Tower body reboiler circulating device

By designing a convenient structure, the problem of inconvenient installation and disassembly of the filter device in the reboiler circulation device is solved, and efficient cleaning of the filter box and filter screen is achieved.

CN221905828UActive Publication Date: 2024-10-29SHANDONG JINKE ENG DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420173727.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-10-29
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

In the reboiler circulation device, the installation or removal of the filter device requires multiple bolts, which is inconvenient to operate.

Method used

A tower reboiler circulation device is designed, which includes a connecting pipe fixedly connected to the bottom of the outer wall of the circulating reboiler through a connecting flange. A filter box is set on the connecting pipe. A cover plate is placed on the top of the filter box. The cover plate is symmetrically slid and embedded with an embedded plate. , embedded in the plate and fixedly connected to the filter, embedded in the top of the plate The end of the placement plate is fixedly connected to the placing plate, both sides of the placing plate are connected to connecting rods, one end of the connecting rod is fixedly connected to the snap block, both sides of the top of the cover plate are fixedly connected to the placing blocks, one side of the placing block is rotated and embedded in the rotating cylinder, and the outer wall of the rotating cylinder is provided with a guide hole, and Easy disassembly and installation through guide holes and clamping blocks.

Benefits of technology

It realizes convenient cleaning of the inside of the filter box and the filter screen, simplifies the disassembly and installation process of a single embedded plate, and improves the operational convenience of the filter device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221905828U_ABST
    Figure CN221905828U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of reboiler circulating equipment, in particular to a tower body reboiler circulating device which comprises a circulating reboiler, the bottom of the outer wall of the circulating reboiler is fixedly connected with a connecting pipe through a connecting flange, a filter box is arranged on the connecting pipe, a cover plate is placed at the top end of the filter box, and the cover plate is fixedly connected with the circulating reboiler. The device comprises a filter box, embedded plates are symmetrically embedded in the filter box in a sliding manner, filter screens are fixedly connected to the interiors of the embedded plates, and a placement plate is fixedly connected to the top ends of the embedded plates. A clamping block is placed in a rotating cylinder, then the rotating cylinder is rotated, an embedded plate can be conveniently installed, a cover plate can be detached, and therefore the interior of the filter box and the two filter screens can be cleaned at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of reboiler circulation equipment, in particular to a tower body reboiler circulation device. Background Art

[0002] The reboiler is a special heat exchanger that can exchange heat and has a vaporization space. The material level in the reboiler is at the same height as the distillation tower level. The liquid phase is provided from the bottom line of the tower to enter the reboiler. Usually 25%-30% of the liquid phase is vaporized in the reboiler, and the vaporized two-phase flow is sent back to the distillation tower. The gas phase component in the return tower passes upward through the tower plate, while the liquid phase component falls back to the bottom of the tower. The material expands or even vaporizes due to the heat in the reboiler, and the density decreases, thereby leaving the vaporization space and returning smoothly to the tower. The gas-liquid two phases in the return tower, the gas phase passes upward through the tower plate, and the liquid phase falls to the bottom of the tower. Due to the effect of the static pressure difference, the bottom of the tower will continuously replenish the part of the liquid level that has been evaporated. During the use of the reboiler circulation device, the liquid in the bottom pipe continues to flow, resulting in scaling on the inner wall of the pipe. At this time, the staff needs to clean it regularly.

[0003] Chinese utility model patent CN212369605U discloses a hot water circulation device for a distillation tower reboiler, which not only reduces the temperature fluctuation of the distillation tower reboiler, improves the product quality of the distillation tower, but also enhances the operating convenience of the device.

[0004] However, this patent requires multiple bolts to install or disassemble the filtering device, which is not convenient to operate. Based on this, we propose a tower reboiler circulation device. Utility Model Content

[0005] The utility model aims to provide a tower reboiler circulation device to solve the problem in the above background technology that when installing or disassembling the filter device, multiple bolts are needed for installation or disassembly, which makes the operation inconvenient.

[0006] The technical solution of the utility model is: a tower body reboiler circulation device, comprising a circulation reboiler, the bottom of the outer wall of the circulation reboiler is fixedly connected to a connecting pipe through a connecting flange, and a filter box is arranged on the connecting pipe;

[0007] A cover plate is placed on the top of the filter box, an embedded plate is symmetrically and slidably embedded in the filter box, a filter net is fixedly connected inside the embedded plate, a placement plate is fixedly connected to the top of the embedded plate, connecting rods are fixedly connected to both sides of the placement plate, a clamping block is fixedly connected to one end of the connecting rod, placement blocks are symmetrically and fixedly connected to both sides of the top of the cover plate, a rotating cylinder is rotatably embedded in one side of the placement block, and guide holes are provided on the top of the placement block and the top of the outer wall of the rotating cylinder.

