Geological drilling rig drill rod mounting and dismounting tool

By designing the adjustable-length loading and unloading tool handle and shrinking handle, combined with the snap-on connection of M8 nuts and galvanized chains, the problem of loose connection and inconvenient disassembly of the drill pipe adapter is solved, improving the efficiency and safety of drill pipe disassembly and reducing the construction costs.

CN221818503UActive Publication Date: 2024-10-11SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322928050.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-31
Publication Date
2024-10-11
Estimated Expiration
2033-10-31

AI Technical Summary

Technical Problem

During drilling operations, when the drill pipe joint is not tightly connected, it will cause the drill pipe joint to become chronically tight or hold the drill. It cannot be disassembled with a fork or wrench, and it is inconvenient to replace or install.

Method used

A geological drilling rig drill pipe installation and disassembly tool is designed, which includes an adjustable-length loading and unloading tool handle and a shrinking handle, which are connected through an M8 nut and a galvanized chain to form a buckle. It is combined with a claw hammer to strike the oval interface to strengthen the drill. Tightening and removal of rod catcher.

Benefits of technology

It improves the efficiency of drill pipe disassembly, reduces time and physical consumption, reduces construction costs, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221818503U_ABST
    Figure CN221818503U_ABST
Patent Text Reader

Abstract

The utility model relates to a mounting and dismounting tool for a geological drilling rig drill rod. The tool is mainly composed of a drill rod catcher clamping groove bayonet, an assembling and disassembling tool handle and an assembling and disassembling tool telescopic handle. When the drill rod is connected or disassembled, the handle of the assembling and disassembling tool does not need to be lengthened, and screwing or disassembling operation can be normally conducted. If assembly and disassembly are difficult, the handle can be stretched and contracted, the force arm is lengthened, and the problem that drill rod connectors are not tightly connected is solved. The tool is also suitable for dismounting or mounting the drill rod catcher. According to the utility model, the dismounting efficiency of the drill rod is improved, the working time and manpower are saved, and the construction cost is reduced. The assembling and disassembling tool is easy to manufacture, low in manufacturing cost and convenient to carry, and is an ideal auxiliary tool for assembling and disassembling the drill rod.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The patent of this invention belongs to the field of drilling engineering technology, and specifically relates to a geological drilling rig drill rod installation and disassembly tool. Background Art

[0002] Drilling engineering is an engineering technology used in geological exploration to obtain representative physical geological data in order to find out the shape, occurrence, depth, scale, structure and reserves of hidden ore bodies or certain specific geological bodies. Its contents mainly include drilling engineering, pit exploration engineering and prospecting machinery. Drilling engineering is the most widely used in geological exploration. According to geological design, drilling equipment is used to drill through rock layers at predetermined locations to obtain physical data such as rock samples, water samples, soil samples, etc., and underground physical measurements or groundwater dynamic observations are carried out through drilling holes.

[0003] During drilling operations, if the drill pipe coupling is stuck, the fork cannot be used to remove the drill pipe coupling, and the scaffolding pipe can only be used as a force rod to increase the lever arm. Under the action of equal force, the loading and unloading tools can be used to retract the handle to extend the lever arm to achieve a labor-saving effect. The telescopic handle is a lever system. Under the action of force, according to the principle of lever, the length of the lever arm can be increased, and the labor-saving effect can be achieved through the principle of lever. Summary of the invention

[0004] The technical problem to be solved by the present invention is that when tightening the drill rod, if the joint is not tightly connected when the drill rod is connected, the drill rod connector is slowly tightened during the drilling process, or when the drill is stuck during drilling, the drill rod connector is tightened. After lifting the drill, the drill rod connector cannot be disassembled by using a fork or a wrench during disassembly of the drill rod, and the drill rod connector cannot be disassembled by using a hammer vibration. When disassembling the drill rod connector, it cannot be easily disassembled. When replacing, disassembling or installing the drill rod connector, it cannot be easily disassembled.

[0005] In order to achieve the above-mentioned purpose, the utility model is implemented by adopting the following technical scheme: a geological drilling rig drill rod installation and disassembly tool, including a drill rod hand slot socket 1, a loading and unloading tool handle and a loading and unloading tool retractable handle; the loading and unloading tool handle 2 and the loading and unloading tool retractable handle are adjustable in length, and a positioning pin is provided at the bottom for fixing and preventing them from extending at will; at the same time, the front end of the loading and unloading tool handle 2 is connected to the drill rod hand slot socket 1 to form a whole.

