Wall plastering leveling device

By designing a wall plastering leveling device, the mobile platform and guide rail system are used to achieve lifting of the storage box and uniform discharge of the ash material, which solves the problem that the mechanical leveling device cannot be directly plastered and improves construction efficiency and quality.

CN221941850UActive Publication Date: 2024-11-01QING DAO RI CHU DONG SHAN CHUANG XIN KE JI YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420264866.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-04
Publication Date
2024-11-01
Estimated Expiration
2034-02-04

AI Technical Summary

Technical Problem

In the existing wall plastering technology, mechanical leveling devices cannot be directly combined with plastering, and require manual ash spraying, which consumes a lot of manpower and has low craftsmanship.

Method used

A wall plastering leveling device is designed, including a mobile platform, lifting guide rail, sliding guide rail, storage box and discharge assembly. The lifting motor and pulley set of the storage box can be lifted and discharged at a constant speed, combined with rotation. Motor and linear screw motor realize plastering and scraping of walls.

Benefits of technology

It improves the efficiency and flatness of wall plastering, reduces manpower investment, realizes the automation of wall plastering and scraping, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221941850U_ABST
    Figure CN221941850U_ABST
Patent Text Reader

Abstract

The utility model provides a wall plastering leveling device, which belongs to the technical field of wall plastering construction, and comprises a mobile platform, a lifting guide rail is arranged at the front end of the mobile platform, the lifting guide rail comprises a primary sliding guide rail and a secondary sliding guide rail, the inner side of the primary sliding guide rail is provided with a sliding chute, and the outer side of the secondary sliding guide rail is provided with a sliding groove. Sliding clamping plates are arranged in the sliding grooves in a sliding mode, the sliding clamping plates are fixedly connected through guide columns, clamping plates are arranged at the outer ends of the guide columns, a storage box is connected to one sides of the clamping plates through rotating motors, a lifting motor is arranged on the movable platform, pulley blocks are arranged at the front end of the movable platform and on the lifting guide rails, and a discharging port is formed in the outer side of the storage box. A feeding port is formed in the top end of the storage box, and a discharging assembly is arranged in the storage box. The problems that a mechanical strickling device cannot be combined with plastering, the wall surface needs to be manually sprayed with ash in advance, a large amount of manpower is consumed, and the work efficiency is low can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of wall surface leveling construction, and in particular relates to a wall surface plastering and leveling device. Background Art

[0002] Wall plastering is an important task in the process of building decoration. It can make the wall surface smooth and flat, and improve the aesthetics and living comfort.

[0003] In the prior art, wall plastering mainly relies on manual work, and its construction process usually includes two main steps: wall plastering and scraping. First, construction workers need to manually spray the wall. This process involves carrying plastering equipment, mixing plastering materials, and continuous operation, which consumes a lot of manpower and time. After the plastering is completed, the existing wall scraping device is used for scraping. However, this method has many problems. First, the plastering process requires a lot of manpower and time, and the quality of the plastering is difficult to guarantee. Secondly, in the scraping stage, the use of a manual scraping device not only has low work efficiency, but also makes it difficult to ensure the flatness and consistency of the wall. The mechanical scraping device cannot be combined with plastering, and the wall needs to be manually sprayed in advance, which consumes a lot of manpower and has low work efficiency. Utility Model Content

[0004] In view of this, the utility model provides a wall plastering and leveling device, which can solve the problem that a mechanical scraping device cannot be combined with plastering, and the wall needs to be manually sprayed with plaster in advance, which consumes a lot of manpower and has low work efficiency.

