Baking device
By designing a double-pipe baking device and utilizing mutually backup gas and natural gas supplies, the outage problem of the torpedo can baking system caused by the outage of a single type of fuel is solved, and cold inspection, minor repairs and rapid can preparation are realized. Rapid heating and heat preservation ensure the normal operation of production.
Patent Information
- Application Number
- CN202420323273.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-21
AI Technical Summary
The torpedo can baking system has outage problems caused by the outage of a single type of fuel, as well as technical issues such as cold inspection, minor repairs and rapid can preparation that require rapid heating and insulation.
A dual-pipe baking device including a first pipe and a second pipe is designed, which are in a standby relationship with each other. When a component in one of the pipes fails, gas is supplied through the other pipe, and the gas is supplied through the detection component and The controller performs real-time detection and regulation to ensure real-time heating control of the roaster.
It solves the outage problem of torpedo can baking caused by the outage of a single type of fuel, ensures rapid heating and insulation during cold inspection, minor repairs and rapid can preparation, and ensures normal production operation.
Smart Images

Figure CN221870250U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of torpedo can baking, and in particular relates to a baking device. Background Art
[0002] The torpedo tank is a device for transporting molten iron. It is not only a container for directly transporting molten iron from the blast furnace to the converter for steelmaking, but also an ideal device for smelting pure steel. In addition, it is not only convenient to transport, has low heat loss, and has a long insulation time, but is also safe and reliable. The torpedo tank has a molten iron capacity of 260t, and the main refractory material of the lining is aluminum carbide silicon carbon brick. Each tank can be reused 500-600 times before it needs to be overhauled. During the overhaul, all the refractory bricks in the tank are replaced and then continued to be used. Due to the requirements of the internal refractory bricks and processes, the furnace needs to be baked and preheated according to the baking curve and seasonal temperature changes to prevent the torpedo tank from exploding due to a sudden rise in temperature. At the same time, in order to keep the torpedo tank in good condition at all times, cold inspections and minor repairs will be arranged during operation, which requires a short time of baking so that the torpedo tank temperature can reach the use conditions. In addition, in the event of steelmaking maintenance and pressure tanks, it is necessary to temporarily increase the input of torpedo tanks in a short period of time, which requires a higher baking capacity.
[0003] Based on the above situation, solving the production organization problem of the torpedo tank baking system being shut down due to the suspension of the supply of a single fuel, as well as solving the production technology problem of rapid heating and insulation required for cold inspection, minor repairs and rapid tank preparation of torpedo tanks, are the cornerstones for the efficient and stable operation of torpedo tanks today. Utility Model Content
[0004] The purpose of this application is to provide a baking device, which aims to at least to some extent solve the production organization problem of the baking system of the torpedo tank being shut down due to the suspension of the supply of a single fuel, and to solve the technical problem of production that requires rapid heating and insulation for cold inspection, minor repairs and rapid tank preparation of torpedo tanks.
[0005] In order to solve the above technical problems, this application adopts the following technical solutions:
[0006] A first aspect of an embodiment of the present application provides a baking device for baking torpedo cans, the baking device comprising: a baking device for baking torpedo cans; an air intake component comprising a first pipe, a second pipe and a third pipe, one end of the first pipe being connected to a coal gas source, one end of the second pipe being connected to a natural gas source, and the other ends of the first pipe network and the second pipe being connected to the baking device via the third pipe; a detection component installed in the baking device and the air intake component, the detection component being used to collect data in the baking device and the air intake component; an adjustment component being arranged in the air intake component, the adjustment component being used to adjust the air intake; a controller connected to the detection component and the adjustment component, respectively, the controller being used to collect data collected by the detection component, and controlling the adjustment component to intake air according to the data.
[0007] In some embodiments, the detection component includes: a first detection unit, disposed in the third pipe, for detecting data during air intake; and a second detection unit, disposed in the roaster, for detecting combustion data in the roaster.
[0008] In some embodiments, the first detection unit includes a pressure meter and a flow meter, and the pressure meter and the flow meter are connected to the controller signal; the second detection unit includes a flame detector and a temperature detector, and the flame detector and the temperature detector are connected to the controller signal.
