Asphalt pavement lap joint structure

By using the I-beam steel frame and transverse tie rod support mechanism at the overlap of the asphalt pavement, the problem of inconsistent structural strength between the old and new pavement is solved, the strength of the joint is enhanced, fracture and displacement are prevented, and the service life of the pavement is extended.

CN221918822UActive Publication Date: 2024-10-29QIYE ROAD & BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420521696.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-10-29
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

During the repair or widening process of asphalt pavement, due to the difference in materials and construction time between the old and new pavement, the structural strength of the old and new pavement is inconsistent, resulting in breakage and damage at the overlap, which affects the service life of the pavement.

Method used

A support mechanism and connecting mechanism including an I-shaped steel frame and transverse tie rods are used to provide vertical support through the I-shaped steel frame between the old road base layer and the new road base layer, and the horizontal tie rods are used to strengthen the lateral connection between the old road and the new road. Enhances the strength of seams to prevent breakage and displacement.

Benefits of technology

It effectively prevents damage caused by insufficient pavement strength at joints, ensures the stability and durability of the overlap, and extends the service life of the pavement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221918822U_ABST
    Figure CN221918822U_ABST
Patent Text Reader

Abstract

The utility model discloses an asphalt pavement lap joint structure. The asphalt pavement lap joint structure comprises a lap joint structure main body, the lap joint structure body comprises a soil foundation, an old road part and a new road part are arranged at the top of the soil foundation, a supporting mechanism and a connecting mechanism are arranged in the old road part and the new road part, the supporting mechanism comprises an I-shaped steel frame, one side of the I-shaped steel frame is installed in the old road part, the other side of the I-shaped steel frame is installed in the new road part, and the connecting mechanism comprises a transverse pull rod. A transverse mounting hole is formed in the I-shaped steel frame, and the transverse pull rod is mounted in the transverse mounting hole; according to the utility model, the joint of the old road part and the new road part is supported through the I-shaped steel frame between the old roadbed layer and the new roadbed layer, so that the situation that the pavement joint is damaged in the subsequent use process due to insufficient pavement strength at the joint is prevented; the transverse connection of the old road part and the new road part is strengthened in the horizontal direction, and the old road part and the new road part are prevented from being fractured and displaced when bearing pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to an asphalt pavement overlap structure. Background Art

[0002] Asphalt pavement refers to various types of pavement paved with road asphalt materials mixed into mineral materials. The asphalt binder improves the ability of paving aggregate to resist damage to the road surface caused by driving and natural factors, making the road surface smooth, dust-free, waterproof and durable. Therefore, asphalt pavement is the most widely used high-grade pavement in road construction.

[0003] When the asphalt pavement is damaged or widened, the new and old pavement structures will have inconsistent strengths due to the different materials and construction times of the new and old pavements, which will eventually lead to fractures and damage at the overlap, causing the pavement to be damaged again. Therefore, an asphalt pavement overlap structure is needed to meet people's needs. Utility Model Content

[0004] The purpose of the utility model is to provide an asphalt pavement overlap structure to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an asphalt pavement overlap structure, comprising an overlap structure main body; the overlap structure main body comprises a soil base, an old road part and a new road part are arranged on the top of the soil base, and a supporting mechanism and a connecting mechanism are arranged inside the old road part and the new road part;

[0006] Preferably, the support mechanism comprises an I-beam frame, one side of the I-beam frame is installed in the old road portion, and the other side of the I-beam frame is installed in the new road portion, the I-beam frame is provided with a vertical mounting hole, a vertical support rod is installed in the vertical mounting hole, and a support rod reinforcement kit is sleeved on the vertical support rod;

[0007] Preferably, the connecting mechanism comprises a transverse tie rod, a transverse mounting hole is provided on the I-beam frame, the transverse tie rod is installed in the transverse mounting hole, and a tie rod reinforcement kit is sleeved on the transverse tie rod.

[0008] Preferably, the old road portion includes an old road cushion layer, an old road base layer and an old road pavement layer, the old road cushion layer is fixedly installed on the top of the soil base, the old road base layer is fixedly installed on the top of the old road cushion layer, and the old road pavement layer is fixedly installed on the top of the old road base layer.

