Grey tile with splicing positioning structure

By designing the splicing positioning structure and drainage mechanism on the green tiles, the stability and leakage problems of the green tiles under wind and rain are solved, and higher tile stability and waterproofing effects are achieved.

CN221920028UActive Publication Date: 2024-10-29QUANZHOU TANGYU BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420476831.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-10-29
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

The existing green tiles are easy to fall off when the wind is strong, and rainwater easily penetrates into the gaps, causing the top of the house to get damp. It lacks a splicing structure and an effective drainage mechanism.

Method used

A green tile with a splicing positioning structure is designed. It adopts a combined structure of main tiles and auxiliary tiles, and achieves stable splicing of tiles through components such as butt blocks, buffer pads, movable grooves, buffer springs and diversion grooves. and drainage of rainwater to reduce the risk of shedding and leakage.

Benefits of technology

It improves the stability and waterproofing effect of the tiles, reduces the possibility of rainwater seeping into gaps, enhances the flame retardant and waterproof properties of the tiles, and ensures the sealing and durability of the house.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920028U_ABST
    Figure CN221920028U_ABST
Patent Text Reader

Abstract

The grey tile with the splicing positioning structure comprises a main tile body, the lower side of the main tile body is fixedly connected with a butt joint block, the upper end of an auxiliary tile body is fixedly connected with a fixing block, the lower end of the auxiliary tile body is fixedly connected with a buffering pad, the upper end of the interior of the fixing block is provided with a butt joint groove, and the butt joint groove is fixedly connected with the buffering pad. A splicing mechanism is arranged between the interior of the butt joint groove and the butt joint block, the main flow groove is formed in the outer surface of the main tile, and a drainage mechanism is further arranged between the main tile and the main flow groove. A user can insert a butt joint block at the lower end of a main tile into a butt joint groove in a fixing block in a nested mode, at the moment, the butt joint block extrudes and pushes a clamping block to move towards the two sides, and when butt joint of the butt joint block is completed, the clamping block is driven by the elastic acting force of a buffer spring to reset and enter a clamping groove; at the moment, the clamping block can fix and limit the butt joint block, so that butt joint between the main tile and the auxiliary tile is completed, and falling of the grey tile is reduced to a certain extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of blue tiles, in particular to a blue tile with a splicing positioning structure. Background Art

[0002] Qingwa is a kind of tile made of clay and crystal stone. Because of its metallic luster and high aesthetics, Qingwa is widely used in high-end buildings and ancient buildings. Compared with ordinary tiles, Qingwa has great advantages in material, color and lifespan. However, Qingwa also has defects and deficiencies in some aspects that need to be improved:

[0003] As shown in the application number: CN202020767538.6, a colored fiberglass asphalt shingle comprises an asphalt shingle body, the lower surface of the asphalt shingle body is coated with hot-melt self-adhesive glue, the asphalt shingle body comprises a comb-shaped portion and a bonding portion, the comb-shaped portion and the bonding portion are connected together and form a step-shaped shape for adjacent asphalt shingle bodies to be interlocked and bonded to each other, the comb-shaped portion is higher than the bonding portion, and the upper surface of the comb-shaped portion is provided with a colored mineral particle surface layer; the lower surface of the comb-shaped portion is a step groove 1 for accommodating and bonding the bonding portion of the adjacent asphalt shingle body, the upper surface of the bonding portion is a step groove 2 for placing and bonding the comb-shaped portion of the adjacent asphalt shingle body, and the comb-shaped portion is away from the connecting portion of the comb-shaped portion and the bonding portion A first bevel is provided at one end of the joint, a bevel matching the first bevel is provided on the upper surface of the bonding portion near the connection between the comb-shaped portion and the bonding portion; a second bevel is provided at one end of the bonding portion away from the connection between the comb-shaped portion and the bonding portion, a bevel matching the second bevel is provided on the lower surface of the comb-shaped portion near the connection between the comb-shaped portion and the bonding portion. The colored fiberglass asphalt shingle is designed to be stepped through optimized design to facilitate mutual interlocking and bonding of adjacent asphalt shingle bodies, and is bonded and fixed by hot-melt self-adhesive glue on the lower surface of the asphalt shingle body, and a micro-needle portion is provided for embedding to increase bonding firmness, so that adjacent asphalt shingle bodies can be closely matched without gaps, and the bonding effect is better.

[0004] Most of the tiles in the above documents are installed in a single piece, and two adjacent tiles cannot be spliced ​​together. When the external wind is strong, the tiles may be blown or even fall off, causing leakage on the surface of the house, which is unstable.

