Combined marker pile for buried gas pipeline
By designing detachable combined gas pipeline sign piles, the problems of easy damage and slow repair progress of existing sign piles are solved, rapid repair and material saving are achieved, and construction efficiency is improved.
Patent Information
- Application Number
- CN202420109204.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-17
AI Technical Summary
The existing buried gas pipeline marking piles are easily damaged, resulting in slow maintenance progress and waste of materials, making it difficult to accurately locate the buried gas pipeline.
Design a combined sign pile, including a detachable pile base and pile body, connected by screws and nuts. The exposed part can be quickly replaced, and the pile base can be buried underground. The inner core short section of the chassis can be reused, saving money. Material.
It achieves rapid maintenance of sign piles, saves time and effort, avoids the need to replace the pile base as a whole, improves construction efficiency and saves materials.
Smart Images

Figure CN221927412U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of gas marking piles, and in particular relates to a combined marking pile for buried gas pipelines. Background Art
[0002] Gas marking piles, also known as gas warning piles and gas marking piles, are used with one part buried underground and the other part exposed on the ground to warn of the buried location of gas pipelines and the direction of gas pipelines.
[0003] The construction process of buried gas pipelines is generally to dig trenches, lay gas pipelines, backfill trenches and bury marker stakes above the gas pipelines. At present, the common problem with buried gas pipeline warning marker stakes is that the part of the marker stake exposed on the ground is easily damaged by human beings or by third-party construction. If it is not repaired in time, it is difficult to find the installation position of the original marker stake later, resulting in the inability to accurately locate the buried gas pipeline. It is even easy for the buried gas pipeline to be dug by a third-party construction due to the lack of warning, causing gas leakage accidents.
[0004] However, when repairing damaged marker piles, the buried part must be dug out first, and then replaced with a new marker pile as a whole, and the soil is filled and compacted. The entire repair construction process is slow, time-consuming and labor-intensive, and results in a waste of the buried part of the marker pile. Utility Model Content
[0005] The utility model aims to provide a combined marker pile for buried gas pipelines, which solves the problems that the existing marker piles need to be replaced as a whole after being damaged, the maintenance construction process is slow, time-consuming and labor-intensive, and there is a waste of materials.
[0006] The utility model is realized by the following technical solutions:
[0007] A combined marker pile for a buried gas pipeline, comprising a pile seat and a pile body;
[0008] The pile seat is pre-embedded with a plurality of screw rods, and the top ends of the screw rods extend out of the top surface of the pile seat; specifically, the lower section of each screw rod is pre-embedded and fixed in the pile seat, and the upper section of each screw rod extends out of the top surface of the pile seat by a certain length;
[0009] The pile body comprises a pile body and a chassis disposed at the bottom of the pile body and detachably connected to the pile seat; each screw on the pile seat passes through the chassis, and a nut for locking and fixing the chassis is installed at the top of each screw; specifically, a plurality of through holes for the screws to pass through are provided on the chassis, and the chassis can be removed after the nuts are removed, so that the pile body and the pile seat are detachably connected;
[0010] When the combined marking pile is used, the pile seat is buried in the soil layer above the gas pipeline to ensure its stability, the pile body is installed on the top of the pile seat, the chassis of the pile body and the pile seat are detachably connected by screws and nuts, and a warning sign is set on the pile body to make the pile body exposed on the ground serve as a warning; after the pile body exposed on the ground is damaged, the nut can be removed, the damaged pile body can be dismantled, and a new pile body can be replaced and installed on the pile seat without digging out and replacing the pile seat.
[0011] Furthermore, the top side wall of the pile seat is provided with an annular mark for indicating the burial depth, and the distance between the annular mark and the top surface of the pile seat is 20-30 cm; when the pile seat is buried, the annular mark is flush with the ground, the pile seat part below the annular mark is buried underground, and the pile seat protrudes 20-30 cm from the ground, which can help pipeline inspectors find the pile seat.
