Tail gas treatment system in decoking process of delayed coking device
By designing a gas collecting hood and a dynamic wave reactor in the delayed coking unit to collect and remove solid coke particles in the exhaust gas, and performing multi-stage treatment in the exhaust gas treatment tower, the problem of incomplete exhaust gas treatment is solved and environmentally friendly emissions are achieved. and safe and reliable exhaust gas treatment effect.
Patent Information
- Application Number
- CN202420098695.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-16
AI Technical Summary
Existing delayed coking equipment does not completely treat exhaust gas during the decoking process, causing harmful substances to escape into the environment, causing regional haze, changes in atmospheric pH, and human health problems.
A tail gas treatment system including a coke tower, a coke tank, a tail gas treatment tower and a dynamic wave reactor is designed. The tail gas is collected through a gas collecting hood. The dynamic wave reactor forms foam to remove solid coke powder particles. The tail gas treatment tower is divided into washing area, desulfurization area and defogging area, the adsorption system and heating furnace blower are used to burn and treat the exhaust gas.
Effectively collect and process exhaust gas, avoiding the direct discharge of harmful substances into the environment, achieving environmentally friendly emissions, ensuring the safety and reliability of the exhaust gas treatment system, and reducing harm to human health.
Smart Images

Figure CN221846663U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of delayed coking equipment in petrochemical industry, in particular to a tail gas treatment system in the decoking process of a delayed coking device. Background Art
[0002] It is well known that the decoking process of delayed coking units in most petrochemical enterprises is an open operation. Petroleum coke is stored in the open air and petroleum coke is also shipped in an open area. Coke powder particles and waste gas are directly dispersed in the air. These coke powder particles and waste gas contain a variety of substances harmful to the human body. If such aerosol particles cannot be effectively separated, they will cause a series of problems in the environment, such as regional haze, changes in atmospheric pH, excessive PM content, and a decline in human health index. Therefore, it is an important task to increase the exhaust gas treatment process in production and absorb and separate harmful substances in the exhaust gas before discharging them. Summary of the invention
[0003] In order to overcome the deficiencies in the background technology, the utility model discloses a tail gas treatment system in a decoking process of a delayed coking device.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:
[0005] A tail gas treatment system in a decoking process of a delayed coking device comprises a coke tower, a coke pool and a tail gas treatment tower, wherein the coke tower is connected to the coke pool in a closed area through a coke chute, a loading area is also provided in the closed area, a pipeline connected to an external fan C is provided on the top of the loading area, a fan A is provided on the upper part of the coke tower, an air outlet of the fan A is connected to an inlet of a dynamic wave reactor through a pipeline A, an air outlet of the fan C is connected to the pipeline A through a pipeline B, a plurality of branch pipes are evenly spaced along the length direction of the top of the closed area, the branch pipes are connected to the pipeline A through the pipeline C, an air collecting hood is provided on the coke chute near the coke pool, a pipeline on the air collecting hood is connected to the fan B, an air outlet of the fan B is connected to the pipeline A through a pipeline D, an outlet of the dynamic wave reactor is connected to the tail gas treatment tower through a pipeline E, and a pipeline F at the top of the tail gas treatment tower is connected to a standby adsorption system through a fan pipeline;
[0006] The adsorption system includes two parallel branches, one branch is connected with valve A, adsorption tank A and valve B in sequence, and the other branch is connected with valve C, adsorption tank B and valve D in sequence. The pipeline K at the outer end of valve B and valve D leads to the external discharge port, and the exhaust gas discharge ports of adsorption tank A and adsorption tank B are respectively connected with the pipeline of the heating furnace blower inlet through pipelines.
