Immersed tube connecting section device on slope foundation for transferring load of floating tunnel

By using a combination of immersive tube connection section assembly and pile foundation assembly at the connection between the suspended tunnel and the immersive tube tunnel, the problems of load transfer and foundation deformation of the suspended tunnel are solved, and the smooth connection and durability of the immersive tube tunnel on the slope foundation are achieved. promote.

CN221941443UInactive Publication Date: 2024-11-01TIANJIN RES INST FOR WATER TRANSPORT ENG M O T
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420345803.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the suspended tunnel and the immersed tube tunnel are connected on the slope foundation, it is difficult to deal with the complex loads transmitted by the suspended tunnel and the additional loads caused by the foundation deformation, resulting in cracking and degradation of the immersed tube tunnel structure.

Method used

A device for connecting the immersed tube on a slope foundation with a suspended tunnel is designed. Through the combination of the immersed tube connecting the immersed tube and the pile foundation assembly, the immersed tube connecting the tube body is fixed at a limit to prevent its horizontal or vertical deformation. , and resist loads through pile foundation components such as transverse, longitudinal, and straight piles to ensure structural smoothness.

Benefits of technology

It effectively prevents cracking of the immersed tube tunnel structure, improves the transition smoothness and service life on the sloped seabed, and enhances the durability of the immersed tube tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941443U_ABST
    Figure CN221941443U_ABST
Patent Text Reader

Abstract

The utility model discloses an immersed tube connecting section device on a slope foundation for transferring load of a floating tunnel, which belongs to the technical field of floating tunnels and comprises an immersed tube tunnel component and a floating tunnel component, the floating tunnel component is located in the sea and located at the coast end, and the immersed tube tunnel component is connected with the floating tunnel component. The immersed tube tunnel assembly and the suspension tunnel assembly are fixedly connected through an immersed tube connecting section assembly, and the immersed tube connecting section assembly is located on a slope section with the seabed gradient changing remarkably. The immersed tube connecting section assembly comprises an immersed tube connecting tube body, one end of the immersed tube connecting tube body is in butt joint with the end of the immersed tube tunnel assembly, the other end of the immersed tube connecting tube body is arranged on the outer side of the suspension tunnel assembly in a sleeving mode, the bottom end of the immersed tube connecting tube body is fixedly connected with a pile foundation assembly, and the bottom end of the pile foundation assembly is inserted into the foundation of the slope section. The utility model aims to solve the problem of smoothness of the immersed tube and the suspension tunnel when the immersed tube section connected with the suspension tunnel is subjected to complex load transmitted by the suspension tunnel, additional load caused by long-term deformation of a slope foundation and gradient change.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of suspended tunnels, in particular to a immersed tube connecting section device on a slope foundation for transferring loads of a suspended tunnel. Background Art

[0002] The underwater suspended tunnel is suspended in the water at an appropriate depth through the self-weight of the structure, the buoyancy of the water and the anchoring force. It is a new type of transportation structure used to cross straits, bays, lakes and other waterways. Compared with traditional large-span bridges and submarine tunnels, the suspended tunnel has the characteristics of flexible site selection, low cost, little damage to the environment, and little impact from bad weather. It has significant advantages in crossing deep-water fjords. The suspended tunnel can be connected with structures such as immersed tube tunnels and shield tunnels in shallow water areas, among which immersed tube tunnels are a better choice.

[0003] However, since the suspended tunnel body is subjected to the dynamic load of water flow and waves, it will vibrate and generate additional loads in the horizontal, vertical and longitudinal three-dimensional space, causing the connected immersed tube tunnel to undergo a large displacement, even causing differential settlement, horizontal displacement and longitudinal displacement, resulting in cracking of the immersed tube tunnel structure, reduced durability and even failure. The terrain slope changes significantly at the connection between the suspended tunnel and the immersed tube tunnel, especially when the soft soil layer on the seabed is thick. The traditional cushion foundation form is difficult to meet the needs of the seabed foundation slope change, and cannot cope with the foundation deformation caused by slope scouring and siltation. Existing research and technical solutions have failed to consider the situation where the immersed tube connection section is in a slope foundation. Therefore, it is very necessary to provide a targeted connection form between the immersed tube tunnel and the suspended tunnel in the slope foundation to cope with the slope change and withstand the complex loads transmitted by the suspended tunnel and the additional load of slope foundation deformation. Utility Model Content

[0004] The purpose of the utility model is to solve the problem of the immersed tube section connected to the floating tunnel being subjected to the complex load transmitted by the floating tunnel, the additional load caused by the long-term deformation of the slope foundation, and the smoothness of the immersed tube and the floating tunnel when the slope changes, and to provide a targeted immersed tube connection section construction form to meet the connection structure of the floating tunnel and the immersed tube tunnel in the slope seabed foundation.

