, it achieves stable clamping of multiple specifications of pipes.
It achieves stable clamping and fixation of multiple specifications of pipelines, simplifies the operation process, improves installation efficiency and convenience, and meets the installation needs of multiple specifications of pipelines.
Smart Images

Figure CN221800829U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy pipelines, in particular to a water conservancy pipeline construction, installation and fastening device. Background Art
[0002] During the water conservancy construction process, it is necessary to place drainage and water inlet pipes in the excavated pipe tunnel for water conservancy construction. The pipe is an indispensable and important device in water conservancy construction. The pipe installation process requires that the tunnel be excavated in advance and the support be installed in the tunnel. The tunnel is installed in the support with the support to enhance the installation strength of the pipe and avoid pipe displacement. The inner wall of the tunnel is a rock and soil structure. Therefore, in order to enhance the strength of the pipe installation, it is necessary to ensure that the support installation fits the inner wall.
[0003] For the current water conservancy projects, when carrying out pipeline construction, a single bracket fastening structure is used, which has no adjustment function and cannot meet the installation and use of pipelines of various specifications and sizes. At the same time, the accessories are assisted by a variety of accessories, which makes the operation and installation more troublesome. Utility Model Content
[0004] The purpose of the utility model is to provide a water conservancy pipeline construction and installation fastening device to solve the problem raised in the above background technology that when the pipeline is constructed in the current water conservancy project, a single bracket fastening structure is used, which has no adjustment function and cannot meet the installation and use of pipelines of various specifications and sizes. At the same time, the accessories are connected by a variety of accessories, which makes the operation and installation more troublesome.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A water conservancy pipeline construction installation and fastening device comprises a mounting base, one end of the mounting base is clamped with a rotating block, the top surface of the mounting base is evenly provided with fixing through holes, the top surface of the mounting base is horizontally provided with a top horizontal groove, the top surface of the mounting base is connected with a top moving block, a buckle ring 1 is welded vertically upward on the top surface of one of the top moving blocks, a buckle ring 2 is welded vertically upward on the top surface of one of the top moving blocks, an inner groove is provided on the inner side edges of the buckle ring 1 and the buckle ring 2, an extrusion plate is clamped on the inner side edges of the inner groove, a top screw is inserted on the outer side edges of the buckle ring 1 and the buckle ring 2, a rotating disc is fixedly provided on the top of the buckle ring 1, and the buckle ring 1 is welded vertically upward on the top surface of the top moving block. A top block is welded vertically upward at the top of the buckling ring 2, a matching block is welded vertically upward at the top of the buckling ring 2, a fixing screw is horizontally inserted into the side of the top block, a transmission screw is horizontally inserted into the inner side of the top horizontal groove, a bottom clamping block is horizontally welded on the bottom surface of the top moving block, a transmission screw hole is horizontally opened on the side of the bottom clamping block, a rubber pad layer is fixedly bonded to the inner sides of the buckling ring 1 and the buckling ring 2, an extrusion screw hole is opened on the outer sides of the buckling ring 1 and the buckling ring 2, a through hole is horizontally opened on the side of the top block, a fixing screw hole is horizontally opened on the side of the matching block, a clamping hole is opened on the outer arc surface of the extrusion plate, and an end clamping block is welded on one end of the top screw.
[0007] As a preferred embodiment of the utility model: the rotating block is clamped at the center position of one end of the mounting base plate, and the center position of one end of the rotating block is fixedly sleeved on the extended end of the transmission screw, and there are multiple fixed through holes, and the multiple fixed through holes are all through-opened on the top surface of the mounting base plate near the two side edges.
[0008] As a preferred embodiment of the utility model: the top horizontal groove is horizontally opened at the center line of the top surface of the installation base plate, the number of top moving blocks is two, and the bottom surfaces of the two top moving blocks are butt-connected to the top opening end of the top horizontal groove, and the specifications and dimensions of the buckle ring one and the buckle ring two are kept consistent.