[0009] In some embodiments, the detection component also includes: a gas detector, which is respectively arranged in the first pipeline and the burner, the gas detector is used to detect the concentration of the gas, and the gas detector is connected to the controller signal; a natural gas detector, which is respectively arranged in the second pipeline and the burner, the natural gas detector is used to detect the concentration of the natural gas, and the natural gas detector is connected to the controller signal.
[0010] In some embodiments, the regulating assembly includes: a first regulating unit disposed in the first pipe; a second regulating unit disposed in the second pipe; and a third regulating unit disposed in the third pipe.
[0011] In some embodiments, the first regulating unit includes: a first valve, arranged in the first pipeline, the first valve is used to control the opening or closing of the first pipeline; a first electric blind plate valve, arranged at the connection between the first pipeline and the third pipeline, the first electric blind plate valve is used to control the flow rate of gas in the first pipeline, and the first electric blind plate valve is connected to the controller signal.
[0012] In some embodiments, the second regulating unit includes: a second valve, arranged in the second pipeline, the second valve is used to control the opening or closing of the second pipeline; a pressure regulator, arranged in the second pipeline, the pressure regulator is used to adjust the gas pressure in the second pipeline; a second electric blind plate valve, arranged at the connection between the second pipeline and the third pipeline, the second electric blind plate valve is used to control the flow rate of natural gas in the second pipeline, and the second electric blind plate valve is connected to the controller signal.
[0013] In some embodiments, the second regulating unit includes: an electric regulating valve, which is arranged in the third pipeline, and the electric regulating valve is used to adjust the gas flow of the third pipeline, and the electric regulating valve is connected to the controller signal; a first electromagnetic quick-cut valve, which is arranged in the third pipeline, and the first electromagnetic quick-cut valve is used to control the opening or closing of the third pipeline.
[0014] In some embodiments, the baking device further includes a purge component, which is connected to the third pipeline, and the purge component is used to purge the first pipeline, the second pipeline and the third pipeline before the baking device works.
[0015] In some embodiments, the purge assembly includes: a fourth pipeline, one end of which is connected to the nitrogen gas source, and the other end of the fourth pipeline is connected to the third pipeline; a fourth valve, which is arranged in the fourth pipeline, and the fourth valve is used to control the opening or closing of the fourth pipeline; a second electromagnetic quick-cut valve, which is arranged in the fourth pipeline, and the second electromagnetic quick-cut valve is used to control the opening or closing of the fourth pipeline.
[0016] It can be seen from the above technical solution that the present application has at least the following advantages and positive effects:
[0017] A baking device in the present application provides gas to a baking device by setting up a first pipeline and a second pipeline. The first pipeline and the second pipeline are in a backup relationship with each other. When a component in one of the pipelines fails, gas is supplied through the other pipeline, which solves the production organization problem of the baking system being shut down due to the suspension of supply of a single fuel for baking a torpedo tank. By setting up a detection component to perform real-time detection of the third pipeline and the baking device, and uniformly regulating them through a controller, real-time heat supply regulation of the baking device is guaranteed, which solves the production technical problem of the torpedo tank needing to be quickly heated and kept warm during cold inspection, minor repairs and rapid tank preparation, and ensures that the baking device can be quickly heated and kept warm to ensure normal production operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 It is a structural schematic diagram of a baking device in an embodiment of the present application.