[0005] The utility model is achieved in this way:

[0006] The utility model provides a wall plastering and leveling device, comprising a mobile platform, a lifting guide rail is arranged at the front end of the mobile platform, wherein the lifting guide rail comprises a primary sliding guide rail and a secondary sliding guide rail, a slide groove is provided on the inner side of the primary sliding guide rail, a sliding card plate is slidably arranged inside the slide groove, the sliding card plates are fixedly connected by guide columns, a card plate is arranged at the outer end of the guide column, one side of the card plate is connected to a material storage box through a rotating motor, a group of adjusting scrapers are arranged at the top and bottom ends of the material storage box, a lifting motor is arranged on the mobile platform, and a front end of the mobile platform and the lifting guide rail are provided with a plurality of adjusting scrapers. There is a pulley block, which is used to cooperate with the steel rope output by the lifting motor to drive the storage box and the primary sliding guide rail to rise and fall. The outer side of the storage box is provided with a discharge port, and the top of the storage box is provided with a feed port. The interior of the storage box is provided with a discharge assembly, and the discharge assembly is used to extrude the ash material inside the storage box through the discharge port. The outer end of the secondary sliding guide rail is provided with a limit card, and the limit card is used to fix the position of the mobile platform and the roof. The bottom end of the mobile platform is provided with a support component, and the support component is used to cooperate with the limit card to fix the position of the mobile platform.

[0007] The technical effects of a wall plastering and leveling device provided by the utility model are as follows: by setting a mobile platform to facilitate the position of the mobile device, the material storage box can be close to the wall for plastering; by setting a primary sliding guide rail, the material storage box can be slid and lifted by the sliding clamps on both sides; by setting a secondary sliding guide rail, the two sides of the primary sliding guide rail can be sliding and lifted by the guide rail pulleys; by setting a material storage box to add plaster from the feed port and cooperate with the discharging component to extrude the stored plaster, by setting the discharging port to discharge slowly and cooperate with the slow lifting of the material storage box to achieve plastering and leveling of the wall.

[0008] On the basis of the above technical solution, a wall plastering and leveling device of the utility model can also be improved as follows:

[0009] Among them, one end of the steel rope is fixedly connected to the output end of the lifting motor, and the other end of the steel rope is respectively passed around the pulley group at the front end of the mobile platform, the pulley group at the top of the secondary sliding guide rail, the pulley group at the bottom end of the primary sliding guide rail, and the pulley group at the top of the primary sliding guide rail, and then fixedly connected to the buckle at the top of the guide column.

[0010] The beneficial effect of adopting the above-mentioned improvement scheme is: by setting a lifting motor for collecting the steel rope and cooperating with the pulley group to drive the storage box and the primary sliding guide rail to achieve the lifting effect, uniform speed plastering of the wall can be achieved.

[0011] Furthermore, the bottom end of the secondary sliding guide rail is fixedly connected to the front end of the mobile platform, the outer wall of the primary sliding guide rail is slidably connected to the secondary sliding guide rail via a guide rail pulley, and the sliding clamp is also slidably connected to the primary sliding guide rail via a guide rail pulley.

[0012] The beneficial effect of adopting the above-mentioned improvement scheme is: by setting the guide rail pulley, it is used to realize the sliding of the two sides of the storage box on the inner side of the primary sliding guide rail and the sliding of the two sides of the primary sliding guide rail on the inner side of the secondary sliding guide rail.

[0013] Furthermore, a guide rail groove is provided at the feed port, and a cover plate is detachably provided inside the guide rail groove, and the cover plate is used to close the feed port.

[0014] The beneficial effects of adopting the above-mentioned improvement scheme are: the guide rail groove is provided for disassembling and installing the cover plate, and the cover plate is provided for closing the feed opening.

[0015] Furthermore, the limit clamp includes an arc-shaped enclosure plate and a lifting and fixing seat, the two ends of the arc-shaped enclosure plate are fixedly connected to one side of the top end of the secondary sliding guide rail, two groups of adjustment grooves are arranged on the arc-shaped enclosure plate, the lifting and fixing seat is arranged inside the adjustment groove, the top end of the lifting and fixing seat is fixedly connected to a stop seat, and the bottom end of the lifting and fixing seat is fixedly connected to a crank handle.

[0016] The beneficial effects of adopting the above-mentioned improvement scheme are: by setting the limit clamps, it is used to achieve the effect of height positioning between the top of the mobile platform and the construction roof, and can improve the stability of subsequent leveling of the storage box.

[0017] Furthermore, the outer wall of the lifting and fixing seat is provided with a thread, and the inner wall of the adjusting groove is provided with a thread structure adapted to the lifting and fixing seat, and the adjusting groove is used to facilitate the lifting and fixing seat to adjust the height.

