Drying tower valve testing system

By designing a drying tower valve test system and using air source interfaces, solenoid valves and air pressure gauges to simulate working conditions under different conditions, the problem of low valve maintenance efficiency in the existing technology has been solved, and efficient and accurate valve maintenance has been achieved. , reducing labor costs.

CN221859859UActive Publication Date: 2024-10-18DAQIN RAILWAY CO LTD HOUMA NORTH LOCOMOTIVE DEPOT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323582017.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-10-18
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

The existing technology lacks a testing system for drying tower valves, which results in testing on the vehicle after completion of maintenance. The workload is large and the quality of parts maintenance cannot be guaranteed.

Method used

A drying tower valve test system is designed, including air source interface, solenoid valve, measuring meter, transfer switch, PLC controller and air pressure gauge. By simulating the working status under different conditions, using AC power supply and air source filter, Compare the air pressure gauge display to determine whether the valve meets the standards to avoid repeated disassembly and assembly tests.

Benefits of technology

It improves work efficiency, reduces labor costs, ensures the quality of valve maintenance, avoids repeated tests under the vehicle, and improves maintenance efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221859859U_ABST
    Figure CN221859859U_ABST
Patent Text Reader

Abstract

The utility model provides a drying tower valve test system, and belongs to the technical field of valve test systems. The system comprises an air source generator for generating an air source, an air source switch for controlling the air source generator, an air source filter for filtering the air source, an air source electromagnetic valve for controlling the air source filter, a first air source interface, a second air source interface, a third air source interface, a fourth air source interface, a fifth air source interface and a power switch. The device works by being externally connected with an alternating current power supply and a wind source, simulates the working states of the drying tower valve under different conditions through the change-over switch, judges whether the maintenance of the drying tower valve meets the standard or not by comparing the display of a wind pressure meter and the visual representation of a leakage test agent in the action process, provides a basis for whether the maintenance part is qualified or not, and improves the maintenance efficiency. According to the utility model, the working efficiency is improved, the labor cost is reduced, and the problem that the electric controller, the air inlet valve, the air outlet check valve and the drain valve of the drying tower are subjected to off-vehicle tests and repeated disassembly and assembly tests are avoided is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of valve component testing systems, in particular to a drying tower valve component testing system. Background Art

[0002] Air brake is the main braking method for all locomotives to adjust speed and stop during the journey. Compressed air is the power source of air brake. The quality of compressed air directly affects the working state of air brake and other pneumatic parts of locomotive. In order to obtain dry and pure compressed air, air purification devices (air drying towers) are installed in the air source systems of all locomotives.

[0003] In the prior art, there is no test equipment for the electronic controller, air inlet valve, air outlet check valve and drain valve of the drying tower. After the inspection, they can only be tested on the vehicle, which causes a large workload and cannot guarantee the quality of the parts inspection.

[0004] Therefore, the present application provides a drying tower valve component testing system to meet the needs. Utility Model Content

[0005] The technical problem to be solved by the utility model is to provide a drying tower valve component testing system to solve the problem of frequent disassembly and assembly of existing valve component off-vehicle testing.

[0006] In order to solve the above technical problems, the utility model provides the following technical solutions:

[0007] A drying tower valve component test system, a wind source generator for generating a wind source, a wind source switch for controlling the wind source generator, a wind source filter for filtering the wind source and a wind source solenoid valve for controlling the wind source filter, comprising: a first wind source interface, a second wind source interface, a third wind source interface, a fourth wind source interface, a fifth wind source interface and a power switch;

[0008] a first solenoid valve, a second solenoid valve, a third solenoid valve, a third solenoid valve, a fourth solenoid valve, a fifth solenoid valve and a sixth solenoid valve;

[0009] The first air source interface is mechanically connected to the first solenoid valve, the second air source interface is mechanically connected to the fourth solenoid valve and the fifth solenoid valve, the third air source interface is mechanically connected to the second solenoid valve, the fourth air source interface is mechanically connected to the sixth solenoid valve, and the fifth air source interface is mechanically connected to the third solenoid valve;

[0010] a first measuring meter and a second measuring meter, wherein the first measuring meter is mechanically connected to the fourth solenoid valve, and the second measuring meter is mechanically connected to the fifth solenoid valve;

[0011] a first intermediate relay, a second intermediate relay, a third intermediate relay, a fourth intermediate relay, a fifth intermediate relay, a first conversion switch, a second conversion switch and a third conversion switch, wherein the first conversion switch is electrically connected to the third and fourth intermediate relays, the second conversion switch is electrically connected to the first and second intermediate relays, the third conversion switch is electrically connected to the fifth intermediate relay, and the third conversion switch is electrically connected to a time delay relay;

[0012] A test air cylinder and an air pressure gauge, wherein the test air cylinder is mechanically connected to the sixth solenoid valve and the air pressure gauge.

[0013] Preferably, the first transfer switch, the second transfer switch and the third transfer switch are controlled by a PLC controller, and the PLC controller is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay and the fifth intermediate relay, respectively.

