AI Technical Summary
During the installation process of heating pipelines, errors are prone to occur in pipeline alignment, which affects the quality of welding and laying.
A heating pipeline installation device is designed, including a mounting base, a vertical plate, an electric push rod, a fixed plate, a moving plate, a push rod, a spring and other components. Through the combination of these components, the position of the pipeline can be accurately adjusted and fixed, reducing the need for interference. accurate error and improve installation accuracy.
It effectively reduces the errors in pipeline alignment, improves the quality of welding and laying, and improves the convenience and accuracy of installation.
Smart Images

Figure CN221922255U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of heating pipeline installation, in particular to a heating pipeline installation device. Background Art
[0002] The heating pipeline refers to the pipeline system used to transport and distribute heat energy in the central heating system. The heating pipeline consists of pipelines, pipeline accessories, insulation structures, compensators, pipeline supports and other parts.
[0003] When installing the heating pipeline, the steps include preparation before installation, installation of fixed brackets, installation of pipelines, welding connections, installation of valves, pressure testing, etc. When installing the pipeline, the two sections of the pipeline need to be aligned together and then welded. In the prior art, the two sections of the pipeline are aligned with a fixed bracket before alignment, which may cause errors in the alignment of the pipelines, affecting the quality of welding and the quality of pipeline laying.
[0004] To this end, the utility model provides a heating pipeline installation device. Utility Model Content
[0005] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0006] The technical solution adopted by the utility model to solve its technical problems is: a heating pipeline installation device described in the utility model comprises a mounting base; a vertical plate is fixedly connected to the top of the mounting base; a pair of vertical plates are arranged on the top of the mounting base and are symmetrically arranged; a first electric push rod is fixedly connected to the top of the mounting base near the top of the vertical plate; a plurality of groups of the first electric push rods are arranged on the top of the mounting base and are symmetrically arranged; a pair of the first electric push rods are fixedly connected to the top of a first fixing plate; the first fixing plate slides inside the vertical plate; a second electric push rod is arranged on the top of the first fixing plate; one end of the second electric push rod is fixedly connected to the inside of the vertical plate; the other ... One end is fixedly connected to a first movable plate; the first movable plate slides inside the first fixed plate; a first push rod is arranged in the middle of the first movable plate; multiple groups of the first push rods are arranged in the middle of the first movable plate and are evenly distributed in the middle of the first movable plate; a first spring is fixedly connected to the bottom of the first push rod; the bottom end of the first spring is fixedly connected to the inside of the first movable plate; this step adjusts the pipeline to a suitable position through the arrangement of the first electric push rod, the first fixed plate, the second electric push rod, the first movable plate, the first push rod, and the first spring, thereby improving the convenience of pipeline installation, reducing the error when aligning two sections of pipeline, improving the quality of pipeline welding, and improving the quality of pipeline laying.
[0007] Preferably, the mounting base is fixedly connected to a third electric push rod near the top of the first electric push rod; a pair of the third electric push rods are arranged on the top of the mounting base and are symmetrically arranged; a second fixed plate is fixedly connected to the top of the pair of third electric push rods; a fourth electric push rod is arranged on the top of the second fixed plate; one end of the fourth electric push rod is fixedly connected to the inside of the vertical plate; the other end of the fourth electric push rod is fixedly connected to the second movable plate; the second movable plate slides inside the second fixed plate; in this step, the pipeline is placed on the top of the second movable plate by the arrangement of the third electric push rod, the second fixed plate, the fourth electric push rod and the second movable plate, so as to improve the accuracy of pipeline installation and reduce the possibility of position deviation during pipeline installation.
[0008] Preferably, a second push rod is provided in the middle of the second movable plate; multiple groups of the second push rods are provided in the middle of the second movable plate and are evenly distributed in the middle of the second movable plate; a suction cup is fixedly connected to the top end of the second push rod; a second spring is fixedly connected to the bottom end of the second push rod; the bottom end of the second spring is fixedly connected to the inside of the second movable plate; in this step, the pipeline is fixed on the top of the second movable plate by setting the second push rod, the suction cup and the second spring, thereby reducing the possibility of deviation during pipeline installation, improving the accuracy of pipeline installation, and improving the quality of pipeline installation.
