Auxiliary device for engineering site construction based on BIM
By designing a motor-driven transmission cavity and a threaded rod adjustment mechanism in the auxiliary device for construction on the project site, the problem of fixed position and single adjustability of the surveying and plotting instrument is solved, the flexible and precise position adjustment of the surveying and plotting instrument is realized, and the work efficiency and Accuracy.
Patent Information
- Application Number
- CN202420374833.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing BIM-based auxiliary device surveying device for on-site construction has a fixed position, single adjustment, and requires manual adjustment, resulting in time consumption and difficulty in ensuring accuracy.
An adjustment mechanism including a base, a transmission cavity, a rotating shaft, a transmission component, a motor and a universal wheel is designed. The motor drives the rotating shaft and threaded rod to realize the height and angle adjustment of the surveyor, which improves the flexibility and accuracy of adjustment.
It realizes simple, flexible and precise position adjustment of the surveying and plotting instrument, improving work efficiency and accuracy.
Smart Images

Figure CN221824926U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering construction, and in particular to an auxiliary device for engineering site construction based on BIM. Background Art
[0002] For example, the BIM-based auxiliary device for on-site construction mentioned in announcement number CN202221318821.6, Building Information Modeling is a new tool for architecture, engineering and civil engineering. It is used to describe computer-aided designs that are mainly based on three-dimensional graphics, object-oriented, and related to architecture. At present, when calculating the cost of an engineering project, it is often necessary to go to the construction site to measure the data on site, and then input the data into the corresponding BIM program for calculation and result. During the construction process on the construction site, the staff often need to use surveying and mapping instruments for surveying, but it is often inconvenient for the staff to fix the surveying and mapping instruments, which greatly affects the work efficiency of the staff;
[0003] The solution is to adjust the position of the threaded round rod on the connecting plate by rotating the nut, thereby fixing the position of the second clamping block, and opening the first electric cylinder to drive the connecting plate to move, so that the surveying and mapping tool is clamped and fixed, so that it is convenient to use, and opening the second electric cylinder to drive the clamping table to move up and down, and the positioning slider can be embedded in the limit block to play a limiting role, and the first slider can move on the guide rod to play a guiding role;
[0004] With respect to the above-mentioned related technologies, the inventor believes that the position of the surveying instrument of the device is relatively fixed, and the overall adjustability is relatively simple, requiring manual position adjustment, which is not only time-consuming but also difficult to ensure accuracy;
[0005] The above information disclosed in the background technology is only used to increase the understanding of the background technology of the present application, and therefore, it may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content
[0006] In order to solve the problem that the position of the surveying instrument of the device is relatively fixed and the overall adjustability is relatively simple, manual position adjustment is required, which is not only time-consuming but also difficult to ensure accuracy. The present application provides an auxiliary device for engineering site construction based on BIM.
[0007] The present application provides a BIM-based auxiliary device for on-site construction of an engineering project, which adopts the following technical solution:
[0008] A BIM-based auxiliary device for on-site construction of an engineering project comprises a base, a first motor is installed on the left side of the base, a transmission cavity is opened in the base, a rotating rod is rotatably connected between the left and right inner walls of the transmission cavity, a transmission assembly is arranged on the rotating rod, a bottom plate is arranged above the base, a surveying instrument is arranged above the bottom plate, and an adjustment mechanism for the surveying instrument is arranged on the base.
[0009] Preferably, the adjustment mechanism includes a rotating shaft rotatably connected between the upper and lower inner walls of the transmission chamber, and the transmission assembly includes two meshing turbines and worms, and the turbines and worms are respectively mounted on the rotating rod and the rotating shaft.
[0010] Preferably, the upper end of the rotating shaft passes through the inner top of the transmission cavity and extends to the upper end of the base, and is fixedly connected to the lower end of the bottom plate. A rectangular cavity is opened at the lower end of the bottom plate, and a third motor is installed at the inner top of the rectangular cavity.
[0011] Preferably, the output shaft end of the third motor extends to the upper end of the base plate and is fixedly connected to a threaded rod, a slider is threadedly connected to the threaded rod, and a guide rod is fixedly connected to the upper end of the base plate, the guide rod passes through the slider and is slidably connected to the slider.