[0006] Furthermore, the loading and unloading tool handle 2 and the loading and unloading tool retractable handle 3 are sleeved together, and the length after stretching is 141 cm, and the length after shortening is 87 cm.

[0007] Furthermore, the retractable handle 3 of the handling tool is 1 cm longer than the handle 2 of the handling tool, and an M8 nut 10 is welded at the end thereof.

[0008] Furthermore, an M8 nut 10 is welded on the same surface of the end of the retractable handle and the drill pipe handle slot 1, and is connected to the pin 12 through a 3mm galvanized chain 11 to form a snap connection.

[0009] Furthermore, the front end 5 cm of the handling tool handle 2 is hammered with a claw hammer to form an elliptical interface, which is connected to the drill pipe joint slot bayonet 1, and the bayonet and the elliptical handling tool handle 2 are welded together by light arc welding.

[0010] Furthermore, the geological drilling rig drill rod handling tool can be used for drilling, tightening the drill rod coupling or lifting the drill, and disassembling the drill rod coupling during drilling construction.

[0011] Furthermore, when replacing, disassembling or installing the drill rod adapter, the drill rod loading and unloading tool is used to disassemble or install the drill rod adapter.

[0012] Beneficial effects of the utility model:

[0013] A retractable handle is installed on the drill rod takeover slot handle, which improves the efficiency of drill rod disassembly, reduces the working time of drill rod disassembly, reduces the physical consumption of workers, reduces the number of disassembly workers, saves construction costs for drill rod disassembly, and is easy to use during work. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 Front view of the drill pipe handling tool extended;

[0015] Figure 2 Drill pipe handling tool extended side view;

[0016] Figure 3 Extended cross-section of drill pipe handling tools;

[0017] Figure 4 Shortened section view of drill pipe handling tool;

[0018] Figure 5 Drill pipe handling tool extension misalignment 7 section drawing;

[0019] Figure 6 The large-scale drawing of the shortened and misaligned section of the drill pipe handling tool;

[0020] Figure 7 Large drawing of positioning pins, galvanized chain and nuts.

[0021] In the figure: 1-drill pipe adapter slot, 2-loading and unloading tool handle, 3-loading and unloading tool retraction handle, 4-drill pipe adapter slot handle, 5-deformation joint 5, 6-weld, 7-loading and unloading tool extension misalignment, 8-loading and unloading tool hand shortening misalignment, 9-pin positioning hole, 10-nut, 11-galvanized chain, 12-pin, 13-positioning hole alignment mark notch. DETAILED DESCRIPTION

[0022] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Typical embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described in the present invention. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0023] Unless otherwise defined, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by technicians in the technical field of the present invention. The terms used in the present invention in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0024] Embodiment 1