[0005] To achieve the above purpose, the utility model provides the following solutions:

[0006] An immersed tube connection section device on a slope foundation for transferring loads through a suspended tunnel, comprising an immersed tube tunnel assembly and a suspended tunnel assembly, wherein the suspended tunnel assembly is located in the sea, the immersed tube tunnel assembly is located at the coast end, the immersed tube tunnel assembly and the suspended tunnel assembly are fixedly connected by an immersed tube connection section assembly, and the immersed tube connection section assembly is located in a slope section where the seabed slope changes significantly;

[0007] The immersed tube connecting section assembly includes an immersed tube connecting tube body, one end of which is connected to the end of the immersed tube tunnel assembly, and the other end is sleeved on the outside of the suspended tunnel assembly. The bottom end of the immersed tube connecting tube body is fixedly connected to a pile foundation assembly, and the bottom end of the pile foundation assembly is inserted into the foundation of the slope section.

[0008] Preferably, the pile foundation assembly includes a plurality of transverse inclined piles, a plurality of longitudinal inclined piles, and a plurality of straight piles fixedly connected to the bottom end of the immersed tube connecting body, and the plurality of transverse inclined piles, the plurality of longitudinal inclined piles, and the plurality of straight piles are respectively distributed along the radial direction of the immersed tube connecting body, the transverse inclined piles are located at one end of the immersed tube connecting body close to the floating tunnel assembly, and the straight piles are divided into two parts, one part of the straight piles and the longitudinal inclined piles are located together in the middle of the bottom end of the immersed tube connecting body, and the other part of the straight piles are located at one end of the immersed tube connecting body close to the immersed tube tunnel assembly, and the bottom ends of the transverse inclined piles, the longitudinal inclined piles, and the straight piles are inserted into the foundation of the slope section.

[0009] Preferably, the immersed tube tunnel assembly comprises an immersed tube tunnel body, an end of the immersed tube tunnel body is butted with an end of the immersed tube connecting body, the immersed tube tunnel body is buried in a foundation trench opened in the seabed, and a connecting section between the immersed tube tunnel body and the immersed tube connecting body is located in the foundation trench;

[0010] A gravel-based cushion layer is laid in the foundation trench, and a covering layer is laid on the upper end of the immersed tube tunnel body. The covering layer and the gravel-based cushion layer are used to stabilize the immersed tube tunnel body.

[0011] Preferably, the suspended tunnel assembly includes a suspended tunnel body, the end of the suspended tunnel body close to the slope section is connected to the immersed tube connecting body, a portion of the suspended tunnel body is embedded in the immersed tube connecting body, the portion forms an overlapping section, and the overlapping section and the immersed tube connecting body are connected by overlapping steel bars and are cast as a whole by concrete, one end of the anchor cable is fixed to the bottom end of the suspended tunnel body, and the other end of the anchor cable is embedded in the seabed.

[0012] Preferably, some of the straight piles are located at one end of the immersed tube connecting body close to the immersed tube tunnel body, and the transverse inclined piles are located at one end of the immersed tube connecting body close to the suspended tunnel body.

[0013] Preferably, the length of the overlap section is not less than 1 / 2 of the diameter of the floating tunnel body.

[0014] Preferably, pile caps are fixed to the top ends of the transverse inclined piles, longitudinal inclined piles and straight piles, and the pile caps are anchored into the bottom plate of the immersed tube connecting body through pile cap steel bars, and the bottom plate is fixed to the bottom end of the immersed tube connecting body.

[0015] Preferably, the boundary of the covering layer does not exceed the joint between the immersed tube connecting body and the floating tunnel body.

