Transformation structure for subway station and subway station
By setting up separation and support mechanisms in subway stations, the problems of collapse and offset during the reconstruction and expansion process were solved, ensuring construction safety and stability.
Patent Information
- Application Number
- CN202420257983.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-02
AI Technical Summary
During the reconstruction and expansion of subway stations, due to complex underground forces, collapse or displacement is prone to occur, affecting construction safety.
Separation mechanisms and supporting mechanisms are used to prevent cracking, deflection and collapse caused by soil loads by setting up partition walls and supporting mechanisms for the early and later expansion spaces to ensure the stability of the expansion space.
It can effectively prevent the subway station from cracking or shifting, prevent the expansion space from collapsing, ensure the safety of construction workers and passengers, and ensure safety during the construction process.
Smart Images

Figure CN221920402U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of subway engineering, and in particular to a reconstruction structure for a subway station and a subway station. Background Art
[0002] With the continuous development of urban subway projects, various forms of renovation and expansion projects for existing subway stations are increasing. When renovating and expanding existing subway stations, due to the complex stress conditions underground, collapse or displacement of existing subway stations from their original positions are prone to occur during the construction process, affecting the personal safety of construction workers and passengers in the existing subway stations. Summary of the invention
[0003] Based on this, it is necessary to provide a reconstruction structure and a subway station for a subway station in order to address the problem of low safety factor in traditional technologies when renovating and expanding existing subway stations.
[0004] The technical solution is as follows:
[0005] One embodiment provides a reconstruction structure for a subway station, comprising:
[0006] An existing subway station, the existing subway station being located underground and having a first side and a second side opposite to each other;
[0007] A partition mechanism, the partition mechanism comprising a first partition wall, a second partition wall, a third partition wall and a fourth partition wall, the first partition wall and the second partition wall are both located on the first side, the first partition wall and the second partition wall are spaced apart in a direction perpendicular to the direction of gravity to form an early expansion space, a first opening is provided on a side of the early expansion space close to the ground surface, the third partition wall and the fourth partition wall are located on the second side, the third partition wall and the fourth partition wall are spaced apart in a direction perpendicular to the direction of gravity to form a late expansion space, a second opening is provided on a side of the late expansion space close to the ground surface; and,
[0008] A first supporting mechanism and a second supporting mechanism, wherein the first supporting mechanism is located in the early expansion space and pressed between the first partition wall and the second partition wall, and the second supporting mechanism is located in the late expansion space and pressed between the third partition wall and the fourth partition wall.
[0009] In the above-mentioned reconstruction structure for subway stations, the first partition wall and the second partition wall are arranged at intervals on the first side of the existing subway station to form an early expansion space, and a first supporting mechanism is arranged in the early expansion space to press between the first partition wall and the second partition wall, which can prevent the soil located on the second side of the existing subway station from applying an eccentric load to the existing subway station, thereby causing the existing subway station to crack or shift, and can also prevent the soil on the side of the early expansion space far away from the existing subway station from applying a load to the partition wall of the early expansion space, thereby causing the partition wall to collapse; the third partition wall and the fourth partition wall are arranged at intervals on the second side of the existing subway station to form a later expansion space, and in the later expansion space A second supporting mechanism is arranged to press against the third partition wall and the fourth partition wall to prevent the soil of the later expansion space away from the existing subway station from applying load to the partition wall of the later expansion space and causing the partition wall to collapse. The first opening and the second opening are used for construction personnel to enter and exit the early expansion space and the later expansion space through construction equipment, so as to facilitate the construction of the first supporting mechanism, the second supporting mechanism and the subsequent expansion facilities. Compared with the traditional technology, the above-mentioned reconstruction structure for subway stations can not only prevent the existing subway station from cracking or shifting, but also prevent the expansion space from collapsing, thereby ensuring the personal safety of construction personnel and passengers in the existing subway station and ensuring the safety during the construction process.
[0010] In one embodiment, the first supporting mechanism includes a first top supporting member, which is located in the first opening and pressed between the first partition wall and the second partition wall, and the second supporting mechanism includes a second top supporting member, which is located in the second opening and pressed between the third partition wall and the fourth partition wall.
[0011] In one embodiment, the first top support member includes a first crown beam, a second crown beam and a first support column, the first crown beam is arranged at one end of the first partition wall close to the first opening, the second crown beam is arranged at one end of the second partition wall close to the first opening, and the opposite ends of the first support column are respectively abutted against the first crown beam and the second crown beam, and the second top support member includes a third crown beam, a fourth crown beam and a second support column, the third crown beam is arranged at one end of the third partition wall close to the second opening, the fourth crown beam is arranged at one end of the fourth partition wall close to the second opening, and the opposite ends of the second support column are respectively abutted against the third crown beam and the fourth crown beam.
[0012] In one embodiment, the existing subway station has at least one floor in the direction of gravity, the first supporting mechanism further includes at least one first middle supporting member, the first middle supporting member is pressed between the first partition wall and the second partition wall and corresponds one-to-one to the floors, and the second supporting mechanism further includes at least one second middle supporting member, the second middle supporting member is pressed between the third partition wall and the fourth partition wall and corresponds one-to-one to the floors.