[0009] Preferably, the new road portion includes a new road cushion layer, a new road base layer and a new road surface layer, the new road cushion layer is fixedly installed on the top of the soil base, the new road base layer is fixedly installed on the top of the new road cushion layer, and the new road surface layer is fixedly installed on the top of the old road base layer.

[0010] Preferably, the old road cushion layer is installed on one side of the new road cushion layer, and the support rod reinforcement kit is installed in the new road cushion layer.

[0011] Preferably, the old roadbed is installed on one side of the new roadbed, one side of the I-beam frame is installed in the old roadbed, and the other side of the I-beam frame is installed in the new roadbed.

[0012] Preferably, one end of the transverse tie rod is installed in the old road base layer, the other end of the transverse tie rod is installed in the new road base layer, and the tie rod reinforcement kit is installed in the old road base layer.

[0013] Preferably, the old pavement layer is installed on one side of the new pavement layer, and the old pavement layer and the new pavement layer are located at the top of the overlapping structure body.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The utility model supports the joint between the old road portion and the new road portion through the I-beam frame between the old road base and the new road base, thereby preventing the pavement strength at the joint from being insufficient, which may cause damage to the pavement joint during subsequent use. The lateral connection between the old road portion and the new road portion is strengthened in the horizontal direction through the I-beam frame and the lateral tie rod, thereby preventing the old road portion and the new road portion from being broken and displaced when subjected to pressure. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a three-dimensional structural schematic diagram of an asphalt pavement overlap structure proposed by the utility model;

[0017] Figure 2 A schematic cross-sectional view of a new road portion of an asphalt pavement overlap structure proposed by the utility model;

[0018] Figure 3 A schematic cross-sectional view of an old road portion of an asphalt pavement overlap structure proposed by the utility model;

[0019] Figure 4 This is a structural schematic diagram of a support mechanism and a connection mechanism of an asphalt pavement overlap structure proposed by the utility model;

[0020] Figure 5 The utility model provides a schematic structural diagram of a vertical support rod and a transverse tie rod of an asphalt pavement overlap structure.

[0021] In the figure: 1. main body of the overlapping structure; 2. soil foundation; 3. old road part; 4. new road part; 5. supporting mechanism; 6. connecting mechanism; 31. old road cushion layer; 32. old road base layer; 33. old road surface layer; 41. new road cushion layer; 42. new road base layer; 43. new road surface layer; 51. I-beam frame; 52. vertical mounting holes; 53. vertical struts; 54. strut reinforcement kit; 61. transverse tie rods; 62. transverse mounting holes; 63. tie rod reinforcement kit. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Example 1: Please refer to Figure 1-5 The utility model provides a technical solution: an asphalt pavement overlap structure, including an overlap structure body 1; in order to solve the problem that the new and old pavement materials and construction times are different, the new and old pavement structures will have inconsistent strengths, which will eventually lead to fracture and damage at the overlap, causing the pavement to be damaged again, the overlap structure body 1 includes a soil base 2, an old road part 3 and a new road part 4 are arranged on the top of the soil base 2, the old road part 3 includes an old road cushion layer 31, an old road base layer 32 and an old road surface layer 33, the old road cushion layer 31 is fixedly installed on the top of the soil base 2, the old road base layer 32 is fixedly installed on the top of the old road cushion layer 31, the old road surface layer 33 is fixedly installed on the top of the old road base layer 32, and the new road part 4 includes a new road cushion layer 41, a new road base layer 42 and a new road surface layer 43, a new road cushion layer 41 is fixedly installed on the top of the soil foundation 2, a new road base layer 42 is fixedly installed on the top of the new road cushion layer 41, a new road surface layer 43 is fixedly installed on the top of the old road base layer 32, the old road surface layer 33 is installed on one side of the new road surface layer 43, the old road surface layer 33 and the new road surface layer 43 are located at the top of the overlap structure main body 1, and a supporting mechanism 5 and a connecting mechanism 6 are provided in the old road portion 3 and the new road portion 4. When repairing the road surface, the portion to be repaired is excavated to the soil foundation 2, and a groove is excavated in the old road base layer 32 of the old road portion 3 around the excavated road pit, and the supporting mechanism 5 and the connecting mechanism 6 are placed, and the vertical and horizontal strengths of the old road portion 3 and the new road portion 4 are strengthened by the supporting mechanism 5 and the connecting mechanism 6;

