Primary lining reinforcing system for avoiding collapse during opening of ingate in vertical shaft

By setting up a cage-like structure on the primary lining of the shaft for reinforcement, the collapse problem of the primary lining of the shaft due to the inability to resist formation pressure due to multiple horse-head gates was solved, and the safety of the excavation and the integrity of the secondary lining were achieved.

CN221838327UActive Publication Date: 2024-10-15BEIJING URBAN CONSTR ROAD & BRIDGE GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420603117.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-10-15
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

When multiple tunnels are excavated at the same height of the shaft in different directions, the initial lining of the shaft is unable to resist the formation pressure due to the large number of horse-head gates, resulting in a high risk of collapse.

Method used

A cage-like structure composed of horizontal ring beams and concealed columns is used to reinforce the primary lining, which is supported on the free surface of the primary lining of the shaft to ensure that the primary lining of the shaft does not collapse when the tunnel is excavated, and is filled after the construction of the second lining is completed. Reinforced concrete walls to form a complete structure.

Benefits of technology

It effectively avoids the risk of collapse when the horse head door is opened in the shaft, ensures excavation safety and construction efficiency, and forms a watertight secondary lining structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221838327U_ABST
    Figure CN221838327U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of shaft linings, and discloses a primary lining reinforcing system used for avoiding collapse when a vertical shaft is provided with a horsehead, and the primary lining reinforcing system is used for avoiding collapse of a primary lining of the vertical shaft when a plurality of tunnels are excavated with the vertical shaft as a starting point, and the tunnels to be excavated respectively extend in different directions at the same height of the vertical shaft. The reinforcing system is of a cage-shaped structure formed by fixedly connecting a plurality of horizontal ring beams arranged at intervals in the vertical direction and a plurality of embedded columns arranged at intervals in the circumferential direction of the vertical shaft in a surrounding mode, and the cage-shaped structure is supported on the free face of the vertical shaft primary lining. According to the cage-shaped structure, the cage-shaped structure composed of the ring beams and the columns is arranged on the back of the primary lining of the vertical shaft to reinforce the primary lining, so that the primary lining of the vertical shaft can be supported while a horsehead is not blocked, and it is ensured that the primary lining does not collapse in the horsehead opening process. Therefore, the safety is ensured when a plurality of tunnels extending in different directions are excavated by taking the same height of the vertical shaft as a starting point.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of shaft lining, in particular to a primary lining reinforcement system for preventing collapse when a shaft gate is opened. Background Art

[0002] First, the name explanation:

[0003] Primary lining / first lining: It is also the primary lining of various underground caverns, including annular arches, steel meshes arranged between the arches, and concrete sprayed on the steel meshes against the ground;

[0004] Secondary lining: also known as the secondary lining of various underground caverns, it is a reinforced concrete cylinder cast in a formwork, close to the primary lining; the primary lining is sufficient to resist the ground pressure, and the secondary lining is further strengthened to ensure waterproofing. Since it needs to be complete to ensure waterproofing, holes are not allowed on the secondary lining, and its construction is very late;

[0005] Horse head gate: The gate serving as the starting point of a dark tunnel is opened on the primary lining of a vertical shaft or a horizontal passage.

[0006] Urban underground structures, including subway stations, require a large number of underground tunnels to be excavated. The usual method of underground excavation is to first dig a vertical shaft to reach the construction layer, and then excavate a horizontal passage from the vertical shaft as a passage for transporting soil and other construction materials underground. Finally, various required tunnels are excavated horizontally to the left and right sides of the horizontal passage with this horizontal passage as the starting point, perpendicular to the horizontal passage.

