Heat energy utilization equipment for heat energy power engineering of power plant
By designing the structure of the air storage chamber and multiple heat pipes in the power plant thermal power project, increasing the contact time between steam and water, and using bamboo wood carbon and filter elements to filter harmful substances, the low heat exchange efficiency of existing equipment and the waste of heat energy have been solved. problem, achieving more efficient heat energy recovery and safe water recovery.
Patent Information
- Application Number
- CN202420103643.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-16
AI Technical Summary
The heat exchange efficiency of existing thermal energy utilization equipment for thermal power engineering in power plants is low, resulting in serious waste of thermal energy.
A thermal energy utilization equipment including an air storage chamber, multiple heat transfer tubes and a filter structure is designed. The flow of steam is slowed down through the air inlet pipe, so that the contact time between steam and water is longer. Multiple heat transfer tubes are connected to improve the heat exchange efficiency, and Filter the condensed water through bamboo carbon and filter elements to remove harmful substances such as heavy metals and sulfur dioxide.
The efficiency of heat energy recovery is significantly improved, heat energy waste is reduced, and the safety of recycled water is improved through the filtration structure.
Smart Images

Figure CN221924645U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of thermal energy utilization, in particular to thermal energy utilization equipment for thermal energy power engineering of power plants. Background Art
[0002] A power plant is a power plant that converts some form of raw energy into electrical energy for fixed facilities or transportation, such as thermal, hydro, steam, diesel or nuclear power plants. During the power generation process of a power plant, a large amount of excess steam is generated when steam drives the steam turbine to generate electricity. Direct discharge of this steam will cause a large amount of resource waste. Therefore, power plants generally have thermal power projects, among which thermal energy utilization equipment is an important equipment in thermal energy projects.
[0003] In the process of using the heat energy utilization equipment for thermal power engineering of existing power plants, heat exchange equipment is usually used to recover heat energy, the recovery efficiency is limited, and there will be a certain amount of heat energy loss. Therefore, technical personnel in this field provide a heat energy utilization equipment for thermal power engineering of power plants to solve the problems raised in the above background technology. Utility Model Content
[0004] The purpose of the utility model is to solve the shortcomings existing in the prior art, and to propose a heat energy utilization device for thermal power engineering of a power plant. Steam enters the interior of an air storage chamber through an air inlet pipe, slowing down the flow of steam, so that the steam stays in the interior of the air storage chamber for a longer time, and then is connected through a first heat conducting pipe, a second heat conducting pipe, a third heat conducting pipe and a fourth heat conducting pipe, thereby increasing the circulation time of heat exchange water in the air storage chamber, and making the contact time with the steam longer and wider, thereby improving the efficiency of heat exchange and reducing the waste of heat energy.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a heat energy utilization device for thermal power engineering of a power plant, comprising a hot water tank and a control box, wherein the control box is arranged at the front center of one side wall of the hot water tank, a first heat insulation layer is arranged on the inner side wall of the hot water tank, a third solenoid valve is arranged at the lower center of the front end face of the hot water tank, a water storage tank is arranged on the upper end face of the hot water tank, a partition is arranged at the upper part of one side of the water storage tank, a guide plate is arranged at the upper side of the partition, a card slot is arranged at the upper center of one side wall of the water storage tank, and a filter structure is arranged inside the card slot , an air storage chamber is provided at the center of the upper end surface of the water storage tank, an air inlet pipe is provided at the lower center of one side wall of the air storage chamber, an air outlet pipe is provided at the center of the upper end surface of the air storage chamber, the outer wall of the air storage chamber, the outer wall of the air outlet pipe and the outer wall of the air inlet pipe are all provided with a second heat insulation layer, a water pump is provided at the center of the lower inner wall of the water storage tank, a water outlet pipe is provided at the output end of the water pump, a water return pipe is provided at one side of the water pump, one end of the water outlet pipe and the return pipe both pass through the upper inner wall of the water storage tank and the lower end surface of the guide plate in sequence to the inside of the air storage chamber, and a heat exchange structure is provided on the output end of the water outlet pipe inside the air storage chamber;
[0006] Through the above technical solution, steam is transported into the air storage chamber through the air inlet pipe to slow down the flow rate of the steam, and then the heat exchange structure is used for heat exchange to increase the contact time and area with the steam. The condensed water is then filtered through the filtering structure to improve the safety of recycled water use.