[0012] Furthermore, the portion of the top side wall of the pile seat located above the annular mark is sprayed with a color coating, so that the portion of the pile seat exposed to the ground can be more prominent and conspicuous, making it easier for pipeline inspectors to find the pile seat.
[0013] Furthermore, the outside of the screw is sheathed with a plastic sleeve, and the bottom end of the plastic sleeve is pre-buried in the pile seat together with the screw, the top end of the plastic sleeve extends out of the top surface of the pile seat, and the length of the plastic sleeve extending out of the top surface of the pile seat is less than the length of the screw extending out of the top surface of the pile seat, exposing the top end of the screw, which is convenient for installing a nut, the nut is threadedly connected to the top end of the screw, and the nut is sheathed on the top end of the plastic sleeve; a sealing ring is sheathed on the plastic sleeve, and the bottom surface of the nut is interference fit with the sealing ring, and the sealing ring is used to seal the gap between the top surface of the chassis and the bottom surface of the nut, and has a waterproof effect. The plastic sleeve is higher than the top surface of the pile seat by a certain length, and can have a waterproof effect, thereby preventing the screw and the inside of the nut from rusting and affecting disassembly and assembly.
[0014] Furthermore, the pile seat is composed of a pile seat shell and a concrete core cast inside the pile seat shell; the pile seat shell is a hollow shell structure, and a casting hole communicating with the inside and outside is opened at the center of the top surface of the pile seat shell, which is convenient for pouring concrete into the pile seat shell; the pile seat can be prefabricated in the factory and then transported to the construction site for direct installation, or the pile seat shell can be buried underground and then concrete can be poured into the pile seat shell.
[0015] Furthermore, the chassis is composed of a chassis shell and a chassis inner core filled inside the chassis shell, and the pile body is composed of a pile body shell and a pile body inner core filled inside the pile body shell; the chassis shell and the pile body shell are both hollow shell structures with an opening at the bottom, the chassis shell and the pile body shell are integrally formed, and the interiors are connected; the chassis inner core and the pile body core are both made of concrete.
[0016] Furthermore, the pile body inner core is composed of a plurality of overlapping inner core short sections, and the chassis inner core and the plurality of inner core short sections of the pile body inner core are all prefabricated concrete components, the chassis inner core is filled in the interior of the chassis outer shell and is detachable, and the plurality of inner core short sections are filled in the interior of the pile body outer shell and are all detachable; the plurality of inner core short sections can be overlapped on the chassis inner core short section, and then the chassis outer shell and the pile body outer shell are installed from the top downward, and similarly, the chassis outer shell and the pile body outer shell can be pulled out upward; when the pile body is damaged, it is possible to check whether the various inner core short sections of the chassis inner core and the pile body inner core are intact, and if they are intact, they can be reused, and only the damaged chassis outer shell and pile body outer shell and the damaged chassis inner core or inner core short section need to be replaced, which can save materials; in addition, the chassis outer shell and the chassis inner core are both provided with through holes for the plastic sleeve to pass through.
[0017] Furthermore, the pile seat shell, chassis shell and pile body shell are all made of plastic, which is low in cost; in addition, they can also be made of metal materials such as stainless steel and aluminum alloy, but their cost is high.
[0018] Furthermore, the pile seat shell, chassis shell and pile body shell are all in a rectangular or cylindrical shape.
[0019] It can be seen from the above technical solution that the utility model provides a combined marker pile for buried gas pipelines, which has the following beneficial effects:
[0020] The marker pile is composed of a pile seat and a pile body. The pile seat can be buried underground, and the pile body can be detachably installed on the pile seat. The pile body is exposed on the ground to warn the buried position and direction of the gas pipeline. After the pile body is damaged by human beings or by third-party construction, once the pipeline inspection personnel find it, they can promptly remove the damaged pile body and replace it with a new pile body on the pile seat. There is no need to dig out and replace the pile seat, which can achieve rapid maintenance of the marker pile, saving time and effort. The pile seat of the marker pile can still be used, which can save materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0022] Figure 1 It is a schematic diagram of the three-dimensional structure of Example 1 of the utility model.
