Biogas engineering park multi-energy complementary heat supply system based on solar energy, biomass energy and production waste heat
By designing a multi-energy complementary heating system in the engineering park, using solar energy, biomass energy and production waste heat, multiple recovery and utilization of heat energy is achieved, solving the problems of singleness and high cost of the heating system, and reducing the cost of heating cost and improve thermal energy utilization efficiency.
Patent Information
- Application Number
- CN202420340778.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-23
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-02-23
AI Technical Summary
The heating system in the Northern Engineering Park is relatively single and lacks complementary utilization of multiple resources, resulting in high heating costs.
A multi-energy complementary heating system for the biogas engineering park based on solar energy, biomass energy and production waste heat is designed. It uses hot water storage tanks, solar collectors, carbonization furnaces, biomass boilers, fermentation tanks, solid-liquid separation devices, The comprehensive function of biogas slurry tank, organic fertilizer processing device and heat exchanger realizes multiple recovery and utilization of heat energy.
It reduces heating costs and improves thermal energy utilization efficiency. Through measures such as waste heat recovery and biogas slurry reuse, it achieves effective utilization of a variety of heating resources.
Smart Images

Figure CN221839770U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of heating, and specifically relates to a multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and production waste heat. Background Art
[0002] The heating system of the northern engineering park is relatively simple, mainly based on centralized water heating, while the northern region has abundant solar energy resources, and biogas is also a resource that can be utilized. Therefore, it is urgent to develop a heating method that can utilize multiple heating resources to provide multi-party complementary heating for industrial parks and reduce heating costs. Utility Model Content
[0003] The purpose of the utility model is to solve the problem of relatively single heating supply in current engineering parks, and to provide a multi-energy complementary heating system for biogas engineering parks based on solar energy, biomass energy and waste heat production.
[0004] The utility model discloses a multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production, which comprises a heat storage tank, a solar collector, a carbonization furnace, a biomass boiler, an office building and a workshop, a fermentation tank, a solid-liquid separation device, a biogas liquid tank, an organic fertilizer processing device, a first heat exchanger and a second heat exchanger;
[0005] The outer wall of the carbonization furnace is provided with a heat-absorbing water jacket, and the water inlet and the water outlet of the heat-absorbing water jacket are respectively communicated with the heat exchanger outlet a and the heat exchanger inlet b of the first heat exchanger; the heat exchanger inlet c of the first heat exchanger is communicated with the heat storage tank outlet c of the heat storage tank; the heat exchanger outlet d of the first heat exchanger is communicated with the heat storage tank inlet d of the heat storage tank; the hot water inlet e of the heat storage tank is communicated with the hot water outlet of the biomass boiler; the cold water outlet of the heat storage tank is communicated with the water inlet of the biomass boiler; the heat storage tank outlet h of the heat storage tank is communicated with the fermentation tank inlet b of the fermentation tank; the heat storage tank inlet g of the heat storage tank is communicated with the fermentation tank outlet a of the fermentation tank; The discharge port c of the fermentation tank is communicated with the feed port of the solid-liquid separation device; the discharge port of the solid-liquid separation device is communicated with the feed port of the biogas slurry tank; the biogas slurry discharge port of the biogas slurry tank is communicated with the transverse port a of the three-way valve B10, and the other transverse port b of the three-way valve B10 is communicated with the biogas slurry inlet a of the second heat exchanger; the vertical port c of the three-way valve B10 is connected with the vertical port c of the three-way valve B11; the transverse port a of the three-way valve B11 is communicated with the silo; the biogas slurry outlet b of the second heat exchanger is communicated with the inlet of the organic fertilizer processing device; the other transverse port b of the three-way valve B11 is communicated with the material inlet c of the second heat exchanger; the material outlet d of the second heat exchanger is communicated with the inlet of the fermentation tank;
[0006] The hot water inlet of the office building and the factory building is connected to the hot water outlet of the hot water storage tank; the cold water outlet of the office building and the factory building is connected to the water inlet of the hot water storage tank;
[0007] The water outlet of the solar thermal collector is communicated with the water inlet b of the hot water storage tank; the water inlet of the solar thermal collector is communicated with the water outlet a of the hot water storage tank.