[0009] Preferably, a pad is fixedly connected to the top of the first movable plate; the pad is arranged in multiple groups on the top of the first movable plate and is symmetrically arranged; this step reduces the impact of external vibration on pipeline installation and improves the stability of pipeline installation through the arrangement of the pad.
[0010] Preferably, movable wheels are fixedly connected to the bottom of the mounting base; multiple groups of movable wheels are arranged at the bottom of the mounting base and are distributed at the four corners of the bottom of the mounting base; this step improves the convenience of the device when moving and the convenience of adjusting the position of the pipeline during installation through the arrangement of movable wheels.
[0011] Preferably, a spirit level is provided on the side of the first fixed plate away from the second movable plate; the spirit level is provided in the middle of the first fixed plate; in this step, whether the device is level is determined by the setting of the spirit level, thereby improving the accuracy of pipeline installation.
[0012] The beneficial effects of the utility model are as follows:
[0013] 1. The heating pipeline installation device described in the utility model adjusts the pipeline to a suitable position through the arrangement of the first electric push rod, the first fixed plate, the second electric push rod, the first movable plate, the first push rod, and the first spring, thereby improving the convenience during pipeline installation, reducing the error when two sections of pipeline are aligned, improving the quality of pipeline welding, and improving the quality of pipeline laying.
[0014] 2. The heating pipeline installation device described in the utility model places the pipeline on the top of the second movable plate through the arrangement of the third electric push rod, the second fixed plate, the fourth electric push rod and the second movable plate, thereby improving the accuracy of the pipeline installation and reducing the possibility of position deviation during the pipeline installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The utility model will be further described below in conjunction with the accompanying drawings.
[0016] Figure 1 It is a three-dimensional diagram of the utility model;
[0017] Figure 2 It is a structural schematic diagram of the first push rod and the first movable plate in the utility model;
[0018] Figure 3 It is a schematic diagram of the structure of the third electric push rod cooperating with the second fixing plate in the utility model;
[0019] Figure 4 This is a schematic diagram of the structure of the cooperation between the moving wheel and the mounting base in the utility model;
[0020] In the figure: 1. mounting base; 11. vertical plate; 12. first electric push rod; 13. first fixed plate; 14. second electric push rod; 15. first movable plate; 16. first push rod; 17. first spring; 2. third electric push rod; 21. second fixed plate; 22. fourth electric push rod; 23. second movable plate; 3. second push rod; 31. suction cup; 32. second spring; 4. pad; 5. movable wheel; 6. level. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0022] like Figure 1 to Figure 2As shown, a heating pipeline installation device described in an embodiment of the utility model comprises a mounting base 1; a vertical plate 11 is fixedly connected to the top of the mounting base 1; a pair of the vertical plates 11 are arranged at the top of the mounting base 1, and are symmetrically arranged; a first electric push rod 12 is fixedly connected to the top of the mounting base 1 near the vertical plate 11; multiple groups of the first electric push rods 12 are arranged at the top of the mounting base 1, and are symmetrically arranged; a pair of the first electric push rods 12 are fixedly connected to the top of a first fixed plate 13; the first fixed plate 13 slides inside the vertical plate 11; a second electric push rod 14 is arranged on the top of the first fixed plate 13; one end of the second electric push rod 14 is fixedly connected to the inside of the vertical plate 11; the other end of the second electric push rod 14 is fixedly connected to a first movable plate 15; the first movable plate 15 slides inside the first fixed plate 13; a first push rod 16 is arranged in the middle of the first movable plate 15; multiple groups of the first push rods 16 are arranged in the middle of the first movable plate 15, and are evenly spaced. The first push rod 16 is disposed in the middle of the first movable plate 15; the first spring 17 is fixedly connected to the bottom of the first push rod 16; the bottom end of the first spring 17 is fixedly connected to the inside of the first movable plate 15; during operation, the pipe to be installed is placed on the top of the first movable plate 15, and the first push rod 16 fixes the pipe on the top of the first movable plate 15, and the position of the pipe on the first movable plate 15 is adjusted by the first electric push rod 12 and the second electric push rod 14, and the pipe is adjusted to a suitable position, and the pipe presses part of the first push rod 16 to move downward, compressing the first spring 17. After the pipe is installed in place, the device is removed, and the first spring 17 drives the first push rod 16 to reset; in this step, the first electric push rod 12, the first fixed plate 13, the second electric push rod 14, the first movable plate 15, the first push rod 16, and the first spring 17 are set to adjust the pipe to a suitable position, improve the convenience of pipe installation, reduce the error when aligning two sections of pipes, improve the quality of pipe welding, and improve the quality of pipeline laying.