[0024] In order to strengthen the strength of the joint between the old road portion 3 and the new road portion 4, the supporting mechanism 5 includes an I-beam frame 51, the old road base layer 32 is installed on one side of the new road base layer 42, one side of the I-beam frame 51 is installed in the old road base layer 32, and the other side of the I-beam frame 51 is installed in the new road base layer 42, one side of the I-beam frame 51 is installed in the old road portion 3, and the other side of the I-beam frame 51 is installed in the new road portion 4, a vertical mounting hole 52 is opened on the I-beam frame 51, a vertical support rod 53 is installed in the vertical mounting hole 52, and a support rod reinforcement kit 54 is sleeved on the vertical support rod 53, the old road cushion layer 31 is installed on one side of the new road cushion layer 41, and the support rod reinforcement kit 54 is installed in the new road cushion layer 41, a groove is dug in the old road base layer 32 of the old road portion 3 around the excavated road pit, and the I-beam frame 51 is placed, and a tie rod reinforcement kit 63 is placed between the I-beam frame 51 and the old road base layer 32, so as to horizontally The tie rod 61 passes through the transverse mounting hole 62 on the I-beam frame 51 and then through the tie rod reinforcement kit 63, and is driven into the old road base layer 32. In the vertical direction, the support rod reinforcement kit 54 is placed between the I-beam frame 51 and the exposed soil base 2, and the vertical support rod 53 passes through the vertical mounting hole 52 on the I-beam frame 51 and then through the support rod reinforcement kit 54, and is driven into the soil base 2. After the support mechanism 5 and the connecting mechanism 6 are installed, the new road cushion layer 41, the new road base layer 42 and the new pavement layer 43 are filled into the pit in sequence, so that the new road cushion layer 41 is spliced ​​with the old road cushion layer 31, the new road base layer 42 is spliced ​​with the old road base layer 32, and the new pavement layer 43 is spliced ​​with the old pavement layer 33. The I-beam frame 51 between the old road base layer 32 and the new road base layer 42 supports the joint between the old road portion 3 and the new road portion 4 to prevent insufficient pavement strength at the joint, which may cause damage to the pavement joint during subsequent use.

[0025] The working principle is as follows: when repairing the road surface, the part to be repaired is excavated to the soil foundation 2, a groove is excavated in the old road base 32 of the old road part 3 around the excavated road pit, and an I-beam frame 51 is placed, and a tie rod reinforcement kit 63 is placed between the I-beam frame 51 and the old road base 32, and the transverse tie rod 61 is passed through the transverse mounting hole 62 on the I-beam frame 51 and then through the tie rod reinforcement kit 63, and driven into the old road base 32, and in the vertical direction, the support rod reinforcement kit 54 is placed between the I-beam frame 51 and the exposed soil foundation 2, and the vertical support rod 53 is passed through the vertical mounting hole 52 on the I-beam frame 51 and then through the support rod reinforcement kit 54, and driven into the soil foundation 2, and the support mechanism 5 and the connecting machine are installed. After the structure 6 is formed, a new road cushion layer 41, a new road base layer 42 and a new road surface layer 43 are sequentially filled into the pit, so that the new road cushion layer 41 is spliced ​​with the old road cushion layer 31, the new road base layer 42 is spliced ​​with the old road base layer 32, and the new road surface layer 43 is spliced ​​with the old road surface layer 33. The I-beam frame 51 between the old road base layer 32 and the new road base layer 42 supports the joint between the old road portion 3 and the new road portion 4 to prevent insufficient pavement strength at the joint, which may cause damage to the pavement joint during subsequent use. The I-beam frame 51 and the transverse tie rod 61 strengthen the transverse connection between the old road portion 3 and the new road portion 4 in the horizontal direction to prevent the old road portion 3 and the new road portion 4 from breaking and displacement when subjected to pressure.

