Positioning and guiding device for underwater steel pipe pile construction

By designing a positioning guide device during the construction of steel pipe piles in water, and using positioning guide platforms and platform connectors to achieve rapid positioning and verticality control, the problem of low construction efficiency of steel pipe piles in water is solved and construction efficiency and safety are improved.

CN221822906UActive Publication Date: 2024-10-11CHINA RAILWAY FIFTH BUREAU GRP SOUTH CHINA ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420028840.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-10-11
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

The construction of steel pipe piles in water is difficult and the construction efficiency is low. It requires a lot of time for exploration and positioning, and the impact of water flow affects the construction, resulting in long construction time and low efficiency.

Method used

A positioning guide device for the construction of steel pipe piles in water is designed, including a positioning guide platform and platform connectors. By setting reserved positions and through holes for steel pipe piles, rapid positioning and verticality control are achieved, and the assembly structure is simplified. The grid structure improves stability and earthquake resistance, and guardrails are set up on the platform to improve safety.

Benefits of technology

It realizes the rapid positioning and verticality control of steel pipe pile construction in water, saves construction time, improves construction efficiency, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822906U_ABST
    Figure CN221822906U_ABST
Patent Text Reader

Abstract

The utility model relates to a positioning and guiding device for steel pipe pile construction in water, which comprises a positioning and guiding platform and a platform connecting piece, and the positioning and guiding platform is fixedly connected with the platform connecting piece; the positioning guide platform is provided with steel pipe pile reserved positions which are distributed at intervals, the intervals are set according to actual requirements, the steel pipe pile reserved positions are through holes which are through up and down, and the axes of the through holes are perpendicular to the plane of the positioning guide platform; the through hole comprises an upper hole site and a lower hole site which are oppositely arranged, and the upper hole site is communicated with the lower hole site. According to the positioning and guiding device, the steel pipe pile can be quickly positioned before construction by arranging the steel pipe pile reserved position, the steel pipe pile can be directly inserted into a target position by means of the steel pipe pile reserved position during construction, the construction time is saved, the construction efficiency is improved, and the perpendicularity of the steel pipe pile can be effectively controlled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of steel pipe pile construction equipment, in particular to a positioning and guiding device used for underwater steel pipe pile construction. Background Art

[0002] Steel pipe piles are a type of pile body made of steel pipes. They are resistant to bending, pulling, impact, and corrosion. They are easy to operate and relatively inexpensive. Therefore, they are widely used in civil engineering projects such as docks, bridges, and coastal structures. When in use, it is necessary to drill holes in the target area in advance, and then insert the steel pipe piles into the pre-drilled holes, and finally hammer them to the depth required by the design. However, in actual construction, the steel pipe piles in water are difficult to construct, and they also require a lot of extra time, which is inefficient. The reason is that the external environment of the steel pipe piles in water is relatively complex, and it takes a lot of time to explore and locate. In addition, water itself is fluid, and the impact of water flow on the steel pipe piles will also cause trouble for the construction of the steel pipe piles. Therefore, a positioning and guiding device for steel pipe pile construction that can achieve rapid positioning and solve the influence of water flow is needed. Utility Model Content

[0003] Based on this, the purpose of the utility model is to provide a positioning and guiding device for underwater steel pipe pile construction that can achieve rapid positioning.

[0004] In order to achieve the above purpose, the detailed technical solution of the utility model is as follows:

[0005] A positioning and guiding device for underwater steel pipe pile construction comprises a positioning and guiding platform and a platform connector, wherein the positioning and guiding platform is fixedly connected to the platform connector; the positioning and guiding platform is provided with reserved positions for steel pipe piles distributed at intervals, wherein the intervals are set according to actual construction needs, and the reserved positions for steel pipe piles are through holes penetrating from top to bottom, wherein the axis of the through hole is perpendicular to the plane of the positioning and guiding platform.