[0009] As a preferred embodiment of the utility model: the inner groove is opened on the inner side of the buckle ring 1 and the buckle ring 2 near the top end, one end of the top screw is inserted into the inner side of the extrusion screw hole and threadedly connected, and the extended end is docked at the open end of the snap-in hole.
[0010] As a preferred embodiment of the utility model: the side edges of the top pair of blocks and the matching block are butted against each other, the fixing screw is horizontally inserted into the through hole, and the through end is threadedly connected to the inside of the fixing screw hole, the bottom clamping block is horizontally clamped on the inner side of the top horizontal groove, the transmission screw hole is sleeved on the outer side of the transmission screw and threadedly connected, the extrusion screw hole is through-type opened on the outside of the buckle ring one and the buckle ring two near the top position, and the extension end is connected to the inside of the inner channel.
[0011] As a preferred implementation manner of the utility model: the end clamping block is clamped and arranged on the inner side of the clamping hole.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] The utility model is characterized in that the installation base plate is horizontally connected to the base, and the screw rod is inserted into the inside of the fixing through hole to fix it. After the installation base plate is installed, the rotating block at one end is rotated to drive the transmission screw rod to rotate. Under the drive of the transmission screw, the bottom clamping block moves along the top horizontal groove to the center position, so that the top moving block at the top drives the buckle ring one and the buckle ring two to close to the center position, so that the pipe horizontally placed in the center position is clamped and fixed. The fixing screw is passed through the through hole and is fixed and installed with the fixing screw hole thread. When installing a pipe with a smaller diameter, if it is not stable after clamping, the rotating disc on the top is rotated to make the bottom end of the top screw squeeze the extrusion plate to move downward, so that the outer side of the pipe below is squeezed and fixed, and the clamping and fixing are more stable under the padding of the rubber pad layer. The clamping structure is adopted to make the operation more convenient, and at the same time, it is combined with the extrusion fixing structure to meet the installation and use of pipes of various specifications. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Other features, objects and advantages of the present invention will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings:
[0015] Figure 1 It is a three-dimensional structural schematic diagram of a water conservancy pipeline construction and installation fastening device;
[0016] Figure 2 A structural schematic diagram of the side view cross-section connection details of an installation base plate of a water conservancy pipeline construction installation fastening device;
[0017] Figure 3 A schematic structural diagram of a side view of the cross-sectional connection details of a buckle ring of a fastening device for installing a water conservancy pipeline during construction;
[0018] Figure 4It is a structural schematic diagram of the connection details of the two side sections of a buckle ring of a fastening device for installing a water conservancy pipeline during construction;
[0019] Figure 5 A structural schematic diagram of the side view section connection details of an extruded plate for installing a fastening device for water conservancy pipeline construction.
[0020] In the figure: 1. Install the base plate; 2. Rotating block; 3. Fixed through hole; 4. Top horizontal groove; 5. Top moving block; 6. Snap ring 1; 7. Snap ring 2; 8. Inner groove; 9. Extrusion plate; 10. Top screw; 11. Rotating disc; 12. Top block; 13. Matching block; 14. Fixed screw; 15. Transmission screw; 16. Bottom clamping block; 17. Transmission screw hole; 18. Rubber cushion layer; 19. Extrusion screw hole; 20. Through hole; 21. Fixed screw hole; 22. Clamping hole; 23. End clamping block. DETAILED DESCRIPTION
