Auxiliary aligning device for oil field pipeline

By designing the snap-in mechanism and fixing components of the oilfield pipeline auxiliary counterpart device, the problem that the existing device can only be applied to a single diameter pipe is solved, the stable fixation of multiple diameter pipes is achieved, and the workload of workers is reduced.

CN221880435UActive Publication Date: 2024-10-22卢兰
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420618608.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-10-22
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

Existing oil field pipeline docking devices can only be applied to pipelines of one diameter, which results in the need to carry multiple devices when connecting oil pipes of different diameters, which increases the workload of workers.

Method used

An auxiliary coupling device for oil field pipelines is designed, which includes a first connecting rod, a second connecting rod and two sets of clamping mechanisms. Through the symmetrical setting and adjustment of the first clamping frame and the second clamping frame, a fixed chamber is formed. Components and reinforcement components enable stable clamping and fixation of pipes of various diameters.

Benefits of technology

It realizes the fixation of pipes of various diameters, reduces the need for workers to carry multiple counterpart devices, and saves work burden.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221880435U_ABST
    Figure CN221880435U_ABST
Patent Text Reader

Abstract

The utility model discloses an oil field pipeline auxiliary aligning device, and relates to the technical field of oil field pipeline aligning devices, the oil field pipeline auxiliary aligning device comprises a first connecting rod, a second connecting rod and two groups of clamping mechanisms, the two groups of clamping mechanisms are respectively arranged on two oil pipes needing to be butted, and one group of clamping mechanism comprises a first clamping frame and a second clamping frame; the first clamping frame is movably installed on the first connecting rod, the second clamping frame is movably installed on the second connecting rod, and the first clamping frame and the second clamping frame are symmetrically arranged. The first clamping frame and the second clamping frame are arranged, so that the fixing cavity is formed between the first clamping frame and the second clamping frame, then the positions of the first clamping frame and the second clamping frame are adjusted, pipelines with various diameters can be clamped and fixed, in the oil field pipeline alignment operation, multiple alignment devices do not need to be carried, and the workload of workers is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oilfield pipeline docking devices, in particular to an oilfield pipeline auxiliary docking device. Background Art

[0002] The oilfield pipeline docking device is an indispensable tool in the process of laying pipeline networks. It is widely used in line joints, pipe port assembly, and station pipe fitting installation and construction.

[0003] However, the pipe connectors currently sold on the market have a disadvantage when used, that is, during the oil field pipeline docking operation, it may be necessary to dock pipes of different diameters, and the pipe connectors currently sold on the market are only suitable for pipes of one diameter. When oil pipes of different diameters need to be used, multiple pipe connectors need to be carried, which increases the workload of workers. Utility Model Content

[0004] The utility model aims to solve the shortcomings of the prior art and provides an auxiliary docking device for oil field pipelines.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] An oilfield pipeline auxiliary docking device comprises a first connecting rod, a second connecting rod and two groups of clamping mechanisms, the two groups of clamping mechanisms are respectively installed on two oil pipes that need to be docked, one group of clamping mechanisms comprises a first clamping frame and a second clamping frame, the first clamping frame is movably installed on the first connecting rod, the second clamping frame is movably installed on the second connecting rod, the first clamping frame and the second clamping frame are arranged in symmetrical positions, notches are respectively opened at both ends of the second clamping frame, the side walls at both ends of the first clamping frame are movably installed inside the two notches, a fixed chamber is formed between the first clamping frame and the second clamping frame, the oil pipe is located inside the fixed chamber, a fixing assembly is arranged between the first connecting rod and the second connecting rod, the fixing assembly is used to fix the first clamping frame and the second clamping frame, so that the two oil pipes that need to be docked remain stable.

[0007] The above technical solution further includes: first sleeves are fixed on the outer walls of the first bracket and the second bracket respectively, and a first fastening screw is threadedly connected to the outer wall of the first sleeve, and the first fastening screw is used to lock and fix the first sleeve.

[0008] The fixing components are provided with two groups, and the two groups of fixing components are used to reinforce the stability between the first bracket and the second bracket, and one group of fixing components includes two second sleeves, and the two second sleeves are movably installed on the outer walls of the first connecting rod and the second connecting rod respectively, and the second fastening screw is threadedly connected on the outer wall of the second sleeve, and two mounting plates are symmetrically installed on the outer wall of the second sleeve, and the outer wall of the mounting plate is provided with a through hole, and the mounting plate located on the first connecting rod and the mounting plate located on the second connecting rod are locked and fixed by the cooperation of the second locking screw and the second locking nut.

[0009] A reinforcement component is arranged between the first bracket and the second bracket, and the reinforcement component includes a first locking screw and a first locking nut. Through grooves are respectively provided on the side walls at both ends of the first bracket, and two open grooves are respectively provided on the side walls at both ends of the second bracket. The open grooves are connected with the interior of the notch, and the first locking screw is movable through the interior of the open grooves and the through grooves, and is locked and fixed by the first locking nut.