[0006] Compared with the prior art, the positioning and guiding device of the utility model can fix the positioning and guiding platform to the hull of the pile-driving ship or other fixing devices through the arrangement of platform connecting parts, so as to facilitate the surface of the positioning and guiding platform to remain level. By arranging reserved positions for steel pipe piles on the positioning and guiding platform, rapid positioning of the underwater steel pipe piles before construction can be achieved. During the preliminary exploration, the reserved positions for the steel pipe piles can be aligned with the target positions. During the construction of the steel pipe piles, the reserved positions for the steel pipe piles can be directly inserted into the target positions with the help of the reserved positions for the steel pipe piles, thereby saving construction time and improving construction efficiency.

[0007] Furthermore, the through hole includes an upper hole position and a lower hole position which are arranged relatively, and the upper hole position is connected with the lower hole position. The upper and lower hole positions can effectively control the verticality of the steel pipe pile, and no extra time is spent on correcting the verticality of the steel pipe pile, which further saves construction time and improves construction efficiency.

[0008] Furthermore, the positioning guide platform comprises two guide frames arranged opposite to each other and a positioning plate arranged between the two guide frames, and one end of the guide frame is fixedly connected to the platform connector. The positioning guide platform has a simple structure, is easy to produce and assemble, and is conducive to saving costs and improving production efficiency.

[0009] Furthermore, the steel pipe pile reserved position is arranged on the guide frame. The steel pipe pile reserved position is integrated with the guide frame to simplify the structure of the device.

[0010] Furthermore, the guide frame includes two oppositely arranged vertical grids and a plurality of positioning connectors, wherein the plurality of positioning connectors are respectively arranged between the tops of the two vertical grids and between the bottoms of the two vertical grids and vertically connected to the two vertical grids. The grid structure and the positioning connectors can save materials and make installation and use easier. The grid structure itself also has the advantages of spatial force, light weight, high rigidity, and good earthquake resistance.

[0011] Furthermore, the upper hole position of the through hole is formed by the tops of the two vertical grids and the two positioning connectors connected thereto, and the lower hole position of the through hole is formed by the bottoms of the two vertical grids and the two positioning connectors connected thereto. The upper hole position and the lower hole position of the through hole are formed by the positioning connectors and the vertical grids themselves, and there is no need to set up an additional channel to connect the two, which not only saves materials, but also allows the size of the through hole to be more flexibly adjusted during assembly to accommodate steel pipe piles of different sizes.

[0012] Furthermore, the positioning guide platform further comprises a plurality of guide frame connecting members, which are arranged between the two guide frames and support the positioning plate. The overall stability of the device can be improved by arranging a plurality of guide frame connecting members.

[0013] Furthermore, the guide frame connector adopts a grid structure. The grid structure can effectively transfer horizontal loads, improve the stability of the device, and provide a stable environment for steel pipe pile construction. The grid structure is simple in structure and light in weight, which can reduce the pulling force of the platform itself on the connector and extend the service life of the platform connector.

[0014] Furthermore, the platform connection member includes two triangular grid structures arranged opposite to each other and a transverse connection member, wherein the transverse connection member is arranged between the two triangular grid structures. The triangular grid structure is simpler and more stable, and can easily connect the positioning guide platform and the pile driving vessel.

[0015] Furthermore, a guardrail is provided on the surface of the positioning and guiding platform. The guardrail is used to set equipment such as warning slogans and life buoys, which can improve the safety of the construction process of the device.

[0016] In order to better understand and implement the present invention, the present invention is described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of the positioning and guiding device of the utility model;

[0018] Figure 2 for Figure 1 A top view of the positioning guide device;

[0019] Figure 3 for Figure 1 Front view of the positioning guide device;

[0020] Figure 4 for Figure 1 Right view of the positioning guide device;

[0021] Among them, 1: positioning guide device, 11: positioning guide platform, 111: guide frame, 1111: vertical grid, 1111a: horizontal rod, 1111b: vertical rod, 1111c: cross web bar, 1112: positioning connector, 112: positioning plate, 113: guide frame connector, 12: platform connector, 121: vertical rod, 122: oblique rod, 123: horizontal connecting rod, 13: guardrail. DETAILED DESCRIPTION

[0022] In the prior art, before the construction of steel pipe piles, the preparation work required is to first survey the construction site, formulate construction drawings based on the survey results, and finally determine the technical parameters of the steel pipe piles and the pile top elevation based on the soil conditions and the pile foundation design. In actual construction, the steel pipe piles are first hammered into the soil, and after the piles are buried to a certain depth, the drop distance of the pile hammer is gradually increased to the specified value to hammer the steel pipe piles until the target depth is reached.