[0007] The tail gas treatment system in the decoking process of the delayed coking device, the tail gas treatment tower includes three areas from bottom to top, namely, a washing area A, a desulfurization area B and a demisting area C, and two adjacent areas are separated by an oil collecting tank riser a; a pipeline G connected to the coke pool is provided at the lower part of the washing area A, and an inlet is provided on the washing area A, and the inlet is connected to the outlet of the dynamic wave reactor through a pipeline E;
[0008] Two rows of alkali liquid nozzles b are arranged in the desulfurization zone B, the outlet pipeline of the desulfurization zone B is connected to the alkali liquid circulation pump, the outlet pipeline of the alkali liquid circulation pump is connected to the two rows of alkali liquid nozzles b, a branch is arranged on the inlet pipeline of the alkali liquid circulation pump, the branch is connected to the external fresh alkali liquid pipeline, and a branch is arranged on the outlet pipeline of the alkali liquid circulation pump for discharging the alkali liquid lean liquid with degraded performance;
[0009] A pipeline I connected to the pipeline G is provided at the bottom of the demisting area C. A dryer f, a demister d and a cooler c are provided in the demisting area C from top to bottom. The inlet pipeline of the cooler c is connected to the outlet of the external circulation pump, and the outlet pipeline of the cooler c is connected to the inlet of the external circulation pump for conveying circulating water; cleaning nozzles e are provided on the upper and lower surfaces of the demister d, and the cleaning nozzle e is connected to one of the pipelines from the fresh water, and the other pipeline H from the fresh water is connected to the inlet of the dynamic wave reactor; an inlet and an outlet are provided on the dryer f, and the pipeline on the inlet is connected to the outlet of the external low-pressure steam supply system, and the pipeline on the outlet is connected to the inlet of the external low-pressure steam supply system.
[0010] In the tail gas treatment system during the decoking process of the delayed coking device, a tail gas outlet is provided at the upper end of the demisting zone C, and the tail gas outlet is connected to the pipeline F.
[0011] The exhaust gas treatment system in the decoking process of the delayed coking device, the fan pipeline includes two parallel branches, one branch is provided with a fan E and a valve E, the other branch is provided with a fan D and a valve F, the inlets of fans E and D are connected with the outlet of pipeline F, the pipeline outlet ends of valves E and valve F are both connected with the inlet of pipeline J, the outlet of pipeline J is respectively connected with the pipelines at the inlets of valves A and valve C on the adsorption system, and the pipeline of the heating furnace blower inlet is connected to pipeline J.
[0012] The tail gas treatment system in the decoking process of the delayed coking device is provided with valves on the pipelines connected to the tail gas treatment tower.
[0013] In the tail gas treatment system in the decoking process of the delayed coking device, the cooler C adopts a cooler with a spray structure or a cooler with a heat exchanger structure.
[0014] The tail gas treatment system in the decoking process of the delayed coking device is also provided with a pipeline L connected to the pipeline K at the upper part of the closed area, and a valve is provided on the pipeline L.
[0015] Due to the adoption of the above technical solution, the utility model has the following beneficial effects:
[0016] The exhaust gas treatment system in the decoking process of the delayed coking device described in the utility model can collect the exhaust gas at the place where the exhaust gas is generated by arranging a gas collecting hood on the coke chute, and the outside of the coke pool and the loading area are set as a closed area, so as to effectively avoid the generated waste gas from being directly discharged into the external environment. By arranging a dynamic wave reactor, the nozzle of the dynamic wave reactor will reversely collide the sprayed water with the exhaust gas coming from the import to form foam, so that the solid coke powder particles in the exhaust gas can be removed, and then after being treated by the exhaust gas treatment tower, it enters the adsorption tank for adsorption or is burned by the heating furnace blower and then discharged into the atmosphere. The utility model has a reasonable structure and a compact layout, realizes the requirements of environmentally friendly emissions, and the exhaust gas treatment system is safe and reliable, avoiding the harm of harmful substances in the exhaust gas to the human body. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the utility model.
[0018] In the figure: 1. coke tower; 2. fan A; 3. fan B; 4. coke chute; 5. gas collecting hood; 6. coke pool; 7. closed area; 8. loading area; 9. fan C; 10. dynamic wave reactor; 11. tail gas treatment tower;
[0019] 11A, washing area; 11B, desulfurization area; 11C, demisting area;
[0020] 11a, oil collecting tank riser; 11b, alkali solution nozzle; 11c, cooler; 11d, demister; 11e, cleaning nozzle; 11f, dryer;
[0021] 12. Alkali solution circulation pump; 13. Fan D; 14. Fan E; 15. Adsorption tank A; 16. Adsorption tank B. Implementation
[0022] The present invention can be explained in detail through the following embodiments. The purpose of disclosing the present invention is to protect all technical improvements within the scope of the present invention.
