Hanging bracket platform for sand blasting and corrosion prevention in large oil storage tank
By designing a hanger platform for sandblasting and anti-corrosion in large oil storage tanks, and using technologies such as lifting components and safety locks, the problems of low efficiency and insufficient safety of traditional construction have been solved, and the efficiency and safety of anti-corrosion construction in the tank have been achieved. promote.
Patent Information
- Application Number
- CN202420174986.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-24
AI Technical Summary
The traditional construction of scaffolding inside and outside the tank results in low anti-corrosion and thermal insulation construction efficiency, limited operation of construction personnel, and slow transfer of materials, affecting construction efficiency.
Design a hanger platform for sandblasting and anti-corrosion in large oil storage tanks, including lifting components, electric hoists, guide chains, seamless steel pipes, construction scaffolding, protective railings, diagonal tie rods, counterweights, traction ropes and U-shaped grooves Steel, the electric hoist is used to drive the lifting of the construction scaffolding, and the positioning wire rope and safety lock are used to ensure safety and stability.
It improves the efficiency of anti-corrosion construction in the tank, shortens the construction period, and provides safety guarantee to ensure the stability and safety of the construction process.
Smart Images

Figure CN221878765U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of a hanger platform, in particular to a hanger platform for sandblasting and anti-corrosion in a large oil storage tank. Background Art
[0002] The traditional method for anti-corrosion and thermal insulation construction inside and outside the tank is to build a full-height scaffolding inside the tank and a double-row scaffolding outside the tank. This method is considered safe in people's minds. However, in terms of the construction characteristics of anti-corrosion and thermal insulation projects, this method is not efficient;
[0003] Firstly, the time for erecting scaffolding is basically equal to that for anti-corrosion or thermal insulation construction. In fact, erecting scaffolding takes even longer than that for anti-corrosion construction. Secondly, the use of scaffolding for anti-corrosion and thermal insulation construction faces many obstacles, which affects the operation of construction workers and greatly reduces the construction efficiency. The obstacle comes from the fact that when the scaffolding is erected, the scaffolding materials can only be transferred into the tank through the manhole in the pipe wall, which is slow and inefficient. Therefore, a hanger platform for sandblasting anti-corrosion in large oil storage tanks is proposed. Utility Model Content
[0004] In view of this, the utility model provides a hanger platform for sandblasting and anti-corrosion in a large oil storage tank to solve or alleviate the technical problems existing in the prior art and at least provide a beneficial choice.
[0005] The technical solution of the embodiment of the utility model is implemented as follows: a hanger platform for sandblasting and anti-corrosion in a large oil storage tank, including a lifting assembly, the lifting assembly including a tank body, an electric hoist, a guide chain, a seamless steel pipe, a construction scaffold, a center ear plate, a guardrail, a diagonal tie rod, a counterweight, a traction rope, a lifting ear, and a U-shaped channel steel;
[0006] The top of the tank body is fixedly connected with a U-shaped channel steel, an electric hoist is provided on the top inner wall of the U-shaped channel steel, a guide chain is provided on the electric hoist, a construction scaffold is provided in the tank body, a seamless steel pipe is fixedly connected to the construction scaffold, a guardrail is provided on the construction scaffold, a plurality of inclined tie rods are movably contacted on the construction scaffold, a counterweight is provided on the top of the construction scaffold, a center ear plate is provided at the bottom of the tank body, two lifting ears are fixedly connected to the bottom of the construction scaffold, three traction ropes are provided, the lifting ears are fixedly connected to the corresponding traction ropes, the end of the traction rope is fixed on the center ear plate, a U-shaped buckle is fixedly connected to one side of the seamless steel pipe, a hook is provided on the guide chain, and the hook is hung on the U-shaped buckle.
[0007] Further preferably, a positioning steel wire rope is provided on the top inner wall of the U-shaped channel steel, and the end of the positioning steel wire rope passes through the seamless steel pipe and is fixed on the center ear plate.
[0008] Further preferably, another one of the three traction ropes is provided with a fall arrester.
