Multifunctional guide frame

Through the design of the multi-functional guide frame, the L-shaped steel frame body and the C-shaped positioning frame structure are used to solve the problem of frequent disassembly and assembly of the steel pipe pile guide frame and operating platform, improve the bridge construction efficiency and safety, and realize the steel pipe pile guide frame and operating platform. Efficient installation of piles and connections.

CN221919409UActive Publication Date: 2024-10-29CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420496358.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-10-29
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

During bridge construction, the frequent disassembly and assembly of steel pipe pile guide frames and operating platforms results in low construction efficiency and high safety hazards, and the existing technology cannot effectively guarantee the installation quality.

Method used

Design a multi-functional guide frame that uses an L-shaped steel frame body, a C-shaped positioning frame and a telescopic rod structure. By adjusting the positioning frame and telescopic rods, the guide positioning of steel pipe piles and the switching of platform functions are realized, reducing the number of guide frames and Cumbersome installation and switching of platforms.

Benefits of technology

It improves the construction efficiency of the steel trestle substructure, reduces construction safety risks, and achieves efficient installation of steel pipe piles, pile top distribution beams and connection systems between piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919409U_ABST
    Figure CN221919409U_ABST
Patent Text Reader

Abstract

The utility model discloses a multifunctional guide frame which comprises a steel frame body which is of an L-shaped frame structure and comprises a vertical part and a horizontal part. A connecting piece is fixedly arranged on one side, far away from the horizontal part, of the vertical part; the two positioning frames are fixedly arranged at the two ends of the side, away from the vertical part, of the horizontal part correspondingly; the positioning frame is of a C-shaped frame structure, a telescopic rod is arranged at an opening of the positioning frame, and the opening of the positioning frame is opened or closed by adjusting the length of the telescopic rod. Openings of the two positioning frames are oppositely arranged; a positioning device is arranged in the positioning frame and is used for positioning the steel pipe pile; and the hanging platform is fixedly arranged at the bottom of the steel frame body. According to the utility model, the problem that the steel pipe pile guide frame, the pile top distribution beam mounting platform and the inter-pile connecting system mounting platform need to be frequently assembled, disassembled and switched in the construction process of the steel trestle is solved, the field construction efficiency of the lower structure of the steel trestle is greatly improved, and the construction safety risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel trestle construction, and more specifically, to a multifunctional guide frame. Background Art

[0002] After entering the 21st century, my country's bridge development has entered the fast lane, and a large number of bridges across mountain valleys, rivers, lakes and seas are under construction or planning. Due to the need for material and equipment transportation and personnel passage during bridge construction, temporary trestles need to be built during bridge construction. In the construction of cross-river and cross-sea bridges, the length of the trestles often reaches several kilometers or even more than ten kilometers, and they are widely used.

[0003] The installation and disassembly of the pier will take up considerable equipment and resources, and the construction period is long. The installation and disassembly process also involves water and high-altitude operations, and requires a large number of operating platforms. The lower structure of the pier adopts a steel pipe pile foundation. When the fishing method is used to construct the steel pipe pile, in order to control the plane position and verticality of the steel pipe pile, a steel pipe pile guide frame is generally designed. After the steel pipe pile is inserted and driven into place, before the pile top distribution beam is installed, it is necessary to first dismantle the steel pipe pile guide frame, install the pile top distribution beam welding operating platform, and then install the pile top distribution beam. After the pile top distribution beam is installed, it is necessary to dismantle the pile top distribution beam welding operating platform, install the steel pipe pile connection system welding operating platform, and then install the steel pipe pile connection system. Since it involves the installation and disassembly switching of the guide frame and various operating platforms many times, the construction site often uses non-standard or simple guide frames and operating platforms, which poses a great safety hazard, the pier installation quality cannot be guaranteed, and the installation efficiency is low. Utility Model Content

[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described below.

[0005] In order to achieve these purposes and other advantages according to the utility model, a multifunctional guide frame is provided, comprising:

[0006] The steel frame is an L-shaped frame structure, comprising a vertical portion and a horizontal portion; a connecting piece is fixedly provided on a side of the vertical portion away from the horizontal portion;

[0007] Two positioning frames, which are respectively fixedly arranged at two ends of the horizontal part away from the vertical part; the positioning frame is a C-shaped frame structure, and a telescopic rod is arranged at its opening, and the length of the telescopic rod is adjusted to open or close the opening of the positioning frame; the openings of the two positioning frames are arranged opposite to each other; a positioning device is arranged in the positioning frame to position the steel pipe pile;

[0008] The hanging platform is fixedly arranged at the bottom of the steel frame.

