Simulation fortification capable of being quickly built

Through the layered assembly of block bodies and water filling technology, the problems of high physical consumption and lack of freshness during the reconstruction of simulated fortifications were solved, and the rapid construction and stable simulation of fortifications were achieved.

CN221889155UActive Publication Date: 2024-10-25ZHEJIANG SUNFLOWER OUTDOOR PROD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420385908.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-25
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Existing simulated fortifications require a lot of physical energy to be rebuilt, and it is difficult to ensure the freshness of the game.

Method used

A block body design is adopted, in which the upper end face of the block body is provided with a protruding block and the lower end face is provided with an adapted cavity. It is assembled through stacking to form a right-angled quadrilateral simulation fortification. After the assembly is completed, water is injected into the interior to increase the quality and stability. sex.

Benefits of technology

It achieves rapid assembly and reduces physical consumption, and at the same time enhances the stability of the simulated fortifications after construction, ensuring the freshness of the game.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221889155U_ABST
    Figure CN221889155U_ABST
Patent Text Reader

Abstract

The utility model discloses a simulation fortification capable of being quickly built, which comprises block-shaped bodies, protruding blocks are arranged on the upper end faces of the block-shaped bodies, concave cavities matched with the protruding blocks are arranged on the lower end faces of the block-shaped bodies, and the two same block-shaped bodies can be connected together through the matching of the protruding blocks and the concave cavities. The utility model provides the simulation fortification capable of being quickly built, the simulation fortification capable of being quickly built can be quickly assembled to form a right-angle quadrilateral simulation fortification in a stacking and assembling mode, and the block-shaped body is designed to be a cavity, so that the mass is light, physical output can be reduced during carrying and assembling, the simulation fortification can be more quickly assembled, and the working efficiency is improved. After the simulation fortification is built, all the block bodies form a whole, and all the block bodies can be filled with water after the water is injected into the whole, so that the mass of each block body is increased, and the built simulation fortification is more stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of simulated fortifications, in particular to simulated fortifications that can be quickly constructed. Background Art

[0002] Fortifications refer to earthworks built on favorable terrain to reduce casualties and hinder enemy attacks during war. Nowadays, outdoor entertainment projects such as real-life CS need to simulate real combat environments, so some fortifications are also needed.

[0003] In real-life CS outdoor entertainment projects, in order to ensure the freshness of the game, it is often necessary to replace the fortifications with new ones after they have been used for a period of time to ensure the freshness of the game. The existing fortifications are generally constructed with sandbags or fixed rotating blocks, which require a lot of physical strength when reconstructing. Utility Model Content

[0004] The utility model aims at the deficiencies in the prior art and provides a simulated fortification that can be quickly constructed.

[0005] In order to solve the above technical problems, the utility model solves them through the following technical solutions: a simulated fortification that can be quickly constructed includes a block body, the upper end face of the block body is provided with a protruding block, and the lower end face is provided with a concave cavity adapted to the protruding block, and two identical blocks can be connected together through the cooperation of the protruding block and the concave cavity.

[0006] In the above scheme, preferably, two protruding blocks are stacked on the left and right sides of the upper end surface of the block body, and two concave cavities are arranged on the lower end surface corresponding to the protruding blocks.

[0007] In the above scheme, preferably, the block body is a cavity with protruding blocks and concave cavity end faces opened.

[0008] The beneficial effect is that through the stacking assembly method, a rectangular simulated fortification can be quickly assembled, and the block is designed as a cavity, so the weight is light, which can reduce physical exertion during transportation and assembly, making the assembly of the simulated fortification faster.

[0009] In the above scheme, preferably, a through hole is opened on the side wall of the protruding block, and when the protruding block is arranged in the concave cavity, the upper end surface of the protruding block is higher than the upper end surface of the concave cavity.

[0010] In the above scheme, preferably, a sealing plate is elastically pressed on the upper end surface of the cavity, and when the protruding block is cooperatively arranged in the cavity, the upper end surface of the protruding block elastically lifts the sealing plate, and the through hole is higher than the upper end surface of the cavity.

[0011] In the above scheme, preferably, a guide rod is provided on the lower end surface of the sealing plate, a guide plate is provided around the concave cavity, the sealing plate is slidably set on the guide plate through the guidance of the guide rod, and a first elastic member is sleeved on the guide rod, and the two ends of the first elastic member respectively contact the limit member at the lower end of the guide rod and the guide plate.