[0023] Combined with Figure 1The tail gas treatment system in the decoking process of the delayed coking device includes a coke tower 1, a coke pool 6 and a tail gas treatment tower 11. The coke tower 1 is connected to the coke pool 6 in the closed area 7 through a coke chute 4. A loading area 8 is also provided in the closed area 7. A pipeline connected to an external fan C9 is provided on the top of the loading area 8. A fan A2 is provided on the upper part of the coke tower 1. The air outlet of the fan A2 is connected to the inlet of the dynamic wave reactor 10 through a pipeline A. The air outlet of the fan C9 is connected to the inlet of the dynamic wave reactor 10 through a pipeline B. On pipeline A, multiple branch pipes are evenly spaced along the length direction at the top of the closed area 7, and the branch pipes are connected to pipeline A through pipeline C. A gas collecting hood 5 is provided on the coke chute 4 near the coke pool 6, and the pipeline on the gas collecting hood 5 is connected to the fan B3, and the air outlet of the fan B3 is connected to pipeline A through pipeline D. The outlet of the dynamic wave reactor 10 is connected to the tail gas treatment tower 11 through pipeline E, and the pipeline F at the top of the tail gas treatment tower 11 is connected to the standby adsorption system through the fan pipeline;
[0024] The adsorption system includes two parallel branches, one of which is connected with valve A, adsorption tank A15 and valve B in sequence, and the other is connected with valve C, adsorption tank B16 and valve D in sequence. The pipeline K at the outer end of valve B and valve D leads to the external discharge port, and the tail gas discharge ports of adsorption tank A15 and adsorption tank B16 are respectively connected with the pipeline of the heating furnace blower inlet through pipelines; a pipeline L connected with pipeline K is also provided at the upper part of the closed area 7, and a valve is provided on pipeline L;
[0025] The fan pipeline includes two parallel branches, one branch is provided with a fan E14 and a valve E, the other branch is provided with a fan D13 and a valve F, the inlets of fans E14 and D13 are connected with the outlet of pipeline F, the pipeline outlet ends of valves E and valve F are connected with the inlet of pipeline J, the outlet of pipeline J is respectively connected with the pipelines at the inlets of valves A and valve C on the adsorption system, and the pipeline of the heating furnace blower inlet is connected to pipeline J.
[0026] Furthermore, the tail gas treatment tower 11 includes three areas from bottom to top, namely, a washing area 11A, a desulfurization area 11B and a demisting area 11C, and two adjacent areas are separated by an oil collecting tank riser 11a; a pipeline G connected to the coke pool 6 is provided at the lower part of the washing area 11A, and an inlet is provided on the washing area 11A, and the inlet is connected to the outlet of the dynamic wave reactor 10 through a pipeline E;
[0027] Two upper and lower rows of alkali liquid nozzles 11b are provided in the desulfurization zone 11B. The outlet pipeline of the desulfurization zone 11B is connected to the alkali liquid circulation pump 12. The outlet pipeline of the alkali liquid circulation pump 12 is connected to the two rows of alkali liquid nozzles 11b. A branch is provided on the inlet pipeline of the alkali liquid circulation pump 12. The branch is connected to the external fresh alkali liquid pipeline. A branch is provided on the outlet pipeline of the alkali liquid circulation pump 12 for discharging the alkali liquid lean liquid with degraded performance.
[0028] The alkali liquid nozzle 11b sprays out misted alkali liquid, which reacts with the tail gas to remove hydrogen sulfide and acidic gases, and then falls to the bottom of the desulfurization zone 11B. The alkali liquid circulation pump 12 draws the alkali liquid at the bottom of the desulfurization zone 11B into the pump for pressurization, and then flows back into the alkali liquid nozzle 11b for spraying.