[0009] Further preferably, skirting boards are fixedly connected to the inner walls on both sides of the guardrail.
[0010] Further preferably, a wire mesh is fixedly connected to the top of the construction scaffolding.
[0011] Further preferably, the positioning steel wire rope is provided with a plurality of safety locks, and the positioning steel wire rope is fixed to the seamless steel pipe by the safety locks.
[0012] Further preferably, a plurality of assembly blocks are fixedly connected to the construction scaffolding and the seamless steel pipe.
[0013] Further preferably, the diagonal tie rod is threadedly connected to the corresponding assembly block via bolts.
[0014] The embodiment of the utility model has the following advantages due to the adoption of the above technical solution:
[0015] The utility model transports the guide chain to the top of the tank body, hangs the hook on the seamless steel pipe on the construction scaffolding, slowly puts the guide chain and the hook into the tank body from the breathing valve hole, and drops them to the position of the U-shaped buckle of the inner frame, the hook hooks the U-shaped buckle, and the electric hoist is used as the lifting drive of the construction scaffolding. In order to prevent the guide chain from failing, a positioning wire rope is added in parallel with the guide chain as a sliding rope, and the construction scaffolding slides up and down along the positioning wire rope. When the construction scaffolding is lifted, it is pulled by the traction rope and operated by people on the ground to control the smooth lifting of the construction scaffolding. When it reaches the working surface, it stops. Lifting, at this time, the positioning wire rope is locked on the seamless steel pipe with a safety lock, which very safely prevents the construction scaffolding from falling. At the same time, the traction rope is tied to the center ear plate. When workers walk on the construction scaffolding, it can completely prevent the construction scaffolding from losing balance and tilting. The switch of the electric hoist is connected to the bottom inner wall of the tank body, and the personnel on the construction scaffolding in the tank body operate the lifting and lowering of the construction scaffolding. In summary, the internal hanger is mature in production and use. Its application in tank anti-corrosion construction can greatly improve construction efficiency, shorten construction period, and is safe.
[0016] The above summary is for the purpose of description only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the utility model will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a structural diagram of the utility model;
[0019] Figure 2 It is a partial structural diagram of the utility model;
[0020] Figure 3 This is a top view structural diagram of a construction scaffold of the utility model;
[0021] Figure 4 For the utility model Figure 2 Enlarged structural diagram of area A in the middle.
[0022] Figure numerals: 1. lifting assembly; 2. tank body; 3. electric hoist; 4. guide chain; 5. seamless steel pipe; 6. construction scaffolding; 7. positioning wire rope; 8. center ear plate; 9. guardrail; 10. inclined rod; 11. safety lock; 12. counterweight; 13. traction rope; 14. lifting ear; 15. U-shaped channel steel; 16. fall arrester; 17. skirting board; 18. wire mesh; 19. assembly block; 20. bolt. DETAILED DESCRIPTION
[0023] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit or scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0024] The embodiments of the present utility model are described in detail below with reference to the accompanying drawings.
