Prefabricated cross beam of large-span concrete-filled steel tube arch bridge
By designing a prefabricated beam system with replaceable side form sections and an integral hanging formwork system, the problems of insufficient beam stiffness and difficulty in hoisting in the existing technology have been solved, and efficient construction and quality assurance of large-span beams have been achieved.
Patent Information
- Application Number
- CN202323403491.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-13
AI Technical Summary
In the construction of existing long-span concrete-filled steel tube arch bridge beams, the rigidity of the prefabricated formwork is insufficient, making it difficult to produce large-span beams, and the formwork support and demoulding require a lot of labor, and grout leakage is prone to occur during the hoisting process, and the prefabricated beams are difficult to hoist. .
A prefabricated beam system including a base, beam side formwork, pulleys, gantry crane and other components was designed. Through the replaceable side formwork sections and the overall hanging formwork system, the beam can be flexibly adjusted and efficiently hoisted to ensure construction quality.
It improves the material utilization rate of the beam, simplifies the hoisting process, reduces labor consumption, and ensures construction quality and hoisting safety.
Smart Images

Figure CN221877755U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of crossbeam construction of a large-span steel tube concrete arch bridge, in particular to a prefabricated assembled crossbeam of a large-span steel tube concrete arch bridge. Background Art
[0002] With the rapid development of my country's modernization, the national railways, highways, and urban transportation lines are well connected. As an important part of the transportation lines, bridge construction has also been shining and achieved brilliant achievements. With the continuous emergence of new materials and the improvement of people's knowledge of mechanics, various arch bridges have appeared one after another, from the initial stone arch bridges to the later iron arch bridges, steel arch bridges, and concrete arch bridges. The spanning capacity of arch bridges has also been greatly improved, and the cross-sectional size has also been reduced.
[0003] At present, beams are generally prefabricated in factories and hoisted and installed on site. The templates currently used in prefabrication sites have limited rigidity and cannot produce beams with larger spans. Furthermore, the current template support and demoulding require a lot of manpower, and the ends of the templates are prone to leakage. At the same time, during the construction of steel tube concrete arch bridges, the hoisting of prefabricated beams is also one of the difficulties in construction. In engineering, cable cranes are often used to directly bind the beams for hoisting or floating cranes are used for hoisting. However, these two methods are subject to certain conditions in engineering applications. Utility Model Content
[0004] The utility model aims to overcome the deficiencies in the prior art and provide a prefabricated assembled cross beam for a large-span steel tube concrete arch bridge.
[0005] The prefabricated assembled cross beam of the large-span steel tube concrete arch bridge comprises a base and a temporary bracket. The prefabricated cross beam is placed on the base. The two sides of the prefabricated cross beam are provided with cross beam side molds. The outer side of the cross beam side mold is provided with a side mold reinforced double-jointed channel steel. A pulley is provided at the bottom of the reinforced double-jointed channel steel. A replaceable side mold section is provided on the upper part of the cross beam side mold. A gantry crane is provided on the outer side of the cross beam side mold.
[0006] Two reserved square holes are arranged on the top of the base, and a steel plate is arranged on the top surface of the reserved square holes of the base. A bottom sleeve of a lifting rope is arranged in the reserved square hole of the base below the steel plate; a lifting rope sleeve fixing plate is arranged on the top of the side form of the beam, a semi-embedded tripod is arranged at the rear of the lifting rope sleeve fixing plate, and a lifting rope sleeve is arranged on the lifting rope sleeve fixing plate;
[0007] When the prefabricated crossbeam is hoisted, a hoisting rope is passed through the bottom sleeve and the rope sleeve, and the gantry crane is connected to the hoisting rope through a hook.
[0008] Preferably, the crossbeam side form is placed on a base, with multiple side form supporting angles arranged between the two, the replaceable side form section and the crossbeam side form are connected by replaceable side form fixing bolts, a support spring is arranged between the replaceable side form section and the side form reinforced double-piece channel steel, a plurality of channel steel reserved screw holes are arranged on the top of the side form reinforced double-piece channel steel, the channel steel reserved screw holes are used to install the upper adjusting screws on the side form top connecting plate, the side form upper tensioning screws are arranged on the top surface of the reinforced double-piece channel steel, and a pulley locking plate is arranged on one side of the pulley.