[0016] Compared with the prior art, the utility model has the following advantages and technical effects:

[0017] The utility model connects an immersed tube tunnel assembly and a suspended tunnel assembly together through an immersed tube connecting section assembly, and limits and fixes the immersed tube connecting section assembly through a pile foundation assembly to prevent the immersed tube connecting pipe body from being deformed in the horizontal or vertical direction and causing cracking of the immersed tube tunnel structure, so that the transition between the immersed tube tunnel assembly and the suspended tunnel assembly on the slope of the seabed is smoother, thereby improving the durability and service life of the immersed tube tunnel structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor:

[0019] Figure 1 It is a structural schematic diagram of the utility model;

[0020] Figure 2 This is a schematic diagram of the structure of the immersed tube connecting section assembly of the utility model;

[0021] Figure 3 It is a structural schematic diagram of the overlapping section of the utility model;

[0022] Figure 4 It is a structural schematic diagram of the pile foundation assembly of the utility model;

[0023] Figure 5 This is a diagram of the use state of the utility model;

[0024] Figure 6 It is a perspective front view of the utility model;

[0025] Figure 7 is a perspective side view of the utility model;

[0026] Figure numerals: 1. immersed tube tunnel assembly; 101. immersed tube tunnel body; 102. foundation trench; 103. gravel base cushion layer; 104. covering layer; 2. suspended tunnel assembly; 201. suspended tunnel body; 202. overlap section; 203. anchor cable; 3. immersed tube connection section assembly; 301. immersed tube connection body; 302. pile foundation assembly; 3021. transverse inclined pile; 3022. longitudinal inclined pile; 3023. straight pile; 3024. pile cap; 4. seabed. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0028] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0029] like Figure 1-7 As shown, the utility model provides an immersed tube connection section device on a slope foundation for transferring loads through a suspended tunnel, comprising an immersed tube tunnel assembly 1 and a suspended tunnel assembly 2, wherein the suspended tunnel assembly 2 is located in the sea, and the immersed tube tunnel assembly 1 is located at the coast end, and the immersed tube tunnel assembly 1 and the suspended tunnel assembly 2 are fixedly connected by an immersed tube connection section assembly 3, and the immersed tube connection section assembly 3 is located in a slope section where the slope of the seabed 4 changes significantly;

[0030] The immersed tube connecting section assembly 3 includes an immersed tube connecting pipe body 301, one end of which is connected to the end of the immersed tube tunnel assembly 1, and the other end is sleeved on the outside of the suspended tunnel assembly 2. The bottom end of the immersed tube connecting pipe body 301 is fixedly connected to the pile foundation assembly 302, and the bottom end of the pile foundation assembly 302 is inserted into the foundation of the slope section.

[0031] The immersed tube tunnel assembly 1 and the floating tunnel assembly 2 are connected together through the immersed tube connecting section assembly 3, and the immersed tube connecting section assembly 3 is limited and fixed by the pile foundation assembly 302 to prevent the immersed tube connecting pipe body 301 from deforming in the horizontal or vertical direction and causing the immersed tube tunnel structure to crack, so that the transition between the immersed tube tunnel assembly 1 and the floating tunnel assembly 2 on the slope of the seabed 4 is smoother, thereby improving the durability and service life of the immersed tube tunnel structure.

[0032] A further optimized solution is provided, in which the pile foundation assembly 302 comprises a plurality of transverse inclined piles 3021, a plurality of longitudinal inclined piles 3022 and a plurality of straight piles 3023 fixedly connected to the bottom end of the immersed tube connecting body 301, wherein the plurality of transverse inclined piles 3021, the plurality of longitudinal inclined piles 3022 and the plurality of straight piles 3023 are respectively distributed along the radial direction of the immersed tube connecting body 301, the transverse inclined piles 3021 are located at one end of the immersed tube connecting body 301 close to the suspended tunnel assembly 2, the straight piles 3023 are divided into two parts, one part of the straight piles 3023 and the longitudinal inclined piles 3022 are located at the middle part of the bottom end of the immersed tube connecting body 301, and the other part of the straight piles 3023 are located at one end of the immersed tube connecting body 301 close to the immersed tube tunnel assembly 1, and the bottom ends of the transverse inclined piles 3021, the longitudinal inclined piles 3022 and the straight piles 3023 are inserted into the foundation of the slope section.

[0033] The non-connected parts at both ends of the immersed tube connecting pipe body 301 are blocked to prevent seawater from entering. By controlling the ratio of buoyancy to gravity (buoyancy-to-weight ratio) to be less than 1, the immersed tube connecting pipe body 301 is stabilized on the pile foundation assembly 302 under the action of gravity to prevent excessive buoyancy from causing the immersed tube connecting pipe body 301 to float. At the same time, the ratio of buoyancy to gravity (buoyancy-to-weight ratio) should be greater than 0.5 to reduce the load on the foundation and the immersed tube bottom plate.