[0008] Preferably, mounting grooves are provided at the top of the cover plate near the four corners of the two placement plates, a spring is fixedly connected in the mounting groove, a movable plate is fixedly connected to the top of the spring, a rubber pad is bonded to the bottom surface of the placement plate, a locking hole is provided on the rubber pad for the movable plate to extend into, the placement blocks on the same side are fixedly connected to the same support block on one side, the bottom end of the support block is fixedly connected to a limit plate, and the limit plate is fixedly connected to the filter box by positioning bolts.

[0009] Preferably, a handle is fixedly connected to the outer wall of the rotating cylinder.

[0010] Preferably, the width of the clamping block is the same as the width of the inside of the guide hole.

[0011] Preferably, a sealing gasket is bonded to the bottom surface of the cover plate.

[0012] The utility model provides a tower reboiler circulation device through improvement, which has the following improvements and advantages compared with the prior art:

[0013] The utility model can conveniently disassemble a single embedded plate when scaling on the filter screen inside the filter box needs to be processed, and during installation, the clamping block is placed inside the rotating drum, and then the rotating drum is rotated to conveniently install the embedded plate, and the cover plate can also be disassembled to clean the inside of the filter box and the two filter screens. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a structural schematic diagram of the filter box of the utility model;

[0017] Figure 3 It is a structural schematic diagram of the embedded plate and the filter screen of the utility model;

[0018] Figure 4 yes Figure 3 A partial enlarged view of the middle A;

[0019] Figure 5 It is a structural schematic diagram of the rotating cylinder and the clamping block of the utility model.

[0020] Description of reference numerals:

[0021] 1. Circulation reboiler; 2. Connection flange; 3. Connection pipe; 4. Filter box; 5. Embedded plate; 6. Filter screen; 7. Placement plate; 8. Connecting rod; 9. Snap-in block; 10. Placement block; 11. Rotating cylinder; 12. Guide hole; 13. Cover plate; 14. Mounting groove; 15. Spring; 16. Movable plate; 17. Rubber pad; 18. Support block; 19. Limit plate; 20. Positioning bolt. DETAILED DESCRIPTION

[0022] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] like Figure 1 - Figure 5 As shown, a tower reboiler circulation device comprises a circulation reboiler 1 , the bottom of the outer wall of the circulation reboiler 1 is fixedly connected to a connecting pipe 3 via a connecting flange 2 , and a filter box 4 is arranged on the connecting pipe 3 .

[0024] A cover plate 13 is placed on the top of the filter box 4, an embedded plate 5 is symmetrically slidably embedded in the filter box 4, a filter screen 6 is fixedly connected inside the embedded plate 5, a placement plate 7 is fixedly connected to the top of the embedded plate 5, connecting rods 8 are fixedly connected to both sides of the placement plate 7, a clamping block 9 is fixedly connected to one end of the connecting rod 8, placement blocks 10 are symmetrically fixedly connected to both sides of the top of the cover plate 13, a rotating cylinder 11 is rotatably embedded on one side of the placement block 10, and guide holes 12 are provided on the top of the placement block 10 and the top of the outer wall of the rotating cylinder 11.

[0025] Furthermore, mounting grooves 14 are provided at the top of the cover plate 13 near the four corners of the two placement plates 7, and a spring 15 is fixedly connected in the mounting groove 14, and a movable plate 16 is fixedly connected to the top of the spring 15, and a rubber pad 17 is bonded to the bottom of the placement plate 7, and the placement block 10 on the same side is fixedly connected to the same support block 18 on one side, and the bottom end of the support block 18 is fixedly connected to a limit plate 19, and the limit plate 19 is fixedly connected to the corresponding side of the filter box 4 through a positioning bolt 20, and the rotating cylinder 11 rotates and aligns the guide hole 12 on the rotating cylinder 11 with the clamping block 9, thereby releasing the restriction on the clamping block 9, and pulling the placement plate 7 upward, so that the placement plate 7 drives the clamping block 9 to detach from the inside of the rotating cylinder 11, so that a single embedded plate 5 can be easily disassembled, thereby cleaning the scale on the filter screen 6 on one side of the embedded plate 5.

[0026] Furthermore, a handle is fixedly connected to the outer wall of the rotating cylinder 11, so that the staff can easily rotate the angle of the rotating cylinder 11 through the handle.

[0027] Furthermore, the outer wall of the clamping block 9 contacts the inner wall of the rotating cylinder 11, and the width of the clamping block 9 is the same as the width of the guide hole 12, so that the clamping block 9 can be moved out of the rotating cylinder 11 through the guide hole 12, and when the clamping block 9 is located in the rotating cylinder 11 and the guide hole 12 on the rotating cylinder 11 is offset from the guide hole 12 on the placement block 10, the clamping block 9 can be locked.