[0009] Preferably, the positioning frame includes multiple main beams and multiple cross beams, the main beams and the cross beams are vertically cross-connected, and an open groove is formed on one side; two telescopic rods are provided, and the two telescopic rods are respectively arranged at the opening and the middle of the open groove, and the two are arranged parallel to the main beams; when the two telescopic rods are extended, they are combined with the cross beams on both sides to form a guide channel for the steel pipe piles.

[0010] Preferably, the positioning device comprises four angle supports symmetrically arranged about the center of the guide channel, each of the angle supports is fixedly provided with a vertical support on one side facing the center of the guide channel, and a guide wheel is rotatably connected to the vertical support.

[0011] Preferably, the steel frame further comprises a plurality of inclined rods spaced apart along the longitudinal direction of the steel frame, and two ends of the inclined rods are respectively fixedly connected to the vertical portion and the horizontal portion.

[0012] Preferably, the hanging platform includes a horizontal frame and a vertical hanger, and two ends of the vertical hanger are fixedly connected to the horizontal frame and the steel frame body respectively.

[0013] Preferably, a steel ladder is provided on the vertical portion and the vertical hanger, respectively.

[0014] Preferably, scaffolding boards and guardrails are provided on the horizontal portion, the positioning frame and the horizontal frame.

[0015] The utility model at least has the following beneficial effects:

[0016] The multifunctional guide frame provided by the utility model realizes the guiding positioning of the steel pipe piles, the functional switching of the pile connection platform, the pile top distribution beam and the pile connection system installation construction platform through the adjustment control of the positioning frame and the telescopic rod. There is no need to carry out the cumbersome installation and disassembly switching of the steel pipe pile guide frame, the pile top distribution beam installation platform and the pile connection system installation platform, which greatly improves the on-site construction efficiency of the steel trestle substructure and reduces the construction safety risks.

[0017] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a side structural schematic diagram of the multifunctional guide frame of the utility model;

[0019] Figure 2 It is a top view of the multifunctional guide frame when the telescopic rod of the utility model is extended;

[0020] Figure 3It is a top view of the multifunctional guide frame when the telescopic rod of the utility model is retracted;

[0021] Figure 4 It is a top view of the steel frame of the utility model;

[0022] Figure 5 It is a top view of the positioning frame of the utility model;

[0023] Figure 6 It is a side structural schematic diagram of the positioning device of the utility model; DETAILED DESCRIPTION

[0024] The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0025] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0026] like Figures 1 to 6 As shown, the utility model provides a multifunctional guide frame, comprising:

[0027] The steel frame 1 is an L-shaped frame structure, comprising a vertical portion 11 and a horizontal portion 12; a connecting member 9 is fixedly provided on a side of the vertical portion 12 away from the horizontal portion 12;

[0028] Two positioning frames 5, which are respectively fixedly arranged at two ends of the horizontal portion 12 on a side away from the vertical portion 11; the positioning frame 5 is a C-shaped frame structure, and a telescopic rod 15 is arranged at its opening, and the length of the telescopic rod 15 is adjusted to open or close the opening of the positioning frame 5; the openings of the two positioning frames 5 are arranged opposite to each other; a positioning device 16 is arranged in the positioning frame 5 to position the steel pipe pile 4;

[0029] The hanging platform 2 is fixedly arranged at the bottom of the steel frame 1 .

[0030] In this technical solution, the Bailey beam 10 is fixedly arranged on the completed steel pipe pile 4 and the pile top distribution beam 14, and the multifunctional guide frame is detachably connected to the Bailey beam 10 through the connecting piece 9. When in use, the number of the connecting pieces 9 can be flexibly set according to the bearing capacity requirements. Figure 2 , extend the telescopic rod 15 so that the positioning frame 5 forms a complete rectangular frame structure, thereby enhancing the overall stability of the positioning frame 5. The positioning device 16 is used to position the steel pipe pile 4 during the insertion process. After the steel pipe pile 4 is inserted and driven into place, refer to Figure 3 , retract the telescopic rod 15 so that the pile top distribution beam 14 and the pile connection system 3 between the two steel pipe piles 4 can be lowered and installed from the openings opposite to each other in the two positioning frames 5. At this time, the steel frame 1 and the positioning frame 5 only serve as an operating platform and bear a relatively small load. The hanging platform 2 is used to install the pile connection system 3. The multifunctional guide frame realizes the positioning of the steel pipe piles 4, the pile connection platform and the pile top distribution beam 14 and the pile connection system 3 installation construction platform through the adjustment control of the positioning frame and the telescopic rod 15. There is no need to perform cumbersome installation and disassembly switching of the steel pipe pile 4 guide frame, the pile top distribution beam 14 installation platform, and the pile connection system 3 installation platform, which greatly improves the on-site construction efficiency of the steel trestle substructure and reduces the construction safety risk.

