Stirrup buckle connection superposed beam for green building

By using components such as square steel bars, placing grooves, supporting ribs, stretching ribs and hooks in the overlapping beam, the problem of inconvenient overlap between stirrup rings and straight ribs is solved, and the rapid positioning and high-strength installation of the overlapping beam is achieved. , improves the overall load-bearing capacity and installation convenience of the overlapping beam.

CN221941752UActive Publication Date: 2024-11-01SHANDONG HUABANG CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420539593.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-01
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

The overlapping of stirrup rings and straight ribs inside the existing overlapping beams is inconvenient for positioning, which increases the difficulty of prefabricated installation of the overlapping beams, and has low structural strength, which affects the load-bearing capacity and handling convenience of the overlapping beams.

Method used

Components such as steel bar square frames, placement grooves, support ribs, stretch bars and hooks are adopted to quickly position and overlap through spacing arrangement and specification matching, improve structural strength, and facilitate installation through connection grooves and convex plates.

Benefits of technology

The rapid positioning and overlapping of the overlapping beam is achieved, structural strength and installation convenience are improved, and the load-bearing capacity and handling convenience of the overlapping beam are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941752U_ABST
    Figure CN221941752U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of superposed beams, and discloses a green building stirrup buckle connection superposed beam which comprises a beam body, a steel bar square frame is fixedly connected to the interior of the beam body, a first containing groove is formed in the surface of the steel bar square frame, a first supporting rib is fixedly connected to the inner side of the first containing groove, and a second supporting rib is fixedly connected to the inner side of the first supporting rib. A second placing groove is formed in the surface of the steel bar square frame; the first containing grooves in the surface of the steel bar square frame and the first supporting ribs are installed in a matched mode, and the second containing grooves in the surface of the steel bar square frame and the second supporting ribs are installed in a matched mode, so that rapid positioning lap joint of a bearing structure in the composite beam is achieved; the structural strength of the superposed beam is improved, the convenience of lap joint installation of the tie bar and the bearing main body is also improved, and meanwhile, the structural strength of installation and connection of the superposed beam is achieved by adopting a first connecting groove and a second connecting groove to be matched with a first convex plate and a second convex plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of composite beams, in particular to a composite beam connected by stirrup rings for green buildings. Background Art

[0002] The cross section of the composite beam is generally rectangular or T-shaped. When the floor structure is a prefabricated floor, in order to reduce the height occupied by the structure and increase the building clearance, the cross section of the composite beam is often cross-shaped or basket-shaped. In the assembled integral frame structure, the prefabricated beam is often made into a T-shaped cross section. After the prefabricated panel is installed in place, part of the concrete is poured again to form the so-called composite beam. The composite beam is a beam that is poured with concrete twice. The first time is made into a prefabricated beam in the prefabrication yard; the second time is carried out at the construction site. After the prefabricated beam is hoisted and placed, the upper concrete is poured to connect it into a whole. Composite beams can be divided into two categories according to their stress performance: "one-stage stress composite beam" and "two-stage stress composite beam". Composite beams can be divided into two categories according to their stress performance: "one-stage stress composite beam and Two-stage load-bearing composite beams. The former refers to the installation of reliable supports under the precast beams during the construction phase to ensure that all loads acting during the construction phase are transmitted to the supports. The latter refers to the installation of no supports under the simply supported precast beams during the construction phase, and all loads during the construction phase are borne entirely by the precast beams. Composite beams require the use of a rolled steel bar frame with stirrup rings during the prefabrication process. The existing composite beams use stirrup rings and straight bars extending outside the composite beams to overlap and then cast concrete to form the beam body. The overlap of stirrup rings and straight bars cannot be easily positioned, which increases the difficulty of prefabrication and installation of the load-bearing body of the composite beam. The composite beams are connected by straight bars and stirrup rings to form a low structural strength of the load-bearing body. The steel bars used to transport the composite beams cannot be quickly connected to form a whole with the frame connection composed of straight bars and stirrup rings. Utility Model Content

[0003] In order to solve the problem that the existing composite beams use stirrup rings and straight bars extending out of the composite beams to overlap and then cast concrete to form the beam body, the stirrup rings and straight bars cannot be easily positioned, which increases the difficulty of prefabricating and installing the load-bearing body of the composite beam, the load-bearing body formed by the straight bars and stirrup rings inside the composite beam is low in structural strength, and the steel bars used for transporting the composite beams and the frame connection composed of the straight bars and stirrup rings cannot be quickly connected to form an integrated whole, the purpose of quickly positioning and overlapping the above-mentioned load-bearing body, high strength of the multi-layer overlap structure, and positioning and connecting the transported steel bars and the structural body as one is achieved.