[0020] The accompanying drawings are marked as follows: 1. roaster; 2. first pipeline; 3. second pipeline; 4. third pipeline; 5. torpedo tank; 6. pressure gauge; 7. flow meter; 8. first valve; 9. first electric blind valve; 10. second valve; 11. pressure regulator; 12. second electric blind valve; 13. electric regulating valve; 14. first electromagnetic quick-cut valve; 15. fourth pipeline; 16. fourth valve; 17. second electromagnetic quick-cut valve. DETAILED DESCRIPTION
[0021] In order to make the technical personnel in the technical field to which the present application belongs to understand the present application more clearly, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0022] See also Figure 1
[0023] Figure 1 is a schematic diagram of the structure of a baking device in an embodiment of the present application, such as Figure 1As shown, the device is used to bake a torpedo can, and the baking device includes: a baker 1, used to bake a torpedo can 5; an air intake component, including a first pipeline 2, a second pipeline 3 and a third pipeline 4, one end of the first pipeline 2 is connected to a coke oven gas source, one end of the second pipeline 3 is connected to a natural gas source, and the other end of the first pipeline 2 and the second pipeline 3 are connected to the baker 1 through the third pipeline 4; a detection component, installed in the baker 1 and the air intake component, the detection component is used to collect data in the baker 1 and the air intake component; an adjustment component is arranged in the air intake component, the adjustment component is used to adjust the air intake; a controller, respectively connected to the detection component and the adjustment component, the controller is used to collect data collected by the detection component, and control the adjustment component to intake air according to the data. By setting up a first pipeline 2 and a second pipeline 3 as dual pipelines to provide gas to the roaster 1, the first pipeline 2 and the second pipeline 3 are in a backup relationship with each other. When a component in one of the pipelines fails, gas is supplied through the other pipeline, which solves the production organization problem of the roasting system stopping due to the suspension of supply of a single fuel during the roasting of the torpedo tank 5. By setting up a detection component to perform real-time detection of the third pipeline 4 and the roaster 1, and unified regulation through the controller, real-time heat supply regulation of the roaster 1 is guaranteed, and the production technical problem of the torpedo tank 5 needing to be quickly heated and kept warm during cold inspection, minor repairs and rapid tank preparation is solved, which ensures that the roasting device can be quickly heated and kept warm to ensure normal production operation.
[0024] like Figure 1 As shown, in some embodiments, a plurality of roasters 1 are provided, and the first pipeline 2 and the second pipeline 3 form a material delivery network to supply gas to the plurality of roasters 1 .
[0025] In some embodiments, the controller controls the flow and pressure of coke oven gas and natural gas through the regulating component, and detects various data of coke oven gas and natural gas through the detecting component, wherein various data can be set according to actual needs.
[0026] In some embodiments, the detection component includes: a first detection unit, disposed in the third pipe 4, for detecting data during air intake; and a second detection unit, disposed in the roaster 1, for detecting combustion data in the roaster 1.
[0027] In some embodiments, the first detection unit includes a pressure gauge 6 and a flow meter 7, and the pressure gauge 6 and the flow meter 7 are connected to the controller by signal; the second detection unit includes a flame detector and a temperature detector, and the flame detector and the temperature detector are connected to the controller by signal. The pressure gauge 6 and the flow meter 7 detect the air pressure and the flow rate in the third pipeline 4, and the flame detector and the temperature detector detect the combustion condition in the roaster 1, and feed back to the controller.
[0028] In some embodiments, the detection component also includes: a gas detector, which is respectively arranged in the first pipeline 2 and the burner, and is used to detect the concentration of the gas, and the gas detector is connected to the controller signal; a natural gas detector, which is respectively arranged in the second pipeline 3 and the burner, and is used to detect the concentration of the natural gas, and the natural gas detector is connected to the controller signal to transmit the concentration information to the controller for display.
[0029] In some embodiments, the regulating component includes: a first regulating unit, disposed in the first pipeline 2 ; a second regulating unit, disposed in the second pipeline 3 ; and a third regulating unit, disposed in the third pipeline 4 .
[0030] In some embodiments, the first regulating unit includes: a first valve 8, which is arranged on the first pipeline 2, and the first valve 8 is used to control the opening or closing of the first pipeline 2; a first electric blind plate valve 9, which is arranged at the connection between the first pipeline 2 and the third pipeline 4, and the first electric blind plate valve 9 is used to control the flow rate of the gas in the first pipeline 2, and the first electric blind plate valve 9 is connected to the controller signal.
[0031] Specifically, the first valve 8 is a manual valve. Three first valves 8 are provided, and two first valves 8 are provided on one side of the first pipeline 2 close to the first electric blind plate valve 9 .
[0032] In some embodiments, the second regulating unit includes: a second valve 10, which is arranged on the second pipeline 3, and the second valve 10 is used to control the opening or closing of the second pipeline 3; a pressure regulator 11, which is arranged on the second pipeline 3, and the pressure regulator 11 is used to adjust the gas pressure in the second pipeline 3; a second electric blind plate valve 12, which is arranged at the connection between the second pipeline 3 and the third pipeline 4, and the second electric blind plate valve 12 is used to control the flow rate of natural gas in the second pipeline 3, and the second electric blind plate valve 12 is connected to the controller signal.
