Lifting assembly for large-span steel truss space vertical rotation construction

By designing the upper and lower cages combined with hydraulic lifters and steel strand lifting components, the problem of complicated installation of the hydraulic system during the lifting of large-span steel trusses was solved, the installation process was simplified, and the construction efficiency was improved.

CN221917090UActive Publication Date: 2024-10-29CHINA CONSTR FOURTH ENG DIV CORP LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420193571.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-10-29
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

The existing long-span steel truss requires a long-term use of the hydraulic lifting system when lifting, and the installation is complicated, which affects construction efficiency and progress.

Method used

A lifting component including an upper cage and a lower cage is designed. Through the hydraulic lift and steel strand, combined with the winching group and the tire module group, the installation process of the hydraulic system is simplified, the installation difficulty is reduced, and the hinge is reduced meet welding requirements.

Benefits of technology

It effectively reduces the difficulty of installing the hydraulic system in the long-span steel truss, improves construction efficiency, simplifies the installation process, and reduces welding steps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221917090U_ABST
    Figure CN221917090U_ABST
Patent Text Reader

Abstract

The utility model discloses a lifting assembly for large-span steel truss space vertical rotation construction. The lifting assembly comprises a plurality of main steel columns arranged on the ground, an upper-layer steel truss arranged between the main steel columns and a to-be-lifted steel truss arranged between the upper-layer steel truss and the ground. The lifting set is arranged on the side, away from the twisting set, of the steel truss to be lifted, the lifting set comprises an upper lifting cage arranged on the bottom face of the upper-layer steel truss, the upper lifting cage is arranged on the side, away from the twisting set, of the upper-layer steel truss, a hydraulic lifter is arranged in the upper lifting cage, and a steel strand is arranged on the hydraulic lifter; through the arrangement of the upper suspension cage and the lower suspension cage, the fixing effect of the hydraulic lifter can be guaranteed, the installation difficulty of a hydraulic system in the large-span steel truss can be effectively reduced, and finally, the upper suspension cage and the lower suspension cage are hinged to different positions of the vertical rotating steel truss respectively, so that only corresponding welding needs to be carried out at suspension points.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of vertical rotation devices, and more specifically, to a lifting component for the vertical rotation construction of a large-span steel truss space. Background Art

[0002] In recent years, with the rapid development of steel structure engineering, in order to meet the needs of building use functions, the span and scale of steel structures are constantly increasing, and the shapes are becoming more complex. New steel structure forms such as string structures, cable domes, and cable trusses are constantly emerging. The design of some structures is special, and common installation methods are not suitable for large-span steel truss systems.

[0003] Existing large-span steel trusses need to occupy the hydraulic lifting system for a long time when lifting. Different hydraulic lifting systems have different installation complexities because different hydraulic system manufacturers have different hydraulic system kits. According to the on-site conditions, the installation is relatively complicated, which seriously affects the installation efficiency and construction progress. Utility Model Content

[0004] The utility model aims to provide a lifting assembly for vertical rotation construction of a large-span steel truss space, which is a lifting assembly with a simple and reliable structure and can be used for vertical rotation and lifting in different steel truss systems.

[0005] The above technical purpose of the utility model is achieved through the following technical scheme: a lifting assembly for the spatial vertical rotation construction of a large-span steel truss, comprising a plurality of main steel columns arranged on the ground, an upper steel truss arranged between the main steel columns, and a steel truss to be lifted arranged between the upper steel truss and the ground.

[0006] The twisting group is arranged at one end of the steel truss to be lifted and the twisting group is located at a side of the steel truss to be lifted close to the ground.

[0007] The lifting group is arranged on the side of the steel truss to be lifted away from the twisting group and is located between the upper steel truss and the steel truss to be lifted. The lifting group includes an upper hoisting cage arranged on the bottom surface of the upper steel truss. The upper hoisting cage is arranged on the side of the upper steel truss away from the twisting group and is hinged to the upper steel truss. A hydraulic lifter is arranged in the upper hoisting cage, and a steel strand is arranged on the hydraulic lifter. A lower hoisting cage is arranged on the end of the steel strand away from the hydraulic lifter. The lower hoisting cage is hinged to the side of the steel truss to be lifted away from the twisting group, and the lower hoisting cage is located on the side of the steel truss to be lifted close to the upper steel truss.