[0008] The utility model has the following beneficial effects:
[0009] The utility model system provides heat for the office building and the factory building through the comprehensive action of the heat storage tank, the solar collector, the carbonization furnace, the biomass boiler, the office building and the factory building, the fermentation tank, the solid-liquid separation device, the biogas tank, the organic fertilizer processing device, the first heat exchanger and the second heat exchanger, and comprehensively utilizes the products of biogas fermentation, thereby reducing the heating cost.
[0010] 1) Recovering the waste heat from the biomass carbonization furnace equipment: During the biomass carbonization production process, the temperature inside the biomass carbonization furnace can reach above 400°C, and the heat is exchanged to 70°C through the plate heat exchanger (first heat exchanger), and the waste heat is stored in the hot water storage tank 1 in the form of hot water.
[0011] 2) Recover waste heat from the discharge of the fermentation tank: The fermentation temperature in the fermentation tank is about 37°C. A certain amount of feeding and discharging is required every day. The feed liquid contains a large amount of recyclable heat energy. The plate heat exchanger (second heat exchanger) is used to recover the waste heat in the discharged biogas slurry to heat the new incoming materials, reduce heat loss, and improve the efficiency of heat energy utilization.
[0012] 3) Biogas slurry recycling: The newly-input materials have low water content and poor fluidity, which are not suitable for fermentation production and need to be diluted with a certain amount of liquid. The utility model designs a biogas slurry recycling process, which uses the biogas slurry in the discharge as a diluent for the newly-input materials to improve the thermal energy utilization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of a multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production;
[0014] In the figure, hot water storage tank 1, solar collector 2, carbonization furnace 3, biomass boiler 4, office building and factory building 5, fermentation tank 6, solid-liquid separation device 7, biogas slurry tank 8, organic fertilizer processing device 9, first heat exchanger 10, second heat exchanger 11, three-way valve B1012, three-way valve B11 13, silo 14, valve B1 15, valve B2 16, valve B3 17, valve B4 18, valve B5 19, valve B6 20, valve B7 21, valve B8 22, valve B9 23, valve B12 24, valve B13 25, valve B14 26, circulation pump A12 7, circulation pump A2 28, circulation pump A3 29, circulation pump A4 30, circulation pump A5 31, circulation pump A6 32, circulation pump A7 33, circulation pump A8 34, circulation pump A9 35. Check valve N1 36. Temperature sensor T1 37. Temperature sensor T2 38. Temperature sensor T3 39. Temperature sensor T4 40. Temperature sensor T5 41. Heat dissipation port 42. DETAILED DESCRIPTION
[0015] In order to make the objectives, technical solutions and advantages of the embodiments of the present invention more clearly understood, the spirit of the contents disclosed by the present invention will be described in detail below. After understanding the embodiments of the contents of the present invention, any technician in the relevant technical field can change and modify them according to the techniques taught by the contents of the present invention without departing from the spirit and scope of the contents of the present invention.
[0016] The exemplary embodiments of the present invention and the description thereof are used to explain the present invention but are not intended to limit the present invention.