[0009] Preferably, the base is a cast-in-place concrete structure, the top surface of the steel plate is provided with steel plate anchor bars, the base is provided with multiple base upper screw holes and base lower screw holes, the openings of the base lower screw holes are provided with base opening protection rings, the upper screw holes of the base are provided with base upper screws, and the lower screw holes of the base are provided with base lower screws.
[0010] Preferably, an end plate 1 is provided at the end of the side form of the beam, an end plate 2 is provided on the outer side of the end plate 1, and the end plate 1 is provided with a corrugated protection ring and a main reinforcement positioning groove; the end plate 2 is provided with a main reinforcement reserved hole and a corrugated pipe reserved hole.
[0011] Preferably, a Bailey beam is provided on the top of the temporary support, a load-bearing beam is provided on the top of the Bailey beam, a distribution beam is provided on the upper part of the load-bearing beam, a positioning-casting integrated bottom form is provided on the top of the distribution beam, the end of the prefabricated cross beam is arranged on the positioning-casting integrated bottom form, a tie beam is also provided on the load-bearing beam, and the prefabricated cross beam is placed between the tie beams of the two temporary supports.
[0012] Preferably, the prefabricated beam is provided with an end beam at the farthest end, an end beam side formwork is provided on the outer side of the end beam, reserved pull rings for the end beam side formwork are provided on the end beam side formwork close to the cap beam, embedded pull rings for the cap beam are provided on the cap beam, a basket pull rod is provided between the embedded pull rings for the cap beam and the reserved pull rings for the end beam side formwork, the end beam side formwork is L-shaped, a side formwork self-supporting rod and a weight block are provided at the bottom of the end beam side formwork, beam tension bolts are provided on the top of the end beam side formwork, an end beam bottom formwork is provided at the bottom of the end beam side formwork, an end support I-beam is provided under the end beam bottom formwork, sleepers are provided on the end support I-beam, and an end beam side formwork connecting screw is provided between the end support I-beam and the expanded end of the bottom of the end beam side formwork.
[0013] Preferably, a wet joint is provided between the prefabricated cross beam and the tie beams at both ends, wet joint side hanging formworks are provided on both sides of the wet joint, a positioning-casting integrated bottom formwork is provided at the bottom of the wet joint side hanging formworks, the wet joint side hanging formworks and the positioning-casting integrated bottom formworks are connected by wet joint side hanging formwork fixing bolts, a hanging formwork enlargement end is provided at the wet joint side hanging formworks near the tie beam end, two hanging steel plates are provided on the top of the wet joint side hanging formworks, and one end of the hanging steel plate is placed on the tie beam.
[0014] The beneficial effects of the utility model are:
[0015] 1) The upper part of the prefabricated beam formwork adopts replaceable side formwork sections, which makes it adjustable within a certain height range. It is suitable for the prefabrication construction of beams with various beam heights, thereby improving the utilization rate of materials.
[0016] 2) When the beam is prefabricated, a square hole is reserved in the base to embed the lifting rope sleeve used for beam transportation. The lifting rope passes through the lifting rope sleeve to lift the prefabricated beam, which protects the beam body during transportation and does not cause the lifting rope to slide.
[0017] 3) The wet joint between the tie beam and the prefabricated cross beam adopts an integral hanging formwork system. The wet joint side hanging formwork is connected with a positioning-casting integrated bottom formwork through the wet joint side hanging formwork fixing bolts, ensuring the construction quality of the wet joint. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is an overall schematic diagram of the prefabricated assembled beam of a long-span steel tube concrete arch bridge;
[0019] Figure 2 It is a schematic diagram of template support;
[0020] Figure 3 yes Figure 1 and Figure 2 Schematic diagram of area A in the middle;
[0021] Figure 4 This is a schematic diagram of the square hole reserved for the base;
[0022] Figure 5 yes Figure 4 Middle AA section;
[0023] Figure 6 It is a schematic diagram of the end plate;
[0024] Figure 7 It is a schematic diagram of the second end plate;
[0025] Figure 8 It is a schematic diagram of accurate beam drop;
[0026] Fig. 9 It is a schematic diagram of the suspension rope arrangement;
[0027] Fig.10 This is a schematic diagram of the end beam formwork;
[0028] Fig.11 It is a side view of the wet joint of the precast beam;
[0029] Fig.12 It is a cross-section diagram of the wet joint of the precast beam.