[0008] The tire mold set is arranged on a side of the steel truss to be lifted close to the ground.

[0009] The tire mold group is used to support the steel truss to be lifted, and the twisting group is used to rotate the steel truss to be lifted.

[0010] The utility model is further configured as follows: the upper hoist cage includes two upper vertical plates arranged parallel to each other, upper side plates parallel to each other and perpendicular to the upper vertical plates are arranged on both sides of the bottom between the two upper vertical plates, the two upper vertical plates and the two upper side plates together form an upper rectangular channel, and two upper hinged plates parallel to each other are arranged on the top between the two upper vertical plates.

[0011] The utility model is further configured as follows: mutually symmetrical stiffening plates are arranged on one side of the two upper vertical plates away from the side plates.

[0012] The utility model is further configured as follows: an upper reinforcing plate is provided on one side of the two upper hinged plates close to the upper side plates and on one side of the two upper side plates close to the upper hinged plate, and the upper reinforcing plate is located between the two upper vertical plates.

[0013] The utility model is further configured as follows: the lower cage includes two lower vertical plates arranged parallel to each other, lower side plates parallel to each other and perpendicular to the lower vertical plates are arranged on both sides of the top between the two lower vertical plates, the two lower vertical plates and the two lower side plates together form a lower rectangular channel, and two lower hinged plates parallel to each other are arranged on the top between the two lower vertical plates.

[0014] The utility model is further configured as follows: a lower reinforcing plate is provided on one side of the two lower hinged plates close to the upper side plate and a side of the two lower side plates close to the lower hinged plate, and the lower reinforcing plate is located between the two lower vertical plates.

[0015] The utility model is further configured as follows: a tic-tac-toe structure plate is arranged in the upper rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strand to pass through.

[0016] The utility model is further configured as follows: a tic-tac-toe structure plate is arranged in the lower rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strand to pass through.

[0017] To sum up, the utility model has the following beneficial effects: through the setting of the upper hoist cage and the lower hoist cage, the fixing effect of the hydraulic lifter can be guaranteed, and the installation difficulty of the hydraulic system in the large-span steel truss can be effectively reduced. Finally, by respectively hinged the upper hoist cage and the lower hoist cage at different positions of the vertical steel truss, it is only necessary to perform welding at the corresponding hanging points. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is an assembly diagram in an embodiment of the utility model;

[0019] Figure 2It is a detailed enlarged view of the lower cage in the embodiment of the utility model;

[0020] Figure 3 It is an enlarged view of the details of the upper hanging cage in the embodiment of the utility model.

[0021] In the figure:

[0022] 1. Upper steel truss;

[0023] 2. Steel trusses to be lifted;

[0024] 3. Promotion group;

[0025] 31. Upper cage; 311. Upper vertical plate; 312. Upper side plate; 313. Upper reinforcement plate; 314. Upper hinged plate;

[0026] 32, lower cage; 321, lower vertical plate; 322, lower side plate; 323, lower reinforcing plate; 324, lower hinged plate; 315, stiffening plate;

[0027] 33. Steel strand; 34. Hydraulic lifter;

[0028] 4. Twisting group;

[0029] 5. Tire mold. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1-3 The utility model is described in further detail.

[0031] Example

[0032] A lifting assembly for vertical rotation construction of a large-span steel truss comprises a plurality of main steel columns arranged on the ground, an upper steel truss 1 arranged between the main steel columns and a steel truss 2 to be lifted arranged between the upper steel truss 1 and the ground.

[0033] The twisting group 4 is arranged at one end of the steel truss 2 to be lifted and the twisting group 4 is located at a side of the steel truss 2 to be lifted close to the ground.