[0007] There are many reasons why we do not dig the required tunnels directly from the shaft, but dig a transverse passage first and then dig the required tunnels. First, the transverse passage itself is indispensable for multiple tunnels. It is used to connect multiple tunnels together and also serves as a passage for transporting soil and other construction materials underground. Second, the shaft itself is not suitable as the starting point of multiple tunnels, because the cross section of the primary lining of the shaft is very small, and opening a horse head gate will cause great damage to the lining of the shaft. If multiple tunnels are built, multiple horse head gates will need to be opened on the shaft. If these horse head gates are located at the same height, the primary lining of the shaft at this position will be completely unable to resist the compression of the stratum, directly causing the shaft to collapse. If a transverse passage is used, these tunnels can be staggered to avoid the collapse caused by the concentrated opening of a large number of horse head gates on the primary lining of the transverse passage.

[0008] However, if some tunnels start from a shaft, it will be very helpful for their performance. A typical example is the subway air duct, which is connected to the ground through a shaft, so that passengers underground can breathe the air on the ground. According to the principles of fluid mechanics, if the air duct is excavated from a horizontal channel, it is equivalent to adding an elbow and a section of pipe to the pipeline, which will increase the flow resistance for no reason and increase energy consumption. At the same time, after the staggered, the inlet areas of these air ducts will no longer overlap, resulting in the problem of "wind grabbing" of the air ducts close to the shaft (when overlapping, the air intake of one air duct will promote the air intake of other air ducts, and the opposite is true when they do not overlap).

[0009] The utility model relates to the air duct of the Beitaipingzhuang Station of Beijing Subway Line 19, which is a tunnel suitable for excavation directly starting from a vertical shaft. If the safety of such excavation can be ensured, it will be very helpful to reduce the energy consumption of the subway station operation. Utility Model Content

[0010] The utility model provides a primary lining reinforcement system for preventing collapse of a shaft when a horse head door is opened.

[0011] The technical problem to be solved is: when excavating multiple tunnels from the same height of the shaft in different directions, a large number of gates are broken in the same section of the initial lining of the shaft, resulting in the initial lining of the shaft being unable to resist the stratum pressure.

[0012] In order to solve the above technical problems, the utility model adopts the following technical solutions: a primary lining reinforcement system for preventing the collapse of the shaft when the shaft opens the horse head gate, which is used to prevent the primary lining of the shaft from collapsing when multiple tunnels are excavated with the shaft as the starting point, and each tunnel to be excavated extends in different directions at the same height of the shaft. The reinforcement system is a cage-like structure surrounded and fixedly connected by a plurality of horizontal ring beams arranged at intervals along the vertical direction and a plurality of hidden columns arranged at intervals along the circumference of the shaft. The cage-like structure is supported on the free surface of the primary lining of the shaft, the horizontal ring beam is recorded as an advance construction ring beam, and the hidden column is recorded as an advance construction hidden column;

[0013] The dimensions of the pre-constructed ring beam and the pre-constructed hidden column in the direction perpendicular to the adjacent shaft wall are equal to the thickness of the secondary lining of the shaft. The upper and lower surfaces of the pre-constructed ring beam are both rough and have rebars. The side elevations of the pre-constructed hidden column perpendicular to the adjacent shaft wall are both rough and have rebars.

[0014] Furthermore, the secondary lining of the shaft is a reinforced concrete lining, including vertical main reinforcement and horizontal main reinforcement surrounding the shaft in the horizontal direction, and the pre-constructed ring beam and pre-constructed hidden column are both reinforced concrete strips including a steel cage extending along their own length direction;

[0015] The steel bars in the pre-constructed ring beam include the original horizontal main bars in the secondary lining of the shaft, the original vertical main bars in the secondary lining of the shaft located in the pre-constructed ring beam, and the newly added stirrups arranged on the horizontal main bars to form a steel cage together with the horizontal main bars; the vertical main bars located in the pre-constructed ring beam are tied to the steel cage and thrown outside the pre-constructed ring beam;

[0016] The steel bars in the pre-constructed hidden columns include the original vertical main bars in the secondary lining of the shaft, the original horizontal main bars in the secondary lining of the shaft located in the pre-constructed hidden columns, and the newly added stirrups arranged on the vertical main bars to form a steel cage together with the vertical main bars; the horizontal main bars located in the pre-constructed hidden columns are tied to the steel cage and thrown outside the pre-constructed hidden columns;

[0017] When the tunnel to be excavated has been excavated and the secondary lining has been constructed, the grids of the cage-like structure are filled with cast-in-place reinforced concrete walls, and the reinforced concrete walls are connected to the cage-like structure to form the secondary lining of the shaft.