[0013] In one embodiment, the first middle support member includes a first waist beam, a second waist beam and a third support column, the first waist beam is arranged on the side of the first partition wall away from the existing subway station, the second waist beam is arranged on the side of the second partition wall close to the existing subway station, and the opposite ends of the third support column are respectively abutted against the first waist beam and the second waist beam, the second middle support member includes a third waist beam, a fourth waist beam and a fourth support column, the third waist beam is arranged on the side of the third partition wall away from the existing subway station, the fourth waist beam is arranged on the side of the fourth partition wall close to the existing subway station, and the opposite ends of the fourth support column are respectively abutted against the third waist beam and the fourth waist beam.
[0014] In one embodiment, the first supporting mechanism further includes a first bottom supporting member, one end of the first bottom supporting member is arranged at one end of the first partition wall away from the first opening, and the other end of the first bottom supporting member is arranged at one end of the second partition wall away from the first opening, and the second supporting mechanism further includes a second bottom supporting member, one end of the second bottom supporting member is arranged at one end of the third partition wall away from the second opening, and the other end of the second bottom supporting member is arranged at one end of the fourth partition wall away from the second opening.
[0015] In one embodiment, the first bottom support member includes a first bottom plate and a first partition plate, one end of the first bottom plate is arranged on the first partition wall, and the other end of the first bottom plate is spaced apart from the second partition wall to form a first post-cast gap, one end of the first partition plate is arranged on the second partition wall, and the other end of the first partition plate is arranged on the side of the first bottom plate away from the first opening, and the second bottom support member includes a second bottom plate and a second partition plate, one end of the second bottom plate is arranged on the third partition wall, and the other end of the second bottom plate is spaced apart from the fourth partition wall to form a second post-cast gap, one end of the second partition plate is arranged on the fourth partition wall, and the other end of the second partition plate is arranged on the side of the second bottom plate away from the second opening.
[0016] In one embodiment, the first bottom support member also includes a first reinforcement rib, which is sequentially passed through the second partition wall, the first partition plate and the first bottom plate, and the second bottom support member also includes a second reinforcement rib, which is sequentially passed through the fourth partition wall, the second partition plate and the second bottom plate.
[0017] In one embodiment, the partition mechanism also includes a first retaining wall, a second retaining wall, a third retaining wall and a fourth retaining wall, the first retaining wall is arranged on a side of the first partition wall close to the first opening and extends in the opposite direction of the gravity direction, the second retaining wall is arranged on a side of the second partition wall close to the first opening and extends in the opposite direction of the gravity direction, the third retaining wall is arranged on a side of the third partition wall close to the second opening and extends in the opposite direction of the gravity direction, and the fourth retaining wall is arranged on a side of the fourth partition wall close to the second opening and extends in the opposite direction of the gravity direction.
[0018] Another embodiment provides a subway station, which includes the modified structure for a subway station as described above.
[0019] In the above-mentioned subway station, the first partition wall and the second partition wall are spaced apart on the first side of the existing subway station to form an early expansion space, and a first supporting mechanism is arranged in the early expansion space to press between the first partition wall and the second partition wall, which can prevent the soil located on the second side of the existing subway station from applying an eccentric load to the existing subway station, thereby causing the existing subway station to crack or deviate, and can also prevent the soil on the side of the early expansion space far from the existing subway station from applying a load to the partition wall of the early expansion space, thereby causing the partition wall to collapse; the third partition wall and the fourth partition wall are spaced apart on the second side of the existing subway station to form a later expansion space, and a first supporting mechanism is arranged in the later expansion space to press between the first partition wall and the second partition wall. The second supporting mechanism for the third partition wall and the fourth partition wall can prevent the soil on the side of the later expansion space away from the existing subway station from applying load to the partition wall of the later expansion space and causing the partition wall to collapse. The first opening and the second opening are used for construction personnel to enter and exit the early expansion space and the later expansion space through construction equipment, which is convenient for the construction of the first supporting mechanism, the second supporting mechanism and subsequent expansion facilities. Compared with traditional technology, the above-mentioned renovation structure for subway stations can not only prevent cracking or deviation of existing subway stations, but also prevent the collapse of expansion space, ensure the personal safety of construction personnel and passengers in existing subway stations, and ensure safety during the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] FIG. 1 is a schematic diagram of a modified structure for a subway station in one embodiment of the present application.
[0022] FIG. 2 is a schematic diagram of the structure of the early expansion space in one embodiment of the present application.
[0023] FIG. 3 is a schematic diagram of the structure of the later expansion space in one embodiment of the present application.
[0024] FIG. 4 is a schematic structural diagram of a first bottom support member in an embodiment of the present application.
[0025] FIG. 5 is a schematic diagram of the structure of an existing subway station after renovation in one embodiment of the present application.