[0025] A geological drilling rig drill pipe installation and removal tool, which adopts a steel plate with a thickness of 25mm to make a drill pipe joint slot 1; uses ∅51mm and ∅34mm thick-walled seamless steel pipes as a drill pipe loading and unloading tool handle 2 and a drill pipe loading and unloading tool retracting handle 3, which play the role of a force rod, and has a wall thickness of 3.5mm, wherein the ∅51mm thick-walled seamless steel pipe is 80cm long, and the rear end 15cm is upset to 6cm, which is 2.5 times the upset steel pipe wall thickness, about 8.75mm thick (because the inner diameter of the ∅51mm steel pipe is 44mm, and the outer diameter of the ∅34mm steel pipe is 34m m, the clearance between the upset part of ∅34mm steel pipe and the sliding part of the inner diameter of ∅51mm steel pipe is 1mm, that is, the outer diameter of the upset part of ∅34mm steel pipe is 42mm, the deviation between the outer diameter of the upset part of ∅34mm steel pipe and the outer diameter of the un-upset part is 8mm, and the upsetting 2.5 times can meet the requirements), the length of ∅51mm thick-walled seamless steel pipe after upsetting is 71cm; the length of ∅34mm thick-walled seamless steel pipe is 76cm, the front end 15cm upsetting is 6cm, 2.5 times the thickness of the upset steel pipe wall, about 8.75mm thick (because the inner diameter of ∅51mm steel pipe is 44mm, The outer diameter of the ∅34mm steel pipe is 34mm, and the gap between the inner diameter of the upset part of the ∅51mm steel pipe and the sliding part of the outer diameter of the ∅34mm steel pipe is 1mm, that is, the inner diameter of the upset part of the ∅51mm steel pipe is 36mm. The inner diameter deviation between the upset part and the un-upset part of the ∅51mm steel pipe is 8mm, and the upsetting must be 2.5 times to meet the requirements). The length of the ∅34mm thick-walled seamless steel pipe after upsetting is 67cm. The outer diameter part of the upset part of the ∅34mm steel pipe larger than 42mm is removed by a lathe, and the inner diameter part of the upset part of the ∅51mm steel pipe less than 36mm is milled by a milling machine to form a misalignment with the original inner diameter; the two sections of the processed steel pipe ends are inserted into each other, so that the small-diameter steel pipe is inserted into the large-diameter steel pipe, so that the two upset-processed ports are misaligned to form a snap-on connection. After the steel pipes of different diameters are inserted into each other, they play the role of shrinking the length and are made into shrinkage rods. After shrinking, the ∅34mm thick-walled seamless steel pipe is 1cm longer than the ∅51mm steel pipe, which is convenient for welding the M8 nut 10 at the end of the ∅34mm steel pipe. After shrinking, a hole is drilled 2cm away from the tail of the handle. The hole is drilled through the ∅51mm and ∅34mm steel pipes, which serves as the positioning pin positioning hole of the handle after shrinking. After the handle is shrunk, the pin 12 is passed through the pin positioning hole 9 to position it, so that the extension rod will not be extended at will. At the port of the un-upset part of the rear end of the ∅34mm thick-walled seamless steel pipe, the M8 nut 10 is welded on the same surface as the drill rod handle slot bayonet 1, and the 3mm galvanized chain 11 is used to connect the M8 nut 10, and the other end of the 3mm galvanized chain 11 is connected to the ∅5mm pin 12. The front 5 cm of the ∅51mm handling tool handle 2 is struck into an oval shape with a claw hammer, and then connected to the drill pipe joint slot bayonet 1. The bayonet and the oval handle are welded together by light arc welding, so that the two sections of the handle and the bayonet become a whole. At the same time, after welding, the small-caliber handling tool retractable handle 3 cannot slide out from the front end of the large-caliber handle.The two sections of the handle (including the bayonet) are connected together. The length after stretching is 141cm, and the length after shortening is 87cm.

[0026] In the work of loading and unloading drill pipes, if the drill pipe loading and unloading tool is not extended, the drill pipe can be tightened or disassembled normally, and there is no need to extend the drill pipe loading and unloading tool. When the work cannot be disassembled by force, the drill pipe loading and unloading tool is extended, and the handle is extended and retracted to lengthen the handle force arm, which is helpful for the connection and disassembly of the drill pipe, and reduces the chronic tightness of the drill pipe coupling during the drilling process when the joint is not tightly connected when the drill pipe is connected. The drill pipe coupling cannot be disassembled by hammering, and it cannot be easily disassembled when disassembling the drill pipe coupling. When replacing, disassembling or installing the drill pipe coupling, this drill pipe loading and unloading tool can also be used to disassemble or install the drill pipe coupling.

[0027] Drill pipe loading and unloading operation of geological drilling rig, operation one, drill pipe connection and installation. After the two drill pipe adapters are docked, the operator twists the upper drill pipe by hand to tighten the thread of the drill pipe adapter until it cannot be twisted by hand, and uses the drill pipe loading and unloading tool to tighten the drill pipe adapter, takes out the drill pipe loading and unloading tool, stands up the drill pipe loading and unloading tool vertically, and makes the retraction handle 3 of the loading and unloading tool downward, and under the action of gravity, the retraction handle retracted inside can be extended. Use the drill pipe loading and unloading tool to fork the drill pipe adapter bayonet, and the operator moves the drill pipe loading and unloading tool with force in a forward direction to tighten the drill pipe adapter. Operation two, drill pipe disassembly. Take out the drill pipe loading and unloading tool, stand up the drill pipe loading and unloading tool vertically, and make the retraction handle 3 of the loading and unloading tool downward, and under the action of gravity, the retraction handle retracted inside can be extended. Use the drill rod loading and unloading tool to clamp the upper drill rod coupling bayonet, and the operator reverses and forcefully moves the drill rod loading and unloading tool to remove the drill rod coupling thread and loosen the connection between the two connected drill rod couplings. During the drill rod loading and unloading work, if the drill rod loading and unloading tool is not extended, the drill rod can be tightened or disassembled normally, and there is no need to extend the drill rod loading and unloading tool. Operation three, when replacing, disassembling or installing the drill rod coupling, this drill rod loading and unloading tool can also be used to disassemble or install the drill rod coupling. Operation four, the two sections of the retractable handles that are sleeved together have a length of 141cm after stretching and a length of 87cm after shortening. Operation five, insert the retractable handle into the loading and unloading tool handle 2, so that the locating pin hole of the retractable handle inserted into the loading and unloading tool handle 2 corresponds to each other, insert the locating pin into the locating pin hole, and complete the locating pin function.