[0023] Figure 2 This is a schematic cross-sectional view of Example 1 of the utility model.
[0024] Figure 3 This is a schematic diagram of the explosion structure of Example 2 of the utility model.
[0025] Figure 4 This is a schematic cross-sectional view of Example 2 of the utility model.
[0026] Attached photos
[0027] 1- Pile seat,
[0028] 1.1-Pile base shell,
[0029] 1.1.1- Casting holes,
[0030] 1.2-Concrete core,
[0031] 2- Pile body,
[0032] 2.1-Pile body,
[0033] 2.1.1-Pile casing,
[0034] 2.1.2-The core inside the pile,
[0035] 2.1.2.1-Inner core short section,
[0036] 2.2-Chassis,
[0037] 2.2.1- Chassis shell,
[0038] 2.2.2-Inner core of chassis,
[0039] 3- Screw,
[0040] 4-Plastic sleeve,
[0041] 5- Sealing ring,
[0042] 6- Nut,
[0043] 7- Ring mark,
[0044] 8- Color coating. DETAILED DESCRIPTION
[0045] The following embodiments of the technical solution of the utility model are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the utility model, and are therefore only used as examples, and cannot be used to limit the protection scope of the utility model.
[0046] In the description of the present application, it should be understood that the terms "upper", "lower", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention. Example
[0047] like Figure 1 and Figure 2 As shown, a buried gas pipeline combined marker pile includes a pile seat 1 and a pile body 2. The pile seat 1 and the pile body 2 are both prefabricated concrete components and can be transported to the construction site for direct installation after being prefabricated in the factory.
[0048] Four screw rods 3 are pre-embedded on the pile seat 1, and the top ends of the screw rods 3 extend out of the top surface of the pile seat 1; specifically, the lower section of each screw rod 3 is pre-embedded and fixed in the pile seat 1, and the upper section of each screw rod 3 extends out of the top surface of the pile seat 1 by a certain length;
[0049] Each screw rod 3 is sheathed with a plastic sleeve 4, the bottom end of the plastic sleeve 4 is pre-buried in the pile seat 1 together with the screw rod 3, the top end of the plastic sleeve 4 extends out of the top surface of the pile seat 1, and the length of the plastic sleeve 4 extending out of the top surface of the pile seat 1 is less than the length of the screw rod 3 extending out of the top surface of the pile seat 1, and the external thread at the top end of the screw rod 3 is exposed;
[0050] The pile body 2 comprises a pile body 2.1 and a chassis 2.2 which is detachably connected to the pile seat 1 and is arranged at the bottom of the pile body 2.1. The pile body 2.1 and the chassis 2.2 are integrally formed prefabricated concrete components. Each screw 3 on the pile seat 1 passes through the chassis 2.2. Specifically, four through holes are provided on the chassis 2.2 for the plastic sleeve 4 to pass through. A sealing ring 5 and a nut 6 for locking and fixing the chassis 2.2 are installed at the top of each screw 3. The nut 6 is threadedly connected to the top of the screw 3, and the nut 6 is sleeved on the top of the plastic sleeve 4. The screw The bottom surface of the cap 6 is interference fit with the sealing ring 5, and the sealing ring 5 is used to seal the gap between the top surface of the chassis 2.2 and the bottom surface of the nut 6, and has a waterproof effect. Specifically, the inside of the nut 6 is a stepped hole, the upper section of the stepped hole is a small-diameter internal threaded hole, which is threadedly connected to the screw rod 3, and the lower section of the stepped hole is a large-diameter hole, which is sleeved on the top of the plastic sleeve 4; the plastic sleeve 4 is higher than the top surface of the pile seat 1 by a certain length, which can have a waterproof effect and prevent the screw rod 3 and the nut 6 from rusting and affecting disassembly and assembly; in addition, the screw 3 and the nut 6 are made of stainless steel, which can also prevent rust;
[0051] After the nut 6 is tightened, the nut 6 locks and fixes the chassis 2.2. After the nut 6 is removed, the chassis 2.2 can be removed, so that the pile body 2 and the pile seat 1 are detachably connected.