[0026] Notes on the attached drawings:
[0027] 100, existing subway station; 110, first side; 120, second side; 210, first partition wall; 220, second partition wall; 230, third partition wall; 240, fourth partition wall; 250, early expansion space; 251, first opening; 260, later expansion space; 261, second opening; 300, first supporting mechanism; 310, first top supporting member; 311, first crown beam; 312, second crown beam; 313, first supporting column; 320, first middle supporting member; 321, first waist beam; 322, second waist beam; 323, third supporting column; 330, first bottom supporting member Support member; 331, first bottom plate; 332, first partition; 333, first post-cast gap; 334, first reinforcing rib; 400, second supporting mechanism; 410, second top supporting member; 411, third crown beam; 412, fourth crown beam; 413, second supporting column; 420, second middle supporting member; 421, third waist beam; 422, fourth waist beam; 423, fourth supporting column; 430, second bottom supporting member; 431, second bottom plate; 432, second partition; 510, first retaining wall; 520, second retaining wall; 530, third retaining wall; 540, fourth retaining wall. DETAILED DESCRIPTION
[0028] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0029] In the description of the present application, it should be understood that if the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. appear, the orientation or position relationship indicated by these terms is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.
[0030] In addition, if the terms "first" or "second" appear, these terms are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, if the term "plurality" appears, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0031] In this application, unless otherwise clearly specified and limited, if the terms "installed", "connected", "connected", "fixed" and the like appear, these terms should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to the specific circumstances.
[0032] In the present application, unless otherwise clearly specified and limited, if there is a description that a first feature is "above" or "below" a second feature, etc., or similar descriptions appear, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0033] It should be noted that if an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. If an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. If any, the terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used in this application are for illustrative purposes only and do not represent the only implementation method.
[0034] Please refer to FIG. 1 . An embodiment of the present application provides a reconstruction structure for a subway station, including an existing subway station 100, a partition mechanism, a first supporting mechanism 300, and a second supporting mechanism 400. The existing subway station 100 is located underground and has a first side 110 and a second side 120 opposite to each other. The partition mechanism includes a first partition wall 210, a second partition wall 220, a third partition wall 230, and a fourth partition wall 240. The first partition wall 210 and the second partition wall 220 are both located on the first side 110. The first partition wall 210 and the second partition wall 220 are spaced apart in a direction perpendicular to the direction of gravity to form an early expansion space 250. A first opening 251 is provided on a side of the early expansion space 250 close to the ground surface, the third partition wall 230 and the fourth partition wall 240 are located on the second side 120, the third partition wall 230 and the fourth partition wall 240 are spaced apart in a direction perpendicular to the direction of gravity to form a later expansion space 260, and a second opening 261 is provided on a side of the later expansion space 260 close to the ground surface; the first supporting mechanism 300 is located in the early expansion space 250 and is pressed between the first partition wall 210 and the second partition wall 220, and the second supporting mechanism 400 is located in the later expansion space 260 and is pressed between the third partition wall 230 and the fourth partition wall 240.
[0035] In the above-mentioned reconstruction structure for a subway station, the first partition wall 210 and the second partition wall 220 are arranged at intervals on the first side 110 of the existing subway station 100 to form an early expansion space 250, and a first support mechanism 300 is arranged in the early expansion space 250 to press between the first partition wall 210 and the second partition wall 220, which can prevent the soil located on the second side 120 of the existing subway station 100 from applying an eccentric load to the existing subway station 100, thereby causing the existing subway station 100 to crack or deviate, and can also prevent the soil on the side of the early expansion space 250 away from the existing subway station 100 from applying a load to the partition wall of the early expansion space 250, thereby causing the partition wall to collapse; the third partition wall 230 and the fourth partition wall 240 are arranged at intervals on the second side 120 of the existing subway station 100 to form a later expansion space 260 A second supporting mechanism 400 is provided in the later expansion space 260 to press against the third partition wall 230 and the fourth partition wall 240, so as to prevent the soil of the later expansion space 260 away from the existing subway station 100 from applying load to the partition wall of the later expansion space 260 and causing the partition wall to collapse. The first opening 251 and the second opening 261 are used by construction personnel to enter and exit the early expansion space 250 and the later expansion space 260 through construction equipment, so as to facilitate the construction of the first supporting mechanism 300, the second supporting mechanism 400 and the subsequent expansion facilities. Compared with the conventional technology, the above-mentioned reconstruction structure for the subway station can not only prevent the existing subway station 100 from cracking or deflecting, but also prevent the expansion space from collapsing, thereby ensuring the personal safety of construction personnel and passengers in the existing subway station 100 and ensuring the safety during the construction process.
