By introducing slide rails and length adjustment components into the prefabricated cable tube tooling, the problem of fixing the length of the prefabricated cable tube is solved, adaptation to different length requirements is achieved, and the flexibility and production efficiency of the tooling are improved.
Patent Information
- Application Number
- CN202420435839.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-07
AI Technical Summary
In the production process of existing prefabricated cable tube preparation tooling, the length of the prefabricated cable tube is fixed and cannot adapt to different length requirements. As a result, the tooling mold needs to be significantly modified after use to prepare cable tubes of other specifications.
A prefabricated cable pipe preparation tool is designed, which includes a slide rail installed on the inner wall of the prefabricated box and a length adjustment component. Through the locking mechanism of the sliding side plate and the support screw, the length of the PVC pipe is adjusted to meet different length requirements.
The adjustability of the length of the prefabricated cable tube is achieved, the modification of the tooling mold is avoided, and the applicability and production efficiency of the tooling are improved.
Smart Images

Figure CN221912557U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated cable pipe preparation, in particular to a prefabricated cable pipe preparation tool. Background Art
[0002] At present, the auxiliary installation of optical fiber cables in cities mostly adopts prefabricated assembled concrete cable pipes with built-in PVC pipes. This kind of pipe has extremely high strength, can withstand very high external loads, has strong impact resistance and anti-interference, can withstand 40 to 150T external pressure without damage, and is very safe even in the event of earthquakes or ground subsidence. It has good impermeability, sealing and corrosion resistance.
[0003] When making prefabricated cable pipes, the PVC pipe needs to be passed through the side plate of the tooling mold, and then concrete is poured inside the tooling mold. It is then compacted by a vibrator. After the prefabricated cable pipe is completely solidified, the side plate is opened and the prefabricated cable pipe inside the tooling mold is taken out.
[0004] However, in the production process of prefabricated cable tube preparation tooling, it is necessary to produce tooling molds of corresponding lengths according to the designed lengths of the prefabricated cable tubes, so that the lengths of the prefabricated cable tubes produced by the prefabricated cable tube preparation tooling are fixed, and cannot be adapted to different length requirements, resulting in the tooling molds needing to be significantly modified after use before prefabricated cable tubes of other specifications can be prepared. In view of this, the present application proposes a prefabricated cable tube preparation tooling. Utility Model Content
[0005] In view of the shortcomings of the prior art, the utility model provides a prefabricated cable tube preparation tooling, which has the advantages of being able to adjust the length of the prefabricated cable tubes produced. It solves the problem that the length of the prefabricated cable tubes produced by the prefabricated cable tube preparation tooling is fixed and cannot be adapted to different length requirements, resulting in the need for major modifications to the tooling mold after use before prefabricated cable tubes of other specifications can be prepared.
[0006] To achieve the above object, the utility model provides the following technical solutions: a prefabricated cable tube preparation tool, comprising a prefabricated box, the inner wall of the prefabricated box is fixedly installed with a slide rail, a through hole is opened on one side of the prefabricated box, and a length adjustment component is arranged inside the prefabricated box;
[0007] The length adjustment assembly comprises a sliding side plate slidably mounted on the inner side wall of the prefabricated box, a support screw is fixedly mounted on one side of the sliding side plate, and two locking nuts are threadedly mounted on the surface of the support screw.
[0008] Furthermore, an arc groove matched with the slide rail is provided on one side of the sliding side plate, and a rounded corner matched with the inner bottom angle of the prefabricated box is provided at the bottom corner of the sliding side plate.
[0009] Furthermore, the support screw extends to the outside of the prefabricated box through the through hole, and the two locking nuts are respectively located inside and outside the prefabricated box.
[0010] Furthermore, a mounting groove is provided on one side of the opening of the prefabricated box, a mounting shaft is fixedly installed on one side of the mounting groove close to the bottom, and a rotating side plate is rotatably installed on the surface of the mounting shaft.
[0011] Furthermore, a PVC pipe installation hole for installing a PVC pipe is provided on one side of the sliding side plate and the rotating side plate.