[0030] Among them: 1. Prefabricated beam 2. Beam side form 3. Side form reinforced double-piece channel steel 4. Side form support angle steel 5. Support spring 6. Semi-embedded tripod 7. Side form top connection plate 8. Channel steel reserved screw hole 9. Side form upper tension screw 10. Lifting rope sleeve 11. Lifting rope sleeve fixing plate 12. Upper adjustment bolt 13. Replaceable side form section 14. Replaceable side form fixing bolt 15. Pulley 16. Pulley locking plate 17. Screw reserved hole on base 18. Base 19. Base hole protection ring 20. Base lower screw 21. Base upper screw 22. End plate 1 23. Corrugated pipe protection ring 24. Main reinforcement positioning groove 25. End plate 2 26. Main reinforcement reserved hole 27. Corrugated pipe reserved hole 28. Steel plate 29. Base Reserved square hole in the seat 30. Bottom sleeve of the lifting rope 31. Steel plate anchor 32. Temporary support 33. Bailey beam 34. Distribution beam 35. Load-bearing beam 36. Tie beam 38. Lifting rope 39. Positioning-casting integrated bottom formwork 40. Bottom formwork supporting I-beam 41. Cap beam 42. End supporting I-beam 43. Sleeper 44. Side formwork of end beam 45. Pre-buried pull ring of cap beam 46. Flower basket pull rod 47. Reserved pull ring of side formwork of end beam 48. Tension bolts of end beam 49. End beam 50. Self-supporting rod of side formwork 51. Weight block 52. Connecting screw of side formwork of end beam 53. Fixing bolts of side hanging formwork of wet joint 54. Enlarged end plate of hanging formwork 55. Side hanging formwork of wet joint 56. Suspension steel plate 57. Gantry crane 58. Lifting hook 59. Track. DETAILED DESCRIPTION
[0031] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
[0032] As an example, Figures 1 to 12 As shown, this large-span steel tube concrete arch bridge prefabricated assembled beam mainly includes a prefabricated beam 1, a beam side form 2, a supporting spring 5, a replaceable side form section 13, a pulley 15, a base 18, an end plate, a temporary bracket 32, a Bailey beam 33, a load-bearing beam 35, a lifting rope 38, a positioning-casting integrated bottom form 39, a wet joint side hanging form 55, a hook 58, a rail 59, etc. The prefabricated beam 1 is placed on the base 18, and beam side formworks 2 are arranged on both sides of the prefabricated beam 1. Side formwork reinforced double-jointed channel steels 3 are arranged on the outer side of the beam side formwork 2, and a pulley 15 is arranged on the bottom of the reinforced double-jointed channel steels 3. A replaceable side form section 13 is arranged on the upper part of the beam side formwork 2, and a prefabricated beam transfer gantry crane 57 is arranged on the outer side of the beam side formwork 2.
[0033] Two reserved square holes 29 are provided on the top of the base 18, and a steel plate 28 is provided on the top surface of the reserved square holes 29. A bottom sleeve 30 for a hanging rope is provided in the reserved square holes 29 below the steel plate 28; a hanging rope sleeve fixing plate 11 is provided on the top of the beam side mold 2, a semi-embedded tripod 6 is provided at the rear of the hanging rope sleeve fixing plate 11, and a hanging rope sleeve 10 is provided on the hanging rope sleeve fixing plate 11;
[0034] When the prefabricated cross beam 1 is hoisted, a hoisting rope 38 is passed through the hoisting rope bottom sleeve 30 and the hoisting rope sleeve 10 , and the gantry crane 57 is connected to the hoisting rope 38 via a hook 58 .
[0035] The beam side formwork 2 is placed on a base 18, a side formwork reinforcing double-jointed channel steel 3 is arranged on the outer side of the beam side formwork 2, a plurality of side formwork supporting angle steels 4 are arranged between the two, a replaceable side formwork section 13 is arranged on the upper part of the beam side formwork 2, the replaceable side formwork section 13 and the beam side formwork 2 are connected by replaceable side formwork fixing bolts 14, a support spring 5 is arranged between the replaceable side formwork section 13 and the side formwork reinforcing double-jointed channel steel 3, a plurality of channel steel reserved screw holes 8 are arranged on the top of the side formwork reinforcing double-jointed channel steel 3, the channel steel reserved screw holes 8 are used to install the upper adjusting screws 12 on the side formwork top connecting plate 7, a rope sleeve fixing plate 11 is arranged on the top of the beam side formwork 2, a semi-embedded tripod 6 is arranged at the rear of the rope sleeve fixing plate 11, a rope sleeve 10 is arranged on the rope sleeve fixing plate 11, a side form upper tension screw 9 is arranged on the top surface of the reinforced double-jointed channel steel 3, a pulley 15 is arranged at the bottom of the reinforced double-jointed channel steel 3, and a pulley locking plate 16 is arranged on one side of the pulley 15.
