Ventilation system for tunnel construction

By setting up a cooling device outside the tunnel cross tunnel, the special arrangement of air supply and exhaust branch pipes and monitoring of air quality sensors in the tunnel construction ventilation system, the problems of poor ventilation effect and insufficient air quality monitoring in the tunnel construction are solved, and better results are achieved ventilation effect and construction environment guarantee.

CN221921040UActive Publication Date: 2024-10-29GUANGXI ROAD & BRIDGE ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420032522.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-10-29
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

The existing tunnel construction ventilation system has problems such as poor ventilation effect, frequent position adjustment of refrigeration components, poor hot air discharge and lack of air quality monitoring, which affects the construction environment and safety.

Method used

A tunnel construction ventilation system is designed, the cooling device is set outside the tunnel horizontal hole, the air supply branch pipe is at the lower part of the main hole of the tunnel, the exhaust branch pipe is at the upper part, and the water storage container and cooling pipe are used to cool down, and temperature, humidity and carbon dioxide are set in the tunnel. Air quality monitoring and adjustment with dust sensors.

Benefits of technology

Effectively reduce the temperature in the main tunnel, improve ventilation effect, reduce the frequency of position adjustment of refrigeration components, timely monitor and adjust air quality, and ensure the construction environment and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221921040U_ABST
    Figure CN221921040U_ABST
Patent Text Reader

Abstract

The utility model discloses a ventilation system for tunnel construction, which belongs to the technical field of ventilation equipment and comprises an air supply device, an exhaust device and a cooling device. The air supply device comprises an air supply main pipe, two air supply branch pipes and an air blower, the two air supply branch pipes are located on the lower portion of the tunnel main hole, the air supply main pipe penetrates through the tunnel transverse hole, one end of the air supply main pipe is connected with the two air supply branch pipes, the other end of the air supply main pipe is connected with the air blower, and the air blower is connected with the cooling device located outside the tunnel transverse hole. The exhaust device comprises an exhaust main pipe, two exhaust branch pipes and an exhaust fan, the two exhaust branch pipes are located on the upper portion of the tunnel main hole, the exhaust main pipe penetrates through the tunnel transverse hole, one end of the exhaust main pipe is connected with the two exhaust branch pipes, and the other end of the exhaust main pipe is connected with the exhaust fan. The cooling device is arranged outside the tunnel transverse hole and used for cooling blown air, the temperature in the tunnel main hole can be effectively reduced, the exhaust branch pipe is arranged on the upper portion in the tunnel main hole, hot air on the upper portion of a construction area can be sucked away, and the temperature in the hole can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of ventilation equipment, in particular to a tunnel construction ventilation system. Background Art

[0002] In the prior art, the ventilation ducts are generally arranged in the main tunnel of the tunnel as follows: Figure 1 As shown in the figure, the compressed air supply method is used for air circulation in the tunnel, but there is a disadvantage of poor ventilation effect, resulting in an extremely poor working environment in the tunnel (for example, the temperature in the construction area is high, dust cannot be discharged, and the carbon dioxide concentration is high), which affects the personal safety of the construction workers, greatly shortens the working hours of the construction workers, and affects the construction efficiency. In addition, this solution is not suitable for the construction of the section from the tunnel cross tunnel to the main tunnel entrance and exit.

[0003] Chinese patent CN 116122886 A discloses a cooling and dust removal system for long tunnel construction areas. The system includes a ventilation component, a refrigeration component and a spray component, wherein the ventilation component includes a pressure-in air supply part and a suction-out exhaust part. During construction, the pressure-in air supply part is used to convey fresh air outside the transverse tunnel section to the tunnel construction area of ​​the straight tunnel section by pressure-in. The pressed fresh air is conveyed downward along the tunnel face from the top of the tunnel construction area, and simultaneously drives the cold air output by the refrigeration component and the water mist output by the spray component downward, thereby reducing the temperature and dust on the tunnel face. The hot air and dust are then discharged to the non-construction area through the suction-out exhaust part. However, the system has the following defects: (1) The refrigeration component is set in the construction area. When the position of the construction area changes, the refrigeration component also needs to change position accordingly, which is very troublesome to operate. (2) As we all know, hot air has the characteristic of moving upward. The suction port of the suction-out exhaust part of the system is set at the bottom of the tunnel construction area, which is not conducive to discharging the upward-moving hot air out of the main tunnel. Therefore, the cooling effect will be greatly affected. (3) There are no sensors for monitoring air quality in the main tunnel, so the air quality in the tunnel cannot be clearly determined, and adjustments cannot be made in time according to the actual situation in the tunnel, which makes it impossible to ensure the safety of construction. Utility Model Content