[0021] See also Figure 1 In the embodiment of the utility model, a water conservancy pipeline construction and installation fastening device comprises a mounting base plate 1, a rotating block 2 is clamped at one end of the mounting base plate 1, and a fixing through hole 3 is evenly opened on the top surface of the mounting base plate 1, the rotating block 2 is clamped and arranged at the center position of one end of the mounting base plate 1, and the center position of one end of the rotating block 2 is fixedly sleeved and arranged on the extended end of the transmission screw 15, the number of the fixing through holes 3 is multiple, and the multiple fixing through holes 3 are all through-type and opened on the top surface of the mounting base plate 1 near the two side edges, the top surface of the mounting base plate 1 is horizontally opened with a top horizontal groove 4, the top surface of the mounting base plate 1 is connected with a top moving block 5, a buckle ring 6 is vertically welded upward on the top surface of a top moving block 5, a buckle ring 2 7 is vertically welded upward on the top surface of a top moving block 5, the top horizontal groove 4 is horizontally opened at the center line position of the top surface of the mounting base plate 1, and the number of the top moving blocks 5 is two Blocks, and the bottom surfaces of the two top moving blocks 5 are butt-connected to the top open end of the top horizontal groove 4, the specifications and sizes of the buckle ring 1 6 and the buckle ring 2 7 are kept consistent, the inner sides of the buckle ring 1 6 and the buckle ring 2 7 are provided with inner grooves 8, the inner sides of the inner grooves 8 are clamped with extrusion plates 9, and the outer sides of the buckle rings 1 6 and the buckle rings 2 7 are plugged with top screws 10, the inner grooves 8 are arranged on the inner sides of the buckle rings 1 6 and the buckle rings 2 7 near the top positions, one ends of the top screws 10 are all through-inserted and threadedly connected to the inner sides of the extrusion screw holes 19, and the extended ends are butt-connected to the open ends of the clamping holes 22, a rotating disk 11 is fixedly provided on the top of the top screw 10, a top block 12 is vertically welded to the top of the buckle ring 1 6, a matching block 13 is vertically welded to the top of the buckle ring 2 7, and a fixing screw 14 is horizontally inserted on the side of the top block 12;
[0022] See also Figure 2-5In the embodiment of the utility model, a water conservancy pipeline construction and installation fastening device is provided, wherein a transmission screw 15 is horizontally inserted into the inner side of the top horizontal groove 4, a bottom clamping block 16 is horizontally welded to the bottom surface of the top moving block 5, and a transmission screw hole 17 is horizontally opened on the side of the bottom clamping block 16. The sides of the top block 12 and the matching block 13 are butt-jointed with each other, a fixing screw 14 is horizontally inserted and arranged inside the through hole 20, and the through end is threadedly connected and arranged inside the fixing screw hole 21, the bottom clamping block 16 is horizontally clamped and arranged on the inner side of the top horizontal groove 4, and the transmission screw hole 17 is sleeved and arranged on the outer side of the transmission screw 15 The edges are threadedly connected, and an extrusion screw hole 19 is opened in a through-type manner on the outer side of the buckle ring 1 6 and the buckle ring 2 7 near the top position, and the extended end is connected to the inside of the inner groove 8. The inner side edges of the buckle ring 1 6 and the buckle ring 2 7 are fixedly bonded with a rubber pad layer 18, and the outer side edges of the buckle ring 1 6 and the buckle ring 2 7 are opened with an extrusion screw hole 19, a through hole 20 is horizontally opened on the side edge of the top block 12, and a fixing screw hole 21 is horizontally opened on the side edge of the matching block 13, a clamping hole 22 is opened on the outer arc surface of the extrusion plate 9, and an end clamping block 23 is welded at one end of the top screw 10, and the end clamping block 23 is clamped on the inner side edge of the clamping hole 22.
[0023] The working principle of the utility model is:
[0024] The mounting base plate 1 is horizontally docked and set on the base, and is fixed after being inserted into the fixing through hole 3 by a screw. After the mounting base plate 1 is installed, the rotating block 2 at one end is rotated to drive the transmission screw 5 to rotate. Driven by the transmission screw 5, the bottom clamping block 16 moves toward the center position along the top horizontal groove 4, so that the top moving block 5 at the top drives the buckle ring 1 6 and the buckle ring 2 7 to close toward the center position, so that a clamping and fixing effect is formed on the pipe horizontally placed in the center position, and the fixing screw 14 is threadedly fixed and installed by passing the fixing screw 14 through the through hole 20 and then fixed with the fixing screw hole 21. When installing a pipe with a smaller diameter, if it is not stable after clamping, the rotating disk 11 on the top is rotated, so that the bottom end of the top screw 10 squeezes the extrusion plate 9 to move downward, so that the outer side of the pipe below is squeezed and fixed, and the clamping and fixing is more stable under the padding of the rubber pad layer 18.