[0018] The beneficial effect of adopting the above-mentioned improvement scheme is that the height of the lifting fixing seat can be adjusted by setting the adjustment slot in cooperation with the crank handle.

[0019] Furthermore, four groups of moving wheels are fixedly connected to the bottom end of the moving platform, and the supporting component includes a supporting seat and supporting hole grooves. The number of the supporting hole grooves is four, and one side corresponding to the position of the moving wheels is opened on the moving platform respectively. The inner wall of the supporting hole groove is provided with a thread, and the outer wall of the support seat is provided with a thread structure adapted to the inner wall of the supporting hole groove, and a crank handle is also provided at the top of the support seat.

[0020] The beneficial effects of adopting the above-mentioned improvement scheme are: by setting the support hole groove to adjust the height of the support seat, by lowering the height of the support seat, the bottom of the support seat is made to contact the ground, the bottom position of the mobile platform can be fixed to prevent the mobile platform from shaking during plastering.

[0021] Furthermore, the adjusting scraper is rotatably connected to the storage box via a rotating shaft kit, the rotating shaft inside the rotating shaft kit is fixedly connected to the adjusting scraper, an adjusting motor is provided at one end of the rotating shaft kit, the output end of the adjusting motor is fixedly connected to one end of the rotating shaft, the adjusting motor is used to drive the adjusting scraper to extend and retract, and an armrest is fixedly connected to the mobile platform, and the armrest is used to facilitate the movement of the mobile platform.

[0022] The beneficial effects of adopting the above-mentioned improvement scheme are: by setting up a rotating shaft kit, the adjusting scraper can be rotated to extend or rotated to be recovered on the storage box, and by setting up an adjusting motor to drive the rotating shaft inside the rotating shaft kit to rotate, it also drives the adjusting scraper to realize rotational adjustment.

[0023] Furthermore, the discharging assembly includes linear screw motors on both sides, the output ends of the linear screw motors are connected to the discharging screws, one end of the discharging screws extends into the interior of the storage box through a screw hole, and one end of the discharging screws located inside the storage box is connected to a pressing plate, and the pressing plate is used to squeeze the ash material stored inside the storage box and extrude it through the discharging port.

[0024] The beneficial effect of adopting the above-mentioned improvement scheme is as follows: a linear screw motor is provided to drive the discharge screw to move linearly, and at the same time, the discharge screw drives the pressing plate to extrude and discharge the ash material inside the storage box.

[0025] Furthermore, the discharging assembly includes a conveyor belt, both ends of which are driving rollers, and multiple groups of supporting rollers are arranged between the driving rollers. One end of the driving roller is fixedly connected to the output end of the driving motor, and the driving motor is used to drive the driving roller.

[0026] The beneficial effect of adopting the above-mentioned improvement scheme is: a driving motor is provided to drive a driving roller to drive a conveying belt to discharge the ash material inside the storage box.

[0027] Compared with the prior art, the wall plastering and leveling device provided by the utility model has the following beneficial effects: by setting a mobile platform to facilitate the position of the mobile device, the material storage box can be close to the wall for plastering; by setting a primary sliding guide rail, the material storage box can be slid and lifted through the sliding clamps on both sides; by setting a secondary sliding guide rail, the first-level sliding guide rail can be set to slide and lift through the guide pulleys on both sides; by setting a storage box to add plaster from the feed port and cooperate with the discharging assembly to extrude the stored plaster, by setting the discharging port to discharge slowly and cooperate with the storage box to lift slowly, so as to achieve the plastering and leveling of the wall; by setting a lifting motor to collect the steel rope and cooperate with the pulley group to drive the material storage box and the primary sliding guide rail to achieve the lifting effect, so as to achieve uniform speed plastering of the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the description of the embodiments of the utility model will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0029] Figure 1 It is a schematic diagram of a first embodiment of a wall plastering and leveling device;

[0030] Figure 2 for Figure 1 A magnified schematic diagram of part A;

[0031] Figure 3 It is a partial schematic diagram of a lifting and fixing seat of a wall plastering and leveling device;