[0036] As an explanation, during actual construction, it is necessary to construct the early expansion space 250 first, and then the later expansion space 260. In the conventional technology, when the early expansion space 250 is formed by the first partition wall 210 and the second partition wall 220 on the first side 110 of the existing subway station 100, since the later expansion space 260 has not yet started construction, the unexcavated soil on the second side 120 of the existing subway station 100 will apply an eccentric load to the existing subway station 100, causing the existing subway station 100 to crack or deviate. At the same time, the soil on the side of the early expansion space 250 away from the existing subway station 100 will also apply a load to the partition wall of the early expansion space 250, causing the partition wall to collapse. A first supporting mechanism 300 is arranged between the second partition walls 220, and the eccentric load on the existing subway station 100 can be transferred to the soil of the early expansion space 250 on the side away from the existing subway station 100 through the first supporting mechanism 300, which can prevent the existing subway station 100 from cracking or deflecting, and can also prevent the partition wall of the early expansion space 250 from collapsing. After the construction in the early expansion space 250 is completed, the construction of the later expansion space 260 is carried out. By arranging a second supporting mechanism 400 between the third partition wall 230 and the fourth partition wall 240, it is prevented that the soil of the later expansion space 260 on the side away from the existing subway station 100 applies load to the partition wall of the later expansion space 260, thereby preventing the partition wall from collapsing, thereby ensuring the safety during the construction process.
[0037] Optionally, the first partition wall 210, the second partition wall 220, the third partition wall 230 and the fourth partition wall 240 can be retaining structure walls surrounded by multiple bored piles, or can be self-supporting cement retaining walls. Suitable walls can be selected based on actual conditions such as the soil quality of the current construction site, and no specific limitations are made here.
[0038] Optionally, the first supporting mechanism 300 and the second supporting mechanism 400 may be supporting columns, or supporting beams, or supporting plates, etc., which are not specifically limited here.
[0039] Specifically, referring to FIG. 1 , the second partition wall 220 is fitted on the first side 110 of the existing subway station 100, and the first partition wall 210 is spaced apart on the side of the first partition wall 210 away from the existing subway station 100 to form an early expansion space 250; the fourth partition wall 240 is fitted on the second side 120 of the existing subway station 100, and the third partition wall 230 is spaced apart on the side of the third partition wall 230 away from the existing subway station 100 to form a later expansion space 260. After the construction is completed, part of the structure of the second partition wall 220 is demolished to connect the existing subway station 100 with the early expansion space 250, and part of the structure of the fourth partition wall 240 is demolished to connect the existing subway station 100 with the later expansion space 260, thereby completing the renovation and expansion project of the existing subway station 100.
[0040] Optionally, after the excavation of the early expansion space 250 is completed, the excavation of the later expansion space 260 may not be carried out first, and the excavation of the later expansion space 260 may be carried out after the construction of the buildings and facilities in the early expansion space 250 is completed; in other embodiments, after the excavation of the early expansion space 250 is completed, the excavation of the later expansion space 260 may be carried out directly, and the buildings and facilities in the early expansion space 250 and the later expansion space 260 may be constructed at the same time, which is not specifically limited here.
[0041] In other embodiments, the second supporting mechanism 400 may also be supported on other partition walls of the later expansion space 260 , as long as the supporting effect on the later expansion space 260 can be achieved.
[0042] Please refer to Figures 1 to 3. In one embodiment, the first support mechanism 300 includes a first top support member 310, which is located in the first opening 251 and pressed between the first partition wall 210 and the second partition wall 220. The second support mechanism 400 includes a second top support member 410, which is located in the second opening 261 and pressed between the third partition wall 230 and the fourth partition wall 240.
[0043] By setting a first top support member 310 located at the first opening 251 and pressing between the first partition wall 210 and the second partition wall 220, the ends of the first partition wall 210 and the second partition wall 220 close to the ground are supported. By setting a second top support member 410 located at the second opening 261 and pressing between the third partition wall 230 and the fourth partition wall 240, the ends of the third partition wall 230 and the fourth partition wall 240 close to the ground are supported. In this way, not only can a safe passage for construction workers to enter and exit the first opening 251 and the second opening 261 be provided, but also the overall stability and safety of the early expansion space 250 and the later expansion space 260 can be improved.
[0044] Specifically, when construction workers are carrying out construction, they should immediately set the first top support member 310 when excavation reaches the preset depth of the first top support member 310 to prevent the first partition wall 210 and the second partition wall 220 from collapsing during the excavation process. The second top support member 410 is similar to the first top support member 310 and will not be repeated here.
[0045] Please refer to Figures 1 to 3. In one embodiment, the first top support member 310 includes a first crown beam 311, a second crown beam 312 and a first support column 313. The first crown beam 311 is disposed at one end of the first partition wall 210 close to the first opening 251, the second crown beam 312 is disposed at one end of the second partition wall 220 close to the first opening 251, and the opposite ends of the first support column 313 are respectively abutted against the first crown beam 311 and the second crown beam 312. The second top support member 410 includes a third crown beam 411, a fourth crown beam 412 and a second support column 413. The third crown beam 411 is disposed at one end of the third partition wall 230 close to the second opening 261, the fourth crown beam 412 is disposed at one end of the fourth partition wall 240 close to the second opening 261, and the opposite ends of the second support column 413 are respectively abutted against the third crown beam 411 and the fourth crown beam 412.
