Foundation structure formed by construction of gantry crane track

By adopting the post-cast concrete layer and reinforced concrete layer structure in the gantry crane track, combined with the self-locking mechanism of embedded bolts and nuts, the convenient replacement of the rail press and the maintenance of the track are realized, and the replacement of the rail press in the existing technology is solved. Inconvenience issues are eliminated and the quality of track maintenance is improved.

CN221822950UActive Publication Date: 2024-10-11CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323237919.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-29
Publication Date
2024-10-11
Estimated Expiration
2033-11-29

AI Technical Summary

Technical Problem

It is inconvenient to replace the rail press of the existing gantry crane track, which affects the quality of daily maintenance of the track.

Method used

It adopts the structure of post-cast concrete layer and reinforced concrete layer, and is designed with embedded bolts and nuts. The rail clamp can be detachably fixed on the post-cast concrete layer. The screw-in self-locking mechanism of the nut and the embedded bolt makes the rail clamp more convenient. Replacement and maintenance of tracks.

Benefits of technology

It facilitates the replacement and maintenance of the rail press and the track, improves the maintenance quality of the track, and solves the problem of inconvenient replacement of the rail press.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822950U_ABST
    Figure CN221822950U_ABST
Patent Text Reader

Abstract

The utility model discloses a foundation structure for construction forming of a gantry crane rail. The foundation structure comprises a post-pouring concrete layer; the track is positioned on the post-pouring concrete layer; the two rail pressing devices are distributed in a spaced mode, and the rail pressing devices are detachably fixed to the post-pouring concrete layer to press the two sides of a rail. Due to the fact that the rail pressing device is detachably fixed on the post-pouring concrete layer to press the rail, the rail pressing device and the rail are convenient to replace and maintain, and the problems that the rail pressing device is inconvenient to replace and the daily maintenance quality of the rail is guaranteed are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a basic structure for the construction and forming of a gantry crane track, and belongs to the technical field of gantry crane track foundations. Background Art

[0002] When the gantry crane is in operation, the rollers at the bottom of the gantry crane's supporting feet move along the laid tracks. The quality of the tracks is one of the important factors to ensure the normal operation of the gantry crane.

[0003] The track laying of the existing gantry crane is shown in China Patent Publication No. CN212294735U. The disclosed technology is: track clamps are arranged at equal intervals on the track, and the track clamps are welded and fixed to the upper surface of the support plate. The top of the standard segment beam is pre-embedded with a support plate; although the track is pressed by the track clamp fixed to the support plate by welding, there is a problem that it is inconvenient to replace the track clamp to ensure the quality of daily maintenance of the track. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a basic structure for the construction and forming of a gantry crane track.

[0005] The utility model is realized through the following technical solutions.

[0006] The utility model provides a basic structure for the construction and forming of a gantry crane track, comprising:

[0007] Post-pour concrete layer;

[0008] Tracks on the post-cast concrete layer;

[0009] There are two rail clamps that are distributed at intervals. The rail clamps can be detachably fixed on the post-cast concrete layer to clamp the two sides of the track.

[0010] A reinforced concrete layer is constructed under the post-cast concrete layer.

[0011] Embedded bolts are embedded in the reinforced concrete layer, and the embedded bolts penetrate through the post-cast concrete layer and extend out to be screwed with nuts.

[0012] The embedded bolts are distributed in two intervals, and a track is laid between the two embedded bolts. The embedded bolts on both sides of the track are covered with rail clamps, and the rail clamps are provided with through holes that penetrate through the embedded bolts. The embedded bolts extend out of the rail clamps and the nuts are screwed on to tighten the rail clamps, so that the rail clamps are detachably fixed on the post-cast concrete layer by being covered on the embedded bolts and screwed on with nuts to tighten the track.

[0013] A foundation concrete layer is constructed under the reinforced concrete layer.

[0014] The reinforced concrete layer is trapezoidal and is located on the foundation concrete layer.

[0015] A foundation cushion concrete layer is constructed under the foundation concrete layer.

[0016] A filling layer is filled between the post-cast concrete layer, the track and the track holder, which can be elastically deformed and has a self-locking property after the nut and the embedded bolt are screwed together.

[0017] The beneficial effect of the utility model is that since the rail clamp can be detachably fixed on the post-cast concrete layer to clamp the rail, it is convenient to replace and maintain the rail clamp and the rail, thus solving the problem of inconvenient replacement of the rail clamp and ensuring the quality of daily maintenance of the rail. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a distribution diagram of the utility model;

[0019] In the figure: 1-foundation cushion concrete layer; 2-foundation concrete layer; 3-reinforced concrete layer; 4-post-cast concrete layer; 5-embedded bolts; 6-track; 7-rail pressure; 8-nuts; 9-filling layer. DETAILED DESCRIPTION

[0020] The technical solution of the utility model is further described below, but the scope of protection required is not limited to the description.