[0029] A pipeline I connected to the pipeline G is provided at the bottom of the demisting area 11C. A dryer 11f, a demister 11d and a cooler 11c are provided in the demisting area 11C from top to bottom. The cooler 11c adopts a cooler with a spray structure or a cooler with a heat exchanger structure. The inlet pipeline of the cooler 11c is connected to the outlet of the external circulation pump, and the outlet pipeline of the cooler 11c is connected to the inlet of the external circulation pump for conveying circulating water; cleaning nozzles 11e are provided on the upper and lower surfaces of the demister 11d, and the cleaning nozzle 11e is connected to one of the pipelines from the fresh water, and the other pipeline H from the fresh water is connected to the inlet of the dynamic wave reactor 10; an inlet and an outlet are provided on the dryer 11f, and the pipeline on the inlet is connected to the outlet of the external low-pressure steam supply system, and the pipeline on the outlet is connected to the inlet of the external low-pressure steam supply system.
[0030] Furthermore, the tail gas treatment system in the decoking process of the delayed coking device is provided with valves on the pipelines connected to the tail gas treatment tower 11.
[0031] The tail gas treatment system in the decoking process of the delayed coking device described in the utility model is implemented. When in use, the coke tower 1, the coke chute 4, the coke pool 6, and the loading area 8 are all places where tail gas, i.e., containing coke powder particles and waste gas, is generated. The gas collecting hood 5 is an auxiliary device for collecting tail gas in the coke chute 4 area, and the closed area 7 is the tail gas emission place of the coke pool 6; the power wave reactor 10 is an existing equipment, which is a foam washing device. The power wave reactor 10 is provided with an inlet and an outlet, and a nozzle is provided inside the power wave reactor 10. The water sprayed from the nozzle collides with the tail gas coming from the inlet in the opposite direction. Foam is formed to remove solid coke powder particles in the exhaust gas; the oil collecting tank riser 11a is a prior art, wherein there is a channel for gaseous matter to pass through in the middle, and there is a shield above the channel, which can block the liquid matter on the upper part so that the liquid matter can only be located in the separated area; the adsorption tank A15 and the adsorption tank B16 are tank bodies with activated carbon arranged inside, and after the exhaust gas passes through the tank body, harmful VOCS components are adsorbed on the activated carbon and separated from the exhaust gas; the exhaust gas treatment system controls the flow path of gaseous and liquid substances by opening or closing each valve.
[0032] The processing flow of the tail gas treatment system in the decoking process of the delayed coking device is as follows: at least one coke tower 1 is provided, and the tail gas in the coke tower 1 passes through the upper valve and the fan A2 in turn through the pipeline A to enter the dynamic wave reactor 10, and the tail gas entering the material in the coke chute 4 is collected by the gas collecting hood 5, and after collection, it is sent to the fan B3 through the pipeline on the upper part of the gas collecting hood 5, and a valve is provided on the pipeline on the upper part of the gas collecting hood 5, and is merged into the pipeline A through the pipeline D at the outlet of the fan B3, and the tail gas in the loading area 8 is passed through the pipeline D at the outlet of the fan B3. After passing through the fan C9 and the pipeline B, the exhaust gas in the closed area 7 flows into the pipeline C through multiple branch pipes on the ceiling, and then flows into the pipeline A through the pipeline C. The exhaust gas collected in the pipeline A enters the dynamic wave reactor 10. Fresh water enters the dynamic wave reactor 10 through the pipeline H and is sprayed out from the nozzle. A valve is provided on the pipeline H. The water sprayed from the nozzle collides with the exhaust gas from the pipeline A in the reverse direction to generate foam washing liquid. The gas phase and the liquid phase intersect and merge and enter the washing area 11A of the exhaust gas treatment tower 11 through the pipeline E.