[0004] The purpose of the invention of the utility model is to solve the above-mentioned technical problems, and to propose a tunnel construction ventilation system, in which a cooling device is arranged outside the tunnel cross hole, and the blown air is cooled, which can effectively reduce the temperature in the main tunnel of the tunnel, and solve the problem that the refrigeration component is arranged in the construction area in the prior art and needs to be frequently changed. The utility model arranges the two exhaust branch pipes of the exhaust device in the upper part of the main tunnel of the tunnel, which is conducive to sucking away the hot air in the upper part of the construction area, reducing the temperature in the tunnel, and solving the problem of poor cooling effect in the prior art. The utility model monitors the air quality in the main tunnel of the tunnel by arranging temperature and humidity sensors, carbon dioxide concentration sensors, and dust concentration sensors in the main tunnel of the tunnel, so as to adjust and control the cooling device, air supply device, and exhaust device, improve the air quality in the tunnel, and solve the problem that the prior art cannot make timely adjustments due to the inability to clearly understand the air quality in the tunnel.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is:

[0006] A tunnel construction ventilation system, comprising an air supply device, an exhaust device and a cooling device, wherein the air supply device comprises an air supply main pipe, two air supply branch pipes and a blower; the two air supply branch pipes are horizontally arranged in the tunnel main hole on a side away from the tunnel cross hole, and respectively face the two ends of the tunnel main hole; the air supply main pipe passes through the tunnel cross hole, one end of which is connected to the two air supply branch pipes, and the other end is connected to the air outlet of the blower, the air inlet of the blower is connected to the cooling device, and the cooling device is located outside the tunnel cross hole; the exhaust device comprises an exhaust main pipe, two exhaust branch pipes and an exhaust fan, the two exhaust branch pipes are horizontally arranged in the tunnel main hole on a side close to the tunnel cross hole, and respectively face the two ends of the tunnel main hole; the exhaust main pipe passes through the tunnel cross hole, one end of which is connected to the two exhaust branch pipes, and the other end is connected to the air inlet of the exhaust fan, and the exhaust fan is located outside the tunnel cross hole; the exhaust branch pipe is located at the upper part of the tunnel main hole, and the air supply branch pipe is located at the lower part of the tunnel main hole.

[0007] Furthermore, a first diversion baffle is provided at one end of the air supply main pipe away from the blower, and is respectively connected to two air supply branch pipes through two first corner pieces; a second diversion baffle is provided at one end of the exhaust main pipe away from the exhaust fan, and is respectively connected to two exhaust branch pipes through two second corner pieces.

[0008] Furthermore, the first corner piece and the second corner piece are both metal bellows.

[0009] Furthermore, in the main tunnel, the horizontal distance between the air supply branch pipe and the exhaust branch pipe facing the same direction is 8-15m.

[0010] As a preferred embodiment, the cooling device includes a water storage container, a cooling pipe and a water pump; the water storage container includes a box body and a cover plate movable on the top of the box body, the box body is provided with a refrigerator for cooling the water in the box, the cooling pipe is arranged in the box body, and its two ends respectively pass through the opposite sides of the box body, and the air inlet of the blower is connected to one end of the cooling pipe; the water outlet of the water pump is connected to the upper part of the inner cavity of the box body through a water supply pipe, and the water inlet of the water pump is connected to a water pumping pipe.

[0011] Furthermore, the box body includes a metal inner mold and an outer shell arranged outside the metal inner mold, the refrigerator is connected to the metal inner mold and is located between the metal inner mold and the outer shell, and the cooling pipe is located in the metal inner mold.

[0012] Furthermore, the cooling pipe is spirally arranged in the metal inner mold.

[0013] As a preferred embodiment, a temperature and humidity sensor is provided in the main tunnel, a monitoring room is provided outside the tunnel side tunnel, a controller and a display are provided in the monitoring room, and the temperature and humidity sensor, refrigerator, blower, exhaust fan and display are all electrically connected to the controller.

[0014] Furthermore, a carbon dioxide concentration sensor is provided in the main tunnel of the tunnel, and the carbon dioxide concentration sensor is electrically connected to the controller.

[0015] Furthermore, a dust concentration sensor is provided in the main tunnel of the tunnel, and the dust concentration sensor is electrically connected to the controller.