[0018] Furthermore, the cross-section of the shaft is rectangular, and among the four side walls of the initial lining of the shaft, the side wall that does not need to open a horse head gate for the tunnel to be excavated is recorded as a non-interference wall. When the tunnel to be excavated has not been excavated, the reinforced concrete wall filled in the grid of the cage-like structure at the position of the non-interference wall forms an integrated cast-in-one pre-construction side wall with the pre-construction ring beam.

[0019] Furthermore, the early construction ring beam and the early construction hidden column are cast simultaneously to form a whole, the steel cages of the early construction ring beam and the early construction hidden column cross and pass through each other, the formwork of the early construction ring beam includes a bottom formwork and a side formwork arranged on the side facade of the early construction ring beam away from the shaft wall, the formwork of the early construction hidden column includes three side formworks respectively arranged on the three side facades of the early construction hidden column facing the air, and the early construction ring beam and the early construction hidden column are supported by a full-floor steel pipe rack.

[0020] Furthermore, the tunnel to be excavated is a tunnel excavated by a multi-pilot tunnel method, the pre-constructed ring beam is arranged at the invert position between the upper and lower pilot tunnels, and the pre-constructed hidden columns are arranged on the left and right sides of each tunnel to be excavated.

[0021] Furthermore, the lower end of the concealed column constructed in advance is connected to the bottom of the shaft as a whole, and a ring beam is arranged every two guide tunnel layers upward from the bottom of the shaft.

[0022] Furthermore, the vertical shaft has a transverse passage which has been excavated before the tunnel to be excavated, and each tunnel to be excavated and the transverse passage extend in different directions at the same height of the vertical shaft.

[0023] Compared with the prior art, the primary lining reinforcement system of the utility model for preventing the collapse of the shaft when the horse head door is opened has the following beneficial effects:

[0024] In the utility model, a cage-like structure composed of a ring beam and columns is arranged behind the primary lining of the shaft to reinforce the primary lining, so that the primary lining of the shaft can be supported without blocking the horse head door, ensuring that the primary lining does not collapse during the opening of the horse head door. This ensures safety when excavating multiple tunnels extending in different directions starting from the same height of the shaft; at the same time, since multiple tunnels are excavated simultaneously and excavation is convenient, the excavation efficiency is also higher. After the tunnel excavation is completed, the grid in the middle of the cage-like structure is filled to form a complete secondary lining structure to ensure that no leakage occurs (this method of filling the wall in the grid surrounded by beams and columns has proven its reliability in countless construction cases, and can form a complete, leak-proof and well-stressed overall structure, a typical case of which is a frame structure building); BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a plan view of the construction site in the utility model;

[0026] Figure 2 for Figure 1 Cross-sectional view of the middle AA section;

[0027] Figure 3 Schematic diagram of the cross section of the reinforcement cage for the early construction of the ring beam;

[0028] Figure 4 A schematic diagram of the cross section of a steel cage for pre-construction of concealed columns;

[0029] In the figure, 1-vertical shaft, 2-horizontal passage, 3-tunnel to be excavated, 41-ring beam constructed in advance, 42-hidden column constructed in advance, 43-side wall constructed in advance. DETAILED DESCRIPTION

[0030] Take the air duct of Beijing Subway Line 19 Beitaipingzhuang Station, to which the utility model is applied, as an example. Figure 1-2 As shown, a primary lining reinforcement system for preventing collapse when a shaft is opened is used to prevent the primary lining of the shaft 1 from collapsing when multiple tunnels are excavated starting from the shaft 1. Each tunnel 3 to be excavated extends in different directions at the same height of the shaft 1. The reinforcement system is a cage-like structure formed by enclosing and fixedly connecting a plurality of horizontal ring beams spaced apart in the vertical direction and a plurality of hidden columns spaced apart along the circumference of the shaft 1. The cage-like structure is supported on the free surface of the primary lining of the shaft 1. The horizontal ring beam is recorded as an advance-construction ring beam 41, and the hidden column is recorded as an advance-construction hidden column 42. The horizontal ring beam and hidden column here can essentially be regarded as part of the secondary lining of the shaft 1 (but some stirrups and other components are added to make it a beam and column), but they are constructed here in advance.