[0033] In the washing area 11A, the washed tail gas escapes from the liquid, passes through the gas channel of the gas riser 11a of the oil collecting tank at the bottom of the tail gas treatment tower 11, and enters the desulfurization area 11B. The liquid flows back to the coke pool 6 through the pipeline G, and the flow rate is controlled by the hydraulic control valve on the pipeline G;
[0034] The tail gas entering the desulfurization zone 11B reacts with the misty alkali solution sprayed from the alkali solution nozzle 11b, and the acidic gas is eliminated through the chemical reaction. The tail gas continues to rise and enters the demisting zone 11C through the gas channel of the oil tank riser 11a above the alkali solution nozzle 11b;
[0035] The tail gas entering the demisting area 11C first passes through the cooler 11c to be cooled, and then passes through the demister 11d. After the liquid water in the tail gas is absorbed by the demister 11d, the tail gas passes through the dryer 11f to evaporate the remaining water in the tail gas and dry the tail gas to increase its temperature. Finally, the tail gas is discharged from the top of the tail gas treatment tower 11 and enters the pipeline F.
[0036] When a cooler with a spray structure is used, the spray water sprayed into the demisting area 11C cools the tail gas and then falls into the bottom of the demisting area 11C. When a cooler with a closed heat exchanger structure is used, the cooling medium flows in the heat exchanger pipe system, and the cooling medium itself does not enter the demisting area 11C, but the water vapor in the tail gas condenses into liquid water on the surface of the heat exchanger pipe, and the formed condensed water falls into the bottom of the demisting area 11C. The accumulated water flows into the pipeline G through the pipeline I and flows back to the coke pool 6. A valve is provided on the pipeline I.
[0037] The demister 11d needs to be cleaned after being used for a period of time. Fresh water delivered from the outside enters the cleaning nozzle 11e through the pipeline and the valve on the pipeline. The jet water sprayed from the cleaning nozzle 11e washes the demister 11d and then falls into the bottom of the demisting area 11C. The cleaning water flows into the pipeline G through the pipeline I and the valve on the pipeline I and flows back to the coke pool 6. The inlet and outlet on the dryer 11f are connected to the outlet and inlet of the external low-pressure steam supply system, and valves are provided on the inlet and outlet pipelines.
[0038] The exhaust gas discharged from the exhaust outlet at the top of the exhaust treatment tower 11, i.e., the top of the demister 11C, enters the pipeline F, which is connected to two parallel branches, and enters the pipeline J through the two parallel branches. The pipeline J is connected to the adsorption system. The adsorption system has two branches, one for backup and one for use. Both branches enter the external discharge port through the pipeline K, and the exhaust gas is discharged into the atmosphere. A valve is provided on the pipeline K; the pipeline J is also connected to the inlet of the heating furnace blower through a pipeline, and a valve is provided on the pipeline between the pipeline J and the inlet of the heating furnace blower;
[0039] The tail gas discharge ports of the adsorption tank A15 and the adsorption tank B16 are respectively connected to the pipeline of the heating furnace blower inlet through pipelines, and valves are provided on the pipelines connecting the adsorption tank A15, the adsorption tank B16 and the heating furnace blower inlet.
[0040] The upper part of the closed area 7 is also connected to a pipeline L, which is in communication with a pipeline K. A valve is provided on the pipeline K, and the connection point between the pipeline K and the pipeline L is provided upstream of the valve on the pipeline K;
[0041] There are several paths for tail gas emission or tail gas flow after pipeline J, and one or more of them can be selected at the same time:
[0042] The tail gas flows into the inlet of the heating furnace blower and is discharged into the atmosphere after combustion;
[0043] The tail gas flows into the heating furnace blower inlet after the harmful components of VOCS are absorbed by the adsorption tank A15 or adsorption tank B16, and then is discharged into the atmosphere after combustion;
[0044] The exhaust gas is discharged into the atmosphere through the external discharge port after the harmful components of VOCS are absorbed by the adsorption tank A15 or adsorption tank B16;
[0045] The exhaust gas passes through the adsorption tank to absorb harmful components of VOCS and then flows back into the closed area 7 through the pipeline L.
[0046] The parts not described in detail in this utility model are prior art.
[0047] The embodiments selected in this article for the purpose of disclosing the invention of the utility model are currently considered to be suitable, but it should be understood that the utility model is intended to include all changes and improvements of the embodiments that belong to the scope of the present concept and utility model.