[0016] Due to the adoption of the above technical solution, the utility model has the following beneficial effects:

[0017] 1. The utility model arranges the cooling device outside the tunnel cross hole, and does not need to change the position frequently with the change of the construction area. The cooling device cools the air blown into the main tunnel hole of the tunnel, which can effectively reduce the temperature in the main tunnel hole of the tunnel.

[0018] 2. The cooling device of the utility model includes a water storage container and a cooling pipe. The water in the water storage container is cooled, and the cooled water is used to cool the air passing through the cooling pipe. The cooled air is driven by a blower and transmitted to the main tunnel. The cooling device needs water and can be set up next to the gully water source or by digging a well to get water. If these conditions are not met, an external water source is used.

[0019] 3. The utility model sets the air supply branch pipe at the lower part of the main tunnel hole so that the cold air blown out is blown toward the construction personnel, and sets the exhaust branch pipe at the upper part of the main tunnel hole, which is conducive to sucking away the hot air in the upper part of the main tunnel hole, thereby effectively improving the cooling effect in the main tunnel hole. A first diverter baffle and a first corner piece are set between the air supply main pipe and the air supply branch pipe, and a second diverter baffle and a second corner piece are set between the exhaust main pipe and the exhaust branch pipe. The setting of the first diverter baffle and the second diverter baffle ensures equal diversion. The first corner piece and the second corner piece are both made of metal bellows, so that the turning point remains smooth without excessive bending, avoiding the formation of angles to reduce ventilation flow.

[0020] 4. The utility model installs temperature and humidity sensors, carbon dioxide concentration sensors, and dust concentration sensors in the main tunnel to monitor the temperature, humidity, carbon dioxide concentration, dust concentration and other air quality indicators in the tunnel. By monitoring the air quality in the main tunnel, the cooling device, the air supply device, and the exhaust device can be adjusted and controlled to improve the air quality in the tunnel, ensure the working environment of the workers and the quality of the physical project, speed up the construction efficiency, and reduce the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a conventional tunnel ventilation method in the prior art;

[0022] Figure 2 This is a schematic diagram of the installation of the tunnel construction ventilation system proposed in Example 1 of the utility model;

[0023] Figure 3 This is a schematic diagram of the structure of the cooling device proposed in Example 1 of the utility model;

[0024] Figure 4 This is a schematic diagram of electrical connections for the tunnel construction ventilation system proposed in Example 2 of the utility model;

[0025] Among them, the markings in the attached drawings are: 1-tunnel main hole, 2-tunnel cross hole, 3-air supply main pipe, 4-air supply branch pipe, 5-first corner piece, 6-blower, 7-cooling device, 8-exhaust main pipe, 9-exhaust branch pipe, 10-second corner piece, 11-exhaust fan, 12-monitoring room, 13-water source, 14-box, 15-metal inner mold, 16-shell, 17-refrigerator, 18-cover plate, 19-cooling water, 20-cooling pipe, 21-controller, 22-temperature and humidity sensor, 23-carbon dioxide concentration sensor, 24-dust concentration sensor, 25-display. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0028] Example 1

[0029] like Figure 2 As shown, a tunnel construction ventilation system includes an air supply device, an exhaust device and a cooling device 7.

[0030] The air supply device includes an air supply main pipe 3, two air supply branch pipes 4 and a blower 6. The two air supply branch pipes 4 are horizontally arranged in the tunnel main hole 1 on a side away from the tunnel cross hole 2, and respectively face the two ends of the tunnel main hole 1. The air supply main pipe 3 passes through the tunnel cross hole 2, one end of which is connected to the two air supply branch pipes 4, and the other end is connected to the air outlet of the blower 6. The air inlet of the blower 6 is connected to the cooling device 7, and the cooling device 7 is located outside the tunnel cross hole 2.

[0031] The utility model arranges the cooling device 7 outside the tunnel cross hole 2, and does not need to change the position frequently with the change of the construction area. The cooling device 7 cools the air blown into the tunnel main hole 1, which can effectively reduce the temperature in the tunnel main hole 1.

[0032] The exhaust device includes an exhaust main pipe 8, two exhaust branch pipes 9 and an exhaust fan 11. The two exhaust branch pipes 9 are horizontally arranged on one side of the tunnel main hole 1 close to the tunnel cross hole 2 and respectively face the two ends of the tunnel main hole 1. The exhaust main pipe 8 passes through the tunnel cross hole 2, one end of which is connected to the two exhaust branch pipes 9, and the other end is connected to the air inlet of the exhaust fan 11, and the exhaust fan 11 is located outside the tunnel cross hole 2.