[0033] Specifically, the second valve 10 is a manual valve, and three second valves 10 are provided, wherein two second valves 10 are respectively provided at the air inlet and air outlet ends of the pressure regulator 11 , and another second valve 10 is provided at one side of the second pipeline 3 close to the second electric blind plate valve 12 .
[0034] In some embodiments, the second regulating unit includes: an electric regulating valve 13, which is arranged in the third pipeline 4, and the electric regulating valve 13 is used to adjust the gas flow of the third pipeline 4, and the electric regulating valve 13 is connected to the controller signal; a first electromagnetic quick-cut valve 14, which is arranged in the third pipeline 4, and the first electromagnetic quick-cut valve 14 is used to control the opening or closing of the third pipeline.
[0035] In some embodiments, the baking device further includes a purge assembly, which is connected to the third pipeline 4 and is used to purge the first pipeline 2, the second pipeline 3 and the third pipeline 4 before the baking device 1 works.
[0036] In some embodiments, the purge assembly includes: a fourth pipeline 15, one end of which is connected to a nitrogen gas source, and the other end of the fourth pipeline 15 is connected to the third pipeline 4; a fourth valve 16, which is arranged in the fourth pipeline 15, and the fourth valve 16 is used to control the opening or closing of the fourth pipeline 15; a second electromagnetic quick-cut valve 17, which is arranged in the fourth pipeline 15, and the second electromagnetic quick-cut valve 17 is used to control the opening or closing of the fourth pipeline.
[0037] Based on the above embodiment, when the controller detects through the pressure gauge 6 that the gas pressure at the air inlet of the electric regulating valve 13 is not within the preset pressure range, the first electromagnetic quick-cut valve 14 is controlled to close and the second electromagnetic quick-cut valve 17 is opened for nitrogen purge.
[0038] When the controller detects through the flow meter 7 that the gas flow rate at the air inlet of the electric regulating valve 13 is not within the preset flow rate range, the controller controls the regulating component to operate, and the electric regulating valve 13 operates to adjust the gas output.
[0039] When the controller detects through the thermometer that the internal temperature of the torpedo tank 5 is not within the preset temperature range, the control adjustment component is operated, and the electric regulating valve 13 is actuated to adjust the gas output, and further adjust the internal temperature of the torpedo tank 5. When more gas enters the roaster 1, the internal temperature of the torpedo tank 5 increases, and when less gas enters the roaster 1, the internal temperature of the torpedo tank 5 decreases. However, the adjustment range of the flow rate is related to whether the torpedo tank 5 is in the state of overhaul, minor repair, cold inspection, and standby tank maintenance, because each maintenance state corresponds to a different baking curve, and each baking curve corresponds to a different baking temperature, baking time, and heating rate, so the corresponding gas demand flow rate is also different.
[0040] When the controller detects through the flame detector that the flame of the roaster 1 is extinguished during operation, it controls the control unit in the roaster 1 to immediately shut down the ignition burner and the main burner quickly. At the same time, the pneumatic quick-cut valve of the control regulating component is closed, and finally a flameout alarm is issued.
[0041] When the controller detects that the gas alarm value of the roaster 1 system platform exceeds the preset range through the coal gas detector and the natural gas detector, it controls the regulating component and the purge component to control the first electromagnetic quick-cut valve 14 to close and open the second electromagnetic quick-cut valve 17 for nitrogen purge.
[0042] Based on the above embodiment, the coke oven gas and natural gas supply are mutually backup. By setting two gases for gas supply, when the torpedo tank 5 needs to be quickly heated and kept warm for cold inspection, minor repair and quick tank standby, the calorific value of the coke oven gas is 4000kcal / m 3 、The calorific value of natural gas is 9227kcal / m 3 The numerical relationship is that natural gas is selected to carry out the baking operation of the torpedo tank 5. It can be seen from the above technical solution that the present application has at least the following advantages and positive effects:
[0043] A baking device in the present application provides gas to a baking device by setting up a first pipeline and a second pipeline. The first pipeline and the second pipeline are in a backup relationship with each other. When a component in one of the pipelines fails, gas is supplied through the other pipeline, which solves the production organization problem of the baking system being shut down due to the suspension of supply of a single fuel for baking a torpedo tank. By setting up a detection component to perform real-time detection of the third pipeline and the baking device, and uniformly regulating them through a controller, real-time heat supply regulation of the baking device is guaranteed, which solves the production technical problem of the torpedo tank needing to be quickly heated and kept warm during cold inspection, minor repairs and rapid tank preparation, and ensures that the baking device can be quickly heated and kept warm to ensure normal production operation.