[0023] like Figure 1 , Figure 3 and Figure 4As shown, the mounting base 1 is fixedly connected to a third electric push rod 2 near the top of the first electric push rod 12; a pair of the third electric push rods 2 are arranged on the top of the mounting base 1, and are symmetrically arranged; a second fixed plate 21 is fixedly connected to the top of the pair of third electric push rods 2; a fourth electric push rod 22 is arranged on the top of the second fixed plate 21; one end of the fourth electric push rod 22 is fixedly connected to the inside of the vertical plate 11; the other end of the fourth electric push rod 22 is fixedly connected to the second movable plate 23; the second movable plate 23 slides inside the second fixed plate 21; during operation, after the adjustment of the pipeline through the second electric push rod 14, the first movable plate 15 and other components is completed, the second movable plate 23 is moved to the bottom of the pipeline by adjusting the third electric push rod 2 and the fourth electric push rod 22, and the pipeline is placed on the top of the second movable plate 23; this step places the pipeline on the top of the second movable plate 23 through the arrangement of the third electric push rod 2, the second fixed plate 21, the fourth electric push rod 22 and the second movable plate 23, thereby improving the accuracy of pipeline installation and reducing the possibility of position displacement during pipeline installation.
[0024] like Figure 1 and Figure 3 As shown, a second push rod 3 is arranged in the middle of the second movable plate 23; multiple groups of the second push rod 3 are arranged in the middle of the second movable plate 23, and are evenly distributed in the middle of the second movable plate 23; a suction cup 31 is fixedly connected to the top of the second push rod 3; a second spring 32 is fixedly connected to the bottom of the second push rod 3; the bottom end of the second spring 32 is fixedly connected to the inside of the second movable plate 23; during operation, when the second movable plate 23 moves to the bottom of the pipeline, the suction cup 31 contacts the pipeline and adsorbs it, and the suction cup 31 drives the second push rod 3 to compress the second spring 32 downward. After the pipeline is installed, the second spring 32 drives the second push rod 3 and the suction cup 31 to reset after the pipeline is removed; in this step, the pipeline is fixed on the top of the second movable plate 23 by the arrangement of the second push rod 3, the suction cup 31, and the second spring 32, thereby reducing the possibility of deviation during pipeline installation, improving the accuracy of pipeline installation, and improving the quality of pipeline installation.
[0025] like Figure 2 As shown, a cushion block 4 is fixedly connected to the top of the first movable plate 15; multiple groups of the cushion blocks 4 are arranged on the top of the first movable plate 15, and are symmetrically arranged; during operation, when the pipeline is placed on the top of the first movable plate 15, the cushion blocks 4 are in contact with the pipeline to reduce the impact of external vibration on the pipeline; this step reduces the impact of external vibration on the pipeline installation through the arrangement of the cushion blocks 4, thereby improving the stability of the pipeline during installation.
[0026] like Figure 1As shown, the bottom of the mounting base 1 is fixedly connected with moving wheels 5; the moving wheels 5 are arranged in multiple groups at the bottom of the mounting base 1 and are distributed at the four corners of the bottom of the mounting base 1; during work, when the mounting base 1 needs to be moved, the mounting base 1 is moved by the moving wheels 5; this step improves the convenience of the device when moving and improves the convenience of adjusting the position of the pipeline during installation through the setting of the moving wheels 5.
[0027] like Figure 1 As shown, a level meter 6 is provided on the side of the first fixed plate 13 away from the second movable plate 23; the level meter 6 is provided in the middle of the first fixed plate 13; during operation, the level meter 6 is used to determine whether the device is level; this step determines whether the device is level through the setting of the level meter 6, thereby improving the accuracy of pipeline installation.
[0028] like Figure 2 As shown, a flexible gasket is provided at the top of the first push rod 16; during operation, the flexible gasket at the top of the first push rod 16 contacts the pipeline, reducing the loss to the pipeline when adjusting the pipeline.