[0014] Preferably, it also includes an AC power supply and an AC voltmeter, the AC power supply is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay, the fifth intermediate relay, the first solenoid valve, the second solenoid valve, the third solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve and the sixth solenoid valve, respectively, the AC power supply is electrically connected to the AC voltmeter, and the power switch is electrically connected to the AC power supply.

[0015] Preferably, it also includes a first power indicator light, a second power indicator light and a DC voltmeter, and the first power indicator light and the second power indicator light are electrically connected to the power switch.

[0016] Compared with the prior art, the utility model has at least the following beneficial effects:

[0017] In the above scheme, it is operated by external AC power supply and air source, and the working status of the drying tower valve under different conditions is simulated by the conversion switch. During the operation, the display of the wind pressure gauge and the intuitive appearance of the leak test agent are compared to judge whether the maintenance of the drying tower valve meets the standards, which provides a basis for whether the repaired parts are qualified, improves work efficiency, reduces labor costs, and solves the problem of off-vehicle testing of the drying tower's electronic control controller, air inlet valve, air outlet check valve, and discharge valve components, avoiding repeated disassembly and assembly tests. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is the overall flow chart of the drying tower valve test system.

[0019] Attached photos

[0020] 1. First air source interface; 2. Second air source interface; 3. Third air source interface; 4. Fourth air source interface; 5. Fifth air source interface; 6. Power switch; 7. Wind pressure gauge; 8. First measuring gauge; 9. Second measuring gauge; 10. First power indicator light; 11. AC voltmeter; 12. Second power indicator light; 13. DC voltmeter; 14. First conversion switch; 15. Second conversion switch; 16. Third conversion switch.

[0021] As shown in the figure, in order to clearly implement the structure of the embodiment of the utility model, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the utility model to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments, and the adjustments or modifications made are still included in the scope of the attached claims. DETAILED DESCRIPTION

[0022] The following is a detailed description of a drying tower valve test system provided by the utility model in combination with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for more specific description of the embodiments, and are not intended to specifically limit the utility model.

[0023] like Figure 1 As shown, the embodiment of the utility model provides a drying tower valve component test system, comprising: a first air source interface 1, a second air source interface 2, a third air source interface 3, a fourth air source interface 4, a fifth air source interface 5 and a power switch 6;

[0024] a first solenoid valve, a second solenoid valve, a third solenoid valve, a third solenoid valve, a fourth solenoid valve, a fifth solenoid valve and a sixth solenoid valve;

[0025] The first air source interface 1 is mechanically connected to the first solenoid valve, the second air source interface 2 is mechanically connected to the fourth solenoid valve and the fifth solenoid valve, the third air source interface 3 is mechanically connected to the second solenoid valve, the fourth air source interface 4 is mechanically connected to the sixth solenoid valve, and the fifth air source interface 5 is mechanically connected to the third solenoid valve;

[0026] a first measuring meter 8 and a second measuring meter 9, wherein the first measuring meter 8 is mechanically connected to the fourth solenoid valve, and the second measuring meter 9 is mechanically connected to the fifth solenoid valve;

[0027] a first intermediate relay, a second intermediate relay, a third intermediate relay, a fourth intermediate relay, a fifth intermediate relay, a first transfer switch 14, a second transfer switch 15 and a third transfer switch 16, wherein the first transfer switch 14 is electrically connected to the third and fourth intermediate relays, the second transfer switch 15 is electrically connected to the first and second intermediate relays, the third transfer switch 16 is electrically connected to the fifth intermediate relay, and the third transfer switch 16 is electrically connected to a time delay relay;

[0028] Test the air cylinder and the air pressure gauge 7, and test the mechanical connection between the air cylinder and the sixth solenoid valve and the air pressure gauge 7.

[0029] In this embodiment, the first transfer switch 14, the second transfer switch 15 and the third transfer switch 16 are controlled by a PLC controller, and the PLC controller is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay and the fifth intermediate relay respectively.

[0030] In this embodiment, an AC power supply and an AC voltmeter 11 are also included. The AC power supply is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay, the fifth intermediate relay, the first solenoid valve, the second solenoid valve, the third solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve and the sixth solenoid valve, respectively. The AC power supply and the AC voltmeter 11 are electrically connected, and the power switch 6 is electrically connected to the AC power supply.

[0031] In this embodiment, a first power indicator light 10 , a second power indicator light 12 and a DC voltmeter 13 are further included. The first power indicator light 10 and the second power indicator light 12 are electrically connected to the power switch 6 .

[0032] In another embodiment, the solenoid valve replaces the electro-pneumatic valve, a DC power supply interface is reserved, the DC power supply is connected to the electro-pneumatic valve electrical appliance, and the voltage is displayed through a DC voltmeter 13, and the electro-pneumatic valve is mechanically connected to the above-mentioned air source interfaces.