[0052] As a preferred embodiment, in this embodiment, Figure 1 and Figure 2As shown, the top side wall of the pile seat 1 is provided with an annular mark 7 for indicating the burial depth, and the distance between the annular mark 7 and the top surface of the pile seat 1 is 20-30 cm; when the pile seat 1 is buried, the annular mark 7 is flush with the ground, the part of the pile seat 1 below the annular mark 7 is buried underground, and the pile seat 1 protrudes 20-30 cm from the ground, which can help pipeline inspectors to find the pile seat 1.
[0053] As a preferred embodiment, in this embodiment, Figure 1 As shown, the portion of the top side wall of the pile seat 1 located above the annular mark 7 is sprayed with a color coating 8, so that the portion of the pile seat 1 exposed on the ground can be more prominent and conspicuous, making it easier for pipeline inspectors to find the pile seat 1.
[0054] The working principle and technical effects of this embodiment are as follows:
[0055] When the combined marking pile is used, the concrete prefabricated components of the pile seat 1 and the pile body 2 are produced in the factory, transported to the construction site for installation, the pile seat 1 is buried in the soil layer above the gas pipeline, and its stability is ensured. The top of the pile seat 1 protrudes 20-30 cm above the ground. The pile body 2 is installed on the top of the pile seat 1. The chassis 2.2 of the pile body 2 is detachably connected to the pile seat 1 through the screw rod 3 and the nut 6. By setting a warning sign on the pile body 2 (such as spraying a color coating 8, spraying words, setting a reflective tape, etc.), the pile body 2 exposed on the ground has a warning effect; after the pile body 2 exposed on the ground is damaged, the damaged pile body 2 or the pile seat 1 protruding 20-30 cm above the ground can be easily discovered by pipeline inspection personnel. During maintenance, the nut 6 is removed, the damaged pile body 2 is removed, and a new pile body 2 is replaced and installed on the pile seat 1, without digging out and replacing the pile seat 1. The entire maintenance construction process is fast, which can save construction time, improve construction efficiency, and save the buried pile seat 1. Example
[0056] like Figure 3 and Figure 4 As shown, a combined marker pile for buried gas pipelines is different from Example 1 in that:
[0057] The pile seat 1 is composed of a pile seat shell 1.1 and a concrete core 1.2 cast inside the pile seat shell 1.1; the pile seat shell 1.1 is a hollow shell structure, and a casting hole 1.1.1 communicating with the inside and outside is opened at the center of the top surface of the pile seat shell 1.1, which is convenient for pouring concrete into the pile seat shell 1.1; in addition, four sleeve insertion holes communicating with the inside and outside are opened on the top surface of the pile seat shell 1.1, which are convenient for inserting a plastic sleeve 4 and a screw 3 when pouring concrete inside the pile seat shell 1.1, and pre-burying the plastic sleeve 4 and the screw 3 in the concrete core 1.2; the pile seat 1 can be transported to the construction site for direct installation after being prefabricated in the factory, or the pile seat shell 1.1 can be buried underground and then concrete can be poured into the pile seat shell 1.1;
[0058] The pile body 2 is composed of a pile body 2.1 and a chassis 2.2 which is arranged at the bottom of the pile body 2.1 and is detachably connected to the pile seat shell 1.1. The chassis 2.2 is composed of a chassis shell 2.2.1 and a chassis inner core 2.2.2 filled inside the chassis shell 2.2.1. The pile body 2.1 is composed of a pile body shell 2.1.1 and a pile inner core 2.1.2 filled inside the pile body shell 2.1.1.
