Simple hand-push type concrete guardrail reinforcing steel bar mounting, positioning and detecting device
Through a simple hand-pushed concrete guardrail steel bar installation and positioning detection device, using technical means such as control racks and scale marks, the problem of inaccurate installation of concrete guardrail steel bars is solved, achieving fast, high-quality detection and construction, and reducing costs.
Patent Information
- Application Number
- CN202323563719.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The installation of concrete guardrail steel bars is not accurate enough, resulting in slow construction speed, poor quality, high cost, and slow manual inspection with large errors.
A simple hand-pushed concrete guardrail steel bar installation and positioning detection device is designed, including a control frame, a main pole, a horizontal frame, a vertical pole, a rubber block and an arc-shaped slide groove. The precise positioning and positioning of the steel bars is achieved through scale marks and friction plates. detection.
The mechanized detection of concrete guardrail steel bars is realized, with fast detection speed, high quality, low cost, simple structure and easy operation, which reduces maintenance and production costs.
Smart Images

Figure CN221924854U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of highway construction equipment, and specifically relates to a simple hand-push type concrete guardrail reinforcement installation positioning detection device. Background Art
[0002] There are two types of highway guardrails: rigid guardrails and flexible guardrails. Rigid guardrails are used on both sides of the bridge. In the past, flexible guardrails were mostly used for median guardrails. Since flexible guardrails need to be equipped with greening to prevent glare, it is difficult to maintain greening plants and the later investment cost is high. Now, most median guardrails are also mostly made of rigid guardrails. Rigid guardrails are also concrete guardrails. Concrete guardrails are mostly prefabricated or cast-in-place. Whether prefabricated or cast-in-place, the guardrail steel bars must be tied first. At present, the guardrail steel bars are tied manually, which has slow construction speed, poor quality and high cost. The guardrail steel bars have horizontal bars, vertical bars and oblique bars. The position and slope of the guardrail steel bars are difficult to control. In addition, after the guardrail steel bars are tied, the steel bar tying quality is manually inspected, which is slow, with large errors and large human factors. Therefore, it is of practical significance to improve the inspection efficiency and the construction quality of concrete guardrails. Summary of the invention
[0003] The utility model aims to provide a simple hand-push type concrete guardrail reinforcement installation positioning detection device to solve the problem that the concrete guardrail reinforcement installation is not accurate enough.
[0004] The purpose of the utility model is achieved as follows: a simple hand-push concrete guardrail steel bar installation positioning detection device, which includes a control frame, the control frame includes a main pole and a horizontal frame, a telescopic rod is arranged in the middle of the main pole, a connecting plate is arranged at the lower end of the main pole, a pulley is arranged at the bottom of the connecting plate, an upper plate and a lower plate are arranged at the upper end of the main pole, a handrail is arranged on the upper side of the upper plate, a horizontal frame is arranged between the upper plate and the lower plate, a vertical pole is arranged inside the horizontal frame, a sleeve is arranged on the outer side of the vertical pole, the sleeve cooperates with the horizontal frame, and a rubber block is arranged at the lower end of the vertical pole.
[0005] The main rod is perpendicular to the ground, and the main rod is a cylindrical steel pipe rod.
[0006] A balance block is arranged at the right end of the horizontal frame.
[0007] A screw hole is arranged inside the sleeve, and a positioning bolt is arranged inside the screw hole.
[0008] An arc-shaped slide plate groove is arranged on the outer side of the sleeve, a friction plate is arranged inside the arc-shaped slide plate groove, and the arc-shaped slide plate groove cooperates with the horizontal frame.
[0009] The surfaces of the main rod, the horizontal frame and the vertical rod are all provided with scale lines.