[0033] In the above scheme, when the drying tower air outlet check valve is tested, the first air source interface 1 takes in air through the air inlet on the left side of the air outlet check valve (not shown in the figure), the third air source interface 3 takes in air through the air inlet on the right side of the air outlet check valve (not shown in the figure), and the fourth air source interface 4 is connected to the main air interface of the air outlet check valve (not shown in the figure), and then the first conversion switch 14 is rotated to gear position 1, at this time the first solenoid valve and the sixth solenoid valve are energized, and the air volume is pumped into the test air cylinder for air storage. At this time, the air pressure of the test air cylinder is displayed by the air pressure gauge 7, and then the leak test agent is used to detect the leakage of the interfaces of each component, and then the first conversion switch 14 is rotated to the middle gear position, and the sixth solenoid valve is delayed for three seconds to exhaust air. After repeated tests three times and data recording, the air pressure display of the air pressure gauge 7 returns to the initial state, and the remaining solenoid valves are operated in the same steps, and the subsequent valve component test operations are carried out;

[0034] Among them, the leak test agent includes but is not limited to oil-soluble or water-soluble leak test agents used to test the sealing performance. Such leak test agents are not within the scope of protection of the present utility model and will not be described in detail.

[0035] The wind source generator is used to generate a wind source, the wind source switch is used to control the wind source generator, the wind source filter is used to filter the wind source, and the wind source solenoid valve controls the wind source filter.

[0036] It is worth noting that the solid lines in the drawings of this scheme represent schematic lines of mechanical connection, and the dotted lines represent schematic lines of electrical connection. KA1, KA2, KA3, KA4, and KA5 in the drawings represent the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay, and the fifth intermediate relay, respectively;

[0037] The rotation positions of the first conversion switch 14, the second conversion switch 15 and the third conversion switch 16 are the rotation gears of the universal switch, and the intermediate relays controlled are connected differently, thereby controlling the connection of different pipelines;

[0038] The solenoid valve is a general-purpose solenoid valve equipped with a time-delay relay and is limited to single-valve use;

[0039] The first power indicator light 10 and the second power indicator light 12 are respectively a 220V power indicator light and a 110V power indicator light.

[0040] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.

Claims

1. A drying tower valve test system, a wind source generator for generating a wind source, a wind source switch for controlling the wind source generator, a wind source filter for filtering the wind source and a wind source solenoid valve for controlling the wind source filter, characterized in that: include: A first wind source interface (1), a second wind source interface (2), a third wind source interface (3), a fourth wind source interface (4), a fifth wind source interface (5) and a power switch (6); a first solenoid valve, a second solenoid valve, a third solenoid valve, a fourth solenoid valve, a fifth solenoid valve and a sixth solenoid valve; The first air source interface (1) is mechanically connected to the first solenoid valve, the second air source interface (2) is mechanically connected to the fourth solenoid valve and the fifth solenoid valve, the third air source interface (3) is mechanically connected to the second solenoid valve, the fourth air source interface (4) is mechanically connected to the sixth solenoid valve, and the fifth air source interface (5) is mechanically connected to the third solenoid valve; a first measuring meter (8) and a second measuring meter (9), wherein the first measuring meter (8) is mechanically connected to the fourth solenoid valve, and the second measuring meter (9) is mechanically connected to the fifth solenoid valve; a first intermediate relay, a second intermediate relay, a third intermediate relay, a fourth intermediate relay, a fifth intermediate relay, a first conversion switch (14), a second conversion switch (15) and a third conversion switch (16), wherein the first conversion switch (14) is electrically connected to the third and fourth intermediate relays, the second conversion switch (15) is electrically connected to the first and second intermediate relays, the third conversion switch (16) is electrically connected to the fifth intermediate relay, and the third conversion switch (16) is electrically connected to a time delay relay; A test air cylinder and an air pressure gauge (7), wherein the test air cylinder is mechanically connected to the sixth solenoid valve and the air pressure gauge (7).

2. The drying tower valve component testing system according to claim 1, characterized in that: The first conversion switch (14), the second conversion switch (15) and the third conversion switch (16) are controlled by a PLC controller, and the PLC controller is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay and the fifth intermediate relay respectively.

3. The drying tower valve component testing system according to claim 2, characterized in that: It also includes an AC power supply and an AC voltmeter (11), wherein the AC power supply is electrically connected to the first intermediate relay, the second intermediate relay, the third intermediate relay, the fourth intermediate relay, the fifth intermediate relay, the first solenoid valve, the second solenoid valve, the third solenoid valve, the fourth solenoid valve, the fifth solenoid valve and the sixth solenoid valve, respectively; the AC power supply is electrically connected to the AC voltmeter (11); and the power switch (6) is electrically connected to the AC power supply.

4. The drying tower valve component testing system according to claim 1, characterized in that: It also comprises a first power indicator light (10), a second power indicator light (12) and a DC voltage meter (13), wherein the first power indicator light (10) and the second power indicator light (12) are electrically connected to the power switch (6).