Bus duct system for data center
By designing the bus duct system for data centers and using technologies such as 5P busbar copper bars and aviation connectors, the space occupation, complex construction and power loss problems of traditional power distribution methods have been solved, and efficient and flexible power distribution and monitoring have been achieved, improving the efficiency of power distribution. The scalability and maintenance convenience of the computer room.
Patent Information
- Application Number
- CN202420362493.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-27
AI Technical Summary
The traditional data computer room power distribution method has the problems of large space occupation, complex construction, high power loss, and inconvenient expansion and change.
Design a bus duct system for data centers, which consists of a bus duct and a plug-in box. It uses 5P busbar copper bars, aviation connectors and snap-on structures to realize power tapping and support flexible installation and monitoring.
It improves power efficiency and safety, simplifies installation and maintenance, and enables dynamic adjustment of the computer room and flexible replacement of electrical equipment.
Smart Images

Figure CN221929271U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of electrical connection, in particular to a bus duct system for a data center. Background Art
[0002] Data centers are places where large amounts of data are stored and processed, and they have extremely high requirements for the stability and reliability of power supply. The traditional power distribution method for data centers uses a header cabinet and cables to draw power from the UPS output cabinet and distribute it to the PDUs in each cabinet through the header cabinet. This method has the following problems and disadvantages:
[0003] 1. The cabinet is large in size, which seriously occupies the space of the computer room and reduces the utilization rate and benefits of the cabinet;
[0004] 2. The cable laying is complicated, which increases the construction cost and time, and also increases the potential faults and difficulty of troubleshooting;
[0005] 3. The cable resistance and contact resistance are large, resulting in large power loss and temperature rise, which affects power efficiency and safety;
[0006] 4. It is difficult to achieve plug-and-play for cables, which is not conducive to the expansion and change of the computer room.
[0007] Therefore, it is necessary to design a bus duct system for data centers to solve the problems and shortcomings existing in the power supply of traditional data centers. Utility Model Content
[0008] In order to overcome the above-mentioned shortcomings, the utility model provides a technical solution that can solve the above-mentioned problems.
[0009] A bus duct system for a data center, consisting of a bus duct and a plug-in box;
[0010] The bus duct includes a bus housing and a 5P bus copper bar, the 5P bus copper bar is embedded and fixed on the upper surface of the bus housing, and the left and right sides of the bus housing are formed with docking slots;
[0011] The plug-in box includes a box body, a circuit breaker, a base and an aviation connector;
[0012] The box is arranged above the bus duct, and buckles are arranged at the four ends of the box, and the bottom ends of the buckles are respectively inserted into the docking slots on the left and right sides of the bus housing;
[0013] The base is fixedly installed in the box, the circuit breaker is fixedly installed on the base, the bottom end of the circuit breaker is electrically connected with 5 pins, the bottom ends of the 5 pins are all extended out of the box, and the 5 pins are inserted into the 5P busbar copper bar with corresponding gaps one by one;
[0014] The aviation connector is embedded and installed on the outer side of the box body, and the aviation connector and the circuit breaker are electrically connected to each other.
[0015] Further: the buckle includes a side panel and a right-angle buckle, the side panels of the four buckles are formed one by one at the four ends of the box body, locking bolts are installed between the side panels and the right-angle buckles, and the lower ends of the right-angle buckles of the four buckles are buckled one by one in the docking grooves on the left and right sides of the busbar casing.
[0016] Furthermore: vertical adjustment slots are formed on the side panels of the four buckles, and the locking bolts pass through the vertical adjustment slots one by one to lock.
[0017] Further: there is a wiring connection between the wiring terminal at the bottom end of the circuit breaker and the five pins in a one-to-one electrical connection.
[0018] Furthermore: a terminal is fixedly mounted on the upper end of the pin, and the lower end of the wiring is electrically connected to the terminal in a one-to-one correspondence.
[0019] Further: a cover plate is hingedly mounted on the upper edge of the box body, and the cover plate covers the circuit breaker in the box body.
[0020] Further: three aviation joints are provided.
[0021] Compared with the prior art, the beneficial effects of the utility model are:
[0022] The bus duct is the main body of power transmission in the bus duct power distribution system. It consists of a bus housing and a 5P bus copper bar. The copper bar is provided with insulating materials and related accessories. It has the following advantages:
[0023] 1. Large current capacity, good electrical performance, different specifications can be selected according to different load requirements;
[0024] 2. Good heat dissipation performance, heat is dissipated through the metal shell, avoiding heat accumulation and short circuit risks of the cable, and prolonging the service life;
[0025] 3. Easy installation. The bus duct is equipped with a standard mounting bracket. No separate bridge support is required. It can be installed horizontally or vertically according to the layout of the machine room.
[0026] 4. Simple maintenance. Daily maintenance of the bus duct only requires measuring the temperature rise of the casing, through bolts and joints, without the need to disassemble and replace cables.