[0010] The beneficial effects of the utility model are as follows: when the device is in use, the upper end of the vertical rod passes through the sleeve, and the lower end of the vertical rod is connected to the rubber block. The vertical rod can slide up and down along the sleeve, and the height of the rubber block can be accurately set by the height scale line on the vertical rod. Arc-shaped slide grooves are provided on both sides of the sleeve, and the two side rods of the horizontal frame are located in the arc-shaped slide grooves. The sleeve can slide left and right along the horizontal frame, driving the vertical rod and the rubber block to slide left and right, so as to adjust the left and right positions of the rubber blocks, and the left and right positions of the rubber blocks can be accurately positioned by the scale lines on the horizontal frame. From left to right, the four rubber blocks are marked as block 1, block 2, block 3 and block 4, and the positions of the four rubber blocks are adjusted. Block 1 is located in the middle of the left side of the concrete guardrail steel bar, block 2 is located at the top of the concrete guardrail steel bar, the bottom of block 3 is located at the fold line position of the concrete guardrail steel bar, and the top of block 4 is located at the fold line position of the concrete guardrail steel bar. The height of the bottom surface of block 2 is the height of the concrete guardrail steel bar, which can be read from the height scale line on the vertical bar; the spacing between the inner sides of block 1 and block 2 is the width of the upper part of the concrete guardrail steel bar, which can be calculated from the scale lines on the horizontal frame; the spacing between the inner sides of block 1 and block 4 is the width of the lower part of the concrete guardrail steel bar, which can be calculated from the scale lines on the horizontal frame; the height coordinate of the lowest position of block 3 is the starting height coordinate of the concrete guardrail steel bar fold line, which can be read from the height scale lines on the vertical bar; the height coordinate of the highest position of block 4 is the end height coordinate of the concrete guardrail steel bar fold line, which can be read from the height scale lines on the vertical bar. Then push the handrail to make the whole machine move forward. When the position of the concrete guardrail steel bar is accurate, ensure that the four rubber blocks are tightly fitted with the concrete guardrail steel bar when moving forward; when a certain position is inaccurate, it will cause the rubber block to deviate. The offset of the rubber block read or calculated is the error of the concrete guardrail steel bar. When the error exceeds the specified range, the steel bar is re-tied. The utility model realizes the mechanized detection of concrete guardrail steel bars, has the advantages of fast detection speed, high quality and low cost, and the control frame can adopt standard parts, has a simple structure, is easy to process, install and operate, is easy to maintain and has a low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a front view of the simple hand-push concrete guardrail steel bar installation positioning detection device of the utility model.
[0012] Figure 2 It is a top view of the simple hand-push concrete guardrail steel bar installation positioning detection device of the utility model.
[0013] Figure 3 This is a side structural diagram of a sleeve, an arc-shaped slide groove and a horizontal frame of a simple hand-push concrete guardrail reinforcement installation positioning detection device of the utility model.
[0014] In the figure: 1, positioning bolts 2, vertical rods 3, handrails 4, scale lines 5, balance blocks 6, telescopic rods 7, main rods 8, connecting plates 9, pulleys 10, rubber blocks 11, concrete guardrail steel bars 12, sleeves 13, friction plates 14, horizontal frames 15, lower plates 16, upper plates 17, and arc-shaped slide plate grooves. Implementation
[0015] The utility model is further described below in conjunction with the accompanying drawings. Example
[0016] like Figure 1-3 As shown, a simple hand-push concrete guardrail steel bar installation positioning detection device, a simple hand-push concrete guardrail steel bar installation positioning detection device, comprises a control frame, the control frame comprises a main rod 7 and a horizontal frame 14, a telescopic rod 6 is arranged in the middle of the main rod 7, a connecting plate 8 is arranged at the lower end of the main rod 7, a pulley 9 is arranged at the bottom of the connecting plate 8, an upper plate 16 and a lower plate 15 are arranged at the upper end of the main rod 7, a handrail 3 is arranged on the upper side of the upper plate 16, a horizontal frame 14 is arranged between the upper plate 16 and the lower plate 15, a vertical rod 2 is arranged inside the horizontal frame 14, a sleeve 12 is arranged on the outer side of the vertical rod 2, the sleeve 12 cooperates with the horizontal frame 14, and a rubber block 10 is arranged at the lower end of the vertical rod 2.