[0010] Reinforcement plates are fixedly mounted on the inner walls of the first bracket and the second bracket respectively.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] In the utility model, a first clamping frame and a second clamping frame are provided, the first clamping frame and the second clamping frame are both in a "V" shape, and the first clamping frame and the second clamping frame are symmetrically placed, so that a fixed chamber is formed between the first clamping frame and the second clamping frame, and then the positions of the first clamping frame and the second clamping frame are adjusted, so that pipes of various diameters can be clamped and fixed. In the oil field pipeline docking operation, there is no need to carry multiple docking devices, which saves the workload of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the use status of an oilfield pipeline auxiliary docking device proposed by the utility model;

[0014] Figure 2 This is a schematic diagram of the overall structure of an oilfield pipeline auxiliary docking device;

[0015] Figure 3 This is a schematic diagram of the first exploded structure of the utility model;

[0016] Figure 4 It is a schematic diagram of the second decomposed structure of the utility model;

[0017] Figure 5 for Figure 3 Schematic diagram of the enlarged structure at point A in the middle.

[0018] In the figure:

[0019] 11. First connecting rod; 12. First bracket; 13. Through slot; 21. Second connecting rod; 22. Second bracket; 23. Notch; 24. Open slot; 31. First locking screw; 32. First locking nut; 41. First sleeve; 42. First fastening screw; 51. Second sleeve; 52. Second fastening screw; 53. Mounting plate; 54. Through hole; 55. Second locking screw; 56. Second locking nut; 61. Reinforcement plate. DETAILED DESCRIPTION

[0020] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0021] Embodiment 1

[0022] See attached Figure 1-5 The utility model provides an auxiliary docking device for oilfield pipelines, comprising a first connecting rod 11, a second connecting rod 21 and two groups of clamping mechanisms, the two groups of clamping mechanisms are respectively installed on two oil pipes that need to be docked, wherein one group of clamping mechanisms comprises a first clamping frame 12 and a second clamping frame 22, the first clamping frame 12 is movably installed on the first connecting rod 11, the second clamping frame 22 is movably installed on the second connecting rod 21, the first clamping frame 12 and the second clamping frame 22 are arranged in symmetrical positions, notches 23 are respectively opened at both ends of the second clamping frame 22, the side walls at both ends of the first clamping frame 12 are movably installed inside the two notches 23, a fixed chamber is formed between the first clamping frame 12 and the second clamping frame 22, the oil pipe is located inside the fixed chamber, a fixing component is arranged between the first connecting rod 11 and the second connecting rod 21, the fixing component is used to fix the first clamping frame 12 and the second clamping frame 22, so that the two oil pipes that need to be docked remain stable.

[0023] Reinforcement plates 61 are fixedly mounted on the inner walls of the first card frame 12 and the second card frame 22 , respectively. The reinforcement plates 61 can enhance the stability of the structures of the first card frame 12 and the second card frame 22 .

[0024] The first sleeve 41 is fixed on the outer walls of the first bracket 12 and the second bracket 22, respectively. The first sleeve 41 is threadedly connected to the outer wall of the first sleeve 41 with a first fastening screw 42. The first fastening screw 42 is used to lock and fix the first sleeve 41. The positions of the second bracket 22 and the first bracket 12 can be adjusted on the first connecting rod 11 and the second connecting rod 21. When adjusting, it is only necessary to move the position of the first sleeve 41, and then rotate the first fastening screw 42. The end of the first fastening screw 42 is tightened against the outer wall of the first bracket 12 or the second bracket 22 to complete the fixation of the first sleeve 41.

[0025] Two groups of fixing components are provided, and the two groups of fixing components are used to strengthen the stability between the first bracket 12 and the second bracket 22, wherein one group of fixing components includes two second sleeves 51, and the two second sleeves 51 are movably mounted on the outer walls of the first connecting rod 11 and the second connecting rod 21 respectively, and the second fastening screw 52 is threadedly connected to the outer wall of the second sleeve 51, and two mounting plates 53 are symmetrically mounted on the outer wall of the second sleeve 51, and a through hole 54 is opened on the outer wall of the mounting plate 53, and the mounting plate 53 located on the first connecting rod 11 and the mounting plate 53 located on the second connecting rod 21 are locked and fixed by the cooperation of the second locking screw 55 and the second locking nut 56; wherein, when fixing the first bracket 12 and the second bracket 22, the second locking screw 55 can be installed between the upper and lower mounting plates 53 on the same side (such as Figure 2 As shown), the second locking nut 56 is then locked on the second locking screw 55. After the installation of multiple second locking screws 55 is completed, the first bracket 12 and the second bracket 22 can be fixed.