[0034] According to a further optimized solution, the immersed tube tunnel assembly 1 includes an immersed tube tunnel body 101, an end of the immersed tube tunnel body 101 is butted with an end of an immersed tube connecting body 301, the immersed tube tunnel body 101 is buried in a foundation trench 102 opened in the seabed 4, and a connection section between the immersed tube tunnel body 101 and the immersed tube connecting body 301 is located in the foundation trench 102;

[0035] A gravel-based cushion layer 103 is provided in the foundation trench 102 , and a covering layer 104 is laid on the upper end of the immersed tube tunnel body 101 . The covering layer 104 and the gravel-based cushion layer 103 are used to stabilize the immersed tube tunnel body 101 .

[0036] A further optimized solution is that the suspended tunnel assembly 2 includes a suspended tunnel body 201, and the end of the suspended tunnel body 201 close to the slope section is connected to the immersed tube connecting body 301, and a part of the suspended tunnel body 201 is embedded in the immersed tube connecting body 301, which forms a lap section 202, and the lap section 202 and the immersed tube connecting body 301 are connected by lap steel bars and are cast as a whole by concrete, and the bottom end of the suspended tunnel body 201 is fixedly connected to one end of the anchor cable 203, and the other end of the anchor cable 203 is embedded in the seabed 4.

[0037] In a further optimized solution, some of the straight piles 3023 are located at one end of the immersed tube connecting body 301 close to the immersed tube tunnel body 101 , and the transverse inclined piles 3021 are located at one end of the immersed tube connecting body 301 close to the suspended tunnel body 201 .

[0038] The symmetrical arrangement of the transverse inclined piles 3021 is used to resist the horizontal load transmitted by the floating tunnel body 201 and the horizontal load borne by the immersed tube connecting body 301 itself. The horizontal load is mainly generated by the lateral drag of water flow and waves. The resistance of the transverse inclined piles 3021 can be calculated based on the lateral load components of water flow and waves.

[0039] The longitudinal inclined piles 3022 are symmetrically arranged to resist the longitudinal load transmitted by the suspended tunnel body 201. The longitudinal load is generated by the longitudinal drag of the water flow and waves on the suspended tunnel body. At the same time, the additional load generated by the deformation of the slope foundation is resisted. The resistance of the longitudinal inclined piles 3022 is calculated based on the longitudinal load components of the water flow and waves and the additional load of the slope deformation. The positions of the transverse inclined piles 3021 and the longitudinal inclined piles 3022 can be adjusted according to the load-bearing requirements.

[0040] The rear row pile foundation adopts straight piles 3023 to gradually transition to the gravel-based cushion layer 103. The straight piles 3023 are mainly used to resist the deadweight of the immersed tube connecting pipe body 301, the vertical loads of water flow and waves, and the vertical loads transmitted by the suspended tunnel pipe body 201 (caused by water flow, waves, buoyancy, and gravity). The resistance of the straight piles 3023 is calculated based on the vertical loads of the immersed tube connecting pipe body 301 and the suspended tunnel pipe body 201.

[0041] The distance between piles and the distance between piles should not be too small to avoid siltation of soil between piles.

[0042] To further optimize the solution, the length of the overlap section 202 is not less than 1 / 2 of the diameter of the floating tunnel body 201, so as to transfer the water load on the floating tunnel body 201 to the immersed tube tunnel body 101 and its foundation, so that the deformation of the floating tunnel body 201 and the immersed tube tunnel body 101 are coordinated, and at the same time avoid stress concentration caused by too short overlap length.

[0043] To further optimize the solution, pile caps 3024 are fixed to the tops of the transverse inclined piles 3021, the longitudinal inclined piles 3022, and the straight piles 3023. The pile caps 3024 are anchored into the bottom plate of the immersed tube connecting pipe body 301 through pile cap steel bars, and the bottom plate is fixed to the bottom end of the immersed tube connecting pipe body 301.

[0044] In a further optimized solution, the boundary of the cover layer 104 does not exceed the joint between the immersed tube connecting pipe body 301 and the floating tunnel pipe body 201, so as to prevent the floating tunnel pipe body 201 from being covered by soil. A certain distance is reserved between the cover layer 104 and the floating tunnel pipe body 201 to cope with the impact of long-term seabed topography changes.

[0045] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0046] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.