[0027] The plug-in box is the output end of the bus duct power distribution system. It connects the power of the bus duct to the PDU in each cabinet in a plug-and-play manner. It has the following advantages:
[0028] 1. High flexibility, different plug-in boxes can be selected according to the power and circuit requirements of the cabinet;
[0029] 2. Strong scalability, plug-in boxes can be added or changed at any time to achieve dynamic adjustment of the computer room, and electrical equipment can be replaced without power outage or cable replacement;
[0030] 3. High intelligence. A monitoring module can also be set in the plug-in box to measure and communicate the voltage, current, power, electric energy and other parameters of each circuit of each cabinet. Aviation connectors are used to output data, which is convenient for analyzing and optimizing the power consumption of the cabinet.
[0031] The utility model forms a bus duct system dedicated to a data center by cooperating with a bus duct and a plug-in box, and can solve the defects existing in the power supply of a data center in the prior art.
[0032] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0034] Figure 1 It is a structural schematic diagram of the utility model;
[0035] Figure 2 It is a schematic diagram of the explosion structure of the utility model;
[0036] Figure 3 It is a side sectional structural schematic diagram of the utility model.
[0037] As shown in the figure: 1. Bus duct; 11. Bus housing; 12. 5P busbar copper bar; 2. Plug-in box; 21. Box body; 22. Circuit breaker; 23. Base; 24. Aviation connector; 3. Docking slot; 4. Buckle; 41. Side panel; 42. Right-angle buckle; 5. 5 pins; 6. Vertical adjustment slot; 7. Wiring; 8. Terminal; 9. Cover plate; 10. Locking bolt. DETAILED DESCRIPTION
[0038] The technical solution of the present utility model will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present utility model, rather than all of the embodiments.
[0039] The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention.
[0040] Based on the embodiments of the present utility model, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present utility model.
[0041] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0042] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0043] like Figure 1-3 As shown, a bus duct system for a data center of the present invention is composed of a bus duct 1 and a plug-in box 2; the bus duct 1 includes a bus housing 11 and a 5P bus copper bar 12, the 5P bus copper bar 12 is embedded and fixed on the upper surface of the bus housing 11, and the left and right sides of the bus housing 11 are formed with docking slots 3; the plug-in box 2 includes a box body 21, a circuit breaker 22, a base 23 and an aviation connector 24; the box body 21 is arranged above the bus duct 1, and the four ends of the box body 21 are provided with card slots The bottom ends of the buckles 4 are respectively inserted into the docking slots 3 on the left and right sides of the busbar housing 11; the base 23 is fixedly installed in the box body 21, and the circuit breaker 22 is fixedly installed on the base 23. The bottom end of the circuit breaker 22 is electrically connected with 5 pins 5, and the bottom ends of the 5 pins 5 are all extended out of the box body 21, and the 5 pins 5 are inserted into the 5P busbar copper bar 12 with corresponding gaps one by one; the aviation connector 24 is embedded and installed on the outer side of the box body 21, and the aviation connector 24 and the circuit breaker 22 are electrically connected to each other;
[0044] The principle is: when installing and connecting, the five pins 5 extending from the bottom of the plug-in box 2 are plugged into the 5P busbar copper bar 12 on the bus duct 1, and then locked using the buckles 4 at the four ends to complete the stable connection between the bus duct 1 and the plug-in box 2.
[0045] Furthermore: the buckle 4 includes a side panel 41 and a right-angle buckle 42, the side panels 41 of the four buckles 4 are formed one by one at the four ends of the box body 21, and locking bolts 10 are installed between the side panels 41 and the right-angle buckles 42. The lower ends of the right-angle buckles 42 of the four buckles 4 are buckled one by one in the docking slots 3 on the left and right sides of the busbar housing 11; after the busbar duct 1 and the plug-in box 2 are connected to each other, the locking bolts 10 can be used to lock them to ensure the stability of the busbar duct system.
[0046] Furthermore: vertical adjustment slots 6 are formed on the side panels 41 of the four buckles 4, and the locking bolts 10 pass through the vertical adjustment slots 6 one by one for locking; the vertical adjustment slots 6 can reserve plug-in positions for the plug-in boxes 2 and can be suitable for plug-in boxes 2 of different sizes.
[0047] Furthermore: the wiring 7 at the bottom end of the circuit breaker 22 is electrically connected to the five pins 5 in a one-to-one correspondence; the upper ends of the pins are fixedly mounted with terminals 8, and the lower ends of the wiring 7 are electrically connected to the terminals 8 in a one-to-one correspondence; the stability of the electrical connection can be ensured.
[0048] Furthermore, a cover plate 9 is hingedly mounted on the upper edge of the box body 21 , and the cover plate 9 covers the circuit breaker 22 in the box body 21 , so that the circuit breaker 22 in the box body 21 can be easily inspected and maintained.
[0049] Furthermore: three aviation connectors 24 are provided; the aviation connectors 24 can be used to output monitoring data, so that the daily maintenance of the bus duct 1 only needs to measure the temperature rise of the bus housing 11, the locking bolts 10 and the aviation connectors 24, without the need to disassemble and replace the cables, which is convenient and quick.