[0012] In the above scheme, preferably, the protruding block and the concave cavity are arranged in a circular shape, and a rubber layer is arranged on the outer side wall of the protruding block and the inner side wall of the concave cavity for sealing when the protruding block is combined with the concave cavity.

[0013] In the above scheme, preferably, the length of the block is twice the width, and the distance between the two protruding blocks is consistent with the width of the block, and the upper and lower corresponding blocks and concave cavities are on the same axis.

[0014] In the above scheme, preferably, a plurality of blocks are arranged to form a right-angled quadrilateral, and then the protruding blocks and the concave cavities are staggered and stacked together to form a right-angled quadrilateral fortification.

[0015] In the above scheme, preferably, in the rectangular fortification formed by staggered stacking, the inner cavities of all blocks are connected together, and the concave cavities of the bottom block are closed by sealing plates, and water can be injected from the openings of the protruding blocks on the top layer to fill the entire rectangular fortification.

[0016] The beneficial effect is that after the simulated fortifications are built, all the blocks form a whole, and after water is injected into the interior, it can fill all the blocks, thereby increasing the mass of each block and making the simulated fortifications more stable.

[0017] The beneficial effect of the utility model is that the utility model provides a simulated fortification that can be quickly constructed, which can be quickly assembled into a right-angled quadrilateral simulated fortification by stacking and assembling, and the block is designed as a cavity, so the weight is light, which can reduce physical exertion during transportation and assembly, making the assembly of the simulated fortification faster, and after the simulated fortification is completed, all the blocks form a whole, and water can be filled into all the blocks after being injected into the interior, thereby increasing the weight of each block and making the constructed simulated fortification more stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 The utility model is a schematic diagram of a simulated fortification constructed and formed.

[0019] Figure 2 It is a schematic diagram of a block body of the utility model.

[0020] Figure 3 It is a partial cross-sectional view of the utility model in an assembled state.

[0021] Figure 4It is a partial enlarged view of the block body of the utility model after assembly. DETAILED DESCRIPTION

[0022] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments: Figure 1-Figure 4 The simulated fortification that can be quickly constructed includes a block 1, which is in the shape of a rectangular parallelepiped, and the length of the block 1 is twice the width. Two protruding blocks 11 are stacked symmetrically on the upper end surface of the block 1, and the spacing between the two protruding blocks 11 is the same as the width of the block 1. At the same time, the distances from the protruding blocks 11 to the adjacent sides of the block 1 are the same, both of which are half the width of the block 1, and two concave cavities 12 coaxial with the protruding blocks 11 are opened on the lower end surface of the block 1, the protruding blocks 11 and the concave cavities 12 are both circular in design, and the block 1 is a cavity with open end faces of the protruding blocks 11 and the concave cavities 12, and rubber layers are arranged on the outer wall of the protruding blocks 11 and the cavity wall of the concave cavities 12.

[0023] When two blocks 1 are assembled, the protruding block 11 of one block 1 is inserted into the concave cavity 12 of the other, and the joint is kept sealed by the rubber layer, while increasing the friction between the two. After assembly, the two are not easy to separate, thereby improving the stability of the fortification after construction.

[0024] The sealing plate 13 is elastically pressed on the upper end surface of the concave cavity 12, and a guide rod 131 is arranged on the sealing plate 13. A guide plate 121 is arranged around the concave cavity 12, and a guide hole is opened on the guide plate 121. The sealing plate 13 is slidably arranged on the guide plate 121 through the guide rod 131, and a first elastic member 132 is sleeved on the guide rod 131. The two ends of the first elastic member 132 are respectively pressed on the limiter at the lower end of the guide rod 131 and the guide plate 121, so that the sealing plate 13 is pressed against the guide rod 131. On the upper surface of the concave cavity 12, in the initial state, the concave cavity 12 of the block 1 is blocked by the sealing plate 13, and a through hole 111 is opened on the upper end side wall of the protruding block 11, and after the two blocks are assembled in place, the upper end surface of the protruding block 11 is higher than the upper end surface of the concave cavity 12, so that the protruding block 11 pushes the sealing plate 13 upward, and the through hole 111 on the side wall of the protruding block 11 is higher than the upper end surface of the concave cavity 12, so that the inner cavities of the blocks 1 assembled together from top to bottom are connected to each other through the through hole 111.