[0005] Most of the green tiles in the above documents are arc-shaped structures. Rainwater will flow to both sides along the arc-shaped surface of the tiles. At this time, rainwater may seep into the gap between the two green tiles, causing the roof of the house to become damp, which has certain limitations.

[0006] Therefore, we propose a green tile with a splicing positioning structure to solve the above-mentioned problems. Utility Model Content

[0007] The utility model aims to provide a tile with a splicing positioning structure to solve the problem that two adjacent tiles cannot be spliced ​​and rainwater may penetrate into the gap between the two tiles proposed in the above background technology.

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green tile with a splicing positioning structure, comprising a main tile, the lower side of which is fixedly connected with a docking block;

[0009] Auxiliary tiles, the upper end of the auxiliary tiles is fixedly connected to a fixing block, the lower end of the auxiliary tiles is fixedly connected to a buffer pad, and a docking groove is provided at the inner upper end of the fixing block, a splicing mechanism is provided between the inside of the docking groove and the docking block, and the auxiliary tiles can be assembled with the main tiles through the splicing mechanism, thereby reducing the possibility of the green tiles falling off;

[0010] The main stream groove is opened on the outer surface of the main tile, and a drainage mechanism is also arranged between the main tile and the main stream groove. Rainwater can be collected and drained through the drainage mechanism, reducing the possibility of rainwater infiltration from the gaps in the green tiles.

[0011] Furthermore, the splicing mechanism includes a movable groove, which is opened on both sides of the interior of the fixed block, and the interior of the movable groove is nested with a clamping block, and the inner end of the clamping block is fixedly connected to a buffer spring, and the other end of the buffer spring is fixedly connected in the movable groove;

[0012] The two sides of the docking block are provided with engaging grooves, and the inside of the engaging grooves is fixedly connected to the limiting block, the outer end of the engaging block is provided with a limiting groove, and the engaging block is nested in the engaging groove, and the limiting groove is connected to the limiting block.

[0013] Furthermore, a connecting block is fixedly connected to the outer side of the engaging block, a movable groove is provided on the fixed block, and a connecting block is nested and connected inside the movable groove.

[0014] Furthermore, the engaging block forms an elastic structure through a buffer spring and the movable groove, and the engaging block is symmetrically distributed about the center point of the docking groove, and the engaging block and the connecting block are an integrated structure.

[0015] Furthermore, the lower end of the docking block is designed to be an arc-shaped structure, and the engaging block forms a sliding structure through the docking block.

[0016] Furthermore, a flame retardant layer is fixedly connected to the outer side of the main tile, and a buffer waterproof layer is fixedly connected to the outer side of the flame retardant layer.

[0017] Furthermore, the drainage mechanism includes a guide groove, which is opened on the left and right sides of the main tile, and is connected to the main groove, and the guide groove is opened vertically.

[0018] Compared with the prior art, the beneficial effects of the utility model are:

[0019] 1. The flame retardant layer can improve the flame retardant effect of the main tiles to a certain extent, and the buffer waterproof layer can further improve the waterproof effect of the main tiles, reducing the possibility of rainwater infiltrating through the main tiles to the top of the house;

[0020] 2. When it rains outside, the rainwater will gather inside the main groove opened on the main tile, and flow to both sides under the backflow effect of the arc structure of the main tile itself. At this time, the guide groove will further collect the rainwater, which to a certain extent reduces the possibility of rainwater infiltrating into the gap between the two groups of green tiles;

[0021] 3. The main tiles and auxiliary tiles cooperate with each other to complete the assembly and splicing of the green tiles. At the same time, a buffer pad is set on the lower side of the auxiliary tiles, which can buffer the auxiliary tiles to a certain extent, reducing the possibility of damage to the auxiliary tiles due to heavy load-bearing;

[0022] 4. The user can insert the docking block at the lower end of the main tile into the docking groove inside the fixed block. At this time, the docking block will squeeze and push the clamping block to move to both sides. When the docking of the docking block is completed, the clamping block will reset under the elastic force of the buffer spring and enter the inside of the clamping groove. At this time, the clamping block will fix and limit the docking block, so that the docking between the main tile and the auxiliary tile is completed, which reduces the falling of the green tile to a certain extent;