[0036] The base 18 is a cast-in-place concrete structure, with two base reserved square holes 29 arranged in the span, a steel plate 28 arranged on the top surface of the base reserved square hole 29, two lifting rope bottom sleeves 30 arranged on the bottom surface of the steel plate 28, and a steel plate anchor 31 arranged on the top surface. A plurality of base upper screw holes 17 and base lower screw holes are arranged on the base 18, a base hole opening protection ring 19 is arranged at the hole opening of the lower screw hole of the base, an upper base screw 21 is arranged in the upper screw hole 17 of the base, and a lower base screw 20 is arranged in the lower screw hole of the base.
[0037] An end plate 22 is arranged at the end of the beam side form 2, and an end plate 25 is arranged outside the end plate 22. A corrugated protection ring 23 and a main reinforcement positioning groove 24 are arranged on the end plate 22; a main reinforcement reserved hole 26 and a corrugated pipe reserved hole 27 are arranged on the end plate 25.
[0038] A Bailey beam 33 is arranged on the top of the temporary support 32, a load-bearing beam 35 is arranged on the top surface of the Bailey beam 33, a distribution beam 34 is arranged on the upper part of the load-bearing beam 35, a positioning-casting integrated bottom form 39 is arranged on the top surface of the distribution beam 34, a prefabricated cross beam 1 is arranged on the positioning-casting integrated bottom form 39, a tie beam 36 is also arranged on the load-bearing beam 35, the prefabricated cross beam 1 is placed between the tie beams 36 of the two temporary supports 32, and a lifting rope 38 is arranged in the lifting rope bottom sleeve 30 and the lifting rope sleeve 10.
[0039] The end of the prefabricated cross beam 1 is provided with a cast-in-place end cross beam 49, and an end cross beam side formwork 44 is provided on the outer side of the end cross beam 49. Two end cross beam side formwork reserved pull rings 47 are provided every 2m on the end cross beam side formwork 44 near the cap beam 41, and a cap beam embedded pull ring 45 is provided every 2m on the cap beam 41. A basket pull rod 46 is provided between the cap beam embedded pull ring 45 and the end cross beam side formwork reserved pull ring 47. The end cross beam side formwork 44 is L-shaped, and a side formwork self-supporting rod 50 and a weight block 51 are provided at the bottom. A cross beam tension bolt 48 is provided at the top of the end cross beam side formwork 44, and an end cross beam bottom formwork is provided at the bottom of the end cross beam side formwork 44. An end support I-beam 42 is provided under the end cross beam bottom formwork, and a sleeper 43 is provided on the end support I-beam 42. An end cross beam side formwork connecting screw 52 is provided between the end support I-beam 42 and the bottom expanded end of the end cross beam side formwork 44.
[0040] A wet joint is arranged between the prefabricated cross beam 1 and the tie beams 36 at both ends thereof, wet joint side hanging formworks 55 are arranged on both sides of the wet joint, a positioning-casting integrated bottom formwork 39 is arranged at the bottom of the wet joint side hanging formworks 55, and the two are connected by wet joint side hanging formwork fixing bolts 53, a hanging formwork enlarged end 54 is arranged near the end of the tie beam 36 of the wet joint side hanging formworks 55, two hanging steel plates 56 are arranged on the top of the wet joint side hanging formworks 55, and one end of the hanging steel plate 56 is placed on the tie beam 36.