[0012] Preferably, a second motor is installed on the rear side of the slider, and the output shaft end of the second motor extends to the front side of the slider and is fixedly connected to the rear side of the surveying instrument.
[0013] Preferably, a plurality of rotating wheels are symmetrically mounted on the lower end of the base, and all of the plurality of rotating wheels are universal wheels.
[0014] In summary, this application includes the following beneficial technical effects:
[0015] 1. After the third motor is started, the threaded rod rotates, and the rotation of the threaded rod causes the slider connected to the thread to move up or down. When the slider moves up or down, it drives the surveying instrument to move up or down for height adjustment. Then, the second motor can be started, and the second motor can be started to rotate to further adjust the position of the surveying instrument;
[0016] 2. After the first motor is started, the shaft will rotate through the transmission of the transmission assembly. After the shaft rotates, the entire base plate and the surveying instrument will rotate around the shaft. The entire adjustment process is simple and flexible, which can make the surveying instrument simply and accurately placed in the required position, thereby improving the accuracy of the surveying instrument. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the embodiment of the application;
[0018] Figure 2It is a schematic diagram of the internal structure of an embodiment of the application;
[0019] Figure 3 It is an application example Figure 2 Enlarged view of point A.
[0020] Explanation of the accompanying drawings: 1. base; 2. rotating wheel; 3. bottom plate; 4. first motor; 5. threaded rod; 6. guide rod; 7. surveying instrument; 8. slider; 9. second motor; 10. transmission cavity; 11. rotating rod; 12. transmission assembly; 13. rectangular cavity; 14. third motor; 15. rotating shaft. DETAILED DESCRIPTION
[0021] The following is combined with Figure 1-3 This application is described in further detail.
[0022] The present application embodiment discloses an auxiliary device for construction site based on BIM. Figure 1-2 A BIM-based auxiliary device for on-site construction of an engineering project comprises a base 1, a first motor 4 is installed on the left side of the base 1, a transmission cavity 10 is opened in the base 1, a rotating rod 11 is rotatably connected between the left and right inner walls of the transmission cavity 10, a transmission assembly 12 is arranged on the rotating rod 11, a bottom plate 3 is arranged above the base 1, a surveying instrument 7 is arranged above the bottom plate 3, and an adjustment mechanism for the surveying instrument 7 is arranged on the base 1.
[0023] After the third motor 14 is started, the threaded rod 5 is rotated, and the rotation of the threaded rod 5 causes the slider 8 threadedly connected thereto to move up or down. When the slider 8 moves up or down, it drives the surveying instrument 7 to move up or down for height adjustment. Then, the second motor 9 can be started, and the second motor 9 can be started to rotate the surveying instrument 7 to further adjust the position of the surveying instrument 7.
[0024] Reference Figure 2-3 The adjusting mechanism includes a rotating shaft 15 rotatably connected between the upper and lower inner walls of the transmission chamber 10. The transmission assembly 12 includes two meshing turbines and worms, which are respectively mounted on the rotating rod 11 and the rotating shaft 15. The upper end of the rotating shaft 15 passes through the inner top of the transmission chamber 10 and extends to the upper end of the base 1, and is fixedly connected to the lower end of the bottom plate 3. A rectangular cavity 13 is opened at the lower end of the bottom plate 3, and a third motor 14 is installed at the inner top of the rectangular cavity 13.
[0025] After the first motor 4 is started, the shaft 15 will rotate through the transmission of the transmission assembly 12. After the shaft 15 rotates, the entire base plate 3 and the surveying instrument 7 will rotate around the shaft 15. The entire adjustment process is simple and flexible, and the surveying instrument 7 can be simply and accurately placed in the required position.
[0026] Reference Figure 2-3The output shaft end of the third motor 14 extends to the upper end of the base plate 3 and is fixedly connected to a threaded rod 5, on which a slider 8 is threadedly connected. The upper end of the base plate 3 is fixedly connected to a guide rod 6, which passes through the slider 8 and is slidably connected to the slider 8. A second motor 9 is installed on the rear side of the slider 8. The output shaft end of the second motor 9 extends to the front side of the slider 8 and is fixedly connected to the rear side of the surveying instrument 7.