[0023] 5. When the locking block enters the locking groove, the limit block will be synchronously docked to the inside of the limit groove opened on the end side of the locking block. At this time, the stability of the docking of the locking block can be further improved. When the user pushes the connecting block outward, the connecting block will drive the locking block to move to both sides. At this time, the user can disassemble the main tile and the auxiliary tile. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the front cross-sectional structure of the utility model;

[0025] Figure 2 It is a schematic diagram of the three-dimensional structure of the utility model;

[0026] Figure 3 This is a schematic diagram of the front cross-sectional structure of the main channel of the utility model;

[0027] Figure 4 This is a schematic diagram of the front cross-sectional structure of the fixing block of the utility model;

[0028] Figure 5 This is a schematic diagram of the front cross-sectional structure of the main tile of the utility model;

[0029] Figure 6 This is a schematic diagram of the front view structure of the auxiliary tile of the utility model;

[0030] Figure 7 This is a front view structural diagram of the fixing block of the utility model.

[0031] In the figure: 1. main tile; 2. auxiliary tile; 3. fixed block; 4. buffer pad; 101. flame retardant layer; 102. buffer waterproof layer; 7. main stream groove; 8. guide groove; 9. docking block; 10. docking groove; 11. connecting block; 12. moving groove; 13. movable groove; 14. buffer spring; 15. snap block; 16. snap groove; 17. limit block; 18. limit groove. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0033] Embodiment 1:

[0034] like Figure 1 , Figure 3 and Figure 4 The technical solution shown in the figure, the utility model provides the following technical solution: a green tile with a splicing positioning structure, discloses a splicing mechanism, and the auxiliary tile 2 can be assembled with the main tile 1 through the splicing mechanism, thereby reducing the possibility of the green tile falling off:

[0035] A main tile 1, a docking block 9 is fixedly connected to the lower side of the main tile 1;

[0036] Auxiliary tile 2, the upper end of the auxiliary tile 2 is fixedly connected with a fixing block 3, and the lower end of the auxiliary tile 2 is fixedly connected with a buffer pad 4, and the upper end of the inner part of the fixing block 3 is provided with a docking groove 10, and a splicing mechanism is provided between the inner part of the docking groove 10 and the docking block 9;

[0037] The splicing mechanism includes a movable groove 13, which is provided on both sides of the interior of the fixed block 3, and a clamping block 15 is nested and connected inside the movable groove 13, and a buffer spring 14 is fixedly connected to the inner end of the clamping block 15, and the other end of the buffer spring 14 is fixedly connected to the movable groove 13; a clamping groove 16 is provided on both sides of the docking block 9, and a limiting block 17 is fixedly connected to the interior of the clamping groove 16, and a limiting groove 18 is provided at the outer end of the clamping block 15, and the clamping block 15 is nested and connected in the clamping groove 16, and the limiting groove 18 is connected to the limiting block 17;

[0038] The snap block 15 forms an elastic structure with the buffer spring 14 and the movable groove 13, and the snap block 15 is symmetrically distributed about the center point of the docking groove 10, and the snap block 15 and the connecting block 11 are an integrated structure, the lower end of the docking block 9 is designed in an arc structure, and the snap block 15 forms a sliding structure through the docking block 9.

[0039] The user can insert the docking block 9 at the lower end of the main tile 1 into the docking groove 10 inside the fixed block 3. At this time, the docking block 9 will squeeze and push the locking block 15 to move to both sides. When the docking of the docking block 9 is completed, the locking block 15 will be reset under the driving of the elastic force of the buffer spring 14 and enter the inside of the locking groove 16. At this time, the locking block 15 will fix and limit the docking block 9, so that the docking between the main tile 1 and the auxiliary tile 2 is completed, which reduces the falling off of the green tile to a certain extent.

[0040] Embodiment 2:

[0041] like Figure 1 , Figure 2 and Figure 5 The technical solution shown in the figure, the utility model provides the following technical solution: a green tile with a splicing positioning structure, discloses a drainage mechanism, through which rainwater can be collected and drained, reducing the possibility of rainwater infiltrating from the gaps of the green tile:

[0042] The main flow groove 7 is provided on the outer surface of the main tile 1, and a drainage mechanism is provided between the main tile 1 and the main flow groove 7;

[0043] The drainage mechanism includes a guide groove 8, which is opened on the left and right sides of the main tile 1, and is connected to the main groove 7, and the guide groove 8 is opened vertically.

