Loader for constructional engineering

By installing a limit rod and a sliding partition in the loader bucket, combined with the rotating screw and handle mechanism, the problem of material sticking to the inner wall of the loader bucket is solved, achieving efficient cleaning and improving the loader's efficiency.

CN221878221UActive Publication Date: 2024-10-22HEBEI JUNXINTAI CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323644062.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-22
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

When the loader is shoveling sand and gravel, the sand and impurities tend to stick to the inner wall of the bucket, affecting the loading efficiency and making it difficult to clean.

Method used

Design a loader for construction engineering, which is equipped with a transverse limit rod and a sliding partition. There is a scraper at the bottom of the partition that contacts the inner wall of the bucket. Through the rotating screw and handle mechanism, the partition can be moved and fixed to assist in cleaning. Sticky material.

Benefits of technology

It effectively avoids material adhesion, improves the cleaning efficiency of the inner wall of the bucket, and ensures the efficiency and practicality of the loader.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878221U_ABST
    Figure CN221878221U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of loaders, in particular to a loader for constructional engineering, which timely cleans materials adhered to the inner side wall of a bucket, prevents the materials from adhering to the inner side wall of the bucket, ensures the efficiency of using and operating the bucket, and improves the practicability. A bucket is installed at one end of the loading machine, a plurality of limiting rods are transversely and fixedly installed in the bucket, a partition plate is slidably installed on each limiting rod, a scraping plate is fixedly installed on the outer side wall of each partition plate, the bottom end of each scraping plate is slidably connected with the inner side wall of the bucket, and two threaded holes are symmetrically formed in the outer side wall of the bucket. Wherein a first screw rod is screwed on one threaded hole, a threaded groove is formed in the outer side wall of the partition plate, and a second screw rod is transversely screwed on the threaded groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of loaders, and specifically to a loader for construction engineering. Background Art

[0002] Loader is a kind of earthwork construction machinery widely used in construction projects such as highway, railway, building, hydropower, port, mine, etc. It is mainly used for shoveling soil, sand, gravel, lime, coal and other bulk materials, and can also do light shoveling operations on ore, hard soil, etc., and can also perform bulldozing, lifting and loading and unloading operations of other materials such as wood by replacing different auxiliary working devices. In roads, especially in the construction of high-grade highways, loaders are used for filling and excavation of roadbed projects, aggregate and charging of asphalt mixtures and cement concrete material fields, in addition, they can also carry out operations such as pushing soil, leveling the ground and towing other machinery. Because loader has the advantages of fast operating speed, high efficiency, good maneuverability and light operation, it has become one of the main machines for earthwork construction in engineering construction.

[0003] However, the following problems may occur during the shoveling process of the loader:

[0004] During the process of loading sand and gravel by the loader, sand and gravel and impurities will easily stick to the inner wall of the loading and unloading bucket. The long-term adhesion greatly affects the loading efficiency of the bucket. In addition, the long-term adhesion of sand and gravel and impurities to the inner wall of the bucket is not convenient for the subsequent cleaning of the bucket. Therefore, a loader for construction projects is needed. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] In view of the deficiencies in the prior art, the present application provides a method for timely cleaning materials adhered to the inner wall of the bucket, thereby preventing materials from adhering to the inner wall of the bucket, ensuring the efficiency of bucket operation, and improving the practicality of a loader for construction projects.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a loader for construction engineering, including a loader, a bucket is installed at one end of the loader, a plurality of limit rods are fixedly installed horizontally inside the bucket, a partition is slidably installed on each limit rod, a scraper is fixedly installed on the outer wall of the partition, the bottom end of the scraper is slidably connected to the inner wall of the bucket, two threaded holes are symmetrically opened on the outer wall of the bucket, a first screw is screwed on one of the threaded holes, a threaded groove is opened on the outer wall of the partition, and a second screw is screwed horizontally on the threaded groove.

[0009] Preferably, a limit plate is fixedly mounted on the outer side wall of the partition, and the bottom end of the limit plate is fitted with the inner bottom end of the bucket.

[0010] Furthermore, a first handle is fixedly mounted on one end of the second screw rod.

[0011] Furthermore, a second handle is fixedly mounted on the top of the partition.

[0012] Based on the above solution, a third handle is fixedly mounted on one end of the first screw rod.

[0013] (III) Beneficial effects

[0014] Compared with the prior art, the present application provides a loader for construction engineering, which has the following beneficial effects:

[0015] The loader for construction projects loads materials through the rotation and support of the bucket, continuously scrapes materials adhering to the inner wall of the bucket through the scraper at the bottom of the partition constantly contacting the inner wall of the bucket, limits the partition for lateral movement through the bucket, fixes the partition when not in use through the second screw, and assists the partition in moving inside the bucket by rotating the first screw, thereby timely cleaning materials adhering to the inner wall of the bucket to prevent materials from adhering to the inner wall of the bucket, thereby ensuring the efficiency of the bucket use and improving practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the three-dimensional structure of this application;

[0017] Figure 2 This is a schematic diagram of the cross-sectional structure of this application;

[0018] Figure 3 For this application Figure 2 A schematic diagram of the enlarged structure of the middle part A;

[0019] Figure 4 This is a schematic diagram of the connection structure of the bucket and partition etc. in this application.