[0034] The lifting group 3 is arranged on the side of the steel truss 2 to be lifted away from the twisting group 4 and is located between the upper steel truss 1 and the steel truss 2 to be lifted. The lifting group 3 includes an upper hoisting cage 31 arranged on the bottom surface of the upper steel truss 1. The upper hoisting cage 31 is arranged on the side of the upper steel truss 1 away from the twisting group 4 and is hinged to the upper steel truss 1. A hydraulic lifter 34 is arranged in the upper hoisting cage 31. A steel strand 33 is arranged on the hydraulic lifter 34. A lower hoisting cage 32 is arranged on the end of the steel strand 33 away from the hydraulic lifter 34. The lower hoisting cage 32 is hinged to the side of the steel truss 2 to be lifted away from the twisting group 4, and the lower hoisting cage 32 is located on the side of the steel truss 2 to be lifted close to the upper steel truss 1.

[0035] The tire mold set 5 is arranged on the side of the steel truss 2 to be lifted close to the ground.

[0036] The tire mold group 5 is used to support the steel truss 2 to be lifted, and the twisting group 4 is used to rotate the steel truss 2 to be lifted.

[0037] In this embodiment, the upper hoist cage 31 includes two upper vertical plates 311 arranged parallel to each other, and upper side plates 312 parallel to each other and perpendicular to the upper vertical plates 311 are arranged on both sides of the bottom between the two upper vertical plates 311. The two upper vertical plates 311 and the two upper side plates 312 together form an upper rectangular channel, and two upper hinged plates 314 parallel to each other are arranged on the top between the two upper vertical plates 311.

[0038] In this embodiment, mutually symmetrical stiffening plates 315 are provided on the sides of the two upper vertical plates 311 away from the side plates.

[0039] In this embodiment, upper reinforcing plates 313 are provided on one side of the two upper hinge plates 314 close to the upper side plates 312 and on one side of the two upper side plates 312 close to the upper hinge plates 314 , and the upper reinforcing plates 313 are located between the two upper vertical plates 311 .

[0040] In this embodiment, the lower cage 32 includes two lower vertical plates 321 arranged parallel to each other, and lower side plates 322 parallel to each other and perpendicular to the lower vertical plates 321 are arranged on both sides of the top between the two lower vertical plates 321. The two lower vertical plates 321 and the two lower side plates 322 together form a lower rectangular channel, and two lower hinged plates 324 parallel to each other are arranged on the top between the two lower vertical plates 321.

[0041] In this embodiment, a lower reinforcing plate 323 is disposed on one side of the two lower hinge plates 324 close to the upper side plate 312 and on one side of the two lower side plates 322 close to the lower hinge plate 324 , and the lower reinforcing plate 323 is located between the two lower vertical plates 321 .

[0042] Preferably, a tic-tac-toe structure plate is provided in the upper rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strands 33 to pass through.

[0043] Preferably, a tic-tac-toe structure plate is provided in the lower rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strands 33 to pass through.

[0044] In this embodiment, webs providing hinge positions are provided on the lifting points of the upper steel truss 1 and the upper hoist cage 31 and on the connection points between the lower hoist cage 32 and the steel truss 2 to be lifted and the lower hoist cage 32. The upper hinged plate 314 and the lower hinged plate 324 are hinged to the webs at different positions through pins.

[0045] In this embodiment, an anchor plate is provided on the end of the steel strand 33 passing through the cross-shaped structure plate in the lower rectangular channel, and the anchor plate is engaged with the lower cage 32 .

[0046] In this embodiment, the upper hoist cage 31 is directly connected to the hydraulic lifter 34 , and then the steel strand 33 passes through the cross-shaped structural plate in the upper rectangular channel and is connected to the hydraulic lifter 34 .

[0047] Beneficial effect: The setting of the upper hanging cage 31 and the lower hanging cage 32 can ensure the fixing effect of the hydraulic lifter 34, and can effectively reduce the installation difficulty of the hydraulic system in the large-span steel truss. Finally, by respectively hinged the upper hanging cage 31 and the lower hanging cage 32 at different positions of the vertical steel truss, it is only necessary to weld at the corresponding hanging points.

[0048] In this embodiment, the twisting group 4 and the tire mold group 5 are both common technologies on the scene and will not be described in detail.

[0049] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed, but such modifications are protected by patent law as long as they are within the scope of the claims of the present invention.