[0026] A reinforcement component is arranged between the first bracket 12 and the second bracket 22, and the reinforcement component includes a first locking screw 31 and a first locking nut 32. Through grooves 13 are respectively provided on the side walls at both ends of the first bracket 12, and two open grooves 24 are respectively provided on the side walls at both ends of the second bracket 22. The open grooves 24 are connected to the inside of the notch 23, and the first locking screw 31 is movably penetrated from the inside of the open groove 24 and the through groove 13, and is locked and fixed by the first locking nut 32; wherein, in order to facilitate the welding of the two oil pipes, a reinforcement component can be used here to fix the first bracket 12 and the second bracket 22, so that the second locking screw 55 can be removed during welding to avoid the second locking screw 55 blocking the welding work when the distance between the two sets of clamping mechanisms is close; when the reinforcement component is used to fix the first bracket 12 and the second bracket 22, as shown in FIG. Figure 4 The first locking screw 31 can be passed through the opening groove 24 and the through groove 13, and locked and fixed by the first locking nut 32, so that the end of the first bracket 12 is clamped in the notch 23 opened at the end of the second bracket 22. After the installation of multiple first locking screws 31 is completed, the second locking screw 55 can be removed, thereby facilitating the welding of the pipeline.

[0027] In this embodiment, when the device is used to align the oil field pipelines, firstly, the two second brackets 22 are placed on the upper side walls of the two oil pipes, and then the two first brackets 12 are placed on the lower side walls of the two oil pipes (so that the first bracket 12 and the inner wall and the inner wall of the second bracket 22 are respectively pressed against the outer wall of the oil pipe), and then the second locking screw 55 is installed on the two mounting plates 53 of the first connecting rod 11 and the second connecting rod 21, and the first connecting rod 11 and the second connecting rod 21 are fixed to complete the aligning of the two oil pipes, and then the gap between the two oil pipes is pre-treated by spot welding so that the two oil pipes are kept fixed, and then the device can be removed for the final welding work;

[0028] In the device, the first bracket 12 and the second bracket 22 are both in a "V" shape. By placing the first bracket 12 and the second bracket 22 symmetrically, a fixed chamber is formed between the first bracket 12 and the second bracket 22. Then, the positions of the first bracket 12 and the second bracket 22 are adjusted, so that pipes of various diameters can be clamped and fixed. In the oil field pipeline docking operation, there is no need to carry multiple docking devices, which saves the workload of workers.

[0029] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An auxiliary docking device for oilfield pipelines, characterized in that: The invention comprises a first connecting rod (11), a second connecting rod (21) and two groups of clamping mechanisms, wherein the two groups of clamping mechanisms are respectively installed on two oil pipes to be butted together, wherein one group of the clamping mechanisms comprises a first clamping frame (12) and a second clamping frame (22), wherein the first clamping frame (12) is movably installed on the first connecting rod (11), and the second clamping frame (22) is movably installed on the second connecting rod (21), wherein the first clamping frame (12) and the second clamping frame (22) are symmetrically arranged, and notches (23) are respectively provided at both ends of the second clamping frame (22), and the side walls at both ends of the first clamping frame (12) are movably installed inside the two notches (23), wherein a fixed chamber is formed between the first clamping frame (12) and the second clamping frame (22), and the oil pipe is located inside the fixed chamber, and wherein a fixing component is arranged between the first connecting rod (11) and the second connecting rod (21), and wherein the fixing component is used to fix the first clamping frame (12) and the second clamping frame (22), thereby keeping the two oil pipes to be butted together stable.

2. The oilfield pipeline auxiliary docking device according to claim 1, characterized in that: A first sleeve (41) is fixed on the outer wall of the first bracket (12) and the second bracket (22), respectively. A first fastening screw (42) is threadedly connected to the outer wall of the first sleeve (41). The first fastening screw (42) is used to lock and fix the first sleeve (41).

3. The oilfield pipeline auxiliary docking device according to claim 1, characterized in that: The fixing components are provided in two groups, and the two groups of fixing components are used to reinforce the stability between the first bracket (12) and the second bracket (22), wherein one group of fixing components comprises two second sleeves (51), and the two second sleeves (51) are movably mounted on the outer walls of the first connecting rod (11) and the second connecting rod (21), respectively, and the second fastening screws (52) are threadedly connected on the outer walls of the second sleeves (51), and two mounting plates (53) are symmetrically mounted on the outer walls of the second sleeves (51), and the outer walls of the mounting plates (53) are provided with through holes (54), and the mounting plates (53) located on the first connecting rod (11) and the mounting plates (53) located on the second connecting rod (21) are locked and fixed by the cooperation of the second locking screws (55) and the second locking nuts (56).

4. The oilfield pipeline auxiliary docking device according to claim 3, characterized in that: A reinforcement component is arranged between the first bracket (12) and the second bracket (22), and the reinforcement component comprises a first locking screw (31) and a first locking nut (32). The first bracket (12) is provided with a through groove (13) on both end side walls, and the second bracket (22) is provided with two open grooves (24) on both end side walls. The open groove (24) is connected to the inside of the notch (23). The first locking screw (31) is movably inserted through the inside of the open groove (24) and the through groove (13), and is locked and fixed by the first locking nut (32).

5. The oilfield pipeline auxiliary docking device according to claim 4, characterized in that: Reinforcement plates (61) are fixedly mounted on the inner walls of the first card frame (12) and the second card frame (22), respectively.