Claims
1. A prefabricated assembled cross beam of a long-span steel tube concrete arch bridge, characterized in that: It includes a base and a temporary support, a prefabricated beam is placed on the base, beam side molds are arranged on both sides of the prefabricated beam, side mold reinforced double-jointed channel steel is arranged on the outer side of the beam side mold, a pulley is arranged at the bottom of the reinforced double-jointed channel steel, a replaceable side mold section is arranged on the upper part of the beam side mold, and a gantry crane is arranged on the outer side of the beam side mold; Two reserved square holes are arranged on the top of the base, and a steel plate is arranged on the top surface of the reserved square holes of the base. A bottom sleeve of a lifting rope is arranged in the reserved square hole of the base below the steel plate; a lifting rope sleeve fixing plate is arranged on the top of the side form of the beam, a semi-embedded tripod is arranged at the rear of the lifting rope sleeve fixing plate, and a lifting rope sleeve is arranged on the lifting rope sleeve fixing plate; When the prefabricated crossbeam is hoisted, a hoisting rope is passed through the bottom sleeve and the rope sleeve, and the gantry crane is connected to the hoisting rope through a hook.
2. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 1 is characterized in that The crossbeam side formwork is placed on a base, with multiple side formwork supporting angle steels arranged between the two, the replaceable side formwork section and the crossbeam side formwork are connected by replaceable side formwork fixing bolts, a support spring is arranged between the replaceable side formwork section and the side formwork reinforced double-piece channel steel, a plurality of channel steel reserved screw holes are arranged on the top of the side formwork reinforced double-piece channel steel, the channel steel reserved screw holes are used to install the upper adjusting screws on the side formwork top connecting plate, the side formwork upper tensioning screws are arranged on the top surface of the reinforced double-piece channel steel, and a pulley locking plate is arranged on one side of the pulley.
3. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 2 is characterized in that The base is a cast-in-place concrete structure, the top surface of the steel plate is provided with steel plate anchor bars, the base is provided with multiple base upper screw holes and base lower screw holes, the openings of the base lower screw holes are provided with base opening protection rings, the upper screw holes of the base are provided with base upper screws, and the lower screw holes of the base are provided with base lower screws.
4. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 1 is characterized in that An end plate 1 is provided at the end of the side form of the beam, and an end plate 2 is provided on the outer side of the end plate 1. The end plate 1 is provided with a corrugated protection ring and a main reinforcement positioning groove; the end plate 2 is provided with a main reinforcement reserved hole and a corrugated pipe reserved hole.
5. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 4 is characterized in that A Bailey beam is provided on the top of the temporary support, a load-bearing beam is provided on the top surface of the Bailey beam, a distribution beam is provided on the upper part of the load-bearing beam, a positioning-casting integrated bottom form is provided on the top surface of the distribution beam, the end of the prefabricated cross beam is arranged on the positioning-casting integrated bottom form, a tie beam is also provided on the load-bearing beam, and the prefabricated cross beam is placed between the tie beams of the two temporary supports.
6. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 1 is characterized in that The prefabricated crossbeam is provided with an end crossbeam at the farthest end, an end crossbeam side formwork is provided on the outer side of the end crossbeam, reserved pull rings for the end crossbeam side formwork are provided on the end crossbeam side formwork close to the cap beam, embedded pull rings for the cap beam are provided on the cap beam, a basket pull rod is provided between the embedded pull rings for the cap beam and the reserved pull rings for the end crossbeam side formwork, the end crossbeam side formwork is L-shaped, a side formwork self-supporting rod and a weight block are provided at the bottom of the end crossbeam side formwork, crossbeam tension bolts are provided on the top of the end crossbeam side formwork, an end crossbeam bottom formwork is provided at the bottom of the end crossbeam side formwork, an end support I-beam is provided under the end crossbeam bottom formwork, sleepers are provided on the end support I-beam, and an end crossbeam side formwork connecting screw is provided between the end support I-beam and the expanded end of the bottom of the end crossbeam side formwork.
7. The prefabricated assembled cross beam of a long-span steel tube concrete arch bridge according to claim 5 is characterized in that A wet joint is provided between the prefabricated cross beam and the tie beams at both ends, wet joint side hanging formworks are provided on both sides of the wet joint, a positioning-casting integrated bottom formwork is provided at the bottom of the wet joint side hanging formworks, the wet joint side hanging formworks and the positioning-casting integrated bottom formworks are connected by wet joint side hanging formwork fixing bolts, a hanging formwork enlargement end is provided at the wet joint side hanging formworks near the tie beam end, two hanging steel plates are provided on the top of the wet joint side hanging formworks, and one end of the hanging steel plate is placed on the tie beam.