Claims

1. A device for connecting immersed tube sections on a sloped foundation for transferring loads through a suspended tunnel, characterized by: The invention comprises an immersed tube tunnel assembly (1) and a suspended tunnel assembly (2), wherein the suspended tunnel assembly (2) is located in the sea, and the immersed tube tunnel assembly (1) is located at the coastal end; the immersed tube tunnel assembly (1) and the suspended tunnel assembly (2) are fixedly connected via an immersed tube connecting section assembly (3), and the immersed tube connecting section assembly (3) is located at a slope section of the seabed (4) where the slope changes significantly; The immersed tube connection section assembly (3) comprises an immersed tube connection pipe body (301), one end of the immersed tube connection pipe body (301) is butted against the end of the immersed tube tunnel assembly (1), and the other end is sleeved on the outside of the suspended tunnel assembly (2); the bottom end of the immersed tube connection pipe body (301) is fixedly connected to a pile foundation assembly (302), and the bottom end of the pile foundation assembly (302) is inserted into the foundation of the slope section.

2. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 1, characterized in that: The pile foundation assembly (302) comprises a plurality of transverse inclined piles (3021), a plurality of longitudinal inclined piles (3022), and a plurality of straight piles (3023) fixedly connected to the bottom end of the immersed tube connecting body (301); the plurality of transverse inclined piles (3021), the plurality of longitudinal inclined piles (3022), and the plurality of straight piles (3023) are respectively distributed along the radial direction of the immersed tube connecting body (301); the transverse inclined piles (3021) are located on the immersed tube connecting body (301) near the floating tunnel assembly (2), the straight piles (3023) are divided into two parts, one part of the straight piles (3023) is located together with the longitudinal oblique piles (3022) in the middle of the bottom end of the immersed tube connecting pipe body (301), and the other part of the straight piles (3023) is located at one end of the immersed tube connecting pipe body (301) close to the immersed tube tunnel assembly (1), and the bottom ends of the transverse oblique piles (3021), the longitudinal oblique piles (3022) and the straight piles (3023) are inserted into the foundation of the slope section.

3. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 2, characterized in that: The immersed tube tunnel assembly (1) comprises an immersed tube tunnel body (101), the end of the immersed tube tunnel body (101) is butted against the end of the immersed tube connecting body (301), the immersed tube tunnel body (101) is buried in a foundation trench (102) opened on the seabed (4), and the connection section between the immersed tube tunnel body (101) and the immersed tube connecting body (301) is located in the foundation trench (102); A gravel-based cushion layer (103) is provided in the foundation trench (102), and a covering layer (104) is laid on the upper end of the immersed tunnel body (101). The covering layer (104) and the gravel-based cushion layer (103) are used to stabilize the immersed tunnel body (101).

4. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 3, characterized in that: The suspended tunnel assembly (2) comprises a suspended tunnel tube body (201), the end of the suspended tunnel tube body (201) close to the slope section is connected to the immersed tube connecting tube body (301), a portion of the suspended tunnel tube body (201) is embedded in the immersed tube connecting tube body (301), and the portion forms a lap section (202), and the lap section (202) and the immersed tube connecting tube body (301) are connected by lap steel bars and are integrally cast by concrete, and one end of an anchor cable (203) is fixed to the bottom end of the suspended tunnel tube body (201), and the other end of the anchor cable (203) is embedded in the seabed (4).

5. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 4, characterized in that: Some of the straight piles (3023) are located at one end of the immersed tube connecting body (301) close to the immersed tube tunnel body (101), and the transverse inclined piles (3021) are located at one end of the immersed tube connecting body (301) close to the floating tunnel body (201).

6. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 4, characterized in that: The length of the overlapping section (202) is not less than 1 / 2 of the diameter of the floating tunnel tube (201).

7. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 2, characterized in that: The top ends of the transverse inclined piles (3021), longitudinal inclined piles (3022), and straight piles (3023) are fixed with pile caps (3024), and the pile caps (3024) are anchored into the bottom plate of the immersed tube connecting pipe body (301) through pile cap steel bars, and the bottom plate is fixed to the bottom end of the immersed tube connecting pipe body (301).

8. The immersed tube connecting section device on a sloped foundation for transferring loads through a floating tunnel according to claim 4, characterized in that: The boundary of the covering layer (104) does not exceed the joint between the immersed tube connecting pipe body (301) and the floating tunnel pipe body (201).