[0004] The utility model is implemented through the following technical scheme: a composite beam connected by a stirrup ring for green building, comprising a beam body, a steel bar square frame is fixedly connected to the inside of the beam body, a first placement groove is arranged on the surface of the steel bar square frame, a first supporting bar is fixedly connected to the inner side of the first placement groove, a second placement groove is arranged on the surface of the steel bar square frame, a second supporting bar is fixedly connected to the inner side of the second placement groove, a tension bar is fixedly connected to the outside of the steel bar square frame, a hook is fixedly connected to the end of the tension bar, a first connecting groove is opened on the side of the beam body, a second connecting groove is opened on the inner side of the first connecting groove, a first convex plate is fixedly connected to the outside of the beam body, and a second convex plate is fixedly connected to the outside of the first convex plate.

[0005] Furthermore, the number of the steel square frames is at least six, all of which are linearly arranged at equal intervals in the length direction of the beam, the steel square frames match the specifications of the beam, and the number of the first placement grooves is at least three, all of which are linearly arranged at equal intervals on the bottom edge of the steel square frames.

[0006] Furthermore, the first supporting rib corresponds to the position of the first placement groove and matches the specifications thereof, and both ends of the first supporting rib extend out of the beam body.

[0007] Furthermore, the number of the second placement slots is at least three, and all the second placement slots are linearly arranged at equal intervals on the top edge of the steel bar square frame, and the second support ribs correspond to the positions of the second placement slots and have matching specifications.

[0008] Furthermore, the positions of the tie bars correspond to those of the steel bar square frame and their specifications match, the tie bars are connected to the steel bar square frame through hooks, two hooks are symmetrically arranged at both ends of the tie bars, and the length of the second support bar is less than the length of the beam body.

[0009] Furthermore, the first connecting groove is symmetrical with the center of the beam body, and the first connecting groove is symmetrical with the center of the second connecting groove.

[0010] Furthermore, the first protruding plate is centrally symmetrical with the beam body, the first protruding plate corresponds to the position of the first connecting groove and the specifications thereof match, and the second protruding plate corresponds to the position of the second connecting groove and the specifications thereof match.

[0011] The utility model provides a green building stirrup buckle connection composite beam, which has the following beneficial effects:

[0012] The green building uses stirrups to connect the composite beams, and the first placement groove on the surface of the steel square frame is installed in cooperation with the first supporting bar, and the second placement groove is installed in cooperation with the second supporting bar, so as to realize the rapid positioning and overlapping of the internal bearing structure of the composite beam. At the same time, the steel square frame is used to overlap the first supporting bar and the second supporting bar, and the steel square frame is formed into an integrated structure through hooks and tension bars, which not only improves the structural strength of the composite beam, but also improves the convenience of overlapping and installing the tension bars and the bearing body. At the same time, the first connection groove and the second connection groove are used in cooperation with the first convex plate and the second convex plate to realize the structural strength of the installation connection of the composite beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the overall appearance structure of the utility model;

[0014] Figure 2 This is a schematic diagram of the internal cross-sectional structure of the utility model;

[0015] Figure 3 It is a schematic diagram of the connection structure of the steel bar square frame, the first placement groove, the second placement groove, the tensioning rod and the hook mechanism of the utility model.

[0016] In the figure: 1. beam body; 2. steel bar square frame; 3. first placement groove; 4. first supporting rib; 5. second placement groove; 6. second supporting rib; 7. tensioning bar; 8. hook; 9. first connecting groove; 10. second connecting groove; 11. first convex plate; 12. second convex plate. DETAILED DESCRIPTION

[0017] The embodiment of the green building stirrup buckle connection composite beam is as follows:

[0018] Example:

[0019] See also Figure 1 - Figure 3 A green building stirrup ring-connected composite beam comprises a beam body 1, a steel bar square frame 2 is fixedly connected inside the beam body 1, a first placement groove 3 is arranged on the surface of the steel bar square frame 2, the number of the steel bar square frames 2 is at least six, all the steel bar square frames 2 are evenly spaced and linearly arranged in the length direction of the beam body 1, the specifications of the steel bar square frames 2 and the beam body 1 match, the number of the first placement grooves 3 is at least three, and all the first placement grooves 3 are evenly spaced and linearly arranged at the bottom edge of the steel bar square frame 2.

[0020] A first supporting rib 4 is fixedly connected to the inner side of the first placement groove 3, and a second placement groove 5 is provided on the surface of the steel bar square frame 2. The first supporting rib 4 corresponds to the position of the first placement groove 3 and the specifications match. Both ends of the first supporting rib 4 extend out of the beam body 1.

[0021] The inner side of the second placement slot 5 is fixedly connected with a second supporting rib 6, and the outer side of the steel bar square frame 2 is fixedly connected with a tensioning rib 7. The number of the second placement slots 5 is at least three, and all the second placement slots 5 are linearly arranged at equal intervals on the top edge of the steel bar square frame 2. The second supporting rib 6 corresponds to the position of the second placement slots 5 and the specifications match.