[0059] The chassis shell 2.2.1 and the pile body shell 2.1.1 are both hollow shell structures with an opening at the bottom. The chassis shell 2.2.1 and the pile body shell 2.1.1 are integrally formed and communicate with each other internally. Specifically, a connecting hole communicating with the interior of the pile body shell 2.1.1 is provided on the top surface of the chassis shell 2.2.1.
[0060] The pile body core 2.1.2 is composed of a plurality of inner core short sections 2.1.2.1 overlapped, the chassis inner core 2.2.2 and the plurality of inner core short sections 2.1.2.1 of the pile body core 2.1.2 are all prefabricated concrete components, the chassis inner core 2.2.2 is filled inside the chassis outer shell 2.2.1 and is detachable, and the plurality of inner core short sections 2.1.2.1 are filled inside the pile body outer shell 2.1.1 and are detachable; the plurality of inner core short sections 2.1.2.1 can be overlapped on the chassis 2.2 inner core short sections 2.1.2.1, and then the chassis outer shell 2.2.1 and the pile body outer shell 2.1.2 are installed from the top downward. .1.1, similarly, the chassis shell 2.2.1 and the pile body shell 2.1.1 can be pulled out upwards; when the pile body 2 is damaged, the chassis inner core 2.2.2 and the various inner core short sections 2.1.2.1 of the pile body inner core 2.1.2 can be checked to see if they are intact. If they are intact, they can be reused, and only the damaged chassis shell 2.2.1 and the pile body shell 2.1.1 and the damaged chassis inner core 2.2.2 or the inner core short section 2.1.2.1 need to be replaced, which can save materials; in addition, the chassis shell 2.2.1 and the chassis inner core 2.2.2 are both provided with through holes for the plastic sleeve 4 to pass through.
[0061] As a preferred embodiment, in this embodiment, the pile seat shell 1.1, the chassis shell 2.2.1 and the pile body shell 2.1.1 are all made of plastic, which is low in cost. In addition, they can also be made of metal materials such as stainless steel and aluminum alloy, but their cost is high. Figure 3 and Figure 4 As shown, the pile seat shell 1.1, the chassis shell 2.2.1 and the pile body shell 2.1.1 are all rectangular parallelepiped shapes, and correspondingly, the chassis inner core 2.2.2 and each inner core short section 2.1.2.1 are all square prefabricated concrete components; in addition, the pile seat shell 1.1 and the pile body shell 2.1.1 can also be cylindrical, and the chassis shell 2.2.1 is disc-shaped.
[0062] The working principle and technical effects of this embodiment are as follows:
[0063] When the combined marking pile is used, the pile seat 1 can be prefabricated in the factory and then transported to the construction site for direct installation, or the pile seat shell 1.1 can be buried underground and then concrete is poured into the pile seat shell 1.1, the chassis shell 2.2.1 and the pile body shell 2.1.1 of the pile body 2 are transported to the site, and the chassis inner core 2.2.2 and each inner core short section 2.1.2.1 of the pile body 2.1 are all prefabricated with concrete in the factory and transported to the construction site for installation;
[0064] At the construction site, after the pile seat 1 is buried in the soil layer above the gas pipeline, the chassis inner core 2.2.2 can be installed on the pile seat 1, and the four plastic sleeves 4 pass through the chassis inner core 2.2.2 respectively. A plurality of inner core short sections 2.1.2.1 are overlapped and installed on the chassis inner core 2.2.2. The integrally formed chassis outer shell 2.2.1 and the pile body outer shell 2.1.1 are inserted downward from the top of the inner core short section 2.1.2.1 until the chassis outer shell 2.2.1 is sleeved on the chassis inner core 2.2.2, and the four plastic sleeves 4 pass through the chassis outer shell 2.2.1. The sealing rings 5 are sleeved on the top of the four plastic sleeves 4, and the nuts 6 are installed on the top of the four screws 3. After tightening the nuts 6, the chassis outer shell 2.2.1 is locked and fixed;
[0065] During maintenance, the nut 6 is removed, the damaged pile body 2 is removed, the integrity of the chassis inner core 2.2.2 and each inner core short section 2.1.2.1 of the pile body inner core 2.1.2 is checked, and intact prefabricated concrete components are selected for reuse. Only the damaged chassis outer shell 2.2.1 and pile body outer shell 2.1.1 and the damaged chassis inner core 2.2.2 or inner core short section 2.1.2.1 need to be replaced, which can save materials;
[0066] A new pile body 2 is installed on the pile seat 1 without digging out and replacing the pile seat 1. The entire maintenance construction process is fast, which can save construction time, improve construction efficiency, and save the buried pile seat 1 and the chassis inner core 2.2.2 and / or inner core short section 2.1.2.1.