[0033] Specifically, the exhaust branch pipe 9 is located at the upper part of the tunnel main hole 1, and the air supply branch pipe 4 is located at the lower part of the tunnel main hole 1. The utility model arranges the air supply branch pipe 4 at the lower part of the tunnel main hole 1 so that the blown cold air is blown toward the construction personnel, and arranges the exhaust branch pipe 9 at the upper part of the tunnel main hole 1, which is conducive to sucking away the hot air at the upper part of the tunnel main hole 1, thereby effectively improving the cooling effect in the tunnel main hole 1.

[0034] Among them, a first flow diversion baffle is provided at one end of the air supply main pipe 3 away from the blower 6, and two air supply branch pipes 4 are respectively connected through two first corner pieces 5. A second flow diversion baffle is provided at one end of the exhaust main pipe 8 away from the exhaust fan 11, and two exhaust branch pipes 9 are respectively connected through two second corner pieces 10. The first corner piece 5 and the second corner piece 10 are both metal bellows. The first flow diversion baffle and the second flow diversion baffle are set to ensure even flow diversion. The first corner piece 5 and the second corner piece 10 are both metal bellows, so that the bends remain smooth without excessive bending, avoiding the formation of angles to reduce ventilation flow, and ensuring ventilation flow.

[0035] In addition, in the main tunnel 1, the horizontal distance between the air supply branch pipe 4 and the exhaust branch pipe 9 in the same direction is 8-15m. After many tests, it was found that the air circulation efficiency is highest when the exhaust branch pipe 9 in the same direction lags behind the air supply branch pipe 4 by 8-15m. In this embodiment, the exhaust branch pipe 9 lags behind the air supply branch pipe 4 by 12m.

[0036] like Figure 3 As shown, the cooling device 7 includes a water storage container, a cooling pipe 20 and a water pump. The water storage container includes a box body 14 and a cover plate 18 that is movable and covers the top of the box body 14. The box body 14 is provided with a refrigerator 17 for cooling the water in the box. The cooling pipe 20 is arranged in the box body 14, and its two ends respectively pass through the opposite sides of the box body 14, and the air inlet of the blower 6 is connected to one end of the cooling pipe 20. The water outlet of the water pump is connected to the upper part of the inner cavity of the box body through a water pipe, and the water inlet of the water pump is connected to a pumping pipe. The water pump is used to pump water into the box body 14. The box body 14 is also provided with a drain pipe and a drain valve to facilitate drainage management.

[0037] The box body 14 includes a metal inner mold 15 and a shell 16 disposed outside the metal inner mold 15. The refrigerator 17 is connected to the metal inner mold 15 and is located between the metal inner mold 15 and the shell 16. The refrigerator 17 can be a semiconductor refrigeration sheet. The cooling pipe 20 is located in the metal inner mold 15. Preferably, the cooling pipe 20 is spirally disposed in the metal inner mold 15 to increase the contact area and improve the cooling effect.

[0038] The utility model cools the water in the water storage container to form cooling water 19, and then cools the air passing through the cooling pipe 20 through the cooling water 19, and the cooled cold air is transmitted to the main tunnel 1 under the drive of the blower 6. The cooling device 7 needs water, and can be set beside the gully water source 13 or dig a well to get water. If these conditions are not met, an external water source is used.

[0039] Example 2

[0040] like Figure 1 , 4 As shown, on the basis of Example 1, this embodiment further provides a temperature and humidity sensor 22, a carbon dioxide concentration sensor 23 and a dust concentration sensor 24 in the main tunnel 1. A monitoring room 12 is provided outside the tunnel cross hole 2, and a controller 21 and a display 25 are provided in the monitoring room 12. The temperature and humidity sensor 22, the carbon dioxide concentration sensor 23, the dust concentration sensor 24, the refrigerator 17, the blower 6, the exhaust fan 11 and the display 25 are all electrically connected to the controller 21.

[0041] During operation, the controller 21 controls the blower 6, the exhaust fan 11, and the refrigerator 17 to operate at the set power. When it is detected that the temperature in the main tunnel 1 is too high, the controller 21 controls the blower 6, the exhaust fan 11, and the refrigerator 17 to increase the power, further reducing the temperature of the input air in the tunnel, increasing the transmission power of the input air in the tunnel and the extraction power of the hot air in the tunnel, so as to achieve rapid adjustment of the temperature in the main tunnel 1. When it is detected that the carbon dioxide concentration and dust concentration in the main tunnel 1 are too high, the controller 21 controls the blower 6 and the exhaust fan 11 to increase the power, improve the air circulation efficiency, and prevent construction workers from being in an environment with too high carbon dioxide concentration and dust concentration for a long time. All monitoring data are displayed on the display 25 for easy viewing by staff.