[0031] In this embodiment, the vertical shaft 1 has a transverse passage 2 excavated before the excavation of the tunnel 3 to be excavated. The tunnels 3 to be excavated and the transverse passages 2 extend in different directions at the same height of the vertical shaft 1. In step 1, the secondary lining of the vertical shaft 1 is divided after the primary lining of the vertical shaft 1 and the transverse passage 2 are completed. During the construction, the vertical shaft 1 is equivalent to opening three horse head gates, but this is still safe in the actual construction process.

[0032] The dimensions of the pre-constructed ring beam 41 and the pre-constructed hidden column 42 in the direction perpendicular to the adjacent wall of the shaft 1 are equal to the thickness of the second lining of the shaft 1. The upper and lower surfaces of the pre-constructed ring beam 41 are both rough and have rebars. The side elevations of the pre-constructed hidden column 42 perpendicular to the adjacent wall of the shaft 1 are both rough and have rebars.

[0033] The rough surface and the ribs can be easily connected with the reinforced concrete filled in the grid later. The expansion force of the reinforced concrete to the surrounding areas during the pouring process is opposite to the restraining force of the grid, so that the two parts of concrete are tightly combined. The rough surface can be a rough surface formed by chiseling, punching or molding. Of course, the rough surface here can also be replaced by a surface with multiple keyways, but it is cheaper to use the rough surface here.

[0034] The secondary lining of the shaft 1 is a reinforced concrete lining, including vertical main reinforcement and horizontal main reinforcement that surrounds the shaft 1 in the horizontal direction. The pre-constructed ring beam 41 and the pre-constructed hidden column 42 are both reinforced concrete strips that include a steel cage extending along their own length direction.

[0035] The secondary lining usually contains two layers of steel mesh, so it is easy to select some steel bars from them and tie the stirrups to form a Figure 3-4 Such a steel cage. The steel bar section extending outside the steel cage in the figure is not part of the steel cage, but it must be tied to the steel cage when the steel cage is tied, and then connected to the steel bars in the grid of the cage structure set during the pouring of the secondary lining through a threaded sleeve or a grouting sleeve.

[0036] The steel bars in the pre-construction ring beam 41 include the original horizontal main bars in the secondary lining of the shaft 1, the segments of the original vertical main bars in the secondary lining of the shaft 1 located in the pre-construction ring beam 41, and the newly added stirrups arranged on the horizontal main bars to form a steel cage together with the horizontal main bars; the segments of the vertical main bars located in the pre-construction ring beam 41 are tied to the steel cage and thrown out of the pre-construction ring beam 41;

[0037] The steel bars in the pre-construction hidden column 42 include the original vertical main bars in the secondary lining of the shaft 1, the sections of the original horizontal main bars in the secondary lining of the shaft 1 located in the pre-construction hidden column 42, and the newly added stirrups arranged on the vertical main bars to form a steel cage together with the vertical main bars; the sections of the horizontal main bars located in the pre-construction hidden column 42 are tied to the steel cage and thrown out of the pre-construction hidden column 42;

[0038] When the tunnel 3 to be excavated has been excavated and the secondary lining has been constructed, the grids of the cage-like structure are filled with cast-in-place reinforced concrete walls, and the reinforced concrete walls are connected to the cage-like structure to form the secondary lining of the shaft 1.

[0039] The cross section of the shaft 1 is rectangular. Among the four side walls of the initial lining of the shaft 1, the side wall that does not need to open a horse head gate for the tunnel 3 to be excavated is recorded as a non-interference wall. When the tunnel 3 to be excavated is not excavated, the reinforced concrete wall filled in the grid of the cage-like structure at the position of the non-interference wall forms an integrated cast-in-one pre-construction side wall 43 with the pre-construction ring beam 41.