[0027] When the threaded rod 5 rotates, the slider 8 threadedly connected thereto will move up or down. When the slider 8 moves up or down, it will drive the surveying instrument 7 to move up or down for height adjustment. Then, the second motor 9 can be started, and when the second motor 9 is started, the surveying instrument 7 will rotate.
[0028] Reference Figure 1 A plurality of rotating wheels 2 are symmetrically mounted at the lower end of the base 1, and all of the plurality of rotating wheels 2 are universal wheels.
[0029] The implementation principle of the auxiliary device for construction on-site based on BIM in the embodiment of the present application is as follows: when in use, the device can be moved by a plurality of rotating wheels 2, and when the height of the surveying instrument 7 needs to be adjusted, the third motor 14 can be started;
[0030] After the third motor 14 is started, the threaded rod 5 is rotated, and the rotation of the threaded rod 5 causes the slider 8 threadedly connected thereto to move up or down. When the slider 8 moves up or down, it drives the surveying instrument 7 to move up or down for height adjustment. Then, the second motor 9 can be started, and the second motor 9 can be started to rotate the surveying instrument 7 to further adjust the position of the surveying instrument 7.
[0031] When the angle of the surveying instrument 7 needs to be adjusted, the first motor 4 is started. After the first motor 4 is started, the shaft 15 is rotated through the transmission of the transmission assembly 12. After the shaft 15 rotates, the entire base plate 3 and the surveying instrument 7 are rotated around the shaft 15. The entire adjustment process is simple and flexible, and the surveying instrument 7 can be simply and accurately placed in the required position, thereby improving the accuracy of the surveying instrument 7.
[0032] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0033] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0034] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
[0035] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A BIM-based auxiliary device for on-site construction, comprising a base (1), characterized in that: A first motor (4) is installed on the left side of the base (1); a transmission cavity (10) is provided in the base (1); a rotating rod (11) is rotatably connected between the left and right inner walls of the transmission cavity (10); a transmission assembly (12) is provided on the rotating rod (11); a bottom plate (3) is provided above the base (1); a surveying instrument (7) is provided above the bottom plate (3); and an adjustment mechanism for the surveying instrument (7) is provided on the base (1).
2. The BIM-based construction auxiliary device for engineering site according to claim 1, characterized in that: The regulating mechanism comprises a rotating shaft (15) rotatably connected between the upper and lower inner walls of the transmission chamber (10), and the transmission assembly (12) comprises two meshing turbines and worms, which are respectively mounted on the rotating rod (11) and the rotating shaft (15).
3. The BIM-based construction auxiliary device for engineering site according to claim 2, characterized in that: The upper end of the rotating shaft (15) passes through the inner top of the transmission cavity (10) and extends to the upper end of the base (1), and is fixedly connected to the lower end of the bottom plate (3). A rectangular cavity (13) is formed at the lower end of the bottom plate (3), and a third motor (14) is installed at the inner top of the rectangular cavity (13).
4. The BIM-based construction auxiliary device for engineering site according to claim 3, characterized in that: The output shaft end of the third motor (14) extends to the upper end of the base plate (3) and is fixedly connected to a threaded rod (5), a slider (8) is threadedly connected to the threaded rod (5), and the upper end of the base plate (3) is fixedly connected to a guide rod (6), the guide rod (6) passes through the slider (8) and is slidably connected to the slider (8).
5. The BIM-based engineering site construction auxiliary device according to claim 4, characterized in that: A second motor (9) is installed on the rear side of the slider (8), and the output shaft end of the second motor (9) extends to the front side of the slider (8) and is fixedly connected to the rear side of the surveying instrument (7).
6. The BIM-based engineering site construction auxiliary device according to claim 3, characterized in that: A plurality of rotating wheels (2) are symmetrically mounted on the lower end of the base (1), and the plurality of rotating wheels (2) are all universal wheels.