Claims

1. A lifting assembly for long-span steel truss spatial vertical rotation construction, comprising a plurality of main steel columns arranged on the ground, an upper steel truss (1) arranged between the main steel columns, and a steel truss (2) to be lifted arranged between the upper steel truss (1) and the ground, wherein: A twisting group (4) is arranged at one end of the steel truss (2) to be lifted, and the twisting group (4) is located on a side of the steel truss (2) to be lifted close to the ground; The lifting group (3) is arranged on a side of the steel truss (2) to be lifted away from the twisting group (4) and is located between the upper steel truss (1) and the steel truss (2) to be lifted. The lifting group (3) includes an upper hoisting cage (31) arranged on the bottom surface of the upper steel truss (1). The upper hoisting cage (31) is arranged on a side of the upper steel truss (1) away from the twisting group (4) and is hinged to the upper steel truss (1). (31) is provided with a hydraulic lifter (34), a steel strand (33) is provided on the hydraulic lifter (34), a lower hoisting cage (32) is provided at one end of the steel strand (33) away from the hydraulic lifter (34), the lower hoisting cage (32) is hinged to the side of the steel truss (2) to be lifted away from the twisting group (4), and the lower hoisting cage (32) is located on the side of the steel truss (2) to be lifted close to the upper steel truss (1); A tire mold assembly (5) is arranged on a side of the steel truss (2) to be lifted close to the ground; The tire mold group (5) is used to support the steel truss (2) to be lifted, and the twisting group (4) is used to rotate the steel truss (2) to be lifted.

2. The lifting assembly for vertical rotation construction of a large-span steel truss according to claim 1 is characterized by: The upper cage (31) includes two upper vertical plates (311) arranged parallel to each other, and upper side plates (312) parallel to each other and perpendicular to the upper vertical plates (311) are arranged on both sides of the bottom between the two upper vertical plates (311). The two upper vertical plates (311) and the two upper side plates (312) together form an upper rectangular channel, and two upper hinged plates (314) parallel to each other are arranged on the top between the two upper vertical plates (311).

3. The lifting assembly for vertical rotation construction of a large-span steel truss according to claim 2 is characterized by: Mutually symmetrical stiffening plates (315) are provided on one side of the two upper vertical plates (311) away from the side plates.

4. The lifting assembly for vertical rotation construction of a large-span steel truss according to claim 2 is characterized by: An upper reinforcing plate (313) is provided on one side of the two upper hinged plates (314) close to the upper side plate (312) and on one side of the two upper side plates (312) close to the upper hinged plate (314), and the upper reinforcing plate (313) is located between the two upper vertical plates (311).

5. The lifting assembly for vertical rotation construction of a large-span steel truss according to claim 1 is characterized by: The lower cage (32) includes two lower vertical plates (321) arranged parallel to each other, and lower side plates (322) parallel to each other and perpendicular to the lower vertical plates (321) are arranged on both sides of the top between the two lower vertical plates (321). The two lower vertical plates (321) and the two lower side plates (322) together form a lower rectangular channel, and two lower hinged plates (324) parallel to each other are arranged on the top between the two lower vertical plates (321).

6. The lifting assembly for vertical rotation construction of a large-span steel truss according to claim 5 is characterized by: A lower reinforcing plate (323) is provided on one side of the two lower hinged plates (324) close to the lower side plate (322) and on one side of the two lower side plates (322) close to the lower hinged plate (324), and the lower reinforcing plate (323) is located between the two lower vertical plates (321).

7. A lifting assembly for vertical rotation construction of a large-span steel truss according to any one of claims 2 to 4, characterized in that: A tic-tac-toe structure plate is arranged in the upper rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strand (33) to pass through.

8. A lifting assembly for vertical rotation construction of a large-span steel truss according to any one of claims 5 or 6, characterized in that: A tic-tac-toe structure plate is arranged in the lower rectangular channel, and the middle part of the tic-tac-toe structure is used for the steel strand (33) to pass through.

Citation Information

Cited By

  • Self-adaptive vertical rotation lifting construction method for large-span steel structure

    CN116062609A

  • A method for self-adaptive vertical rotation and lifting construction of long-span steel structures

    CN116062609B