[0028] Embodiment 2

[0029] According to the first embodiment, a manufacturing process of a geological drilling rig drill rod installation and removal tool is provided, which includes the following steps:

[0030] Production 1. Preparation work. Make a good material plan for making drill pipe loading and unloading tools, and prepare measuring tools, cutting machines, electric welders, grinders, lathes, milling machines, etc. for making drill pipe loading and unloading tools.

[0031] Production 2: Select materials and use a 25mm thick steel plate to make the drill rod handle slot 1 (1); use ∅51mm and ∅34mm thick-walled seamless steel pipes as the drill rod loading and unloading tool handle 2 (2) and the drill rod loading and unloading tool retractable handle 3 (3), which acts as a force rod, with a wall thickness of 3.5mm; M8 nut 10; 3mm galvanized chain 11; ∅5mm pin 12.

[0032] Production three, cut the material, use the cutting machine to cut the ∅51mm thick wall seamless steel pipe with a length of 80cm, and the ∅34mm thick wall seamless steel pipe with a length of 76cm. Use oxyacetylene cutting to cut the ∅150mm thick 25mm steel plate, and leave the drill pipe joint slot bayonet handle 4 (4) on the 25mm thick steel plate. The edge line of the drill pipe joint slot bayonet handle 4 is tangent to the circumscribed circle of the ∅150mm drill pipe joint slot bayonet 1, and the drill pipe joint slot bayonet 1 ∅150mm.

[0033] Production 4, component processing and forming, the length of ∅51mm thick-walled seamless steel pipe is 80cm, the rear end 15cm upset is 6cm, and the upset steel pipe wall thickness is 2.5 times, about 8.75mm thick (because the inner diameter of ∅51mm steel pipe is 44mm, the outer diameter of ∅34mm steel pipe is 34mm, and the gap between the upset part of ∅34mm steel pipe and the sliding part of the inner diameter of ∅51mm steel pipe is 1mm, that is, the outer diameter of the upset part of ∅34mm steel pipe is 42mm , the outer diameter of the upset part of the ∅34mm steel pipe and the outer diameter of the unupset part have a deviation of 8mm, and the upsetting must be 2.5 times to meet the requirements), the length of the ∅51mm thick-walled seamless steel pipe after upsetting is 71cm; the length of the ∅34mm thick-walled seamless steel pipe is 76cm, the front end 15cm upsetting is 6cm, and the upsetting steel pipe wall thickness is 2.5 times, which is about 8.75mm thick (because the inner diameter of the ∅51mm steel pipe is 44mm, The outer diameter of the ∅34mm steel pipe is 34mm, and the gap between the inner diameter of the upset part of the ∅51mm steel pipe and the sliding part of the outer diameter of the ∅34mm steel pipe is 1mm, that is, the inner diameter of the upset part of the ∅51mm steel pipe is 36mm, and the deviation between the inner diameter of the upset part of the ∅51mm steel pipe and the inner diameter of the un-upset part is 8mm. The requirement can only be met by upsetting 2.5 times). The length of the ∅34mm thick-walled seamless steel pipe after upsetting is 67cm. The outer diameter part of the upset part of the ∅34mm steel pipe larger than 42mm is removed by lathe, and the inner diameter part of the upset part of the ∅51mm steel pipe smaller than 36mm is milled by milling machine to form an offset with the original inner diameter. The loading and unloading tool is extended by 7 (7), and the gap between the offset and the handle is 1mm. The loading and unloading tool hand is shortened by 8 (8), and the gap between the offset and the handle is 1mm. The front 5cm of the ∅51mm handling tool handle 2 is hammered with a claw hammer to form an elliptical deformation joint 5 (5). For the manufacture of the bayonet, the bayonet and bayonet handle shapes are drawn on the plane of a ∅150mm and 25mm thick steel plate, cut into shape using acetylene, and polished smooth using a grinder. The shape and size of the bayonet handle are consistent with the elliptical size of the handling tool handle 2.