[0046] The load on the first partition wall 210 is transmitted to the first support column 313 through the first crown beam 311, and then transmitted to the second partition wall 220 through the second crown beam 312. The load on the third partition wall 230 is transmitted to the second support column 413 through the third crown beam 411, and then transmitted to the fourth partition wall 240 through the fourth crown beam 412. In this way, the force stability of the existing subway station 100, the early expansion space 250 and the later expansion space 260 can be ensured, and the construction process is simple and the cost is low.
[0047] Preferably, when the first partition wall 210, the second partition wall 220, the third partition wall 230 and the fourth partition wall 240 are retaining structure walls surrounded by multiple bored piles, the cap beams arranged on the multiple bored piles can achieve a certain stabilizing effect on the multiple bored piles, thereby improving the stability of the first partition wall 210, the second partition wall 220, the third partition wall 230 and the fourth partition wall 240.
[0048] Please refer to Figures 1 to 3. In one embodiment, the existing subway station 100 has at least one floor in the gravity direction, the first support mechanism 300 also includes at least one first middle support member 320, the first middle support member 320 is pressed between the first partition wall 210 and the second partition wall 220 and corresponds one to one with the floors, and the second support mechanism 400 also includes at least one second middle support member 420, the second middle support member 420 is pressed between the third partition wall 230 and the fourth partition wall 240 and corresponds one to one with the floors.
[0049] By arranging the first middle support member 320 corresponding to each floor of the existing subway station 100 between the first partition wall 210 and the second partition wall 220, and arranging the second middle support member 420 corresponding to each floor of the existing subway station 100 between the third partition wall 230 and the fourth partition wall 240, it is possible to support each floor of the existing subway station 100, and further improve the stress stability of the existing subway station 100, the early expansion space 250 and the later expansion space 260.
[0050] Specifically, when construction workers are carrying out construction, each time they excavate to the depth corresponding to each floor of the corresponding existing subway station 100, they should immediately install the first middle support member 320 to prevent the first partition wall 210 and the second partition wall 220 from collapsing during the excavation process. The second middle support member 420 is similar to the first middle support member 320 and will not be repeated here.
[0051] Please refer to Figures 1 to 3. In one embodiment, the first middle support member 320 includes a first waist beam 321, a second waist beam 322 and a third support column 323. The first waist beam 321 is arranged on the side of the first partition wall 210 away from the existing subway station 100, the second waist beam 322 is arranged on the side of the second partition wall 220 close to the existing subway station 100, and the opposite ends of the third support column 323 are respectively abutted against the first waist beam 321 and the second waist beam 322. The second middle support member 420 includes a third waist beam 421, a fourth waist beam 422 and a fourth support column 423. The third waist beam 421 is arranged on the side of the third partition wall 230 away from the existing subway station 100, the fourth waist beam 422 is arranged on the side of the fourth partition wall 240 close to the existing subway station 100, and the opposite ends of the fourth support column 423 are respectively abutted against the third waist beam 421 and the fourth waist beam 422.
[0052] The load on the first partition wall 210 can be transferred to the third support column 323 through the first waist beam 321, and then transferred to the second partition wall 220 through the second waist beam 322. The load on the third partition wall 230 can be transferred to the fourth support column 423 through the third waist beam 421, and then transferred to the fourth partition wall 240 through the fourth waist beam 422. Since the first waist beam 321, the second waist beam 322, the third waist beam 421, the fourth waist beam 422, the third support column 323 and the fourth support column 423 correspond to the floors of the existing subway station 100 one by one, the safety of each floor of the existing subway station 100 during the construction process can be further improved to prevent displacement or cracking between floors.
[0053] Please refer to Figures 1 to 3. In one embodiment, the first support mechanism 300 also includes a first bottom support member 330, one end of the first bottom support member 330 is arranged at an end of the first partition wall 210 away from the first opening 251, and the other end of the first bottom support member 330 is arranged at an end of the second partition wall 220 away from the first opening 251. The second support mechanism 400 also includes a second bottom support member 430, one end of the second bottom support member 430 is arranged at an end of the third partition wall 230 away from the second opening 261, and the other end of the second bottom support member 430 is arranged at an end of the fourth partition wall 240 away from the second opening 261.
[0054] The first bottom support member 330 can support the end of the first partition wall 210 and the second partition wall 220 away from the first opening 251, and the second bottom support member 430 can support the end of the third partition wall 230 and the fourth partition wall 240 away from the second opening 261. In this way, the bottom of the early expansion space 250 and the bottom of the later expansion space 260 can be supported, further improving the stability and safety of the early expansion space and the later expansion space 260.
[0055] Specifically, referring to FIGS. 1 to 3 , the first bottom support member 330 is disposed on the bottom wall of the early expansion space 250 , and the second bottom support member 430 is disposed on the bottom wall of the later expansion space 260 .