[0032] Figure 4 It is a partial schematic diagram of a support base of a wall plastering and leveling device;

[0033] Figure 5 It is a partial schematic diagram of a second embodiment of a wall plastering and leveling device;

[0034] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0035] 10. Mobile platform; 11. Lifting guide rail; 12. Primary sliding guide rail; 13. Secondary sliding guide rail; 14. Sliding clamp; 15. Guide column; 16. Rotating motor; 17. Storage box; 18. Lifting motor; 19. Arc enclosure; 20. Lifting fixed seat; 21. Fixed seat; 22. Support seat; 23. Support hole groove; 24. Linear screw motor; 25. Discharging screw; 26. Pressing plate; 27. Transfer belt; 28. Drive roller; 29. ​​Support roller; 30. Drive motor; 31. Handrail; 32. Adjusting scraper; 33. Rotating shaft kit. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solution and advantages of the implementation mode of the present invention clearer, the technical solution in the implementation mode of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the implementation mode of the present invention.

[0037] like Figure 1 As shown, it is a first embodiment of a wall plastering and leveling device provided by the utility model. In this embodiment, it includes a mobile platform 10, and a lifting guide rail 11 is arranged at the front end of the mobile platform 10, wherein the lifting guide rail 11 includes a primary sliding guide rail 12 and a secondary sliding guide rail 13, a slide groove is provided on the inner side of the primary sliding guide rail 12, a sliding card plate 14 is slidably arranged inside the slide groove, and the sliding card plates 14 are fixedly connected by guide columns 15, and a card plate is arranged at the outer end of the guide column 15, and one side of the card plate is connected to a storage box 17 through a rotating motor 16, and a group of adjusting scrapers 32 are arranged at the top and bottom of the storage box 17, and a lifting motor is arranged on the mobile platform 10. Machine 18, a pulley block is arranged on the front end of the mobile platform 10 and the lifting guide rail 11, the pulley block is used to cooperate with the steel rope output by the lifting motor 18 to drive the storage box 17 and the primary sliding guide rail 12 to rise and fall, the outer side of the storage box 17 is provided with a discharge port, the top of the storage box 17 is provided with a feed port, the interior of the storage box 17 is provided with a discharge assembly, the discharge assembly is used to extrude the ash material inside the storage box 17 through the discharge port, the outer end of the secondary sliding guide rail 13 is provided with a limit card, the limit card is used to fix the position of the mobile platform 10 and the roof, the bottom end of the mobile platform 10 is provided with a supporting component, the supporting component is used to cooperate with the limit card to fix the position of the mobile platform 10.

[0038] When in use, first move the mobile platform 10 to the wall through the handrail 31, so that the material storage box 17 is close to the wall to maintain the plastering distance. After the position adjustment is completed, the lifting and fixing seat 20 is adjusted to rise by the crank handle, and the top of the stop seat 21 contacts the roof, and the position of the lowering support seat 22 is coordinated to make the bottom end of the support seat 22 contact the ground, which has the effect of fixing and leveling. Then, plaster is added to the material storage box 17 through the feed port, and the lifting motor 18 and the linear screw motor 24 are started. The material is squeezed out at a uniform speed through the pressure plate 26 while the material storage box 17 is kept rising at a uniform speed to achieve plastering of the wall.

[0039] When it is necessary to plaster the roof wall, the lifting and fixing seat 20 is lowered by the crank handle, and the supporting seat 22 is raised. The material storage box 17 is driven by the rotating motor 16 to rotate obliquely upward to the plastering position, and the lifting motor 18 is started to lift the position of the material storage box 17 so that the discharge port of the material storage box 17 maintains a plastering distance from the roof wall. At the same time, the linear screw motor 24 is controlled to drive the pressing plate 26 to discharge the material at a uniform speed, and the operator pulls the mobile platform 10 through the handrail 31 to achieve plastering of the roof wall.