[0017] When the utility model is in use, the upper end of the vertical rod 2 passes through the sleeve 12, and the lower end of the vertical rod 2 is connected to the rubber block 10. The vertical rod 2 can slide up and down along the sleeve 12, and the height of the rubber block 10 can be accurately set by the height scale line 4 on the vertical rod 2. The sleeve 12 is provided with arc-shaped slide grooves 17 on both sides, and the two side rods of the horizontal frame 14 are located in the arc-shaped slide grooves 17. The sleeve 12 can slide left and right along the horizontal frame 14, driving the vertical rod 2 and the rubber block 10 to slide left and right, so as to adjust the left and right positions of the rubber block 10. The rubber block 10 can be accurately positioned on the left and right positions through the scale lines 4 on the horizontal frame 14. The utility model realizes the mechanized detection of the steel bars 11 of the concrete guardrail, with fast detection speed, high quality and low cost. The control frame can use standard parts, with simple structure, convenient processing, installation and operation, convenient maintenance and low cost. Example
[0018] like Figure 1-3As shown, a simple hand-push concrete guardrail steel bar installation positioning detection device includes a control frame, the control frame includes a main rod 7 and a horizontal frame 14, a telescopic rod 6 is arranged in the middle of the main rod 7, a connecting plate 8 is arranged at the lower end of the main rod 7, a pulley 9 is arranged at the bottom of the connecting plate 8, an upper plate 16 and a lower plate 15 are arranged at the upper end of the main rod 7, a handrail 3 is arranged on the upper side of the upper plate 16, a horizontal frame 14 is arranged between the upper plate 16 and the lower plate 15, a vertical rod 2 is arranged inside the horizontal frame 14, a sleeve 12 is arranged on the outer side of the vertical rod 2, the sleeve 12 cooperates with the horizontal frame 14, and a rubber block 10 is arranged at the lower end of the vertical rod 2.
[0019] For better effect, the main rod 7 is perpendicular to the ground, and the main rod 7 is a cylindrical steel pipe rod.
[0020] For better effect, a balancing block 5 is arranged at the right end of the horizontal frame 14. Since there are four vertical rods 2, the left side of the whole machine is heavy and the right side is light. By setting the balancing block 5, the balancing block slides left and right along the horizontal frame 14 to ensure the balance of the whole machine.
[0021] For better effect, a screw hole is arranged inside the sleeve 12 , and a positioning bolt 1 is arranged inside the screw hole. The positioning bolt 1 can fix the vertical rod 2 to the sleeve 12 .
[0022] For better effect, an arc-shaped slide groove 17 is arranged on the outside of the sleeve 12, and a friction plate 13 is arranged inside the arc-shaped slide groove 17. The arc-shaped slide groove 17 cooperates with the horizontal frame 14, and a friction plate 13 is arranged on the arc-shaped slide groove 17. Under the action of friction force, the sleeve 12 can be kept in a horizontal position without sliding. When force in the left and right directions is applied to the vertical rod 2, the friction force can be overcome to make the sleeve 12 slide left and right along the horizontal frame 14.
[0023] For better effect, scale lines 4 are provided on the surfaces of the main rod 7 , the horizontal frame 14 , and the vertical rod 2 .