[0056] Please refer to Figures 1 to 4. In one embodiment, the first bottom support member 330 includes a first bottom plate 331 and a first partition plate 332, one end of the first bottom plate 331 is arranged on the first partition wall 210, and the other end of the first bottom plate 331 is spaced from the second partition wall 220 to form a first post-casting gap 333, one end of the first partition plate 332 is arranged on the second partition wall 220, and the other end of the first partition plate 332 is arranged on the side of the first bottom plate 331 away from the first opening 251, and the second bottom support member 430 includes a second bottom plate 431 and a second partition plate 432, one end of the second bottom plate 431 is arranged on the third partition wall 230, and the other end of the second bottom plate 431 is spaced from the fourth partition wall 240 to form a second post-casting gap, one end of the second partition plate 432 is arranged on the fourth partition wall 240, and the other end of the second partition plate 432 is arranged on the side of the second bottom plate 431 away from the second opening 261.
[0057] Since the first bottom plate 331, the first partition wall 210 and the second partition wall 220 may expand or contract due to temperature or humidity, one end of the first bottom plate 331 is arranged on the first partition wall 210, and the other end of the first bottom plate 331 is arranged at a distance from the second partition wall 220 to form a first post-casting gap 333, sufficient space can be reserved to release the restraining stress when the first bottom plate 331, the first partition wall 210 and the second partition wall 220 expand or contract to prevent cracking. One end of the first partition plate 332 is connected to the second partition wall 220, and the other end of the first partition plate 332 is connected to the side of the first bottom plate 331 away from the first opening 251. In this way, not only the space 251 can be expanded in advance, but also the space 252 can be expanded in advance. 0, the load borne by the second partition wall 220 can also be transferred to the first bottom plate 331 through the first partition plate 332, and then transferred to the first partition wall 210 by the first bottom plate 331, so as to support the bottom of the early expansion space 250 and ensure the stability of the early expansion space 250; similarly, by setting the second post-cast gap, sufficient space can be reserved to release the restraining stress and prevent cracking when the second bottom plate 431, the third partition wall 230 and the fourth partition wall 240 expand or contract. The second partition plate 432 can not only cover the soil at the bottom of the later expansion space 260, but also play a role in transferring the load. The early expansion space 250 is similar and will not be repeated here.
[0058] Optionally, the first partition 332 and the second partition 432 may be concrete slabs cast at the bottom of the early expansion space 250 and the later expansion space 260 , or may be steel plates, etc., which are not specifically limited here.
[0059] Furthermore, after the first base plate 331, the first partition wall 210, the second partition wall 220, the second base plate 431, the third partition wall 230 and the fourth partition wall 240 have been completely formed, the first post-cast gap 333 and the second post-cast gap are filled with concrete to ensure the stress stability of the entire process.
[0060] In one embodiment, the first bottom support member 330 further includes a first structural steel, one end of which is arranged on the second partition wall 220, and the other end of which is arranged on the first bottom plate 331. The second bottom support member 430 further includes a second structural steel, one end of which is arranged on the fourth partition wall 240, and the other end of which is arranged on the second bottom plate 431. In this way, when the first post-casting gap 333 and the second post-casting gap are filled with concrete, the first structural steel and the second structural steel are respectively wrapped by the concrete, thereby strengthening the strength of the concrete and ensuring the stability of the force.
[0061] Please refer to Figure 4. In one embodiment, the first bottom support member 330 also includes a first reinforcement rib 334, which is sequentially penetrated through the second partition wall 220, the first partition plate 332 and the first bottom plate 331, and the second bottom support member 430 also includes a second reinforcement rib, which is sequentially penetrated through the fourth partition wall 240, the second partition plate 432 and the second bottom plate 431.
[0062] The first reinforcing rib 334 is sequentially passed through the second partition wall 220, the first partition wall 210 and the first bottom plate 331 to achieve a stable connection between the second partition wall 220 and the first partition plate 332 and between the first bottom plate 331 and the first partition plate 332. The second reinforcing rib is sequentially passed through the fourth partition wall 240, the second partition plate 432 and the second bottom plate 431 to achieve a stable connection between the fourth partition wall 240 and the second partition plate 432 and between the second bottom plate 431 and the second partition plate 432, thereby enhancing the overall strength of the structure.
[0063] Please refer to FIG. 4 . In other embodiments, other forms of reinforcing ribs may be provided, such as reinforcing ribs that are only provided between the second partition wall 220 and the first partition plate 332 . Such reinforcing ribs may be flexibly provided according to the conditions of the construction site and will not be described in detail here.
[0064] Please refer to Figures 1 to 3. In one embodiment, the partition mechanism also includes a first retaining wall 510, a second retaining wall 520, a third retaining wall 530 and a fourth retaining wall 540. The first retaining wall 510 is arranged on a side of the first partition wall 210 close to the first opening 251 and extends in the opposite direction of the gravity direction. The second retaining wall 520 is arranged on a side of the second partition wall 220 close to the first opening 251 and extends in the opposite direction of the gravity direction. The third retaining wall 530 is arranged on a side of the third partition wall 230 close to the second opening 261 and extends in the opposite direction of the gravity direction. The fourth retaining wall 540 is arranged on a side of the fourth partition wall 240 close to the second opening 261 and extends in the opposite direction of the gravity direction.