[0050] The utility model designs a new type of data room power distribution method, that is, a power distribution method using a bus duct 1. The bus duct power distribution method adopts a "bus duct + plug-in box" power distribution form to achieve flexible power distribution, protection, expansion, monitoring and other functions for electronic information equipment.
[0051] The bus duct 1 is a metal conductive system for effectively distributing electrical energy, which consists of a series of prefabricated metal shells and built-in copper or aluminum conductors; compared with traditional cables, the bus duct 1 has the advantages of easy installation, high transmission efficiency, good heat dissipation performance, and strong scalability; in large buildings or industrial environments, the bus duct 1 is widely used for power distribution from transformers to distribution boards or important equipment.
[0052] The plug-in box 2 is a device used in conjunction with the bus duct system. It allows the user to conveniently draw power from the bus duct 1 without interrupting the main power supply. The plug-in box 2 can be installed at any position of the bus duct 1 as needed to provide a flexible connection point for various electrical equipment.
[0053] The utility model can specifically solve the problems of complex power lines in data centers, multiple branches, difficulty in monitoring, maintenance, line modification, and individual control; among them:
[0054] Power distribution: Bus duct 1 and plug-in box 2 are used for power transmission and distribution. They can connect power to equipment such as racks, equipment cabinets and servers to meet the power needs of the data center, including main power access, current distribution and backup power connection.
[0055] Data center architecture: Bus ducts 1 and plug-in boxes 2 also play a key role in building data center architecture. They can provide reliable and efficient power distribution solutions to ensure that various equipment and systems can maintain normal operation.
[0056] Maintainability: The design of the bus duct 1 and the plug-in box 2 makes the connection and maintenance of the power line more convenient. The power line can be quickly connected or disconnected through the plug-in box 2 for maintenance, replacement or expansion.
[0057] Safety: The bus duct 1 and the plug-in box 2 also play a role of safety isolation in power transmission. They provide isolation and protection for power lines, prevent problems such as circuit short circuit, overload and leakage, and reduce the risk of electric shock.
[0058] Efficiency and flexibility: The bus duct 1 and the plug-in box 2 can be flexibly arranged and adjusted according to the needs of the data center. Through reasonable planning and design, the optimized layout of the power lines can be achieved, and the energy utilization efficiency and system scalability can be improved.
[0059] The bus duct 1 and the plug-in box 2 involve multiple technical fields such as electricity, mechanics, and electronics, requiring attention to knowledge of power transmission, electrical connectors, isolation protection, grounding systems, and safety standards. In addition, it is also necessary to understand relevant knowledge such as data center architecture design and operation and maintenance management to ensure the normal operation and efficient performance of the bus duct and plug-in box in the data center.
[0060] This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the utility model. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the utility model are within the protection scope of the technical solution of the utility model.
Claims
1. A bus duct system for a data center, consisting of a bus duct and a plug-in box; Features: The bus duct includes a bus housing and a 5P bus copper bar, the 5P bus copper bar is embedded and fixed on the upper surface of the bus housing, and the left and right sides of the bus housing are formed with docking slots; The plug-in box includes a box body, a circuit breaker, a base and an aviation connector; The box is arranged above the bus duct, and buckles are arranged at the four ends of the box, and the bottom ends of the buckles are respectively inserted into the docking slots on the left and right sides of the bus housing; The base is fixedly installed in the box, the circuit breaker is fixedly installed on the base, the bottom end of the circuit breaker is electrically connected with 5 pins, the bottom ends of the 5 pins are all extended out of the box, and the 5 pins are inserted into the 5P busbar copper bar with corresponding gaps one by one; The aviation connector is embedded and installed on the outer side of the box body, and the aviation connector and the circuit breaker are electrically connected to each other.
2. A bus duct system for a data center according to claim 1, characterized in that: The buckle includes a side panel and a right-angle buckle. The side panels of the four buckles are formed one by one at the four ends of the box body. Locking bolts are installed between the side panels and the right-angle buckles. The lower ends of the right-angle buckles of the four buckles are buckled one by one in the docking grooves on the left and right sides of the busbar housing.
3. A bus duct system for a data center according to claim 2, characterized in that: Vertical adjustment slots are formed on the side panels of the four buckles, and the locking bolts pass through the vertical adjustment slots one by one for locking.
4. A bus duct system for a data center according to claim 1, characterized in that: There are wires electrically connected between the wiring terminal at the bottom of the circuit breaker and the five pins in a one-to-one correspondence.
5. A bus duct system for a data center according to claim 4, characterized in that: The upper ends of the pins are fixedly mounted with terminals, and the lower ends of the wiring are electrically connected to the terminals one by one.
6. A bus duct system for a data center according to claim 1, characterized in that: A cover plate is hingedly mounted on the upper edge of the box body, and the cover plate covers the circuit breaker in the box body.
7. A bus duct system for a data center according to claim 1, characterized in that: The aviation joints are provided with three.
Citation Information
Cited By
Low-current bus duct suitable for data center rack power distribution
CN120879439A