[0028] Furthermore, the upper part of the movable plate 16 extends into the rubber pad 17 to limit the horizontal position of the placement plate 7. The rubber pad 17 is provided with a locking hole opposite to the movable plate 16. The spring 15 can ensure that the movable plate 16 extends into the corresponding locking hole and ensures that the placement plate 7 and the cover plate 13 are reliably fitted.

[0029] In order to prevent the movable plate 16 from sliding out of the installation groove 14 , the upper end of the installation groove 14 can be threadedly connected to a limit ring, and a boss that matches the limit ring is provided at the bottom of the movable plate 16 .

[0030] Furthermore, a sealing gasket is bonded to the bottom surface of the cover plate 13, so that when the positioning bolts restrict the cover plate 13 to the top of the filter box 4, the air tightness between the filter box 4 and the cover plate 13 can be ensured due to the effect of the sealing gasket.

[0031] Working principle: When the circulating reboiler 1 is working, steam is introduced into the circulating reboiler 1 and mixed with water, and the mixed water and steam are sent back to the circulating reboiler 1 for continuous circulation. After a period of use, the filter screen 6 needs to be cleaned, and the handle is rotated counterclockwise so that the handle drives the rotating cylinder 11 to rotate ninety degrees, so that the guide hole 12 on the rotating cylinder 11 rotates to align with the clamping block 9, thereby releasing the restriction on the clamping block 9, and pulling the placement plate 7 upward so that the placement plate 7 drives the clamping block 9 to disengage from the inside of the rotating cylinder 11, so that the single embedded plate 5 can be easily disassembled, thereby cleaning the scale on the filter screen 6 on one side of the embedded plate 5.

[0032] After cleaning, the embedded plate 5 is inserted into the cover plate 13, so that the embedded plate 5 drives the rubber pad 17 on the bottom of the placement plate 7 to contact the top of the cover plate 13, and the movable plate 16 extends into the locking hole of the rubber pad 17, thereby completing the placement of the embedded plate 5. At the same time, the connecting rod 8 drives the clamping block 9 to enter the rotating cylinder 11 along the guide hole 12 again, and the handle is rotated 90 degrees clockwise, so that the handle drives the guide hole 12 on the rotating cylinder 11 to be staggered with the guide hole 12 on the placement block 10.

[0033] In addition, when the filter screen 6 is fully cleaned, the two positioning bolts 20 are unscrewed to facilitate the disassembly of the cover plate 13, and the cover plate 13 is pulled upward so that the cover plate 13 drives the two embedded plates 5 to be pulled out from the inside of the filter box 4, thereby fully cleaning the inside of the filter box 4 and the two filter screens 6.

[0034] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A tower reboiler circulation device, comprising a circulation reboiler (1), characterized in that: The bottom of the outer wall of the circulation reboiler (1) is fixedly connected to a connecting pipe (3) via a connecting flange (2), and a filter box (4) is arranged on the connecting pipe (3); A cover plate (13) is placed on the top of the filter box (4), an embedded plate (5) is symmetrically slidably embedded in the filter box (4), a filter screen (6) is fixedly connected inside the embedded plate (5), a placement plate (7) is fixedly connected to the top of the embedded plate (5), connecting rods (8) are fixedly connected to both sides of the placement plate (7), one end of the connecting rod (8) is fixedly connected to a clamping block (9), both sides of the top of the cover plate (13) are symmetrically fixedly connected to placement blocks (10), one side of the placement block (10) is rotatably embedded in a rotating cylinder (11), and guide holes (12) are provided at the top of the placement block (10) and the top of the outer wall of the rotating cylinder (11).

2. A tower reboiler circulation device according to claim 1, characterized in that: The top of the cover plate (13) is provided with mounting grooves (14) near the four corners of the two placement plates (7), a spring (15) is fixedly connected in the mounting groove (14), the top of the spring (15) is fixedly connected to a movable plate (16), a rubber pad (17) is bonded to the bottom surface of the placement plate (7), and a locking hole is provided on the rubber pad (17) for the movable plate (16) to extend into, and the placement block (10) located on the same side is fixedly connected to one side with the same support block (18), the bottom end of the support block (18) is fixedly connected to a limit plate (19), and the limit plate (19) is fixedly connected to the filter box (4) via a positioning bolt (20).

3. A tower reboiler circulation device according to claim 1, characterized in that: A handle is fixedly connected to the outer wall of the rotating cylinder (11).

4. A tower reboiler circulation device according to claim 2, characterized in that: The width of the clamping block (9) is the same as the width of the guide hole (12).

5. A tower reboiler circulation device according to claim 1, characterized in that: A sealing gasket is bonded to the bottom surface of the cover plate (13).