[0017] Specific implementation method 1: This implementation method is described in conjunction with the figure. The multi-energy complementary heating system of the biogas engineering park based on solar energy, biomass energy and waste heat production in this implementation method includes a hot water storage tank 1, a solar collector 2, a carbonization furnace 3, a biomass boiler 4, an office building and a plant 5, a fermentation tank 6, a solid-liquid separation device 7, a biogas liquid tank 8, an organic fertilizer processing device 9, a first heat exchanger 10 and a second heat exchanger 11;
[0018] The outer wall of the carbonization furnace 3 is provided with a heat-absorbing heat jacket, and the water inlet and the water outlet of the heat-absorbing heat jacket are respectively connected with the heat exchanger outlet a and the heat exchanger inlet b of the first heat exchanger 10; the heat exchanger inlet c of the first heat exchanger 10 is connected with the hot water tank outlet c of the hot water storage tank 1; the heat exchanger outlet d of the first heat exchanger 10 is connected with the hot water tank inlet d of the hot water storage tank 1; the hot water inlet e of the hot water storage tank 1 is connected with the hot water outlet of the biomass boiler 4; the cold water outlet of the hot water storage tank 1 is connected with the hot water outlet of the biomass boiler 4; The outlet h of the hot water storage tank 1 is connected to the water inlet b of the fermentation tank 6; the hot water storage tank inlet g of the hot water storage tank 1 is connected to the fermentation tank outlet a of the fermentation tank 6; the discharge port c of the fermentation tank 6 is connected to the feed port of the solid-liquid separation device 7; the discharge port of the solid-liquid separation device 7 is connected to the feed port of the biogas slurry tank 8; the biogas slurry discharge port of the biogas slurry tank 8 is connected to the lateral port a of the three-way valve B1012, and the three-way valve B10 Another lateral port b of the three-way valve B10 12 is connected to the biogas slurry inlet a of the second heat exchanger 11; the vertical port c of the three-way valve B10 12 is connected to the vertical port c of the three-way valve B1113; the lateral port a of the three-way valve B11 13 is connected to the silo 14; the biogas slurry outlet b of the second heat exchanger 11 is connected to the inlet of the organic fertilizer processing device 9; another lateral port b of the three-way valve B11 13 is connected to the material inlet c of the second heat exchanger 11; the material outlet d of the second heat exchanger 11 is connected to the inlet of the fermentation tank 6; the upper part of the heat storage tank 1 is provided with a heat dissipation port 42;
[0019] The hot water inlet of the office building and the factory building 5 is connected to the hot water outlet of the hot water storage tank 1; the cold water outlet of the office building and the factory building 5 is connected to the water inlet of the hot water storage tank 1;
[0020] The water outlet of the solar thermal collector 2 is communicated with the water inlet b of the hot water storage tank 1 ; the water inlet of the solar thermal collector 2 is communicated with the water outlet a of the hot water storage tank 1 .
[0021] The heating system of this embodiment is used as follows:
[0022] Heat storage tank: a heat storage device with water as the internal medium. A temperature sensor T2 38 is provided in the heat storage tank 1 to detect the temperature of the medium in the water tank. A heat dissipation port 42 is provided at the upper end to dissipate heat to the outside through the heat dissipation port 42 when the heat storage temperature is too high.
[0023] Solar collector: Heating device, the medium inside the solar collector 2 is water, and a temperature sensor T1 37 is provided inside the solar collector 2 to detect the temperature of the medium inside the collector. When the temperature is lower than 3°C, the water in the solar collector 2 is drained and the water inlet and outlet valves B1 15 are closed.
[0024] Carbonization furnace: The working temperature of the carbonization furnace 3 is greater than 400°C, and a heat-absorbing water jacket is provided on the outer wall. The water inlet and outlet of the water jacket are respectively connected to the a and b ports of the first heat exchanger 10. Under the action of the circulating pump A3 29, the hot water in the water jacket of the carbonization furnace 3 can be transported to the first heat exchanger 10 to exchange heat with the medium on the other side of the first heat exchanger 10; the c and d ports on the other side of the first heat exchanger 10 are connected to the hot water storage tank 1, and the exchanged hot water is transported to the hot water storage tank 1.
[0025] Biomass boiler: a heating device with water as the internal medium. A temperature sensor T3 39 is provided inside to detect the outlet water temperature. The biomass boiler 4 uses biomass pellets as fuel, and the outlet water temperature produced by combustion is set at 70°C, which is transported to the hot water storage tank 1 by the circulation pump A228.
[0026] Office buildings and factory buildings: Radiators are installed inside to heat the office buildings and factory buildings, and the heat source is provided by circulating through the hot water storage tank 1.
[0027] Fermentation tank: There is a heat exchange coil inside. Under the action of the circulation pump A5 31, hot water is drawn from the hot water storage tank h port, enters the heat exchange coil through the fermentation tank b port, exchanges heat with the fermentation material, and then returns to the hot water storage tank g port through the fermentation tank a port. The fermentation tank c port is the discharge port, and the d port is the feed port.