[0044] Unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include the first and second features being in direct contact, or may include the first and second features not being in direct contact but being in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0045] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise" and "counterclockwise" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0046] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0047] In addition, the descriptions of "first", "second", etc. in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0048] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.
Claims
1. A baking device for baking torpedo cans, characterized in that: The baking device comprises: a roaster, for roasting torpedo cans; An air intake assembly, comprising a first pipeline, a second pipeline and a third pipeline, wherein one end of the first pipeline is connected to a coal gas source, one end of the second pipeline is connected to a natural gas source, and the other ends of the first pipeline network and the second pipeline are connected to the roaster through the third pipeline; A detection component installed in the roaster and the air intake component, and the detection component is used to collect data in the roaster and the air intake component; An adjusting component is arranged in the air intake component, and the adjusting component is used to adjust the air intake; The controller is connected to the detection component and the adjustment component respectively, and is used to collect data collected by the detection component and control the adjustment component to intake air according to the data.
2. The baking device according to claim 1, characterized in that: The detection component comprises: A first detection unit, disposed in the third pipe, for detecting data during air intake; The second detection unit is arranged in the roaster and is used for detecting combustion data in the roaster.
3. The baking device according to claim 2, characterized in that: The first detection unit includes a pressure gauge and a flow meter, and the pressure gauge and the flow meter are connected to the controller signal; the second detection unit includes a flame detector and a temperature detector, and the flame detector and the temperature detector are connected to the controller signal.
4. The baking device according to claim 2, characterized in that: The detection component also includes: A gas detector is respectively arranged in the first pipeline and the burner, the gas detector is used to detect the concentration of gas, and the gas detector is connected to the controller signal; A natural gas detector is respectively arranged in the second pipeline and the burner, and is used to detect the concentration of natural gas. The natural gas detector is connected to the controller signal.
5. The baking device according to claim 1, characterized in that: The adjustment component comprises: A first regulating unit is disposed in the first pipeline; A second regulating unit is disposed in the second pipe; The third regulating unit is arranged in the third pipeline.
6. The baking device according to claim 5, characterized in that: The first adjustment unit comprises: a first valve, disposed on the first pipeline, and the first valve is used to control the opening or closing of the first pipeline; The first electric blind plate valve is arranged at the connection between the first pipeline and the third pipeline. The first electric blind plate valve is used to control the flow of the gas in the first pipeline. The first electric blind plate valve is connected to the controller signal.
7. The baking device according to claim 5, characterized in that: The second adjusting unit comprises: a second valve, disposed on the second pipeline, the second valve being used to control the opening or closing of the second pipeline; a pressure regulator, disposed in the second pipeline, and used for regulating the gas pressure in the second pipeline; The second electric blind plate valve is arranged at the connection between the second pipeline and the third pipeline. The second electric blind plate valve is used to control the flow of natural gas in the second pipeline. The second electric blind plate valve is connected to the controller signal.
8. The baking device according to claim 5, characterized in that: The second adjusting unit comprises: an electric regulating valve, disposed in the third pipeline, the electric regulating valve being used to regulate the gas flow in the third pipeline, and the electric regulating valve being connected to the controller signal; The first electromagnetic quick-cut valve is arranged in the third pipeline, and the first electromagnetic quick-cut valve is used to control the opening or closing of the third pipeline.
9. The baking device according to claim 1, characterized in that: The baking device further comprises a purge assembly, which is connected to the third pipeline and is used to purge the first pipeline, the second pipeline and the third pipeline before the baking device works.
10. The baking device according to claim 9, characterized in that: The purge assembly comprises: A fourth pipeline, one end of which is connected to the nitrogen gas source, and the other end of which is connected to the third pipeline; a fourth valve, disposed in the fourth pipeline, and used to control the opening or closing of the fourth pipeline; The second electromagnetic quick-cut valve is arranged in the fourth pipeline, and the second electromagnetic quick-cut valve is used to control the fourth pipeline to be opened or closed.