[0040] Among them, in the above technical scheme, one end of the steel rope is fixedly connected to the output end of the lifting motor 18, and the other end of the steel rope is respectively passed around the pulley group at the front end of the mobile platform 10, the pulley group at the top of the secondary sliding guide rail 13, the pulley group at the bottom end of the primary sliding guide rail 12, and the pulley group at the top of the primary sliding guide rail 12, and then fixedly connected to the ring buckle at the top of the guide column 15.

[0041] There are two groups of steel ropes, which are connected in series with the pulley groups on both sides respectively.

[0042] Furthermore, in the above technical solution, the bottom end of the secondary sliding guide rail 13 is fixedly connected to the front end of the mobile platform 10, the outer wall of the primary sliding guide rail 12 is slidingly connected to the secondary sliding guide rail 13 through a guide pulley, and the sliding clamp 14 is also slidingly connected to the primary sliding guide rail 12 through a guide pulley.

[0043] Furthermore, in the above technical solution, a guide rail groove is provided at the feed port, and a cover plate is detachably provided inside the guide rail groove, and the cover plate is used to close the feed port.

[0044] Furthermore, in the above technical solution, the limiting clamp includes an arc-shaped enclosure 19 and a lifting and fixing seat 20, both ends of the arc-shaped enclosure 19 are fixedly connected to one side of the top end of the secondary sliding guide rail 13, two groups of adjustment grooves are arranged on the arc-shaped enclosure 19, and a lifting and fixing seat 20 is arranged inside the adjustment groove, the top end of the lifting and fixing seat 20 is fixedly connected to a stop seat 21, and the bottom end of the lifting and fixing seat 20 is fixedly connected to a crank handle.

[0045] The top of the fixing seat 21 is a sponge flexible layer.

[0046] Furthermore, in the above technical solution, the outer wall of the lifting and fixing seat 20 is provided with a thread, and the inner wall of the adjustment groove is provided with a thread structure adapted to the lifting and fixing seat 20 , and the adjustment groove is used to facilitate the lifting and fixing seat 20 to adjust the height.

[0047] Furthermore, in the above technical solution, four groups of moving wheels are fixedly connected to the bottom end of the mobile platform 10, and the supporting components include a supporting seat 22 and a supporting hole groove 23. There are four groups of supporting hole grooves 23, which are respectively opened on the mobile platform 10 on one side corresponding to the position of the moving wheels. The inner wall of the supporting hole groove 23 is provided with a thread, and the outer wall of the support seat 22 is provided with a thread structure compatible with the inner wall of the supporting hole groove 23. A crank handle is also provided at the top of the support seat 22.

[0048] Furthermore, in the above technical solution, the adjusting scraper 32 is rotatably connected to the storage box 17 through a rotating shaft kit 33, the rotating shaft inside the rotating shaft kit 33 is fixedly connected to the adjusting scraper 32, an adjusting motor is provided at one end of the rotating shaft kit 33, the output end of the adjusting motor is fixedly connected to one end of the rotating shaft, the adjusting motor is used to drive the adjusting scraper 32 to extend and retract, and an armrest 31 is fixedly connected to the mobile platform 10, and the armrest 31 is used to facilitate the movement of the mobile platform 10.

[0049] When the material is discharged evenly through the discharge port of the storage box 17, the adjusting scrapers 32 at both ends of the storage box 17 are in an extended state. The adjusting scraper 32 at the bottom end of the storage box 17 is used to achieve a leveling effect on the ash material at the discharge port when the storage box 17 moves upward. When the storage box 17 moves to the top, the discharge port continues to discharge material, and the ash material will accumulate between the adjusting scraper 32 at the bottom end of the storage box 17 and the adjusting scraper 32 at the top end of the storage box 17. At this time, the storage box 17 is controlled to move downward, and the plastering is done downward by the adjusting scraper 32 at the top end of the storage box 17, so as to achieve a plastering effect on the entire wall.

[0050] Furthermore, in the above technical solution, the discharging assembly includes a linear screw motor 24 on both sides, the output end of the linear screw motor 24 is connected to a discharging screw 25, one end of the discharging screw 25 extends to the inside of the storage box 17 through a screw hole, and the discharging screw 25 is located inside the storage box 17 and is connected to a pressing plate 26 at one end, and the pressing plate 26 is used to squeeze the ash material stored in the storage box 17 through the discharging port.

