Debris flow protection engineering structure

By laying stone layers and arc-shaped troughs in debris flow prevention and control projects, combined with steel wire mesh and rib sills, the problems of abrasion and insufficient impact resistance of drainage guide troughs are solved, and longer service life and higher abrasion resistance are achieved. .

CN221919251UActive Publication Date: 2024-10-29LIAONING ZHONGBO ENG SURVEY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420126993.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-10-29
Estimated Expiration
2034-01-18

AI Technical Summary

Technical Problem

The drainage channels of existing debris flow prevention and control projects are severely abraded during the movement of debris flows, have short service life and limited impact resistance, and cannot effectively buffer the flow speed of debris flow downwards.

Method used

A layer of block stones is laid on the concrete layer to form an arc-shaped groove. With the support of steel mesh and rib sills, the abrasion resistance and impact resistance of the drainage guide groove are enhanced, and a trapezoidal groove is formed by superposition to improve the overall strength.

Benefits of technology

It can effectively slow down the flow speed of debris flow when it slides down, reduce the impact on the drainage guide channel, extend the service life and reduce maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919251U_ABST
    Figure CN221919251U_ABST
Patent Text Reader

Abstract

The utility model discloses a debris flow protection engineering structure which comprises a mountain body, a steel wire mesh is laid on the outer surface of the upper end of the mountain body, a first block stone layer and a concrete layer are laid on the outer surface of the upper end of the steel wire mesh, and the first block stone layer is located on the outer surface of the lower end of the concrete layer. A second block stone layer is fixedly installed on the outer surface of the upper end of the concrete layer, a rib sill is fixedly installed on the outer surface of the upper end of the steel wire mesh, and the rib sill is located on the outer surface of one side of the steel wire mesh, the first block stone layer, the concrete layer and the second block stone layer. According to the debris flow protection engineering structure, the second block stone layer is laid on the concrete layer, the arc-shaped groove is formed, the flowing speed of debris flow can be effectively reduced when the debris flow slides down, the impact force of the debris flow on the drainage groove is reduced, the abrasion resistance of the drainage groove can be enhanced through the laid block stones, rib sills and steel wire nets, and the service life of the drainage groove is prolonged. The service life of the drainage groove is prolonged, and better use prospects can be brought.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of debris flow protection, in particular to a debris flow protection engineering structure. Background Art

[0002] Drainage channels are one of the main types of debris flow prevention and control projects and are widely used in debris flow management.

[0003] In the existing debris flow prevention and control projects, fully lined debris flow drainage channels (commonly known as V-shaped channels) are commonly used to drain debris flows. Because the debris flow moves too fast in the channel, it will cause huge abrasion to the bottom of the channel, greatly reducing the service life of the drainage channel and increasing the maintenance cost during the operation period. In addition, the impact resistance of the debris flow in the channel is limited, and it cannot effectively buffer the flow speed of the debris flow. Therefore, we propose a debris flow protection engineering structure. Utility Model Content

[0004] Technical problem solved: In view of the deficiencies in the prior art, the utility model provides a debris flow protection engineering structure, which has an arc-shaped groove formed by laying a second stone layer on a concrete layer, which can effectively alleviate the flow speed of the debris flow when it slides down and reduce the impact force of the debris flow on the drainage groove. The laid stones, ribs and wire mesh can enhance the abrasion resistance of the drainage groove and increase the service life of the drainage groove, etc., which can effectively solve the problems in the background technology.

[0005] Technical solution: To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a debris flow protection engineering structure, including a mountain body, the upper outer surface of the mountain body is paved with a wire mesh, the upper outer surface of the wire mesh is paved with a stone layer one and a concrete layer, and the stone layer one is located on the lower outer surface of the concrete layer, the upper outer surface of the concrete layer is fixedly installed with a stone layer two, the upper outer surface of the wire mesh is fixedly installed with a rib sill, and the rib sill is located on the outer surface of one side of the wire mesh, the stone layer one, the concrete layer, and the stone layer two.

[0006] Preferably, the upper outer surface of the second block stone layer is paved to form an arc-shaped groove.

[0007] Preferably, the number of the steel wire mesh, the first stone layer, the concrete layer, the second stone layer, and the arc-shaped groove is five groups, and each group of the steel wire mesh, the first stone layer, the concrete layer, the second stone layer, and the arc-shaped groove forms a trapezoidal groove by superimposing.

[0008] Preferably, the mesh size of the wire mesh is generally 0.1m to 0.3m.

[0009] Preferably, the particle diameters of the steel wire mesh and the stone layer 5 are 0.3m to 0.6m, and the laying thickness of the steel wire mesh is 1m, and the laying thickness of the stone layer 5 is 0.2m.

[0010] Preferably, the rib sill and the side wall are fixedly connected.

[0011] Beneficial effects:

[0012] Compared with the prior art, the utility model provides a debris flow protection engineering structure, which has the following beneficial effects:

[0013] The debris flow protection engineering structure forms an arc-shaped groove by laying a second stone layer on a concrete layer, which can effectively alleviate the flow speed of the debris flow when it slides down and reduce the impact force of the debris flow on the drainage groove. The laid stones, ribs and wire mesh can enhance the abrasion resistance of the drainage groove and increase the service life of the drainage groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The utility model is a schematic diagram of the overall structure of a debris flow protection engineering structure.