[0007] Furthermore, the filtering structure includes a frame, a sealing gasket, a filter element and bamboo charcoal, one end of the frame passes through an inner wall of a card slot to the inside of the water storage tank, and the end is slidably connected to a side wall of the partition, the bamboo charcoal and the filter element are arranged in an up-and-down arrangement inside the frame, and the sealing gasket is sleeved on the outer side of the frame near one side;
[0008] Through the above technical solution, the condensed water is filtered through bamboo charcoal and filter elements to filter out harmful substances such as heavy metals and sulfur dioxide in the water, thereby improving the safety of recycled water use.
[0009] Furthermore, a limiting block is rotatably connected to a side wall of the water storage tank at the upper end of the slot;
[0010] The above technical solution makes it easy to limit the frame.
[0011] Further, the heat exchange structure includes a first heat conducting pipe, a second heat conducting pipe, a third heat conducting pipe, three connecting pipes and a fourth heat conducting pipe, the first heat conducting pipe input end is connected to the water outlet pipe output end, the second heat conducting pipe is arranged at the lower end of the first heat conducting pipe, the third heat conducting pipe is arranged at the lower end of the second heat conducting pipe, the fourth heat conducting pipe is arranged at the lower end of the third heat conducting pipe, the first heat conducting pipe, the second heat conducting pipe, the third heat conducting pipe and the fourth heat conducting pipe are connected through three connecting pipes, and the output end of the fourth heat conducting pipe is connected to the return pipe input end;
[0012] Through the above technical solution, after the first heat conducting pipe, the second heat conducting pipe, the third heat conducting pipe and the fourth heat conducting pipe are connected, the circulation time of the heat exchange water in the air storage chamber is increased, and the contact time between the water and the steam is longer and wider, thereby improving the heat exchange efficiency and reducing the waste of heat energy.
[0013] Furthermore, the first heat conducting tube, the second heat conducting tube, the third heat conducting tube and the fourth heat conducting tube are all arranged in an S shape;
[0014] Through the above technical solution, the circulation time of water in the air storage chamber is increased, and the heat exchange efficiency is improved.
[0015] Furthermore, a connecting rod is provided on one side wall of the first heat conducting tube, the second heat conducting tube, the third heat conducting tube and the fourth heat conducting tube;
[0016] Through the above technical solution, it is convenient to support the first heat conducting pipe, the second heat conducting pipe, the third heat conducting pipe and the fourth heat conducting pipe.
[0017] Furthermore, the lower end of the return pipe passes through the lower inner wall of the water storage tank, the upper end surface of the hot water tank and the upper end surface of the first insulation layer in sequence and passes to the upper inner wall of the first insulation layer;
[0018] Through the above technical solution, hot water can be conveniently transported to the interior of the first heat insulation layer inside the hot water tank for heat preservation and storage.
[0019] Furthermore, a first solenoid valve is provided at the upper center of the front end surface of the water storage tank, and a second solenoid valve is provided at the lower center of the front end surface of the water storage tank;
[0020] Through the above technical solution, it is convenient to replenish the cold water in the water tank and discharge the remaining water.
[0021] The utility model has the following beneficial effects:
[0022] 1. In the utility model, steam enters the air storage chamber through the air inlet pipe of the heat energy utilization equipment for thermal power engineering of the power plant, slows down the flow of steam, and makes the steam stay in the air storage chamber for a longer time. After being connected through the first heat conducting pipe, the second heat conducting pipe, the third heat conducting pipe and the fourth heat conducting pipe, the circulation time of the heat exchange water in the air storage chamber is increased, and the contact time between the water and the steam is longer and wider, thereby improving the efficiency of heat exchange and reducing the waste of heat energy.
[0023] 2. In the utility model, the water in the steam is liquefied after encountering the first heat conducting pipe, the second heat conducting pipe, the third heat conducting pipe and the fourth heat conducting pipe, and then drips on the lower end of the gas storage chamber, and then enters the frame through the guide plate, and the water is filtered through the bamboo charcoal and the filter element, and the heavy metals and sulfur dioxide and other harmful substances contained in the distilled water are filtered, thereby improving the safety of the use of recycled water, and then the frame is pulled out by rotating the limit block, so that the filter element and the bamboo charcoal can be replaced and maintained regularly.