[0020] Markings in the attached drawings: 1. loader; 2. bucket; 3. partition; 4. limit rod; 5. scraper; 6. threaded hole; 7. first screw; 8. second screw; 9. first handle; 10. limit plate; 11. second handle; 12. third handle. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0022] Example

[0023] See also Figure 1-4 A loader for construction engineering includes a loader 1, a bucket 2 is installed at one end of the loader 1, a plurality of limit rods 4 are fixedly installed horizontally inside the bucket 2, a partition 3 is slidably installed on each limit rod 4, a scraper 5 is fixedly installed on the outer wall of the partition 3, the bottom end of the scraper 5 is slidably connected to the inner wall of the bucket 2, two threaded holes 6 are symmetrically opened on the outer wall of the bucket 2, a first screw 7 is screwed on one of the threaded holes 6, a thread groove is opened on the outer wall of the partition 3, and a second screw 8 is screwed horizontally on the thread groove. The loader for construction engineering can rotate and support the bucket 2 to move objects. The material is loaded through the scraper 5 at the bottom of the partition 3, which is in continuous contact with the inner wall of the bucket 2, and the material adhering to the inner wall of the bucket 2 is continuously scraped. The bucket 2 limits the partition 3 for horizontal movement, and the second screw 8 fixes the partition 3 when not in use. The first screw 7 is rotated to assist the partition 3 in moving inside the bucket 2, and the material adhering to the inner wall of the bucket 2 is cleaned in time to avoid the material adhering to the inner wall of the bucket 2, thereby ensuring the efficiency of the bucket 2 and improving the practicability.

[0024] See also Figure 3 A limit plate 10 is fixedly installed on the outer wall of the partition 3, and the bottom end of the limit plate 10 is in contact with the inner bottom end of the bucket 2. By installing the limit plate 10, the material loaded inside the bucket 2 is blocked and limited.

[0025] See also Figure 3 A first handle 9 is fixedly mounted on one end of the second screw rod 8 . By installing the first handle 9 , it is convenient for the user to rotate the second screw rod 8 , thereby fixing the partition 3 .

[0026] See also Figure 4 It should also be noted that a second handle 11 is fixedly installed on the top of the partition 3. By installing the second handle 11, it is convenient for the user to move the partition 3 horizontally under the limit of the bucket 2.

[0027] See also Figure 2A third handle 12 is fixedly mounted on one end of the first screw rod 7 . By installing the third handle 12 , it is convenient for the user to rotate the first screw rod 7 .

[0028] In summary, when the loader for construction projects is in use, the bucket 2 is controlled by the loader 1, so that the bucket 2 is used to load and transport materials. The first handle 9 is rotated and the second screw 8 is synchronously driven to rotate, so that the second screw 8 is disengaged from the threaded groove on the partition 3, and the partition 3 is moved laterally under the limit of the bucket 2 through the second handle 11. The scraper 5 is moved while the partition 3 is moved. The scraper 5 is constantly in contact with the inner wall of the bucket 2, so that the materials adhered to the inner wall of the bucket 2 are cleaned in time. The third handle 12 is rotated and the first screw 7 is synchronously driven to rotate. Since the first screw 7 and the threaded hole 6 are screwed together, one end of the first screw 7 is in contact with the outer wall of the partition 3 when the first screw 7 is rotated, thereby assisting the partition 3 to move laterally.

[0029] Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A loader for construction engineering, comprising a loader (1), characterized in that: A bucket (2) is installed at one end of the loader (1), and a plurality of limit rods (4) are fixedly installed transversely inside the bucket (2), and a partition (3) is slidably installed on each limit rod (4). A scraper (5) is fixedly installed on the outer wall of the partition (3), and the bottom end of the scraper (5) is slidably connected to the inner wall of the bucket (2). Two threaded holes (6) are symmetrically provided on the outer wall of the bucket (2), and a first screw (7) is screwed on one of the threaded holes (6). A threaded groove is provided on the outer wall of the partition (3), and a second screw (8) is screwed transversely on the threaded groove.

2. A construction engineering loader according to claim 1, characterized in that: A limiting plate (10) is fixedly mounted on the outer side wall of the partition (3), and the bottom end of the limiting plate (10) is in contact with the inner bottom end of the bucket (2).

3. A construction engineering loader according to claim 2, characterized in that: A first handle (9) is fixedly mounted on one end of the second screw rod (8).

4. A loader for construction engineering according to claim 3, characterized in that: A second handle (11) is fixedly mounted on the top end of the partition (3).

5. A construction engineering loader according to claim 4, characterized in that: A third handle (12) is fixedly mounted on one end of the first screw rod (7).