Claims
1. A tail gas treatment system in a decoking process of a delayed coking device, comprising a coke tower, a coke pool and a tail gas treatment tower, characterized in that: The coke tower is connected to the coke pool in the closed area through a coke chute. A loading area is also provided in the closed area. A pipeline connected to an external fan C is provided on the top of the loading area. A fan A is provided on the upper part of the coke tower. The air outlet of fan A is connected to the inlet of the dynamic wave reactor through pipeline A. The air outlet of fan C is connected to pipeline A through pipeline B. A plurality of branch pipes are evenly spaced along the length direction of the top of the closed area. The branch pipes are connected to pipeline A through pipeline C. A gas collecting hood is provided on the coke chute near the coke pool. The pipeline on the gas collecting hood is connected to fan B. The air outlet of fan B is connected to pipeline A through pipeline D. The outlet of the dynamic wave reactor is connected to the tail gas treatment tower through pipeline E. The pipeline F on the top of the tail gas treatment tower is connected to a standby adsorption system through the fan pipeline; The adsorption system includes two parallel branches, one branch is connected with valve A, adsorption tank A and valve B in sequence, and the other branch is connected with valve C, adsorption tank B and valve D in sequence. The pipeline K at the outer end of valve B and valve D leads to the external discharge port, and the exhaust gas discharge ports of adsorption tank A and adsorption tank B are respectively connected with the pipeline of the heating furnace blower inlet through pipelines.
2. The tail gas treatment system in the decoking process of the delayed coking device according to claim 1, characterized in that: The tail gas treatment tower includes three areas from bottom to top, namely, the washing area A, the desulfurization area B and the demisting area C. Two adjacent areas are separated by the oil collecting tank riser a. A pipeline G connected to the coke pool is provided at the lower part of the washing area A. An inlet is provided on the washing area A, and the inlet is connected to the outlet of the dynamic wave reactor through a pipeline E. Two rows of alkali liquid nozzles b are arranged in the desulfurization zone B, the outlet pipeline of the desulfurization zone B is connected to the alkali liquid circulation pump, the outlet pipeline of the alkali liquid circulation pump is connected to the two rows of alkali liquid nozzles b, a branch is arranged on the inlet pipeline of the alkali liquid circulation pump, the branch is connected to the external fresh alkali liquid pipeline, and a branch is arranged on the outlet pipeline of the alkali liquid circulation pump for discharging the alkali liquid lean liquid with degraded performance; A pipeline I connected to the pipeline G is provided at the bottom of the demisting area C. A dryer f, a demister d and a cooler c are provided in the demisting area C from top to bottom. The inlet pipeline of the cooler c is connected to the outlet of the external circulation pump, and the outlet pipeline of the cooler c is connected to the inlet of the external circulation pump for conveying circulating water; cleaning nozzles e are provided on the upper and lower surfaces of the demister d, and the cleaning nozzle e is connected to one of the pipelines from the fresh water, and the other pipeline H from the fresh water is connected to the inlet of the dynamic wave reactor; an inlet and an outlet are provided on the dryer f, and the pipeline on the inlet is connected to the outlet of the external low-pressure steam supply system, and the pipeline on the outlet is connected to the inlet of the external low-pressure steam supply system.
3. The tail gas treatment system in the decoking process of the delayed coking device according to claim 1, characterized in that: An exhaust gas outlet is provided at the upper end of the demisting zone C, and the exhaust gas outlet is connected to the pipeline F.
4. The tail gas treatment system in the decoking process of the delayed coking device according to claim 1, characterized in that: The fan pipeline includes two parallel branches, one branch is provided with a fan E and a valve E, the other branch is provided with a fan D and a valve F, the inlets of fans E and D are connected with the outlet of pipeline F, the pipeline outlet ends of valves E and F are connected with the inlet of pipeline J, the outlet of pipeline J is respectively connected with the pipelines at the inlets of valves A and valve C on the adsorption system, and the pipeline of the heating furnace blower inlet is connected to pipeline J.
5. The tail gas treatment system in the decoking process of the delayed coking device according to claim 1, characterized in that: Valves are installed on the pipelines connected to the tail gas treatment tower.
6. The tail gas treatment system in the decoking process of the delayed coking device according to claim 1, characterized in that: Cooler c adopts a cooler with a spray structure or a cooler with a heat exchanger structure.