[0028] Solid-liquid separation device: under the action of the discharge pump A7 33, the material discharged from the fermentation tank discharge port c enters the solid-liquid separation device for solid-liquid separation. The separated biogas slurry enters the biogas slurry tank and is transported to the rear end under the action of the circulation pump A8. The separated biogas residue has a moisture content of about 30% and enters the organic fertilizer processing device 9.
[0029] Organic fertilizer processing device: receiving the biogas residue separated by the solid-liquid separation device 7 and the biogas liquid output from the port b of the second heat exchanger 11, producing the biogas residue into solid organic fertilizer particles and the biogas liquid into foliar organic fertilizer, and the fertilizers are transported to farmland by car for application.
[0030] Three-way valve B10: port a is the inlet, ports b and c are the outlets, and the flow rates of ports b and c can be electrically adjusted.
[0031] Three-way valve B11: ports a and c are inlets, port b is the outlet.
[0032] The second heat exchanger 11:
[0033] On the left side of the second heat exchanger 11: under the action of the circulation pump A8 34, the biogas in the biogas tank is pumped out, flows into the a port and leaves the b port of the second heat exchanger 11 through the a and b channels of the three-way valve B1012, and in this process, heat is exchanged with the medium on the other side of the heat exchanger. After heat exchange, the biogas enters the organic fertilizer processing device 9 through the valve B13 25.
[0034] On the right side of the second heat exchanger 11: new materials are added to the silo. Under the action of the feed pump A9, the materials flow into the heat exchanger 2 from the a and b channels through the three-way valve B11 13, and flow out from the c port and d port. After absorbing the heat of the biogas slurry medium on the left side in the heat exchanger 2, they enter the fermentation tank from the d port through the valve B12 for fermentation.
[0035] On the upper side of the second heat exchanger 11: the flow of the b and c outlets of the three-way valve B10 12 is adjusted by adjusting the valve core opening of the three-way valve B10 12. Under the action of the circulation pump A8 34, part of the biogas in the biogas tank 8 flows out from the c port of the three-way valve B10 12, enters the c port of the three-way valve B11 13 through the valve B9 and the check valve N1 36, and mixes with the new material entering from the a port of the three-way valve B11 13, and then enters the heat exchanger 2 from the c port of the second heat exchanger 11; the other part flows out from the b port of the three-way valve B10 12, enters the second heat exchanger 11 to exchange heat outward.
[0036] Specific implementation method 2: Combination Figure 1 This embodiment is described. The difference between this embodiment and the first embodiment is that a valve B12 24 is provided on the pipeline between the water inlet of the heat absorption water jacket and the water outlet a of the heat exchanger, and a circulation pump A3 29 is provided on the pipeline between the water outlet of the heat absorption water jacket and the water inlet b of the heat exchanger.
[0037] The rest is the same as the first specific implementation mode.
[0038] Specific implementation method three: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that: a valve B5 19 is arranged on the pipeline between the heat exchanger water inlet c of the first heat exchanger 10 and the hot water tank water outlet c of the hot water tank 1, a circulation pump A4 30 and a valve B6 20 are arranged on the pipeline between the heat exchanger water outlet d of the first heat exchanger 10 and the hot water tank water inlet d of the hot water tank 1, a circulation pump A2 28 and a valve B3 17 are arranged between the hot water inlet e of the hot water tank 1 and the hot water outlet of the biomass boiler 4; a valve B3 17 is arranged between the cold water outlet of the hot water tank 1 and the biomass boiler 4.
[0039] The rest is the same as the first specific implementation mode.
[0040] Specific implementation method four: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that a circulation pump A5 31 and a valve B8 22 are arranged on the pipeline between the hot water tank outlet h of the hot water tank 1 and the fermentation tank inlet b of the fermentation tank 6; a valve B7 21 is arranged on the pipeline between the hot water tank inlet g of the hot water tank 1 and the fermentation tank outlet a of the fermentation tank 6.