[0024] When the utility model is in use, the upper end of the vertical rod 2 passes through the sleeve 12, and the lower end of the vertical rod 2 is connected to the rubber block 10. The vertical rod 2 can slide up and down along the sleeve 12, and the height of the rubber block 10 can be accurately set by the height scale line 4 on the vertical rod 2. The sleeve 12 is provided with arc-shaped slide grooves 17 on both sides, and the two side rods of the horizontal frame 14 are located in the arc-shaped slide grooves 17. The sleeve 12 can slide left and right along the horizontal frame 14, driving the vertical rod 2 and the rubber block 10 to slide left and right, so as to adjust the left and right position of the rubber block 10, and the left and right position of the rubber block 10 can be accurately positioned by the scale line 4 on the horizontal frame 14. Mark the four rubber blocks 10 as block 1, block 2, block 3 and block 4 from left to right, and adjust the positions of the four rubber blocks 10, block 1 is located in the middle of the left side of the concrete guardrail steel bar 11, block 2 is located at the top of the concrete guardrail steel bar 11, the bottom of block 3 is located at the fold line of the concrete guardrail steel bar 11, and the top of block 4 is located at the fold line of the concrete guardrail steel bar 11. The height of the bottom surface of block No. 2 is the height of the concrete guardrail steel bar 11, which can be read through the height scale line 4 on the vertical bar 2; the distance between the inner sides of block No. 1 and block No. 2 is the width of the upper part of the concrete guardrail steel bar 11, which can be calculated through the scale line 4 on the horizontal frame 14; the distance between the inner sides of block No. 1 and block No. 4 is the width of the lower part of the concrete guardrail steel bar 11, which can be calculated through the scale line 4 on the horizontal frame 14; the height coordinate of the lowest position of block No. 3 is the starting point height coordinate of the broken line of the concrete guardrail steel bar 11, which can be read through the height scale line 4 on the vertical bar 2; the height coordinate of the uppermost position of block No. 4 is the end point height coordinate of the broken line of the concrete guardrail steel bar 11, which can be read through the height scale line 4 on the vertical bar. Then push the handrail 3 to make the whole machine move forward. When the position of the concrete guardrail steel bar 11 is accurate, the four rubber blocks 10 are ensured to be tightly fitted with the concrete guardrail steel bar 11 when moving forward. When a certain position is inaccurate, it will cause the rubber block 10 to deviate. The offset of the rubber block 10 is read or calculated as the error of the concrete guardrail steel bar 11. When the error exceeds the specified range, the steel bar is tied again. The utility model realizes the mechanized detection of the concrete guardrail steel bar 11, with fast detection speed, high quality and low cost. The control frame can use standard parts, with simple structure, convenient processing, installation and operation, convenient maintenance and low cost.
Claims
1. A simple hand-push concrete guardrail reinforcement installation positioning detection device, which includes a control frame and is characterized by: The control frame includes a main rod and a horizontal frame, a telescopic rod is arranged in the middle of the main rod, a connecting plate is arranged at the lower end of the main rod, a pulley is arranged at the bottom of the connecting plate, an upper plate and a lower plate are arranged at the upper end of the main rod, a handrail is arranged on the upper side of the upper plate, a horizontal frame is arranged between the upper plate and the lower plate, a vertical rod is arranged inside the horizontal frame, a sleeve is arranged on the outer side of the vertical rod, the sleeve cooperates with the horizontal frame, and a rubber block is arranged at the lower end of the vertical rod.
2. The simple hand-push concrete guardrail steel bar installation positioning detection device according to claim 1 is characterized in that: The main rod is perpendicular to the ground, and the main rod is a cylindrical steel pipe rod.
3. The simple hand-push concrete guardrail steel bar installation positioning detection device according to claim 1 is characterized in that: A balance block is arranged at the right end of the horizontal frame.
4. The simple hand-push concrete guardrail steel bar installation positioning detection device according to claim 1 is characterized in that: A screw hole is arranged inside the sleeve, and a positioning bolt is arranged inside the screw hole.
5. The simple hand-push concrete guardrail reinforcement installation positioning detection device according to claim 4 is characterized in that: An arc-shaped slide plate groove is arranged on the outer side of the sleeve, a friction plate is arranged inside the arc-shaped slide plate groove, and the arc-shaped slide plate groove cooperates with the horizontal frame.
6. The simple hand-push concrete guardrail reinforcement installation positioning detection device according to claim 1 is characterized in that: The surfaces of the main rod, the horizontal frame and the vertical rod are all provided with scale lines.