[0065] The first retaining wall 510, the second retaining wall 520, the third retaining wall 530 and the fourth retaining wall 540 can withstand the pressure of the covering soil from the surface, limit the lateral movement of the covering soil, and prevent damage to the buildings or facilities set on the covering soil. In addition, they can also prevent the covering soil from entering the early expansion space 250 or the later expansion space 260 and affecting the construction progress, thereby improving the safety during the construction process.
[0066] Please refer to Figures 1 to 5. In a preferred embodiment of the present application, the first support mechanism 300 includes a first top support member 310, a first middle support member 320 corresponding to the floor of the existing subway station 100, and a first bottom support member 330 arranged on the bottom wall of the early expansion space 250. During the specific construction, the first top support member 310 is excavated to a preset depth and the first top support member 310 is arranged to press between the first partition wall 210 and the second partition wall 220. Subsequently, each time the excavation reaches the corresponding floor depth of the existing subway station 100, a first middle support member 320 is arranged to press between the first partition wall 210 and the second partition wall 220 until the excavation reaches the bottom and the first bottom support member 330 is arranged. At this point, The excavation of the early expansion space 250 is completed, and the construction of the buildings and facilities in the early expansion space 250 has begun. The construction order is from bottom to top. Every time the construction reaches the position of the corresponding first middle support member 320, the corresponding first middle support member 320 is dismantled until the construction reaches the first top support member 310 and the first top support member 310 is dismantled, and the first partition wall 210 and the second partition wall 220 are dismantled. Finally, the upper part of the building in the early expansion space 250 is covered with soil, the pipelines are relocated, and the original road structure is restored. At this point, the construction process of the building in the early expansion space 250 is completed; the construction process of the later expansion space 260 is similar to that of the early expansion space 250, and will not be repeated here.
[0067] Further, in the above embodiments, the first top support member 310, the second top support member 410, the first middle support member 320, the second middle support member 420, the first bottom support member 330 and the second bottom support member 430 are respectively provided with one, or respectively provided with multiple, which is not specifically limited here.
[0068] Another embodiment provides a subway station, which includes the modified structure for a subway station as described above.
[0069] In the above-mentioned subway station, the first partition wall 210 and the second partition wall 220 are arranged at intervals on the first side 110 of the existing subway station 100 to form an early expansion space 250, and a first supporting mechanism 300 is arranged in the early expansion space 250 to press between the first partition wall 210 and the second partition wall 220, which can prevent the soil located on the second side 120 of the existing subway station 100 from applying an eccentric load to the existing subway station 100, thereby causing the existing subway station 100 to crack or deviate, and can also prevent the soil on the side of the early expansion space 250 far from the existing subway station 100 from applying a load to the partition wall of the early expansion space 250, thereby causing the partition wall to collapse; the third partition wall 230 and the fourth partition wall 240 are arranged at intervals on the second side 120 of the existing subway station 100 to form a later expansion space 260, and in the later expansion space 260, the first supporting mechanism 300 is arranged to press between the first partition wall 210 and the second partition wall 220, thereby preventing the soil located on the second side 120 of the existing subway station 100 from applying an eccentric load to the existing subway station 100, thereby causing the existing subway station 100 to crack or deviate, and can also prevent the soil located on the side of the early expansion space 250 far from the existing subway station 100 from applying a load to the partition wall of the early expansion space 250, thereby causing the partition wall to collapse; A second supporting mechanism 400 is arranged in the expansion space 260 to press against the third partition wall 230 and the fourth partition wall 240, so as to prevent the soil of the later expansion space 260 away from the existing subway station 100 from applying load to the partition wall of the later expansion space 260 and causing the partition wall to collapse. The first opening 251 and the second opening 261 are used for construction personnel to enter and exit the early expansion space 250 and the later expansion space 260 through construction equipment, so as to facilitate the construction of the first supporting mechanism 300, the second supporting mechanism 400 and the subsequent expansion facilities. Compared with the traditional technology, the above-mentioned reconstruction structure for the subway station can not only prevent the existing subway station 100 from cracking or deflecting, but also prevent the expansion space from collapsing, thereby ensuring the personal safety of the construction personnel and passengers in the existing subway station 100 and ensuring the safety during the construction process.
[0070] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0071] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A reconstruction structure for a subway station, It is characterized in that include: An existing subway station, the existing subway station being located underground and having a first side and a second side opposite to each other; A partition mechanism, the partition mechanism comprising a first partition wall, a second partition wall, a third partition wall and a fourth partition wall, the first partition wall and the second partition wall are both located on the first side, the first partition wall and the second partition wall are spaced apart in a direction perpendicular to the direction of gravity to form an early expansion space, a first opening is provided on a side of the early expansion space close to the ground surface, the third partition wall and the fourth partition wall are located on the second side, the third partition wall and the fourth partition wall are spaced apart in a direction perpendicular to the direction of gravity to form a late expansion space, a second opening is provided on a side of the late expansion space close to the ground surface; and, A first supporting mechanism and a second supporting mechanism, wherein the first supporting mechanism is located in the early expansion space and pressed between the first partition wall and the second partition wall, and the second supporting mechanism is located in the late expansion space and pressed between the third partition wall and the fourth partition wall.