[0044] The flame retardant layer 101 can improve the flame retardant effect of the main tile 1 to a certain extent, and the buffer waterproof layer 102 can further improve the waterproof effect of the main tile 1, reducing the possibility of rainwater penetrating into the roof of the house through the main tile 1. When it is rainy outside, the rainwater will gather inside the main flow groove 7 opened on the main tile 1, and flow to both sides under the backflow effect of the arc structure of the main tile 1 itself. At this time, the guide groove 8 will further receive the rainwater, reducing the possibility of rainwater penetrating into the gap between the two groups of green tiles to a certain extent.

[0045] Embodiment three:

[0046] like Figure 6 and Figure 7 The technical solution shown in the figure, the utility model provides the following technical solution: a green tile with a splicing positioning structure, discloses a connecting block 11, and the green tile can be disassembled by the connecting block 11:

[0047] The outer side of the main tile 1 is fixedly connected with a flame retardant layer 101, and the outer side of the flame retardant layer 101 is fixedly connected with a buffer waterproof layer 102; the outer side of the locking block 15 is fixedly connected with a connecting block 11, and a moving groove 12 is opened on the fixed block 3, and the inner side of the moving groove 12 is nested with the connecting block 11;

[0048] When the locking block 15 enters the locking groove 16, the limiting block 17 will be synchronously docked to the inside of the limiting groove 18 opened on the end side of the locking block 15, which can further improve the docking stability of the locking block 15. When the user pushes the connecting block 11 outward, the connecting block 11 will drive the locking block 15 to move to both sides. At this time, the user can disassemble the main tile 1 and the auxiliary tile 2.

[0049] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0050] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A green tile with a splicing and positioning structure, comprising a main tile (1), wherein a docking block (9) is fixedly connected to the lower side of the main tile (1); Features: Also includes: An auxiliary tile (2), wherein the upper end of the auxiliary tile (2) is fixedly connected to a fixing block (3), and the lower end of the auxiliary tile (2) is fixedly connected to a buffer pad (4), and a docking groove (10) is provided at the inner upper end of the fixing block (3), and a splicing mechanism is provided between the inside of the docking groove (10) and the docking block (9), and the auxiliary tile (2) can be assembled with the main tile (1) through the splicing mechanism, thereby reducing the possibility of the green tile falling off; A main flow groove (7) is provided on the outer surface of the main tile (1), and a drainage mechanism is provided between the main tile (1) and the main flow groove (7). Rainwater can be collected and drained through the drainage mechanism, thereby reducing the possibility of rainwater infiltrating through the gaps in the tiles.

2. The green tile with a splicing and positioning structure according to claim 1, characterized in that: The splicing mechanism comprises a movable groove (13), the movable groove (13) is arranged on both sides of the interior of the fixed block (3), and a snap-fit ​​block (15) is nested and connected inside the movable groove (13), and a buffer spring (14) is fixedly connected to the inner end of the snap-fit ​​block (15), and the other end of the buffer spring (14) is fixedly connected in the movable groove (13); The two sides of the docking block (9) are provided with engaging grooves (16), and the inside of the engaging grooves (16) is fixedly connected to a limiting block (17), and the outer end of the engaging block (15) is provided with a limiting groove (18), and the engaging block (15) is nested and connected in the engaging grooves (16), and the limiting grooves (18) are connected to the limiting block (17).

3. The green tile with a splicing and positioning structure according to claim 2, characterized in that: The outer side of the locking block (15) is fixedly connected to a connecting block (11), the fixed block (3) is provided with a moving groove (12), and the inside of the moving groove (12) is nestedly connected to the connecting block (11).

4. The green tile with a splicing and positioning structure according to claim 2, characterized in that: The snap-fit ​​block (15) forms an elastic structure through a buffer spring (14) and a movable groove (13), and the snap-fit ​​block (15) is symmetrically distributed about the center point of the docking groove (10), and the snap-fit ​​block (15) and the connecting block (11) are an integrated structure.

5. The green tile with a splicing and positioning structure according to claim 2, characterized in that: The lower end of the docking block (9) is designed to be an arc-shaped structure, and the engaging block (15) forms a sliding structure through the docking block (9).

6. The green tile with a splicing and positioning structure according to claim 1, characterized in that: The outer side of the main tile (1) is fixedly connected to a flame retardant layer (101), and the outer side of the flame retardant layer (101) is fixedly connected to a buffer waterproof layer (102).

7. The green tile with a splicing and positioning structure according to claim 1, characterized in that: The drainage mechanism comprises a drainage groove (8), the drainage groove (8) is opened on the left and right sides of the main tile (1), the drainage groove (8) is connected to the main flow groove (7), and the drainage groove (8) is opened vertically.