[0051] The back end of the pressing plate 26 is connected to the discharge screw 25 through a coupling seat. When the linear screw motor 24 drives the discharge screw 25 to rotate and maintain linear movement, the discharge screw 25 drives the pressing plate 26 to move to achieve extrusion discharge.

[0052] like Figure 1 As shown, it is a second embodiment of a wall plastering and leveling device provided by the utility model. In this embodiment, the discharging assembly includes a conveyor belt 27, and the two ends of the conveyor belt 27 are driving rollers 28. A plurality of groups of supporting rollers 29 are arranged between the driving rollers 28. One end of the driving roller 28 is fixedly connected to the output end of the driving motor 30, and the driving motor 30 is used to drive the driving roller 28.

[0053] Among them, two raised card belts are arranged on the inner wall of the material transfer belt 27, and card grooves matching the raised card belts are arranged on the driving roller 28 and the supporting roller 29. The material transfer belt 27 is sleeved on the outside of the driving roller 28 and the supporting roller 29 through the card groove positions corresponding to the raised card belts, so as to feed the material to the discharge port at a uniform speed.

[0054] During the plastering process, the conveyor belt 27 is used to discharge the material at a uniform speed from the discharge port.

[0055] Specifically, the principle of the utility model is: when in use, first move the mobile platform 10 to the wall through the handrail 31, so that the storage box 17 is close to the wall to maintain the plastering distance. After the position adjustment is completed, the lifting and fixing seat 20 is adjusted to rise through the crank handle, and the top of the fixed seat 21 contacts the roof, and the position of the lowering support seat 22 is coordinated to make the bottom of the support seat 22 contact the ground, which has the effect of fixing and leveling. Then, plaster is added to the storage box 17 through the feed port, and the lifting motor 18 and the linear screw motor 24 are started. The material is squeezed out at a uniform speed through the pressure plate 26 while the storage box 17 is kept rising at a uniform speed to achieve plastering of the wall.

[0056] When it is necessary to plaster the roof wall, the lifting and fixing seat 20 is lowered by the crank handle, the supporting seat 22 is raised, the material storage box 17 is driven to rotate obliquely upward by the rotating motor 16, and the lifting motor 18 is started to lift the position of the material storage box 17 so that the discharge port of the material storage box 17 maintains a plastering distance from the roof wall. At the same time, the linear screw motor 24 is controlled to drive the pressing plate 26 to discharge the material at a uniform speed, and the operator pulls the mobile platform 10 through the handrail 31 to achieve plastering of the roof wall.

Claims

1. A wall plastering and leveling device, comprising a mobile platform (10), wherein a lifting guide rail (11) is arranged at the front end of the mobile platform (10), It is characterized in that The lifting guide rail (11) comprises a primary sliding guide rail (12) and a secondary sliding guide rail (13). A slide groove is provided on the inner side of the primary sliding guide rail (12). A sliding card plate (14) is slidably provided inside the slide groove. The sliding card plates (14) are fixedly connected by guide columns (15). A card plate is provided at the outer end of the guide column (15). One side of the card plate is connected to a material storage box (17) via a rotating motor (16). A group of adjusting scrapers (32) are provided at the top and bottom of the material storage box (17). A lifting motor (18) is provided on the mobile platform (10). A pulley block is provided at the front end of the mobile platform (10) and the lifting guide rail (11). The pulley block is used for adjusting the lifting motor (18). The steel rope output by the lifting motor (18) drives the storage box (17) and the primary sliding guide rail (12) to rise and fall, the outer side of the storage box (17) is provided with a discharge port, the top of the storage box (17) is provided with a feed port, the interior of the storage box (17) is provided with a discharge assembly, the discharge assembly is used to extrude the ash material inside the storage box (17) through the discharge port, the outer end of the secondary sliding guide rail (13) is provided with a limit card, the limit card is used to fix the position of the mobile platform (10) and the roof, the bottom end of the mobile platform (10) is provided with a support component, the support component is used to cooperate with the limit card to fix the position of the mobile platform (10).