[0026] Example 2: Figure 3 , 4 and 5. In order to prevent the connection strength between the old road portion 3 and the new road portion 4 from being insufficient in the horizontal direction, the connection mechanism 6 includes a transverse tie rod 61, one end of which is installed in the old road base layer 32, and the other end of which is installed in the new road base layer 42. A tie rod reinforcement kit 63 is installed in the old road base layer 32. A transverse mounting hole 62 is provided on the I-beam frame 51, and the transverse tie rod 61 is installed in the transverse mounting hole 62. A tie rod reinforcement kit 63 is sleeved on the transverse tie rod 61. The transverse connection between the old road portion 3 and the new road portion 4 is strengthened in the horizontal direction through the I-beam frame 51 and the transverse tie rod 61 to prevent the old road portion 3 and the new road portion 4 from breaking and shifting when under pressure. The remaining features are the same as those in Example 1.

[0027] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An asphalt pavement overlap structure, comprising an overlap structure body (1); characterized in that: The overlapping structure body (1) comprises a soil foundation (2), an old road portion (3) and a new road portion (4) are provided on the top of the soil foundation (2), and a supporting mechanism (5) and a connecting mechanism (6) are provided inside the old road portion (3) and the new road portion (4); The support mechanism (5) comprises an I-beam frame (51), one side of the I-beam frame (51) is installed in the old road portion (3), and the other side of the I-beam frame (51) is installed in the new road portion (4), the I-beam frame (51) is provided with a vertical mounting hole (52), a vertical support rod (53) is installed in the vertical mounting hole (52), and a support rod reinforcement kit (54) is sleeved on the vertical support rod (53); The connecting mechanism (6) comprises a transverse tie rod (61), a transverse mounting hole (62) is provided on the I-beam frame (51), the transverse tie rod (61) is mounted in the transverse mounting hole (62), and a tie rod reinforcement kit (63) is sleeved on the transverse tie rod (61).

2. The asphalt pavement overlap structure according to claim 1, characterized in that: The old road portion (3) comprises an old road cushion layer (31), an old road base layer (32) and an old road surface layer (33), wherein the old road cushion layer (31) is fixedly installed on the top of the soil base (2), the old road base layer (32) is fixedly installed on the top of the old road cushion layer (31), and the old road surface layer (33) is fixedly installed on the top of the old road base layer (32).

3. The asphalt pavement overlap structure according to claim 2, characterized in that: The new road portion (4) comprises a new road cushion layer (41), a new road base layer (42) and a new road surface layer (43), wherein the new road cushion layer (41) is fixedly installed on the top of the soil base (2), the new road base layer (42) is fixedly installed on the top of the new road cushion layer (41), and the new road surface layer (43) is fixedly installed on the top of the old road base layer (32).

4. The asphalt pavement overlap structure according to claim 3, characterized in that: The old road cushion layer (31) is installed on one side of the new road cushion layer (41), and the support rod reinforcement kit (54) is installed in the new road cushion layer (41).

5. The asphalt pavement overlap structure according to claim 3, characterized in that: The old roadbed (32) is installed on one side of the new roadbed (42), one side of the I-beam frame (51) is installed in the old roadbed (32), and the other side of the I-beam frame (51) is installed in the new roadbed (42).

6. The asphalt pavement overlap structure according to claim 3, characterized in that: One end of the transverse tie rod (61) is installed in the old road base layer (32), the other end of the transverse tie rod (61) is installed in the new road base layer (42), and the tie rod reinforcement kit (63) is installed in the old road base layer (32).

7. The asphalt pavement overlap structure according to claim 3, characterized in that: The old pavement layer (33) is installed on one side of the new pavement layer (43), and the old pavement layer (33) and the new pavement layer (43) are located at the top of the overlapped structural body (1).