[0041] The rest is the same as the first specific implementation mode.
[0042] Specific implementation method five: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that a circulation pump A7 33 is provided on the pipeline between the discharge port c of the fermentation tank 6 and the solid-liquid separation device 7; and a valve B12 24 is provided between the material outlet d of the second heat exchanger 11 and the fermentation tank 6.
[0043] The rest is the same as the first specific implementation mode.
[0044] Specific implementation method six: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that: a circulation pump A8 34 is arranged between the biogas slurry discharge port of the biogas slurry tank 8 and the horizontal port a of the three-way valve B10 12; a valve B9 23 and a check valve N1 36 are arranged between the vertical port c of the three-way valve B10 12 and the vertical port c of the three-way valve B11 13.
[0045] The rest is the same as the first specific implementation mode.
[0046] Specific implementation method seven: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that a circulation pump A9 35 is provided between the lateral port a of the three-way valve B1113 and the silo 14; a valve B13 25 is provided between the biogas slurry outlet b of the second heat exchanger 11 and the organic fertilizer processing device 9.
[0047] The rest is the same as the first specific implementation mode.
[0048] Specific implementation method eight: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that a circulation pump A6 32 is provided between the hot water inlet of the office building and the factory building 5 and the hot water storage tank 1; a valve B14 26 is provided between the cold water outlet of the office building and the factory building 5 and the hot water storage tank 1.
[0049] Other components and connection methods are the same as those in the first embodiment.
[0050] Specific implementation method nine: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that: a circulation pump A1 27 and a valve B2 16 are arranged between the water outlet of the solar collector 2 and the water inlet b of the hot water tank 1; a valve B1 15 is arranged between the water inlet of the solar collector 2 and the water outlet a of the hot water tank 1.
[0051] The rest is the same as the first specific implementation mode.
[0052] Specific implementation method ten: Combination Figure 1 This embodiment is described. The difference between this embodiment and the specific embodiment 1 is that the solar collector 2, the hot water storage tank 1, the biomass boiler 4, the fermentation tank 6, and the carbonization furnace 3 are sequentially provided with a temperature sensor T1 37, a temperature sensor T2 38, a temperature sensor T3 39, a temperature sensor T4 40, and a temperature sensor T5 41.
[0053] Other components and connection methods are the same as those in the first embodiment.
Claims
1. A multi-energy complementary heating system for biogas engineering parks based on solar energy, biomass energy and waste heat production. Features It comprises a hot water storage tank (1), a solar energy collector (2), a carbonization furnace (3), a biomass boiler (4), an office building and a factory building (5), a fermentation tank (6), a solid-liquid separation device (7), a biogas slurry tank (8), an organic fertilizer processing device (9), a first heat exchanger (10) and a second heat exchanger (11); The outer wall of the carbonization furnace (3) is provided with a heat-absorbing jacket, and the water inlet and the water outlet of the heat-absorbing jacket are respectively connected to the heat exchanger water outlet a and the heat exchanger water inlet b of the first heat exchanger (10); the heat exchanger water inlet c of the first heat exchanger (10) is connected to the heat storage tank water outlet c of the heat storage tank (1); the heat exchanger water outlet d of the first heat exchanger (10) is connected to the heat storage tank water inlet d of the heat storage tank (1); the hot water inlet e of the heat storage tank (1) is connected to the hot water outlet of the biomass boiler (4); the cold water outlet of the heat storage tank (1) is connected to the water inlet of the biomass boiler (4); the heat storage tank water outlet h of the heat storage tank (1) is connected to the fermentation tank water inlet b of the fermentation tank (6); the heat storage tank water inlet g of the heat storage tank (1) is connected to the fermentation tank water outlet a of the fermentation tank (6); the outlet of the fermentation tank (6) is connected to the water outlet of the fermentation tank (6). The feed port c is communicated with the feed port of the solid-liquid separation device (7); the discharge port of the solid-liquid separation device (7) is communicated with the feed port of the biogas slurry tank (8); the biogas slurry discharge port of the biogas slurry tank (8) is communicated with the transverse port a of the three-way valve B10 (12), and the other transverse port b of the three-way valve B10 (12) is communicated with the biogas slurry inlet a of the second heat exchanger (11); the vertical port c of the three-way valve B10 (12) is connected to the vertical port c of the three-way valve B11 (13); the transverse port a of the three-way valve B11 (13) is communicated with the silo (14); the biogas slurry outlet b of the second heat exchanger (11) is communicated with the inlet of the organic fertilizer processing device (9); the other transverse port b of the three-way valve B11 (13) is communicated with the material inlet c of the second heat exchanger (11); the material outlet d of the second heat exchanger (11) is communicated with the inlet of the fermentation tank (6); The hot water inlet of the office building and the factory building (5) is connected to the hot water outlet of the hot water storage tank (1); the cold water outlet of the office building and the factory building (5) is connected to the water inlet of the hot water storage tank (1); The water outlet of the solar thermal collector (2) is communicated with the water inlet b of the hot water storage tank (1); the water inlet of the solar thermal collector (2) is communicated with the water outlet a of the hot water storage tank (1).
2. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A valve B12 (24) is provided on the pipeline between the water inlet of the heat absorption water jacket and the water outlet a of the heat exchanger, and a circulation pump A3 (29) is provided on the pipeline between the water outlet of the heat absorption water jacket and the water inlet b of the heat exchanger.
3. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A valve B5 (19) is provided on the pipeline between the heat exchanger water inlet c of the first heat exchanger (10) and the hot water tank water outlet c of the hot water tank (1); a circulation pump A4 (30) and a valve B6 (20) are provided on the pipeline between the heat exchanger water outlet d of the first heat exchanger (10) and the hot water tank water inlet d of the hot water tank (1); a circulation pump A2 (28) and a valve B3 (17) are provided between the hot water inlet e of the hot water tank (1) and the hot water outlet of the biomass boiler (4); and a valve B3 (17) is provided between the cold water outlet of the hot water tank (1) and the biomass boiler (4).
4. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A5 (31) and a valve B8 (22) are provided on the pipeline between the water outlet h of the hot water storage tank (1) and the water inlet b of the fermentation tank (6); a valve B7 (21) is provided on the pipeline between the water inlet g of the hot water storage tank (1) and the water outlet a of the fermentation tank (6).
5. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A7 (33) is provided on the pipeline between the material outlet c of the fermentation tank (6) and the solid-liquid separation device (7); a valve B12 (24) is provided between the material outlet d of the second heat exchanger (11) and the fermentation tank (6).
6. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A8 (34) is provided between the biogas slurry discharge port of the biogas slurry tank (8) and the horizontal port a of the three-way valve B10 (12); a valve B9 (23) and a check valve N1 (36) are provided between the vertical port c of the three-way valve B10 (12) and the vertical port c of the three-way valve B11 (13).
7. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A9 (35) is provided between the transverse port a of the three-way valve B11 (13) and the silo (14); a valve B13 (25) is provided between the biogas slurry outlet b of the second heat exchanger (11) and the organic fertilizer processing device (9).
8. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A6 (32) is provided between the hot water inlet of the office building and the factory building (5) and the hot water storage tank (1); a valve B14 (26) is provided between the cold water outlet of the office building and the factory building (5) and the hot water storage tank (1).
9. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features A circulation pump A1 (27) and a valve B2 (16) are provided between the water outlet of the solar thermal collector (2) and the water inlet b of the hot water storage tank (1); a valve B1 (15) is provided between the water inlet of the solar thermal collector (2) and the water outlet a of the hot water storage tank (1).
10. The multi-energy complementary heating system for a biogas engineering park based on solar energy, biomass energy and waste heat production according to claim 1, Features The solar collector (2), the heat storage tank (1), the biomass boiler (4), the fermentation tank (6), and the carbonization furnace (3) are provided with a temperature sensor T1 (37), a temperature sensor T2 (38), a temperature sensor T3 (39), a temperature sensor T4 (40), and a temperature sensor T5 (41) in sequence.