[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model, and they should all be included in the scope of the claims and specification of the utility model.
Claims
1. A combined marker pile for buried gas pipelines, characterized in that: include: A pile seat, wherein a plurality of screw rods are embedded in the pile seat, and the top ends of the screw rods extend out of the top surface of the pile seat; The pile body includes a pile body and a chassis arranged at the bottom of the pile body and detachably connected to the pile seat; each screw on the pile seat passes through the chassis, and a nut for locking and fixing the chassis is installed at the top of each screw.
2. The combined marker stake for buried gas pipelines according to claim 1, characterized in that: The top side wall of the pile seat is provided with an annular mark for indicating the burial depth, and the distance between the annular mark and the top surface of the pile seat is 20-30 cm.
3. The combined marker stake for buried gas pipelines according to claim 2, characterized in that: The portion of the pile seat top side wall above the annular mark is sprayed with a color coating.
4. The combined marker stake for buried gas pipelines according to claim 1, characterized in that: The outside of the screw is sheathed with a plastic sleeve, the bottom end of the plastic sleeve is embedded in the pile seat together with the screw, the top end of the plastic sleeve extends out of the top surface of the pile seat, the nut is threadedly connected to the top end of the screw, and the nut is sheathed on the top end of the plastic sleeve; a sealing ring is sheathed on the plastic sleeve, the bottom surface of the nut is interference fit with the sealing ring, and the sealing ring is used to seal the gap between the top surface of the chassis and the bottom surface of the nut.
5. The combined marker stake for buried gas pipelines according to claim 4, characterized in that: The pile seat is composed of a pile seat shell and a concrete core cast inside the pile seat shell; the pile seat shell is a hollow shell structure, and a casting hole communicating with the inside and outside is opened at the center of the top surface of the pile seat shell.
6. The combined marker stake for buried gas pipelines according to claim 5, characterized in that: The chassis is composed of a chassis shell and a chassis inner core filled inside the chassis shell, and the pile body is composed of a pile body shell and a pile body inner core filled inside the pile body shell; the chassis shell and the pile body shell are both hollow shell structures with an open bottom end, the chassis shell and the pile body shell are integrally formed, and the interiors are connected; the chassis inner core and the pile body inner core are both made of concrete.
7. The combined marker stake for buried gas pipelines according to claim 6, characterized in that: The inner core of the pile body is composed of multiple overlapping inner core short sections. The chassis inner core and the multiple inner core short sections of the pile body are all prefabricated concrete components. The chassis inner core is filled inside the chassis outer shell and is detachable. The multiple inner core short sections are filled inside the pile body outer shell and are all detachable.
8. The combined marker stake for buried gas pipelines according to claim 6, characterized in that: The pile seat shell, chassis shell and pile body shell are all made of plastic.
9. The combined marker stake for buried gas pipelines according to claim 8, characterized in that: The pile seat shell, chassis shell and pile body shell are all in the shape of a cuboid or a cylinder.