[0023] The inventor studied the prior art and found that the construction of steel pipe piles not only requires accurate positioning of the steel pipe piles in advance, but also requires strict control of the verticality of the pile body when driving the steel pipe piles to ensure the reasonable load-bearing of the pile body. Therefore, the existing steel pipe pile construction process requires a lot of time to position the steel pipe piles before construction and to continue to spend a lot of time during the construction process to check whether the verticality of the steel pipe piles meets the requirements. To this end, the utility model designs a positioning and guiding device for underwater steel pipe pile construction, which can realize rapid positioning of underwater steel pipe pile construction and effectively control the verticality of the steel pipe piles.

[0024] See also Figure 1-2The utility model is used for underwater steel pipe pile construction positioning guide device 1 comprises a positioning guide platform 11 and two platform connectors 12, the positioning guide platform 11 is fixedly connected to the pile driving ship hull through the two platform connectors 12 and ensures that the plane of the positioning guide platform 11 remains horizontal.

[0025] The positioning guide platform 11 includes two guide frames 111 disposed opposite to each other and a positioning plate 112 . One end of the guide frame 111 is fixed to the platform connector 12 , and the positioning plate 112 is disposed between the two guide frames 111 .

[0026] See also Figure 3 In this embodiment, the platform connector 12 includes two triangular grid structures arranged opposite to each other and a transverse connecting rod 123, and the transverse connecting rod 123 is arranged between the two triangular grid structures. The triangular grid structure includes a vertical rod 121 and an oblique rod 122, and the platform connector 12 is fixedly connected to the guide frame 111 along the direction of the vertical rod 121 and through the vertical rod 121. One end of the vertical rod 121 is fixedly connected to one end of the oblique rod 122 to form a triangular grid structure, and the connecting line of the ends of the vertical rod 121 and the oblique rod 122 that are not directly connected is parallel to the plane of the positioning guide platform 11, and is fixedly connected to the piling platform.

[0027] The guide frame 111 is provided with a plurality of reserved positions for steel pipe piles at intervals, and the intervals are set according to actual construction needs. The reserved positions for steel pipe piles are through holes, and the axis of the through holes is perpendicular to the plane of the positioning guide platform. In this embodiment, the reserved positions for steel pipe piles include upper and lower hole positions that are relatively arranged, which can limit the vertical direction of the steel pipe piles. The guide frame 111 includes two relatively arranged vertical grids 1111 and a plurality of positioning connectors 1112, and the plurality of positioning connectors 1112 are arranged between the tops and bottoms of the two vertical grids 1111. The upper hole position of the through hole is enclosed by the tops of the two vertical grids 1111 and the two positioning connectors 1112 connected thereto, and the lower hole position of the through hole is enclosed by the bottoms of the two vertical grids 1111 and the two positioning connectors 1112 connected thereto. The upper and lower holes of the through hole are formed by the positioning connector 1112 and the vertical grid 1111 itself, and there is no need to set up an additional channel to connect the two. This not only saves materials, but also allows the size of the through hole to be more flexibly adjusted during assembly to accommodate steel pipe piles of different sizes. Furthermore, the positioning connectors that form the steel pipe pile reserved position interval can form a steel pipe pile reserved position of another size, and the original steel pipe pile reserved position becomes a new interval. When a larger interval is required, the positioning plate 112 can also be used as an interval.

[0028] In this embodiment, the vertical grid comprises two horizontal bars 1111a, a plurality of vertical bars 1111b and a plurality of cross web bars 1111c. The two horizontal bars 1111a and the plurality of vertical bars 1111b are vertically connected to form a support plane, and the cross web bars 1111c are cross-arranged between the two horizontal bars 1111a and connected to two adjacent vertical bars 1111b. The cross web bars 1111c can effectively transfer loads and improve the stability of the grid structure.