[0031] In another embodiment, referring to Figures 2 to 5 , the positioning frame 5 includes a plurality of main beams 51 and a plurality of cross beams 52, the main beams 51 and cross beams 52 are vertically cross-connected, and an open slot 53 is formed on one side; the telescopic rods 15 are provided in two, and the two telescopic rods 15 are respectively provided at the opening and the middle of the open slot 53, and the two are provided in parallel with the main beam 51; when the two telescopic rods 15 are extended, the cross beams 52 on both sides thereof enclose and form a guide channel for the steel pipe pile 4. The positioning frame 5 is a C-shaped frame structure composed of the main beam 51 and the cross beam 52, and the open slot 53 is formed on one side, and the longitudinal depth of the open slot 53 needs to meet the length between the open slots of the two positioning frames so that the pile top distribution beam 14 and the connecting system 3 can be lowered and passed. Therefore, two telescopic rods 15 are provided at the open slot 53 to further improve the overall stability of the multifunctional guide frame when the steel pipe pile 4 is inserted and driven. The telescopic rod 15 can adopt a variety of telescopic structural forms in the prior art, which are not limited here. When the two telescopic rods 15 are extended, the cross beams 52 closest to the two sides thereof and the two telescopic rods 15 together enclose a rectangular guide channel. The positioning device 16 is disposed in the guide channel.

[0032] Specifically, Figure 5 and Figure 6As shown, the positioning device 16 includes four angle braces 161 symmetrically arranged about the center of the guide channel, and each of the angle braces 161 is fixedly provided with a vertical brace 162 on one side facing the center of the guide channel, and a guide wheel 163 is rotatably connected to the vertical brace 162. The angle braces 161 are fixedly provided on the inner wall of the opening groove 53, and the steel pipe pile 4 is guided by four groups of the guide wheels 163, and the axis of the guide wheel is perpendicular to the axis of the steel pipe pile 4.

[0033] In another embodiment, if Figure 4 As shown, the steel frame 1 further includes a plurality of inclined braces 13 arranged at intervals along the longitudinal direction of the steel frame 1, and the two ends of the inclined braces 13 are respectively fixedly connected to the vertical portion 11 and the horizontal portion 12. The inclined braces 13 are used to enhance the overall rigidity of the steel frame 1. Specifically, the horizontal portion 12 is a frame structure formed by vertically cross-connecting a plurality of main longitudinal beams 122 and a main transverse beam 121, and a plurality of diagonal braces 123 are further arranged between the main longitudinal beams 122 and the main transverse beams 121; the vertical portion includes vertical rods 111 arranged at intervals along the main transverse beams 121.

[0034] In another embodiment, the hanging platform 2 includes a horizontal frame 22 and a vertical hanger 21, and two ends of the vertical hanger 21 are fixedly connected to the horizontal frame 22 and the steel frame body 1 respectively.

[0035] Furthermore, a steel ladder 8 is provided on the vertical portion 11 and the vertical hanger 21 , respectively. The steel ladder 8 serves as a vertical passage to facilitate construction workers to pass between the Bailey beam 10 and the steel frame 1 and between the steel frame 1 and the hanging platform 2 .

[0036] In order to ensure the safety of construction workers, scaffolding boards 6 and guardrails 7 are provided on the horizontal portion 12 , the positioning frame 5 and the horizontal frame 22 .

[0037] The method for constructing the steel pipe piles 4, pile top distribution beams 14 and inter-pile connection systems 3 for a steel trestle using the multifunctional guide frame includes:

[0038] S1. Install the multifunctional guide frame; connect the steel frame 1 and the positioning frame 5 to the Bailey beam 10 through the connecting piece 9, and set up the steel ladder 8 between the Bailey beam 10 and the steel frame 1 as a vertical passage from the Bailey beam 10 to the steel frame 1; lay scaffolding boards 6 and guardrails 7 on the steel frame 1 and the positioning frame 5.