[0025] like Figure 1-4 As shown, the embodiment of the utility model provides a hanger platform for sandblasting and anti-corrosion in a large oil storage tank, including a lifting assembly 1, the lifting assembly 1 includes a tank body 2, an electric hoist 3, a guide chain 4, a seamless steel pipe 5, a construction scaffold 6, a center ear plate 8, a guardrail 9, a diagonal tie rod 10, a counterweight 12, a traction rope 13, a lifting ear 14, and a U-shaped channel steel 15;
[0026] The top of the tank body 2 is fixedly connected with a U-shaped channel steel 15, an electric hoist 3 is arranged on the inner wall of the top of the U-shaped channel steel 15, a guide chain 4 is arranged on the electric hoist 3, a construction scaffold 6 is arranged in the tank body 2, a seamless steel pipe 5 is fixedly connected to the construction scaffold 6, a guardrail 9 is arranged on the construction scaffold 6, a plurality of inclined rods 10 are movable in contact with the construction scaffold 6, a counterweight 12 is arranged on the top of the construction scaffold 6, a central ear plate 8 is arranged at the bottom of the tank body 2, and two There are three lifting ears 14 and traction rope 13. The lifting ears 14 are fixedly connected with the corresponding traction rope 13. The end of the traction rope 13 is fixed on the central ear plate 8. One side of the seamless steel pipe 5 is fixedly connected with a U-shaped buckle. The guide chain 4 is provided with a hook, which is hung on the U-shaped buckle. The guide chain 4 is transported to the top of the tank body 2, and the hook is hung on the seamless steel pipe 5 on the construction scaffolding 6. The guide chain 4 and the hook are slowly put into the tank body 2 from the breathing valve hole, and dropped to the position of the U-shaped buckle of the inner frame. The hook is hooked The U-shaped buckle and the electric hoist 3 are used as the lifting drive of the construction scaffold 6. In order to prevent the failure of the guide chain 4, a positioning wire rope 7 is added in parallel with the guide chain 4 as a sliding rope. The construction scaffold 6 slides up and down along this positioning wire rope 7. When the construction scaffold 6 is lifted, it is pulled by the traction rope 13 and the people on the ground operate to control the smooth lifting of the construction scaffold 6. When it reaches the working surface, the lifting is stopped. At this time, the positioning wire rope 7 is locked on the seamless steel pipe 5 with a safety lock buckle 11, which is very safe to prevent the construction scaffold from being damaged. The construction scaffolding 6 falls, and the traction rope 13 is tied to the central ear plate 8 at the same time. When the workers walk on the construction scaffolding 6, the construction scaffolding 6 can be completely prevented from losing balance and tilting. The switch of the electric hoist 3 is connected to the bottom inner wall of the tank body 2, and the personnel on the construction scaffolding 6 in the tank body 2 operate the lifting and lowering of the construction scaffolding 6. In summary, the internal hanger is mature in production and use. Its application in tank anti-corrosion construction can greatly improve construction efficiency, shorten construction period, and is safe.
[0027] In one embodiment, a positioning wire rope 7 is provided on the top inner wall of the U-shaped channel steel 15, and the end of the positioning wire rope 7 passes through the seamless steel pipe 5 and is fixed on the center ear plate 8. The provision of the positioning wire rope 7 plays a positioning role.
[0028] In one embodiment, another traction rope 13 among the three traction ropes 13 is provided with a fall arrester 16, which can quickly lock the traction rope 13 at a critical moment to prevent the worker from falling accidentally or suddenly. It provides an additional safety guarantee for the worker and reduces the risk of injury caused by falling.
[0029] In one embodiment, skirting boards 17 are fixedly connected to the inner walls on both sides of the guardrail 9, and a wire mesh 18 is fixedly connected to the top of the construction scaffolding 6. Both the skirting boards 17 and the wire mesh 18 can provide additional safety protection for the workers. The skirting boards 17 can prevent the workers from stepping on empty space or slipping, thereby reducing the risk of accidental injuries. The wire mesh 18 can prevent the workers from accidentally falling and provide an additional layer of protection.
[0030] In one embodiment, a plurality of safety locks 11 are provided on the positioning wire rope 7, and the positioning wire rope 7 is fixed to the seamless steel pipe 5 through the safety locks 11. The design of the safety locks 11 can ensure that the positioning wire rope 7 is firmly fixed to the seamless steel pipe 5 to prevent it from loosening or falling off.
[0031] In one embodiment, a plurality of assembly blocks 19 are fixedly connected to the construction scaffolding 6 and the seamless steel pipe 5, and the diagonal tie rod 10 is threadedly connected to the corresponding assembly block 19 via bolts 20. The provision of the assembly block 19 facilitates quick assembly.