[0012] Furthermore, two opposite side walls of the installation groove are provided with sliding grooves, a threaded hole is provided on the side of the sliding groove away from the opening of the prefabricated box, and a positioning hole aligned with the threaded hole is provided on the side of the sliding groove close to the opening of the prefabricated box.
[0013] Furthermore, a support plate is slidably installed inside the slide groove, and a bolt is penetrated through one side of the opening of the prefabricated box. The bolt passes through the positioning hole and the support plate and is threadedly connected with the threaded hole.
[0014] Furthermore, three transverse reinforcing ribs are fixedly installed on one side of the prefabricated box, and vertical reinforcing ribs are fixedly installed between two of the transverse reinforcing ribs.
[0015] Compared with the prior art, the utility model provides a prefabricated cable tube preparation tool, which has the following beneficial effects:
[0016] The prefabricated cable tube preparation tooling sets a length adjustment component inside the prefabricated box, moves the sliding side panel to a suitable position according to the design data, and then locks the supporting screw to one side of the prefabricated box through a locking nut, fixes the sliding side panel, and casts the PVC tube after passing it through the PVC tube installation hole, so that the production length of the prefabricated cable tube can be adjusted, which solves the problem that the length of the prefabricated cable tube produced by the prefabricated cable tube preparation tooling is fixed and cannot be adapted to different length requirements, resulting in the tooling mold needing to be significantly modified after use before prefabricated cable tubes of other specifications can be prepared. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 It is a top view schematic diagram of the structure of the utility model;
[0019] Figure 3 This is a front view of the structure of the utility model;
[0020] Figure 4 It is a side sectional view of the structure of the utility model;
[0021] Figure 5 This is a cross-sectional view of the installation groove of the utility model;
[0022] Figure 6 It is a three-dimensional schematic diagram of the prefabricated box of the utility model.
[0023] In the figure: 1. prefabricated box; 2. slide rail; 3. through hole; 4. length adjustment assembly; 41. sliding side panel; 411. arc groove; 42. support screw; 43. locking nut; 5. mounting groove; 6. mounting shaft; 7. rotating side panel; 8. PVC pipe mounting hole; 9. slide groove; 10. threaded hole; 11. positioning hole; 12. support plate; 13. bolt; 14. transverse reinforcement rib; 15. vertical reinforcement rib. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] See also Figure 1 , Figure 2 , Figure 6 A prefabricated cable tube preparation tool comprises a prefabricated box 1, a slide rail 2 is fixedly installed on the inner wall of the prefabricated box 1, a through hole 3 is opened on one side of the prefabricated box 1, and a length adjustment component 4 is arranged inside the prefabricated box 1.
[0026] The length adjustment assembly 4 includes a sliding side plate 41 slidably mounted on the inner wall of the prefabricated box 1 , a support screw 42 is fixedly mounted on one side of the sliding side plate 41 , and two locking nuts 43 are threadedly mounted on the surface of the support screw 42 .
[0027] See also Figure 1-4 An arc groove 411 matching with the slide rail 2 is provided on one side of the sliding side plate 41 , and a rounded corner matching with the inner bottom angle of the prefabricated box 1 is provided at the bottom corner of the sliding side plate 41 .
[0028] The support screw 42 extends through the through hole 3 to the outside of the prefabricated box 1, and the two locking nuts 43 are respectively located inside and outside the prefabricated box 1. After the sliding side plate 41 is moved to the desired position, the two locking nuts 43 are rotated so that the two locking nuts 43 are respectively in contact with the inner wall and the outer side of the prefabricated box 1, and the support screw 42 is fixed to one side of the prefabricated box 1, so that the sliding side plate 41 is fixed to the desired position.
[0029] See also Figure 4 , Figure 5 , Figure 6 A mounting groove 5 is provided on one side of the opening of the prefabricated box 1, a mounting shaft 6 is fixedly installed on one side of the mounting groove 5 close to the bottom, a rotating side plate 7 is rotatably installed on the surface of the mounting shaft 6, and the rotating side plate 7 is erected during pouring.
[0030] A PVC pipe installation hole 8 for installing a PVC pipe is provided on one side of the sliding side plate 41 and the rotating side plate 7 .