[0029] In this embodiment, the positioning guide platform 11 further includes a plurality of groups of guide frame connectors 113, which are arranged at intervals between two guide frames 111 and vertically connected to the two guide frames 111, and the guide frame connectors 113 can also support the positioning plate 112. In this embodiment, the guide frame connectors 113 adopt a grid structure, which has small spatial force, light weight, high rigidity, and good seismic performance, which saves costs and ensures performance.

[0030] Furthermore, the positioning guide platform 11 further includes two oppositely arranged outer plates 114, which are respectively arranged on one side of the two guide frames 111 away from the middle positioning plate 112, and the plane of the outer plates 114 is parallel to the plane of the positioning plate 112. The outer plates 114 can expand the construction space of the steel pipe piles and improve the adaptability of the positioning guide device to steel pipe piles of different sizes.

[0031] See also Figure 4 In this embodiment, the outer surface of the positioning guide platform 11 is provided with a guardrail 13 except for one side where the platform connector 12 is provided. The guardrail 13 is used to set warning signs, life buoys and other equipment, which can improve the safety of the construction process of the device.

[0032] The positioning guide device of the utility model is fixed on the pile driving ship when in use, and the steel pipe pile reserved position of the positioning guide device is aligned with the construction position of the steel pipe pile. The crane clamps the steel pipe pile and vertically inserts it into the steel pipe pile reserved position, and then the steel pipe pile is gradually pushed downward into the soil by hammering by the pile driver. Since the upper and lower parts of the steel pipe pile reserved position control the verticality of the steel pipe pile, the steel pipe pile can be quickly hammered to the target depth during construction, which greatly improves the construction efficiency.

[0033] Compared with the prior art, the positioning and guiding device of the utility model can realize the rapid positioning of underwater steel pipe piles before construction by setting reserved positions for steel pipe piles, thus saving the time for preliminary positioning and drilling, and effectively controls the verticality of the steel pipe piles by restricting the vertical direction of the steel pipe piles through the upper and lower parts of the reserved positions for steel pipe piles, without spending extra time on correcting the verticality, further saving construction time and greatly improving the construction efficiency of underwater steel pipe piles.

[0034] The above-mentioned embodiment only expresses one implementation method of the utility model, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the utility model patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, and the utility model is also intended to include these modifications and modifications.

Claims

1. A positioning and guiding device for underwater steel pipe pile construction, characterized in that: It includes a positioning guide platform and a platform connector, the positioning guide platform is fixedly connected to the platform connector; the positioning guide platform is provided with reserved positions for steel pipe piles distributed at intervals, the intervals are set according to actual construction needs, the reserved positions for steel pipe piles are through holes penetrating from top to bottom, and the axis of the through hole is perpendicular to the plane of the positioning guide platform; the positioning guide platform includes two relatively arranged guide frames, one end of the guide frame is fixedly connected to the platform connector; the guide frame includes two relatively arranged vertical grids and a plurality of positioning connectors, the plurality of positioning connectors are respectively arranged between the tops of the two vertical grids and between the bottoms of the vertical grids and are vertically connected to the two vertical grids; the reserved positions for steel pipe piles are arranged on the guide frames.

2. The positioning guide device according to claim 1, characterized in that: The through hole comprises an upper hole position and a lower hole position which are arranged opposite to each other, and the upper hole position is connected with the lower hole position.

3. The positioning guide device according to claim 2, characterized in that: The positioning guide platform also includes a positioning plate arranged between the two guide frames.

4. The positioning guide device according to claim 3, characterized in that: The upper hole position of the through hole is formed by the tops of the two vertical grids and the two positioning connectors connected thereto, and the lower hole position of the through hole is formed by the bottoms of the two vertical grids and the two positioning connectors connected thereto.

5. The positioning guide device according to claim 4, characterized in that: The positioning guide platform also includes a plurality of groups of guide frame connecting members, which are arranged between two guide frames and support the positioning plate.

6. The positioning guide device according to claim 5, characterized in that: The guide frame connecting piece adopts a grid structure.

7. The positioning guide device according to claim 6, characterized in that: The platform connecting member comprises two triangular grid structures arranged opposite to each other and a transverse connecting member, wherein the transverse connecting member is arranged between the two triangular grid structures and fixedly connected.

8. The positioning guide device according to claim 7, characterized in that: A guardrail is provided on the surface of the positioning guide platform.