[0024] 3. In the utility model, three second heat-insulating layers are used to prevent the air inlet pipe, the air storage chamber and the air outlet pipe from conducting heat out, and then the first heat-insulating layer is used to keep the hot water warm, thereby reducing the loss of heat energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A three-dimensional diagram of a heat energy utilization device for thermal power engineering of a power plant proposed by the utility model;
[0026] Figure 2 This is a front cross-sectional view of a heat energy utilization device for thermal power engineering of a power plant proposed by the utility model;
[0027] Figure 3 This is a three-dimensional diagram of the heat exchange structure of a heat energy utilization device for thermal power engineering of a power plant proposed by the utility model;
[0028] Figure 4 for Figure 2 A magnified schematic diagram of center A.
[0029] Legend:
[0030] 1. hot water tank; 2. water storage tank; 3. filtering structure; 301. frame; 302. sealing gasket; 303. slot; 304. filter element; 305. bamboo charcoal; 306. limit block; 4. air inlet pipe; 5. air storage chamber; 6. first solenoid valve; 7. second solenoid valve; 8. third solenoid valve; 9. first thermal insulation layer; 10. heat exchange structure; 1001. water pump; 1002. return pipe; 1003. outlet pipe; 1004. first heat pipe; 1005. second heat pipe; 1006. third heat pipe; 1007. connecting pipe; 1008. fourth heat pipe; 11. partition; 12. outlet pipe; 13. second thermal insulation layer; 14. guide plate; 15. control box. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] Reference Figure 1-4 The utility model provides an embodiment: a heat energy utilization device for thermal power engineering of a power plant, comprising a hot water tank 1 and a control box 15, the control box 15 is arranged at the front center of one side wall of the hot water tank 1, a first heat insulation layer 9 is arranged on the inner wall of the hot water tank 1, a third solenoid valve 8 is arranged at the lower center of the front end face of the hot water tank 1, a water storage tank 2 is arranged on the upper end face of the hot water tank 1, a partition 11 is arranged at the upper part of one side of the water storage tank 2, a guide plate 14 is arranged at one side of the upper end of the partition 11, a card slot 303 is arranged at the upper center of one side wall of the water storage tank 2, a filter structure 3 is arranged inside the card slot 303, and then the condensed water is filtered by the filter structure 3 to improve the safety of the use of recycled water, an air storage chamber 5 is arranged at the center of the upper end face of the water storage tank 2, and a gas storage chamber 5 is arranged at the lower center of one side wall of the gas storage chamber 5. An air inlet pipe 4 is provided, through which steam is transported into the air storage chamber 5 to slow down the flow rate of steam, an air outlet pipe 12 is provided at the center of the upper end surface of the air storage chamber 5, and the outer wall of the air storage chamber 5, the outer wall of the air outlet pipe 12 and the outer wall of the air inlet pipe 4 are all provided with a second thermal insulation layer 13, a water pump 1001 is provided at one side of the center of the lower inner wall of the water storage tank 2, a water outlet pipe 1003 is provided at the output end of the water pump 1001, and a return pipe 1002 is provided on one side of the water pump 1001, and one end of the water outlet pipe 1003 and the return pipe 1002 both pass through the upper inner wall of the water storage tank 2 and the lower end surface of the guide plate 14 in sequence to the inside of the air storage chamber 5, and a heat exchange structure 10 is provided on the output end of the water outlet pipe 1003 in the air storage chamber 5, and the heat exchange structure 10 is cooperated with the heat exchange structure 10 to increase the contact time and area with the steam.
[0033] The filtering structure 3 includes a frame 301, a sealing gasket 302, a filter element 304 and bamboo charcoal 305. One end of the frame 301 passes through an inner wall of the slot 303 to the inside of the water tank 2, and the end is slidably connected to a side wall of the partition 11. The bamboo charcoal 305 and the filter element 304 are arranged in an upper and lower arrangement inside the frame 301. The sealing gasket 302 is sleeved on the outer side of the frame 301. The condensed water is filtered through the bamboo charcoal 305 and the filter element 304 to filter harmful substances such as heavy metals and sulfur dioxide in the water, thereby improving the safety of recycled water use. A limiting block 306 is rotatably connected to a side wall of the water tank 2 at the upper end of the slot 303 to facilitate limiting the frame 301.