[0022] The end of the tie bar 7 is fixedly connected with a hook 8, a first connecting groove 9 is provided on the side of the beam body 1, the tie bar 7 corresponds to the position of the steel bar square frame 2 and the specifications are matched, the tie bar 7 and the steel bar square frame 2 are installed and connected through the hook 8, two hooks 8 are symmetrically arranged at both ends of the tie bar 7, the length of the second support bar 6 is less than the length of the beam body 1, a second connecting groove 10 is provided on the inner side of the first connecting groove 9, a first convex plate 11 is fixedly connected to the outside of the beam body 1, and a second convex plate 12 is fixedly connected to the outside of the first convex plate 11,

[0023] The first connecting groove 9 is centrally symmetrical with the beam body 1, the first connecting groove 9 is centrally symmetrical with the second connecting groove 10, the first protruding plate 11 is centrally symmetrical with the beam body 1, the first protruding plate 11 corresponds to the first connecting groove 9 and their specifications match, and the second protruding plate 12 corresponds to the second connecting groove 10 and their specifications match.

[0024] By cooperating and installing the first placement groove 3 on the surface of the steel square frame 2 with the first supporting rib 4, and cooperating and installing the second placement groove 5 with the second supporting rib 6, the rapid positioning and overlapping of the internal bearing structure of the composite beam is realized. At the same time, the steel square frame 2 is used to overlap the first supporting rib 4 and the second supporting rib 6, and the steel square frame 2 is formed into an integrated structure through the hook 8 and the tie bar 7, which not only improves the structural strength of the composite beam, but also improves the convenience of overlapping and installing the tie bar 7 and the bearing body. At the same time, the first connecting groove 9 and the second connecting groove 10 are used in conjunction with the first convex plate 11 and the second convex plate 12 to realize the structural strength of the composite beam installation connection.

[0025] Working principle: During the prefabrication process, first position the steel square frame 2 in the prefabricated template, the first support ribs 4 are evenly arranged on the inner side of the first placement groove 3, the second support frame 6 is evenly arranged on the inner side of the second placement groove 5, and the tie rods 7 are connected and clamped on the top of the steel square frame 2 through the hooks 8. After the overlap and fixation are completed, concrete is placed in the prefabricated template and solidified to form a travel composite beam. When the two groups of composite beams are docked, the first convex plate 11 of one group of composite beams drives the second convex plate 12 to move into the inner side of the first connecting groove 9 and cooperate with the second connecting groove 10 until the first convex plate 11 and the first connecting groove 9 are fully connected, and the composite beams are connected.

Claims

1. A green building stirrup ring-connected composite beam, comprising a beam body (1), Features: The interior of the beam body (1) is fixedly connected to a steel bar frame (2); a first placement groove (3) is provided on the surface of the steel bar frame (2); a first support rib (4) is fixedly connected to the inner side of the first placement groove (3); a second placement groove (5) is provided on the surface of the steel bar frame (2); a second support rib (6) is fixedly connected to the inner side of the second placement groove (5); a tensioning rib (7) is fixedly connected to the outer side of the steel bar frame (2); a hook (8) is fixedly connected to the end of the tensioning rib (7); a first connection groove (9) is provided on the side of the beam body (1); a second connection groove (10) is provided on the inner side of the first connection groove (9); a first convex plate (11) is fixedly connected to the outer side of the beam body (1); a second convex plate (12) is fixedly connected to the outer side of the first convex plate (11).

2. A green building stirrup buckle-connected composite beam according to claim 1, Features: The number of the steel bar square frames (2) is at least six, and all the steel bar square frames (2) are arranged linearly at equal intervals in the length direction of the beam body (1). The specifications of the steel bar square frames (2) and the beam body (1) match. The number of the first placement grooves (3) is at least three, and all the first placement grooves (3) are arranged linearly at equal intervals on the bottom edge of the steel bar square frames (2).

3. A green building stirrup buckle-connected composite beam according to claim 1, Features: The first supporting rib (4) corresponds to the position of the first placement groove (3) and has matching specifications, and both ends of the first supporting rib (4) extend out of the beam body (1).

4. A green building stirrup buckle-connected composite beam according to claim 1, Features: The number of the second placement slots (5) is at least three, and all the second placement slots (5) are linearly arranged at equal intervals on the top edge of the steel bar square frame (2), and the second support ribs (6) correspond to the positions of the second placement slots (5) and have matching specifications.

5. The green building stirrup buckle-connected composite beam according to claim 1, Features: The positions of the tie bars (7) and the steel bar square frame (2) correspond and their specifications match; the tie bars (7) and the steel bar square frame (2) are connected and installed via hooks (8); two hooks (8) are symmetrically arranged at both ends of the tie bars (7); and the length of the second support bars (6) is less than the length of the beam body (1).

6. A green building stirrup buckle-connected composite beam according to claim 1, Features: The first connection groove (9) is symmetrical with the center of the beam body (1), and the first connection groove (9) is symmetrical with the center of the second connection groove (10).

7. The green building stirrup buckle-connected composite beam according to claim 1, Features: The first convex plate (11) is centrally symmetrical with the beam body (1), the first convex plate (11) corresponds to the position of the first connecting groove (9) and their specifications match, and the second convex plate (12) corresponds to the position of the second connecting groove (10) and their specifications match.