[0029] During operation, the pipe to be installed is placed on the top of the first movable plate 15, and the first push rod 16 fixes the pipe on the top of the first movable plate 15. The position of the pipe on the first movable plate 15 is adjusted by the first electric push rod 12 and the second electric push rod 14. The pipe is adjusted to a suitable position, and the pipe presses part of the first push rod 16 to move downward, compressing the first spring 17. After the pipe is installed in place, the device is removed, and the first spring 17 drives the first push rod 16 to reset; after the adjustment of the pipe by the second electric push rod 14, the first movable plate 15 and other components is completed, the third electric push rod 2 and the fourth electric push rod 22 are adjusted to move the pipe to the first movable plate 15. The second movable plate 23 moves to the bottom of the pipe, and the pipe is placed on the top of the second movable plate 23; when the second movable plate 23 moves to the bottom of the pipe, the suction cup 31 contacts the pipe and adsorbs it, and the suction cup 31 drives the second push rod 3 to compress the second spring 32 downward. After the pipe is installed, the second spring 32 drives the second push rod 3 and the suction cup 31 to reset after the pipe is removed; when the pipe is placed on the top of the first movable plate 15, the cushion block 4 contacts the pipe to reduce the influence of external vibration on the pipe; when the mounting base 1 needs to be moved, the mounting base 1 is moved by the moving wheel 5; the level meter 6 is used to determine whether the device is level.
[0030] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A heating pipeline installation device, comprising a mounting base (1); characterized in that: The top of the mounting base (1) is fixedly connected to a vertical plate (11); a pair of the vertical plates (11) are arranged on the top of the mounting base (1) and are symmetrically arranged; a first electric push rod (12) is fixedly connected to the top of the mounting base (1) near the vertical plate (11); a plurality of groups of the first electric push rods (12) are arranged on the top of the mounting base (1) and are symmetrically arranged; a pair of the first electric push rods (12) are fixedly connected to the top of a first fixing plate (13); the first fixing plate (13) slides inside the vertical plate (11); a second electric push rod (14) is arranged on the top of the first fixing plate (13); One end of the second electric push rod (14) is fixedly connected to the inside of the vertical plate (11); the other end of the second electric push rod (14) is fixedly connected to the first movable plate (15); the first movable plate (15) slides inside the first fixed plate (13); a first push rod (16) is arranged in the middle of the first movable plate (15); multiple groups of the first push rods (16) are arranged in the middle of the first movable plate (15) and are evenly distributed in the middle of the first movable plate (15); the bottom of the first push rod (16) is fixedly connected to the first spring (17); the bottom end of the first spring (17) is fixedly connected to the inside of the first movable plate (15).
2. A heating pipeline installation device according to claim 1, characterized in that: The mounting base (1) is fixedly connected to a third electric push rod (2) near the top of the first electric push rod (12); a pair of the third electric push rods (2) are arranged on the top of the mounting base (1) and are symmetrically arranged; a second fixed plate (21) is fixedly connected to the top of the pair of third electric push rods (2); a fourth electric push rod (22) is arranged on the top of the second fixed plate (21); one end of the fourth electric push rod (22) is fixedly connected to the inside of the vertical plate (11); the other end of the fourth electric push rod (22) is fixedly connected to the second movable plate (23); the second movable plate (23) slides inside the second fixed plate (21).
3. A heating pipeline installation device according to claim 2, characterized in that: A second push rod (3) is arranged in the middle of the second movable plate (23); a plurality of second push rods (3) are arranged in the middle of the second movable plate (23) and are evenly distributed in the middle of the second movable plate (23); a suction cup (31) is fixedly connected to the top end of the second push rod (3); a second spring (32) is fixedly connected to the bottom end of the second push rod (3); and the bottom end of the second spring (32) is fixedly connected to the inside of the second movable plate (23).
4. A heating pipeline installation device according to claim 3, characterized in that: A cushion block (4) is fixedly connected to the top of the first movable plate (15); a plurality of groups of cushion blocks (4) are arranged on the top of the first movable plate (15) and are symmetrically arranged.
5. A heating pipeline installation device according to claim 4, characterized in that: The bottom of the mounting base (1) is fixedly connected with moving wheels (5); a plurality of moving wheels (5) are arranged at the bottom of the mounting base (1) and are distributed at the four corners of the bottom of the mounting base (1).
6. A heating pipeline installation device according to claim 5, characterized in that: A level (6) is provided on the side of the first fixed plate (13) away from the second movable plate (23); the level (6) is arranged in the middle of the first fixed plate (13).