2. A wall plastering and leveling device according to claim 1, It is characterized in that One end of the steel rope is fixedly connected to the output end of the lifting motor (18), and the other end of the steel rope is respectively passed around the pulley block at the front end of the mobile platform (10), the pulley block at the top end of the secondary sliding guide rail (13), the pulley block at the bottom end of the primary sliding guide rail (12), and the pulley block at the top end of the primary sliding guide rail (12), and then fixedly connected to the ring buckle at the top end of the guide column (15).

3. A wall plastering and leveling device according to claim 2, It is characterized in that The bottom end of the secondary sliding guide rail (13) is fixedly connected to the front end of the mobile platform (10), the outer wall of the primary sliding guide rail (12) is slidably connected to the secondary sliding guide rail (13) via a guide rail pulley, and the sliding clamp (14) is also slidably connected to the primary sliding guide rail (12) via a guide rail pulley.

4. A wall plastering and leveling device according to claim 3, It is characterized in that A guide rail groove is provided at the feed inlet, and a cover plate is detachably provided inside the guide rail groove, and the cover plate is used to close the feed inlet.

5. A wall plastering and leveling device according to claim 4, It is characterized in that The limit clamp comprises an arc-shaped enclosure plate (19) and a lifting and fixing seat (20), the two ends of the arc-shaped enclosure plate (19) are fixedly connected to one side of the top end of the secondary sliding guide rail (13), the arc-shaped enclosure plate (19) is provided with two groups of adjustment grooves, the lifting and fixing seat (20) is provided inside the adjustment grooves, the top end of the lifting and fixing seat (20) is fixedly connected to a stop seat (21), and the bottom end of the lifting and fixing seat (20) is fixedly connected to a crank handle.

6. A wall plastering and leveling device according to claim 5, It is characterized in that The outer wall of the lifting and fixing seat (20) is provided with a thread, and the inner wall of the adjustment groove is provided with a thread structure matched with the lifting and fixing seat (20). The adjustment groove is used to facilitate the lifting and fixing seat (20) to adjust its height.

7. A wall plastering and leveling device according to claim 6, It is characterized in that Four groups of moving wheels are fixedly connected to the bottom end of the moving platform (10); the supporting component comprises a supporting seat (22) and a supporting hole groove (23); the number of the supporting hole groove (23) is four, and one side corresponding to the position of the moving wheel is opened on the moving platform (10); the inner wall of the supporting hole groove (23) is provided with a thread; the outer wall of the supporting seat (22) is provided with a thread structure matched with the inner wall of the supporting hole groove (23); and the top of the supporting seat (22) is also provided with a crank.

8. A wall plastering and leveling device according to claim 7, It is characterized in that The adjusting scraper (32) is rotationally connected to the storage box (17) via a rotating shaft kit (33); the rotating shaft inside the rotating shaft kit (33) is fixedly connected to the adjusting scraper (32); an adjusting motor is provided at one end of the rotating shaft kit (33); the output end of the adjusting motor is fixedly connected to one end of the rotating shaft; the adjusting motor is used to drive the adjusting scraper (32) to extend and retract; and a handrail (31) is fixedly connected to the mobile platform (10); the handrail (31) is used to facilitate the movement of the mobile platform (10).

9. A wall plastering and leveling device according to claim 8, It is characterized in that The discharge assembly comprises linear screw motors (24) on both sides, the output end of the linear screw motor (24) is connected to a discharge screw (25), one end of the discharge screw (25) extends into the interior of the storage box (17) through a screw hole, and one end of the discharge screw (25) located inside the storage box (17) is connected to a pressing plate (26), and the pressing plate (26) is used to squeeze the ash stored in the storage box (17) and extrude it through the discharge port.

10. A wall plastering and leveling device according to claim 8, It is characterized in that The discharging assembly comprises a conveying belt (27), both ends of the conveying belt (27) are driving rollers (28), a plurality of groups of supporting rollers (29) are arranged between the driving rollers (28), one end of the driving roller (28) is fixedly connected to the output end of a driving motor (30), and the driving motor (30) is used to drive the driving roller (28).