[0034] The heat exchange structure 10 includes a first heat conducting pipe 1004, a second heat conducting pipe 1005, a third heat conducting pipe 1006, three connecting pipes 1007 and a fourth heat conducting pipe 1008. The input end of the first heat conducting pipe 1004 is connected to the output end of the water outlet pipe 1003. The second heat conducting pipe 1005 is arranged at the lower end of the first heat conducting pipe 1004, the third heat conducting pipe 1006 is arranged at the lower end of the second heat conducting pipe 1005, and the fourth heat conducting pipe 1008 is arranged at the lower end of the third heat conducting pipe 1006. The second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008 are connected through three connecting pipes 1007, and the output end of the fourth heat conducting pipe 1008 is connected to the input end of the return water pipe 1002. After the first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008 are connected, the circulation time of the heat exchange water in the gas storage chamber 5 is increased, and the contact time between the water and the steam is longer and wider, thereby improving the efficiency of heat exchange and reducing the waste of heat energy.
[0035] The first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008 are all S-shaped, which increases the circulation time of water inside the air storage chamber 5 and improves the efficiency of heat exchange. The first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008 are all provided with connecting rods on one side wall to facilitate supporting the first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008.
[0036] The lower end of the return pipe 1002 passes through the lower inner wall of the water tank 2, the upper end surface of the hot water tank 1 and the upper end surface of the first insulation layer 9 in sequence, and is connected to the upper inner wall of the first insulation layer 9, so as to facilitate the hot water to be transported to the inside of the first insulation layer 9 inside the hot water tank 1 for heat preservation and storage. A first solenoid valve 6 is provided at the upper center of the front end surface of the water tank 2, and a second solenoid valve 7 is provided at the lower center of the front end surface of the water tank 2, so as to facilitate the replenishment of cold water in the water tank 2 and the discharge of remaining water.
[0037] Working principle: When in use, steam enters the air storage chamber 5 through the air inlet pipe 4, slowing down the flow of steam and making the steam stay longer in the air storage chamber 5. Then, by controlling the water pump 1001 to start, the water pump 1001 transports the cold water in the water storage tank 2 to the inside of the water outlet pipe 1003, and then passes through the first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008. After being connected, the circulation time of the heat exchanged water in the air storage chamber 5 is increased, and the contact time with the steam is longer and wider, thereby improving the efficiency of heat exchange and reducing the waste of heat energy. The water after heat exchange enters the first heat insulation layer 9 inside the water storage tank 2 through the return pipe 1002 for heat preservation and storage. After the water in the distilled water meets the first heat conducting pipe 1004, the second heat conducting pipe 1005, the third heat conducting pipe 1006 and the fourth heat conducting pipe 1008 and is liquefied, it drips on the lower end of the air storage chamber 5, and then enters the frame 301 through the guide plate 14, and the water is filtered by the bamboo charcoal 305 and the filter element 304, and the heavy metals and sulfur dioxide and other harmful substances contained in the distilled water are filtered to improve the safety of the use of recycled water, and then the frame 301 is pulled out by rotating the limit block 306, so that the filter element 304 and the bamboo charcoal 305 can be replaced and maintained at a fixed time, and the three second insulation layers 13 are used to prevent the air inlet pipe 4, the air storage chamber 5 and the air outlet pipe 12 from conducting heat out, and then the hot water is kept warm by the first insulation layer 9 to reduce the loss of heat energy.