[0032] The utility model is in operation: when in use, the guide chain 4 is transported to the top of the tank body 2, the hook is hung on the seamless steel pipe 5 on the construction scaffold 6, the guide chain 4 and the hook are slowly put into the tank body 2 from the breathing valve hole, and dropped to the position of the U-shaped buckle of the inner frame, the hook hooks the U-shaped buckle, and the electric hoist 3 is used as the lifting drive of the construction scaffold 6. In order to prevent the guide chain 4 from failing, a positioning wire rope 7 is added in parallel with the guide chain 4 as a sliding rope, and the construction scaffold 6 slides up and down along the positioning wire rope 7. When the construction scaffold 6 is lifted, it is pulled by the traction rope 13, and the people on the ground operate to control the smooth lifting of the construction scaffold 6 to reach the work. When working on the surface, stop lifting. At this time, the positioning wire rope 7 is locked on the seamless steel pipe 5 with a safety lock buckle 11, which very safely prevents the construction scaffolding 6 from falling. At the same time, the traction rope 13 is tied to the center ear plate 8. When workers walk on the construction scaffolding 6, it can completely prevent the construction scaffolding 6 from losing balance and tilting. The switch of the electric hoist 3 is connected to the bottom inner wall of the tank body 2, and the construction scaffolding 6 in the tank body 2 is operated by the personnel on the construction scaffolding 6. In summary, the internal hanger is mature in production and use. Its application in tank anti-corrosion construction can greatly improve construction efficiency, shorten construction period, and is safe.
[0033] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of various changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A hanger platform for sandblasting and anti-corrosion in a large oil storage tank, comprising a lifting assembly (1), characterized in that: The lifting assembly (1) comprises a tank body (2), an electric hoist (3), a guide chain (4), a seamless steel pipe (5), a construction scaffold (6), a central ear plate (8), a guardrail (9), a diagonal tie rod (10), a counterweight (12), a traction rope (13), a lifting ear (14), and a U-shaped channel steel (15); The top of the tank body (2) is fixedly connected to a U-shaped channel steel (15), the top inner wall of the U-shaped channel steel (15) is provided with an electric hoist (3), the electric hoist (3) is provided with a guide chain (4), a construction scaffold (6) is provided in the tank body (2), a seamless steel pipe (5) is fixedly connected to the construction scaffold (6), the construction scaffold (6) is provided with a guardrail (9), a plurality of inclined tie rods (10) are movably contacted on the construction scaffold (6), and the top of the construction scaffold (6) is provided with a plurality of inclined tie rods (10). A counterweight block (12) is provided at the bottom of the tank body (2), a central ear plate (8) is provided at the bottom of the construction scaffold (6), two lifting ears (14) are fixedly connected to the bottom of the construction scaffold (6), three traction ropes (13) are provided, the lifting ears (14) are fixedly connected to the corresponding traction ropes (13), the ends of the traction ropes (13) are fixed to the central ear plate (8), one side of the seamless steel pipe (5) is fixedly connected to a U-shaped buckle, and a hook is provided on the guide chain (4), and the hook is hung on the U-shaped buckle.
2. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 1 is characterized by: A positioning steel wire rope (7) is provided on the top inner wall of the U-shaped channel steel (15), and the end of the positioning steel wire rope (7) passes through the seamless steel pipe (5) and is fixed on the central ear plate (8).
3. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 1 is characterized by: Another traction rope (13) among the three traction ropes (13) is provided with a fall arrester (16).
4. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 1 is characterized by: The inner walls on both sides of the guardrail (9) are fixedly connected with skirting boards (17).
5. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 1 is characterized by: A steel wire mesh (18) is fixedly connected to the top of the construction scaffold (6).
6. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 2 is characterized by: The positioning steel wire rope (7) is provided with a plurality of safety lock buckles (11), and the positioning steel wire rope (7) is fixed to the seamless steel pipe (5) via the safety lock buckles (11).
7. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 1 is characterized by: A plurality of assembly blocks (19) are fixedly connected to the construction scaffold (6) and the seamless steel pipe (5).
8. The hanger platform for sandblasting and anti-corrosion in large oil storage tanks according to claim 7 is characterized in that: The inclined tie rod (10) is threadedly connected to the corresponding assembly block (19) via a bolt (20).