[0015] Figure 2 The utility model is a structural schematic diagram of a steel wire mesh in a debris flow protection engineering structure.

[0016] Figure 3 This is a top view analysis diagram of a debris flow protection engineering structure of the utility model.

[0017] In the figure: 1. Main body of the mountain; 2. Wire mesh; 3. Block stone layer one; 4. Concrete layer; 5. Block stone layer two; 6. Arc groove; 7. Rib sill; 8. Side wall. DETAILED DESCRIPTION

[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0019] like Figure 1-3 As shown, a debris flow protection engineering structure includes a mountain body 1, the upper outer surface of the mountain body 1 is paved with a wire mesh 2, the upper outer surface of the wire mesh 2 is paved with a stone layer 3 and a concrete layer 4, and the stone layer 3 is located on the lower outer surface of the concrete layer 4, and the upper outer surface of the concrete layer 4 is fixedly installed with a stone layer 2 5, and the upper outer surface of the wire mesh 2 is fixedly installed with a rib sill 7, and the rib sill 7 is located on one side of the outer surface of the wire mesh 2, the stone layer 1 3, the concrete layer 4, and the stone layer 2 5. The overall structure is simple, easy to lay, and convenient to maintain.

[0020] Furthermore, an arcuate groove 6 is formed on the outer surface of the upper end of the second rock layer 5. The arcuate groove 6 formed by the laying can effectively alleviate the flow speed of the debris flow when it slides downward.

[0021] Furthermore, the number of the wire mesh 2, the stone layer 1 3, the concrete layer 4, the stone layer 2 5, and the arc groove 6 is five groups, and each group of the wire mesh 2, the stone layer 1 3, the concrete layer 4, the stone layer 2 5, and the arc groove 6 is superimposed to form a trapezoidal groove. The trapezoidal groove formed by superposition can increase the overall strength of the drainage groove.

[0022] Furthermore, the mesh size of the wire mesh 2 is generally 0.1m to 0.3m, which can be planned according to the bulk density of the debris flow. When the bulk density of the debris flow is small, the mesh size is small, and when the bulk density of the debris flow is large, the mesh size is large.

[0023] Furthermore, the particle diameters of the wire mesh 2 and the second stone layer 5 are 0.3m to 0.6m, the laying thickness of the wire mesh 2 is 1m, and the laying thickness of the second stone layer 5 is 0.2m. By laying the first and second stone layers, the cost of laying the stone can be reduced.

[0024] Furthermore, the rib sill 7 and the side wall 8 are fixedly connected. By setting the rib sill 7 and the side wall 8 and the fixed connection therebetween, the strength of the row guide groove can be increased.

[0025] How it works

[0026] Firstly, a wire mesh 2, a rock layer 1 3, a concrete layer 4 and a rock layer 2 5 are sequentially laid on the main surface of the mountain to form an arcuate groove 6. A plurality of sets of wire meshes 2, rock layers 1 3, concrete layers 4 and rock layers 2 5 are superimposed to form a trapezoidal drainage groove. The arcuate groove 6 formed by laying the rock layer 2 5 on the concrete layer 4 can effectively alleviate the flow speed of the debris flow when it slides down and reduce the impact force of the debris flow on the drainage groove. In addition, the laid rocks, ribs 7 and wire mesh 2 can enhance the abrasion resistance of the drainage groove and increase the service life of the drainage groove.

[0027] It should be noted that, in this article, relational terms such as first and second (number one, number two), etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0028] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A debris flow protection engineering structure, comprising a mountain body (1), characterized in that: The upper outer surface of the mountain body (1) is paved with a steel mesh (2), the upper outer surface of the steel mesh (2) is paved with a stone layer (3) and a concrete layer (4), and the stone layer (3) is located on the lower outer surface of the concrete layer (4), the upper outer surface of the concrete layer (4) is fixedly installed with a stone layer (5), and the upper outer surface of the steel mesh (2) is fixedly installed with a rib (7), and the rib (7) is located on one side of the outer surface of the steel mesh (2), the stone layer (3), the concrete layer (4), and the stone layer (5).

2. A debris flow protection engineering structure according to claim 1, characterized in that: The upper outer surface of the second block stone layer (5) is paved to form an arc-shaped groove (6).

3. A debris flow protection engineering structure according to claim 1, characterized in that: The number of the steel wire mesh (2), the first stone layer (3), the concrete layer (4), the second stone layer (5), and the arc-shaped groove (6) is five groups, and each group of the steel wire mesh (2), the first stone layer (3), the concrete layer (4), the second stone layer (5), and the arc-shaped groove (6) forms a trapezoidal groove by stacking.

4. A debris flow protection engineering structure according to claim 1, characterized in that: The mesh size of the steel wire mesh (2) is generally 0.1m to 0.3m.

5. The debris flow protection engineering structure according to claim 1, characterized in that: The particle diameters of the steel wire mesh (2) and the second rock layer (5) are 0.3m to 0.6m, the laying thickness of the steel wire mesh (2) is 1m, and the laying thickness of the second rock layer (5) is 0.2m.

6. The debris flow protection engineering structure according to claim 1, characterized in that: The rib sill (7) and the side wall (8) are fixedly connected.