[0039] S2. Driving and connecting steel pipe piles: the multifunctional guide frame is used as a guide frame and a connecting platform for steel pipe piles 4. The telescopic rods 15 at the openings of the two positioning frames 5 are extended. After the steel pipe piles 4 are transported to the pile position, the steel pipe piles 4 are directly lifted by a crawler crane through a vibrating hammer and a steel wire rope, and the steel pipe piles 4 are slowly moved into the guide frame. Preliminary plane positioning is performed through the GPS system. After the preliminary positioning is completed, the steel pipe piles 4 are accurately adjusted through the positioning device 16. If piles need to be connected, they can be aligned and welded on the multifunctional guide frame, and the steel pipe piles 4 are driven to the designed elevation position according to the design requirements.

[0040] S3, installation of the pile top distribution beam 4 and the pile connection system 3: the multifunctional guide frame is used as the installation platform of the pile top distribution beam 14 and the pile connection system 3, and the telescopic rod 15 at the opening of the two positioning frames 5 is retracted. At this time, the lowering operation space of the pile top distribution beam 14 and the pile connection system 3 is formed between the two positioning frames 5; at the same time, the hanging platform 2 is set under the steel frame 1, and the corresponding steel ladder 8 is set; the scaffolding board 6 and the guardrail 7 are laid on the hanging platform 2. The pile top distribution beam 14 and the pile connection system 3 are hoisted as a whole by a crawler crane, and the pile top distribution beam 14 and the pile connection system 3 are installed on the positioning frame 5 and the hanging platform 2 respectively after the hoisting is in place.

[0041] S4, dismantling the multifunctional guide frame and carrying out the construction of the upper structure of the steel trestle: dismantling the connection between the connecting piece 9 and the Bailey beam 10, using a crawler crane to hoist and dismantle the multifunctional guide frame as a whole, and carrying out the construction of the upper structure of the steel trestle.

[0042] Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A multifunctional guide frame, characterized in that: include: The steel frame is an L-shaped frame structure, comprising a vertical portion and a horizontal portion; a connecting piece is fixedly provided on a side of the vertical portion away from the horizontal portion; Two positioning frames, which are respectively fixedly arranged at two ends of the horizontal part away from the vertical part; the positioning frame is a C-shaped frame structure, and a telescopic rod is arranged at its opening, and the length of the telescopic rod is adjusted to open or close the opening of the positioning frame; the openings of the two positioning frames are arranged opposite to each other; a positioning device is arranged in the positioning frame to position the steel pipe pile; The hanging platform is fixedly arranged at the bottom of the steel frame.

2. The multifunctional guide frame according to claim 1, characterized in that: The positioning frame includes multiple main beams and multiple cross beams, the main beams and the cross beams are vertically cross-connected, and an open groove is formed on one side; the telescopic rods are provided in two, and the two telescopic rods are respectively arranged at the opening and the middle of the open groove, and the two are arranged parallel to the main beams; when the two telescopic rods are extended, they are combined with the cross beams on both sides to form a guide channel for the steel pipe piles.

3. The multifunctional guide frame according to claim 2, characterized in that: The positioning device comprises four angle supports symmetrically arranged about the center of the guide channel, each angle support is fixedly provided with a vertical support on one side facing the center of the guide channel, and a guide wheel is rotatably connected to the vertical support.

4. The multifunctional guide frame according to claim 1, characterized in that: The steel frame also includes a plurality of inclined rods spaced apart along the longitudinal direction of the steel frame, and two ends of the inclined rods are respectively fixedly connected to the vertical portion and the horizontal portion.

5. The multifunctional guide frame according to claim 1, characterized in that: The hanging platform comprises a horizontal frame and a vertical hanger, and two ends of the vertical hanger are fixedly connected to the horizontal frame and the steel frame body respectively.

6. The multifunctional guide frame according to claim 5, characterized in that: The vertical portion and the vertical hanger are respectively provided with steel straight ladders.

7. The multifunctional guide frame according to claim 5, characterized in that: The horizontal part, the positioning frame and the horizontal frame are all provided with scaffolding boards and guardrails.

Citation Information

Cited By

  • Bailey trestle steel pipe pile construction safety operation platform and construction method

    CN120968217A