[0042] The utility model installs a temperature and humidity sensor 22, a carbon dioxide concentration sensor 23, and a dust concentration sensor 24 in the main tunnel hole 1 to monitor the temperature, humidity, carbon dioxide concentration, dust concentration and other air quality indicators in the hole. By monitoring the air quality in the main tunnel hole 1, the cooling device 7, the air supply device, and the exhaust device can be adjusted and controlled to improve the air quality in the hole, ensure the working environment of the workers and the quality of the physical project, speed up the construction efficiency, and reduce the construction cost.

[0043] The above description is a detailed description of the preferred feasible embodiment of the utility model, but the embodiment is not used to limit the scope of the patent application of the utility model. All equivalent changes or modified changes completed under the technical spirit suggested by the utility model should fall within the patent scope covered by the utility model.

Claims

1. A tunnel construction ventilation system, comprising an air supply device, an exhaust device and a cooling device, characterized in that: The air supply device comprises an air supply main pipe, two air supply branch pipes and a blower; Two air supply branch pipes are horizontally arranged in the tunnel main hole at one side away from the tunnel transverse hole, and respectively face the two ends of the tunnel main hole; the air supply main pipe passes through the tunnel transverse hole, one end of which is connected to the two air supply branch pipes, and the other end is connected to the air outlet of the blower, the air inlet of the blower is connected to the cooling device, and the cooling device is located outside the tunnel transverse hole; The exhaust device comprises an exhaust main pipe, two exhaust branch pipes and an exhaust fan. The two exhaust branch pipes are horizontally arranged on one side of the tunnel main hole close to the tunnel cross hole and respectively face the two ends of the tunnel main hole. The exhaust main pipe passes through the tunnel cross hole, one end of which is connected to the two exhaust branch pipes and the other end is connected to the air inlet of the exhaust fan. The exhaust fan is located outside the tunnel cross hole. The exhaust branch pipe is located at the upper part of the main tunnel hole, and the air supply branch pipe is located at the lower part of the main tunnel hole.

2. A tunnel construction ventilation system according to claim 1, characterized in that: The cooling device includes a water storage container, a cooling pipe and a water pump; the water storage container includes a box body and a cover plate movable on the top of the box body, the box body is provided with a refrigerator for cooling the water in the box, the cooling pipe is arranged in the box body, and its two ends respectively pass through the opposite sides of the box body, and the air inlet of the blower is connected to one end of the cooling pipe; the water outlet of the water pump is connected to the upper part of the inner cavity of the box body through a water supply pipe, and the water inlet of the water pump is connected to a water pumping pipe.

3. A tunnel construction ventilation system according to claim 2, characterized in that: The box body comprises a metal inner mold and an outer shell arranged outside the metal inner mold; the refrigerator is connected to the metal inner mold and is located between the metal inner mold and the outer shell; and the cooling pipe is located in the metal inner mold.

4. A tunnel construction ventilation system according to claim 3, characterized in that: The cooling pipe is spirally arranged in the metal inner mold.

5. A tunnel construction ventilation system according to claim 1, characterized in that: A first diversion baffle is provided at one end of the air supply main pipe away from the blower, and is connected to two air supply branch pipes respectively through two first corner pieces; a second diversion baffle is provided at one end of the exhaust main pipe away from the exhaust fan, and is connected to two exhaust branch pipes respectively through two second corner pieces.

6. A tunnel construction ventilation system according to claim 5, characterized in that: The first corner piece and the second corner piece are both metal bellows.

7. A tunnel construction ventilation system according to claim 1, characterized in that: In the main tunnel, the horizontal distance between the air supply branch pipe and the exhaust branch pipe facing the same direction is 8-15m.

8. A tunnel construction ventilation system according to claim 2, characterized in that: A temperature and humidity sensor is arranged in the main tunnel of the tunnel, a monitoring room is arranged outside the cross tunnel of the tunnel, a controller and a display are arranged in the monitoring room, and the temperature and humidity sensor, refrigerator, blower, exhaust fan and display are all electrically connected to the controller.

9. A tunnel construction ventilation system according to claim 8, characterized in that: A carbon dioxide concentration sensor is arranged in the main tunnel of the tunnel, and the carbon dioxide concentration sensor is electrically connected to the controller.

10. A tunnel construction ventilation system according to claim 9, characterized in that: A dust concentration sensor is arranged in the main tunnel of the tunnel, and the dust concentration sensor is electrically connected to the controller.