2. The reconstruction structure for a subway station according to claim 1, It is characterized in that The first supporting mechanism comprises a first top supporting member, which is located in the first opening and pressed between the first partition wall and the second partition wall. The second supporting mechanism comprises a second top supporting member, which is located in the second opening and pressed between the third partition wall and the fourth partition wall.
3. The reconstruction structure for a subway station according to claim 2, It is characterized in that The first top support member includes a first crown beam, a second crown beam and a first support column, the first crown beam is arranged at one end of the first partition wall close to the first opening, the second crown beam is arranged at one end of the second partition wall close to the first opening, and the opposite ends of the first support column are respectively abutted against the first crown beam and the second crown beam, the second top support member includes a third crown beam, a fourth crown beam and a second support column, the third crown beam is arranged at one end of the third partition wall close to the second opening, the fourth crown beam is arranged at one end of the fourth partition wall close to the second opening, and the opposite ends of the second support column are respectively abutted against the third crown beam and the fourth crown beam.
4. The reconstruction structure for a subway station according to claim 1, It is characterized in that The existing subway station has at least one floor in the direction of gravity, the first supporting mechanism also includes at least one first middle supporting member, the first middle supporting member is pressed between the first partition wall and the second partition wall and corresponds one to one with the floors, the second supporting mechanism also includes at least one second middle supporting member, the second middle supporting member is pressed between the third partition wall and the fourth partition wall and corresponds one to one with the floors.
5. The reconstruction structure for a subway station according to claim 4, It is characterized in that The first middle support member includes a first waist beam, a second waist beam and a third support column. The first waist beam is arranged on the side of the first partition wall away from the existing subway station, the second waist beam is arranged on the side of the second partition wall close to the existing subway station, and the opposite ends of the third support column are respectively abutted against the first waist beam and the second waist beam. The second middle support member includes a third waist beam, a fourth waist beam and a fourth support column. The third waist beam is arranged on the side of the third partition wall away from the existing subway station, the fourth waist beam is arranged on the side of the fourth partition wall close to the existing subway station, and the opposite ends of the fourth support column are respectively abutted against the third waist beam and the fourth waist beam.
6. The reconstruction structure for a subway station according to claim 1, It is characterized in that The first supporting mechanism also includes a first bottom supporting member, one end of which is arranged at one end of the first partition wall away from the first opening, and the other end of the first bottom supporting member is arranged at one end of the second partition wall away from the first opening, and the second supporting mechanism also includes a second bottom supporting member, one end of which is arranged at one end of the third partition wall away from the second opening, and the other end of the second bottom supporting member is arranged at one end of the fourth partition wall away from the second opening.
7. The reconstruction structure for a subway station according to claim 6, It is characterized in that The first bottom support member includes a first bottom plate and a first partition plate, one end of the first bottom plate is arranged on the first partition wall, and the other end of the first bottom plate is spaced apart from the second partition wall to form a first post-cast gap, one end of the first partition plate is arranged on the second partition wall, and the other end of the first partition plate is arranged on the side of the first bottom plate away from the first opening, the second bottom support member includes a second bottom plate and a second partition plate, one end of the second bottom plate is arranged on the third partition wall, and the other end of the second bottom plate is spaced apart from the fourth partition wall to form a second post-cast gap, one end of the second partition plate is arranged on the fourth partition wall, and the other end of the second partition plate is arranged on the side of the second bottom plate away from the second opening.
8. The reconstruction structure for a subway station according to claim 7, It is characterized in that The first bottom support member also includes a first reinforcing rib, which is sequentially passed through the second partition wall, the first partition plate and the first bottom plate. The second bottom support member also includes a second reinforcing rib, which is sequentially passed through the fourth partition wall, the second partition plate and the second bottom plate.
9. The reconstruction structure for a subway station according to claim 1, It is characterized in that The partition mechanism also includes a first retaining wall, a second retaining wall, a third retaining wall and a fourth retaining wall. The first retaining wall is arranged on a side of the first partition wall close to the first opening and extends in the opposite direction of the gravity direction. The second retaining wall is arranged on a side of the second partition wall close to the first opening and extends in the opposite direction of the gravity direction. The third retaining wall is arranged on a side of the third partition wall close to the second opening and extends in the opposite direction of the gravity direction. The fourth retaining wall is arranged on a side of the fourth partition wall close to the second opening and extends in the opposite direction of the gravity direction.
10. A subway station, It is characterized in that The subway station comprises the reconstruction structure for a subway station as described in any one of claims 1-9.