[0040] At the location of the side wall 43 constructed in advance, there is no need to cut out the segments of the original vertical main reinforcement in the secondary lining of the shaft 1 located in the ring beam 41 constructed in advance and install them in the ring beam 41 constructed in advance. A whole vertical main reinforcement can be directly tied in, and no subsequent connection is required. Of course, the stirrups in the ring beam 41 constructed in advance cannot be saved. Another benefit of the side wall 43 constructed in advance is that there can be fewer joints. If the joints are reduced, not only the workload of roughening is reduced, but also the secondary lining that needs to face the stratum is a seamless wall, and the joints are in the tunnels on both sides.

[0041] The early construction ring beam 41 and the early construction hidden column 42 are cast simultaneously and form a whole. The steel cages of the early construction ring beam 41 and the early construction hidden column 42 cross and pass through each other. The formwork of the early construction ring beam 41 includes a bottom formwork and a side formwork arranged on the side facade of the early construction ring beam 41 away from the wall of the shaft 1. The formwork of the early construction hidden column 42 includes three side forms respectively arranged on the three side facades of the early construction hidden column 42 facing the air. The early construction ring beam 41 and the early construction hidden column 42 are all supported by a full-floor steel pipe rack.

[0042] The tunnel 3 to be excavated is a tunnel excavated by a multi-pilot method, the pre-constructed ring beam 41 is set at the invert position between the upper and lower pilot tunnels, and the pre-constructed hidden columns 42 are set on the left and right sides of each tunnel 3 to be excavated. Figure 1 At the four corners of middle shaft 1.

[0043] The lower end of the hidden column 42 is connected to the bottom of the shaft 1 in advance, and a ring beam is set every two layers of guide holes from the bottom of the shaft 1 upward. Of course, if the calculation shows that there is a need, it can also be like Figure 2 In this way, some pre-constructed ring beams 41 that do not form a ring are added locally. In addition, due to the requirements of the actual construction space and the stress conditions, the specifications of the pre-constructed ring beams 41 and the pre-constructed hidden columns 42 in this embodiment are changed. In this embodiment, there are a total of four pre-constructed ring beams 41, of which the cross-sectional shapes of the top two are changed, and a half ring beam is added between the two ring beams.

[0044] The utility model discloses a primary lining reinforcement system for preventing a shaft from collapsing when a shaft gate is opened, and a method for using the system comprises the following steps:

[0045] Step 1: Construction of cage structure;

[0046] Step 2: synchronously opening the gates of each tunnel 3 to be excavated on the primary lining of the shaft 1 and starting excavation;

[0047] Step 3: After the secondary lining construction of the tunnel 3 to be excavated is completed, reinforced concrete is poured in the grid of the cage structure and connected to the cage structure to form the secondary lining of the shaft 1.

[0048] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A primary lining reinforcement system for preventing a shaft from collapsing when a shaft is opened, the system being used to prevent a primary lining collapse of a shaft (1) when a plurality of tunnels are excavated starting from the shaft (1), wherein each of the tunnels (3) to be excavated extends in different directions at the same height of the shaft (1), and the system is characterized in that: The reinforcement system is a cage-like structure formed by enclosing and fixedly connecting a plurality of horizontal ring beams arranged at intervals along the vertical direction and a plurality of hidden columns arranged at intervals along the circumference of the shaft (1); the cage-like structure is supported on the free surface of the primary lining of the shaft (1); the horizontal ring beam is referred to as an early-construction ring beam (41), and the hidden column is referred to as an early-construction hidden column (42); The dimensions of the pre-constructed ring beam (41) and the pre-constructed hidden column (42) in a direction perpendicular to the adjacent wall of the shaft (1) are equal to the thickness of the secondary lining of the shaft (1); the upper and lower surfaces of the pre-constructed ring beam (41) are both rough and have ribs; the side elevations of the pre-constructed hidden column (42) perpendicular to the adjacent wall of the shaft (1) are both rough and have ribs.