[0031] Secondly, the two opposite side walls of the installation groove 5 are both provided with sliding grooves 9, the side of the sliding groove 9 away from the opening of the prefabricated box 1 is provided with a threaded hole 10, and the side of the sliding groove 9 close to the opening of the prefabricated box 1 is provided with a positioning hole 11 aligned with the threaded hole 10.
[0032] A support plate 12 is slidably installed inside the chute 9, and a bolt 13 is penetrated on one side of the opening of the prefabricated box 1, and the bolt 13 passes through the positioning hole 11 and the support plate 12 and is threadedly connected with the threaded hole 10. After the rotating side plate 7 is erected, the support plate 12 is placed in the chute 9, and then the bolt 13 passes through the positioning hole 11 and the support plate 12 and is threadedly connected with the threaded hole 10, and the support plate 12 is fixed to the outer side of the rotating side plate 7 to support the rotating side plate 7.
[0033] See also Figure 2 , Figure 3 Three transverse reinforcing ribs 14 are fixedly installed on one side of the prefabricated box 1 , and a vertical reinforcing rib 15 is fixedly installed between the two transverse reinforcing ribs 14 .
[0034] When this embodiment is in use, according to the length of the prefabricated cable pipe required by the design, the rotating side panel 7 is erected, the sliding side panel 41 is installed to a suitable position using the length adjustment component 4, the casting length is adjusted, and then the PVC pipe is installed. The casing is used to prepare the prefabricated cable pipe. After the prefabricated cable pipe solidifies, the rotating side panel 7 is turned down to separate the prefabricated cable pipe from the prefabricated box 1.
[0035] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A prefabricated cable tube preparation tool, comprising a prefabricated box (1), characterized in that: The inner wall of the prefabricated box (1) is fixedly provided with a slide rail (2), a through hole (3) is provided on one side of the prefabricated box (1), and a length adjustment component (4) is provided inside the prefabricated box (1); The length adjustment assembly (4) comprises a sliding side plate (41) slidably mounted on the inner wall of the prefabricated box (1), a support screw (42) being fixedly mounted on one side of the sliding side plate (41), and two locking nuts (43) being threadedly mounted on the surface of the support screw (42).
2. The prefabricated cable tube preparation tool according to claim 1, characterized in that: An arc groove (411) adapted to the slide rail (2) is provided on one side of the sliding side plate (41), and a rounded corner adapted to the inner bottom corner of the prefabricated box (1) is provided at the bottom corner of the sliding side plate (41).
3. The prefabricated cable tube preparation tool according to claim 1, characterized in that: The support screw (42) extends to the outside of the prefabricated box (1) through the through hole (3), and the two locking nuts (43) are respectively located inside and outside the prefabricated box (1).
4. The prefabricated cable tube preparation tool according to claim 1, characterized in that: A mounting groove (5) is provided on one side of the opening of the prefabricated box (1), a mounting shaft (6) is fixedly mounted on one side of the mounting groove (5) close to the bottom, and a rotating side plate (7) is rotatably mounted on the surface of the mounting shaft (6).
5. The prefabricated cable tube preparation tool according to claim 4, characterized in that: A PVC pipe installation hole (8) for installing a PVC pipe is provided on one side of the sliding side plate (41) and the rotating side plate (7).
6. The prefabricated cable tube preparation tool according to claim 4, characterized in that: The two opposite side walls of the installation groove (5) are provided with sliding grooves (9), a threaded hole (10) is provided on the side of the sliding groove (9) away from the opening of the prefabricated box (1), and a positioning hole (11) aligned with the threaded hole (10) is provided on the side of the sliding groove (9) close to the opening of the prefabricated box (1).
7. The prefabricated cable tube preparation tool according to claim 6, characterized in that: A support plate (12) is slidably mounted inside the slide groove (9), and a bolt (13) is passed through one side of the opening of the prefabricated box (1). The bolt (13) passes through the positioning hole (11) and the support plate (12) and is threadedly connected to the threaded hole (10).
8. The prefabricated cable tube preparation tool according to claim 1, characterized in that: Three transverse reinforcing ribs (14) are fixedly installed on one side of the prefabricated box (1), and a vertical reinforcing rib (15) is fixedly installed between two of the transverse reinforcing ribs (14).