[0034] Production five, make a contraction rod, two sections of processed steel pipe ends are inserted, so that the small-diameter steel pipe is inserted into the large-diameter steel pipe, and the un-upset end of the small-diameter steel pipe slides out from the large-diameter upset port, and the large-diameter upset port slides out with a gap of 1mm, so that the two upset ports are staggered and docked to form a snap connection. The gap between the staggered and the inner diameter of the large-diameter steel pipe is 1mm. The staggered makes it impossible for the two sections of steel pipes with different diameters to be separated, and at the same time plays a role in contraction. The upsetting length of the ∅51mm loading and unloading tool handle 2 is about 71cm, and the upsetting length of the ∅34mm loading and unloading tool contraction handle 3 is about 67cm. The upsetting connection parts of the two sections of the handles are about 6cm at each end, so that the two sections of the handles connected together are about 141cm long after stretching, and about 87cm long after shortening, and are made into a contraction rod.

[0035] Production six, parts docking, dock the oval part of the loading and unloading tool handle 2 with the drill pipe handle slot 1.

[0036] Manufacturing seven, the drill pipe joint bayonet handle 4 and the oval part of the loading and unloading tool handle 2 are welded, and the bayonet handle and the oval loading and unloading tool handle 2 are welded together by light arc welding to form a weld 6 (6), so that the two sections of the handle and the bayonet become a whole. At the same time, after welding, the small-diameter shrink handle cannot slide out from the front end of the large-diameter handle.

[0037] Production eight, the shortened length is about 87cm, and it is made into a retractable rod. After the retractable rod is retracted, a positioning pin hole (9) is drilled with an electric drill at a distance of 2cm from the tail, and the positioning pin hole ∅ is 8mm.

[0038] Production nine: Use electric welding to weld the tail of the ∅34mm shrink rod and weld the M8 nut 10 (10) on the same surface as the drill rod connector slot 1.

[0039] To make ten, a 3mm galvanized chain 11 (11) and an M8 nut 10 are used for connection, and the other end of the 3mm galvanized chain 11 is connected to a ∅5mm pin 12 (12).

[0040] Production eleven, insert the retractable handle 3 (3) of the loading and unloading tool into the loading and unloading tool handle 2 (2), so that the retractable handle is inserted into the positioning pin hole of the loading and unloading tool handle 2 and corresponds to each other, and insert the positioning pin into the positioning pin hole to complete the positioning pin function.

[0041] Production twelve, at the tail of the loading and unloading tool that is positioned after contraction, use a hacksaw to cut a positioning hole alignment mark mark 13 (13), when the contraction handle is received in the bayonet handle, the positioning hole alignment mark mark 13 corresponds to a straight line, that is, the bayonet handle and the contraction handle positioning pin hole overlap, so that the bayonet handle and the contraction handle positioning pin hole are aligned, which is convenient for accurate insertion of the positioning pin hole.

[0042] Finally, it should be noted that the implementation methods and techniques described above are only used to illustrate the production, installation and use process of the utility model tool, and are not limited to the only detection method. This article describes it in detail through implementation cases, but technicians in this field can make appropriate changes according to application scenarios and environmental conditions to adapt to different measurement needs and achieve the best effect.

Claims

1. A geological drilling rig drill rod installation and removal tool, characterized in that: The utility model comprises a drill rod receiving handle slot bayonet (1), a loading and unloading tool handle (2) and a loading and unloading tool retracting handle (3); the loading and unloading tool handle (2) and the loading and unloading tool retracting handle (3) are adjustable in length, and a positioning pin is provided at the bottom for fixing and preventing the loading and unloading tool handle from extending at will; at the same time, the front end of the loading and unloading tool handle (2) is connected to the drill rod receiving handle slot bayonet (1) to form a whole.

2. The geological drilling rig drill rod installation and removal tool according to claim 1, characterized in that: The loading and unloading tool handle (2) and the loading and unloading tool retractable handle (3) are sleeved together, and the length after being stretched is 141 cm, and the length after being shortened is 87 cm.

3. The geological drilling rig drill rod installation and removal tool according to claim 1, characterized in that: The retractable handle (3) of the handling tool is 1 cm longer than the handle (2) of the handling tool, and an M8 nut (10) is welded at the end thereof.

4. The geological drilling rig drill rod installation and removal tool according to claim 1, characterized in that: An M8 nut (10) is welded on the same surface of the end of the retractable handle and the drill rod handle slot (1), and is connected to a pin (12) via a 3 mm galvanized chain (11) to form a snap connection.

5. The geological drilling rig drill rod installation and removal tool according to claim 1, characterized in that: The front end 5 cm of the handling tool handle (2) is hammered with a claw hammer to form an elliptical interface, which is connected to the drill pipe joint slot (1), and the slot and the elliptical handling tool handle (2) are welded together using light arc welding.