[0025] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water conservancy pipeline construction installation and fastening device, comprising an installation base plate (1), characterized in that: A rotating block (2) is clamped at one end of the mounting base plate (1), fixing through holes (3) are evenly arranged on the top surface of the mounting base plate (1), a top horizontal groove (4) is horizontally arranged on the top surface of the mounting base plate (1), a top moving block (5) is connected to the top surface of the mounting base plate (1), a buckle ring (6) is vertically welded to the top surface of the top moving block (5), and a buckle ring (7) is vertically welded to the top surface of the top moving block (5). The buckle ring (6) and the buckle ring (7) are provided with an inner groove (8) on their inner sides, and an extrusion plate (9) is clamped on the inner side of the inner groove (8). The buckle ring (6) and the buckle ring (7) are provided with a top screw (10) on their outer sides, and a rotating disc (11) is fixedly provided on the top of the top screw (10). A top block (12) is vertically welded to the top of the buckle ring (6). The top of the second connecting ring (7) is welded vertically upward with a matching block (13), the side of the top block (12) is horizontally plugged with a fixing screw (14), the inner side of the top horizontal groove (4) is horizontally plugged with a transmission screw (15), the bottom surface of the top moving block (5) is horizontally welded with a bottom clamping block (16), and the side of the bottom clamping block (16) is horizontally provided with a transmission screw hole (17), the buckle ring (6) and the buckle ring (7) are A rubber pad layer (18) is fixedly bonded on the inner side edge, an extrusion screw hole (19) is provided on the outer side edge of the buckle ring 1 (6) and the buckle ring 2 (7), a through hole (20) is horizontally provided on the side edge of the top block (12), a fixing screw hole (21) is horizontally provided on the side edge of the matching block (13), a clamping hole (22) is provided on the outer arc surface of the extrusion plate (9), and an end clamping block (23) is welded to one end of the top screw rod (10).
2. A water conservancy pipeline construction, installation and fastening device according to claim 1, characterized in that: The rotating block (2) is clamped and arranged at the center position of one end of the mounting base plate (1), and the center position of one end of the rotating block (2) is fixedly sleeved and arranged at the extended end of the transmission screw (15), and the number of the fixed through holes (3) is multiple, and the multiple fixed through holes (3) are all opened in a through-type manner on the top surface of the mounting base plate (1) near the two side edges.
3. A water conservancy pipeline construction, installation and fastening device according to claim 1, characterized in that: The top horizontal groove (4) is horizontally opened at the center line of the top surface of the installation base plate (1), the number of the top moving blocks (5) is two, and the bottom surfaces of the two top moving blocks (5) are butt-jointedly arranged at the top opening end of the top horizontal groove (4), and the specifications and dimensions of the buckle ring 1 (6) and the buckle ring 2 (7) are arranged to be consistent.
4. A water conservancy pipeline construction, installation and fastening device according to claim 1, characterized in that: The inner groove (8) is arranged on the inner side of the buckle ring 1 (6) and the buckle ring 2 (7) near the top end, and one end of the top screw (10) is inserted into the inner side of the extrusion screw hole (19) in a through-type threaded connection, and the extended end is butt-jointed with the open end of the clamping hole (22).
5. A water conservancy pipeline construction, installation and fastening device according to claim 1, characterized in that: The side edges of the top block (12) and the matching block (13) are butted against each other, the fixing screw (14) is horizontally inserted into the through hole (20), and the through end is threadedly connected to the inside of the fixing screw hole (21), the bottom clamping block (16) is horizontally clamped on the inner side of the top horizontal groove (4), the transmission screw hole (17) is sleeved on the outer side of the transmission screw (15) and threadedly connected, the extrusion screw hole (19) is through-opened on the outer side of the buckle ring 1 (6) and the buckle ring 2 (7) near the top end, and the extended end is kept in communication with the inside of the inner channel (8).
6. A water conservancy pipeline construction, installation and fastening device according to claim 1, characterized in that: The end clamping block (23) is clamped and arranged on the inner side of the clamping hole (22).