[0021] like Figure 1 shown.

[0022] A basic structure for the construction of a gantry crane track in the present application comprises:

[0023] The bottommost foundation cushion concrete layer 1 is composed of C15 concrete and steel bars.

[0024] The foundation concrete layer 2 is composed of C20 concrete and steel bars cast on the foundation cushion concrete layer 1.

[0025] A reinforced concrete layer 3 composed of C30 concrete and steel bars is cast on the foundation concrete layer 2 , and the reinforced concrete layer 3 is trapezoidal on the foundation concrete layer 2 .

[0026] A post-cast concrete layer 4 composed of C40 concrete and steel bars is cast on the reinforced concrete layer 3. Embedded bolts 5 are pre-buried in the reinforced concrete layer 3 and extend through the post-cast concrete layer 4. The embedded bolts 5 are distributed at two intervals.

[0027] The track 6 is laid on the post-cast concrete layer 4 between the two embedded bolts 5, and the embedded bolts 5 on both sides of the track 6 are covered with rail clamps 7. The rail clamps 7 are provided with through holes that penetrate the embedded bolts 5. The embedded bolts 5 extend out of the rail clamp 7 and the nuts 8 are screwed on to press the rail clamp 7, so that the rail clamp 7 can be detachably fixed on the post-cast concrete layer 4 by being covered on the embedded bolts 5 and screwed on by the nuts 8 to press the rail clamp 7.

[0028] An elastically deformable filling layer 9 is filled between the post-cast concrete layer 4, the track 6 and the track clamp 7. The filling layer 9 is made of an elastic rubber sheet or rammed earth. After the track clamp 7 is screwed and pressed onto the track 6 by the nut 8, the filling layer 9 is in the closed space between the post-cast concrete layer 4, the track 6 and the track clamp 7, and deforms to produce elastic force. The elastic force obliquely presses against the threaded engagement of the nut 8 and the embedded bolt 5 to form a self-locking force, which plays a role in the self-locking performance of the screw engagement of the nut 8 and the embedded bolt 5.

[0029] Since the rail clamp 7 can be detachably fixed on the post-cast concrete layer 4 to clamp the rail 6, it is convenient to replace and maintain the rail clamp 7 and the rail 6, solving the problem of inconvenient replacement of the rail clamp and ensuring the quality of daily maintenance of the rail.

Claims

1. A basic structure for the construction of a gantry crane track, characterized in that: include: Post-cast concrete layer (4); A track (6) on the post-cast concrete layer (4); Two rail clamps (7) are arranged at intervals, and the rail clamps (7) can be detachably fixed on the post-cast concrete layer (4) to clamp the two sides of the rail (6); A reinforced concrete layer (3) is constructed under the post-cast concrete layer (4); The reinforced concrete layer (3) is pre-buried with pre-embedded bolts (5), which penetrate the post-cast concrete layer (4) and extend out to be screwed with nuts (8); The embedded bolts (5) are arranged in two intervals, and a track (6) is laid between the two embedded bolts (5). The embedded bolts (5) on both sides of the track (6) are sleeved with rail clamps (7). The rail clamps (7) are provided with through holes that penetrate and are sleeved on the embedded bolts (5). The embedded bolts (5) extend out of the rail clamps (7) and are screwed with nuts (8) to press the rail clamps (7), so that the rail clamps (7) are sleeved on the embedded bolts (5) and screwed with nuts (8) to press the rail clamps (7), so that the rail clamps (7) are detachably fixed on the post-cast concrete layer (4) by being sleeved on the embedded bolts (5) and being screwed with nuts (8) to press the rails (6).

2. The basic structure for the construction of the gantry crane track as claimed in claim 1, characterized in that: A foundation concrete layer (2) is constructed under the reinforced concrete layer (3).

3. The basic structure for the construction of the gantry crane track as claimed in claim 2, characterized in that: The reinforced concrete layer (3) is trapezoidal and is located on the base concrete layer (2).

4. The basic structure for the construction of the gantry crane track as claimed in claim 3, characterized in that: A foundation cushion concrete layer (1) is constructed under the foundation concrete layer (2).

5. The basic structure for the construction of the gantry crane track as claimed in claim 1, characterized in that: A filling layer (9) is filled between the post-cast concrete layer (4), the track (6) and the track clamp (7) and is elastically deformable and has a self-locking property when the nut (8) and the embedded bolt (5) are screwed together.