[0038] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A heat energy utilization device for thermal power engineering of a power plant, comprising a hot water tank (1) and a control box (15), wherein the control box (15) is arranged at the front center of a side wall of the hot water tank (1), and is characterized in that: A first heat insulating layer (9) is provided on the inner wall of the hot water tank (1); a third solenoid valve (8) is provided at the lower center of the front end face of the hot water tank (1); a water storage tank (2) is provided on the upper end face of the hot water tank (1); a partition (11) is provided at the upper part of one side of the water storage tank (2); a guide plate (14) is provided at the upper side of the upper end of the partition (11); a slot (303) is provided at the upper center of one side wall of the water storage tank (2); a filter structure (3) is provided inside the slot (303); an air storage chamber (5) is provided at the center of the upper end face of the water storage tank (2); an air inlet pipe (4) is provided at the lower center of one side wall of the air storage chamber (5); and a filter structure (3) is provided inside the slot (303). An air outlet pipe (12) is provided at the water storage chamber (5), the outer wall of the air outlet pipe (12) and the outer wall of the air inlet pipe (4) are all provided with a second heat insulation layer (13), a water pump (1001) is provided at one side of the center of the lower inner wall of the water storage tank (2), an outlet pipe (1003) is provided at the output end of the water pump (1001), a return pipe (1002) is provided at one side of the water pump (1001), the outlet pipe (1003) and one end of the return pipe (1002) are respectively passed through the upper inner wall of the water storage tank (2) and the lower end surface of the guide plate (14) to the inside of the air storage chamber (5), and a heat exchange structure (10) is provided at the output end of the outlet pipe (1003) inside the air storage chamber (5).
2. The thermal energy utilization equipment for thermal power engineering of a power plant according to claim 1, characterized in that: The filtering structure (3) comprises a frame (301), a sealing gasket (302), a filter element (304) and bamboo charcoal (305); one end of the frame (301) passes through an inner wall of the slot (303) and leads to the inside of the water storage tank (2), and the end is slidably connected to a side wall of the partition (11); the bamboo charcoal (305) and the filter element (304) are arranged vertically inside the frame (301), and the sealing gasket (302) is sleeved on the outside of the frame (301) and close to one side.
3. The heat energy utilization equipment for thermal power engineering of a power plant according to claim 1, characterized in that: A limiting block (306) is rotatably connected to a side wall of the water storage tank (2) at the upper end of the slot (303).
4. The thermal energy utilization equipment for thermal power engineering of a power plant according to claim 1, characterized in that: The heat exchange structure (10) comprises a first heat conducting pipe (1004), a second heat conducting pipe (1005), a third heat conducting pipe (1006), three connecting pipes (1007) and a fourth heat conducting pipe (1008); the input end of the first heat conducting pipe (1004) is connected to the output end of the water outlet pipe (1003); the second heat conducting pipe (1005) is arranged at the lower end of the first heat conducting pipe (1004); the third heat conducting pipe (1006) is arranged at the lower end of the second heat conducting pipe (1005); the fourth heat conducting pipe (1008) is arranged at the lower end of the third heat conducting pipe (1006); the first heat conducting pipe (1004), the second heat conducting pipe (1005), the third heat conducting pipe (1006) and the fourth heat conducting pipe (1008) are connected via three connecting pipes (1007); the output end of the fourth heat conducting pipe (1008) is connected to the input end of the return water pipe (1002).
5. The heat energy utilization equipment for thermal power engineering of a power plant according to claim 4, characterized in that: The first heat conducting pipe (1004), the second heat conducting pipe (1005), the third heat conducting pipe (1006) and the fourth heat conducting pipe (1008) are all arranged in an S-shape.
6. The heat energy utilization equipment for thermal power engineering of a power plant according to claim 4, characterized in that: A connecting rod is provided on one side wall of the first heat conducting tube (1004), the second heat conducting tube (1005), the third heat conducting tube (1006) and the fourth heat conducting tube (1008).
7. The thermal energy utilization equipment for thermal power engineering of a power plant according to claim 1, characterized in that: The lower end of the return pipe (1002) passes through the lower inner wall of the water storage tank (2), the upper end surface of the hot water tank (1) and the upper end surface of the first thermal insulation layer (9) in sequence, and is connected to the upper inner wall of the first thermal insulation layer (9).
8. The thermal energy utilization equipment for thermal power engineering of a power plant according to claim 1, characterized in that: A first electromagnetic valve (6) is provided at the upper center of the front end surface of the water storage tank (2), and a second electromagnetic valve (7) is provided at the lower center of the front end surface of the water storage tank (2).
Citation Information
Cited By
Heat energy utilization equipment for heat energy power engineering of power plant
CN224415817U