[0025] When constructing the simulated fortifications, the blocks 1 are first arranged in sequence to form a rectangular rectangle, and then the second layer of blocks 1 is assembled on the blocks 1 of the bottom layer. The second layer of blocks 1 is staggered with the bottom layer, that is, the two concave cavities 12 of each block 1 of the second layer are installed on the protruding blocks 11 of two adjacent blocks 1 of the bottom layer, so that the blocks 1 of the bottom layer are connected to each other in pairs through the second block 1, and then the blocks 1 are stacked upward in sequence in an staggered manner to finally form a rectangular simulated fortification, and except for the sealing plate 13 of the bottom layer block 1 which is not jacked up, the rest are jacked up, so the simulated fortification formed by the entire block 1 becomes a hollow cavity with a closed bottom layer and an open top layer. At this time, water is passed inward from the opening of the protruding block 11 of the top layer block 1, and the water flow can fill all the protruding blocks 11, thereby making the constructed simulated fortifications more stable.

[0026] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A simulated fortification that can be quickly constructed, characterized by: It comprises a block (1), the upper end surface of the block (1) is provided with a protruding block (11), and the lower end surface is provided with a concave cavity (12) adapted to the protruding block (11), and two identical blocks (1) can be connected together through the protruding block (11) and the concave cavity (12); A through hole (111) is provided on the side wall of the protruding block (11), and when the protruding block (11) is arranged in the concave cavity (12), the upper end surface of the protruding block (11) is higher than the upper end surface of the concave cavity (12).

2. The simulated fortification that can be quickly constructed according to claim 1 is characterized in that: Two protruding blocks (11) are stacked on the left and right sides of the upper end surface of the block body (1), and two concave cavities (12) are arranged on the lower end surface corresponding to the protruding blocks (11).

3. The simulated fortification that can be quickly constructed according to claim 2 is characterized in that: The block (1) is a cavity with open end faces of the protruding block (11) and the concave cavity (12).

4. The rapidly constructible simulated fortification according to claim 1, characterized in that: A sealing plate (13) is elastically pressed against the upper end surface of the cavity (12); when the protruding block (11) is arranged in cooperation with the cavity (12), the upper end surface of the protruding block (11) elastically lifts the sealing plate (13), and the through hole (111) is higher than the upper end surface of the cavity (12).

5. The simulated fortification that can be quickly constructed according to claim 4 is characterized in that: A guide rod (131) is provided on the lower end surface of the sealing plate (13), a guide plate (121) is provided around the concave cavity (12), the sealing plate (13) is slidably provided on the guide plate (121) through the guidance of the guide rod (131), and a first elastic member (132) is sleeved on the guide rod (131), and two ends of the first elastic member (132) respectively contact a stop member at the lower end of the guide rod (131) and the guide plate (121).

6. The simulated fortification that can be quickly constructed according to claim 2, characterized in that: The protruding block (11) and the concave cavity (12) are arranged in a circular shape, and a rubber layer is arranged on the outer wall of the protruding block (11) and the inner wall of the concave cavity (12) for sealing when the protruding block (11) and the concave cavity (12) are combined.

7. The simulated fortification that can be quickly constructed according to claim 2, characterized in that: The length of the block (1) is twice its width, and the distance between the two protruding blocks (11) is consistent with the width of the block (1), and the upper and lower corresponding blocks (1) and the concave cavity (12) are on the same axis.

8. The simulated fortification that can be quickly constructed according to claim 1 is characterized in that: A plurality of blocks (1) are arranged to form a rectangular quadrilateral, and then the protruding blocks (11) and the concave cavities (12) are staggered and stacked together to form a rectangular quadrilateral structure.

9. The simulated fortification that can be quickly constructed according to claim 8, characterized in that: In the rectangular fortification formed by staggered stacking, the inner cavities of all the blocks (1) are connected together, and the concave cavity (12) of the bottom block (1) is sealed by a sealing plate (13), and water can be injected from the opening of the uppermost protruding block (11) to fill the entire rectangular fortification.