2. A primary lining reinforcement system for preventing shaft collapse when opening a horse head gate according to claim 1, characterized in that: The secondary lining of the shaft (1) is a reinforced concrete lining, comprising vertical main reinforcement and horizontal main reinforcement that surrounds the shaft (1) in the horizontal direction, and the pre-constructed ring beam (41) and pre-constructed concealed column (42) are both reinforced concrete strips that include a steel cage extending along their length direction; The steel bars in the pre-constructed ring beam (41) include the original horizontal main bars in the secondary lining of the shaft (1), the segments of the original vertical main bars in the secondary lining of the shaft (1) located in the pre-constructed ring beam (41), and the newly added stirrups arranged on the horizontal main bars to form a steel cage together with the horizontal main bars; the segments of the vertical main bars located in the pre-constructed ring beam (41) are tied to the steel cage and thrown outside the pre-constructed ring beam (41); The steel bars in the pre-constructed hidden column (42) include the original vertical main bars in the secondary lining of the shaft (1), the original horizontal main bars in the secondary lining of the shaft (1) located in the pre-constructed hidden column (42), and the newly added stirrups arranged on the vertical main bars to form a steel cage together with the vertical main bars; the horizontal main bars located in the pre-constructed hidden column (42) are tied to the steel cage and thrown outside the pre-constructed hidden column (42); When the excavation of the tunnel (3) to be excavated has been completed and the secondary lining has been constructed, the grids of the cage-like structure are filled with cast-in-place reinforced concrete walls, and the reinforced concrete walls are connected to the cage-like structure to form the secondary lining of the shaft (1).

3. A primary lining reinforcement system for preventing shaft collapse when opening a horse head gate according to claim 2, characterized in that: The vertical shaft (1) has a rectangular cross section. Among the four side walls of the initial lining of the vertical shaft (1), the side wall that does not need to be opened for the tunnel (3) to be excavated is recorded as a non-interference wall. When the tunnel (3) to be excavated is not excavated, the reinforced concrete wall filled in the grid of the cage-like structure at the non-interference wall position forms an integrally cast pre-construction side wall (43) with the pre-construction ring beam (41).

4. A primary lining reinforcement system for preventing shaft collapse when opening a horse head gate according to claim 2, characterized in that: The pre-constructed ring beam (41) and the pre-constructed hidden column (42) are cast simultaneously and form a whole. The steel cages of the pre-constructed ring beam (41) and the pre-constructed hidden column (42) cross and penetrate each other. The template of the pre-constructed ring beam (41) includes a bottom template and a side template arranged on the side elevation of the pre-constructed ring beam (41) away from the wall of the shaft (1). The template of the pre-constructed hidden column (42) includes three side templates respectively arranged on three side elevations of the pre-constructed hidden column (42) facing the air. The pre-constructed ring beam (41) and the pre-constructed hidden column (42) are both supported by a full-height steel pipe rack.

5. The primary lining reinforcement system for preventing shaft collapse when opening a horse head gate according to claim 1, characterized in that: The tunnel to be excavated (3) is a tunnel excavated using a multi-pilot tunnel method, the pre-constructed ring beam (41) is arranged at the invert position between the upper and lower pilot tunnels, and the pre-constructed concealed columns (42) are arranged on the left and right sides of each tunnel to be excavated (3).

6. A primary lining reinforcement system for preventing shaft collapse when opening a sprocket door according to claim 1, characterized in that: The lower end of the pre-constructed hidden column (42) is connected to the bottom cover of the vertical shaft (1) as a whole, and a ring beam is arranged every two layers of guide holes from the bottom cover of the vertical shaft (1) upward.

7. A primary lining reinforcement system for preventing shaft collapse when opening a horse head gate according to claim 1, characterized in that: The vertical shaft (1) has a transverse passage (2) which has been excavated before the excavation of the tunnel (3) to be excavated. The tunnels (3) to be excavated and the transverse passages (2) extend in different directions at the same height of the vertical shaft (1).