Energy-saving garbage bin heating system

By optimizing the waste bin heating system with finned heat exchangers and stainless steel nozzles, the problems of heat waste and deaerator overheating and overpressure were solved, achieving stable control of waste bin temperature and increased power generation.

CN221944213UActive Publication Date: 2024-11-01ZHEJIANG WANGNENG ENVIRONMENTAL PROTECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420605837.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-01
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

The existing waste storage heating system leads to a reduction in the power generation of the steam turbine generator set, the unreasonable layout of the hot air inlet causes heat waste, and the heat source of the deaerator exceeds the standard, resulting in overheating and overpressure of the deaerator, which increases operating costs and environmental risks.

Method used

The design employs a finned heat exchanger and stainless steel nozzles to use the flash steam in the flash tank of the primary air steam preheater to heat the cold air. The hot air is then blown into the waste bin through downward-sloping stainless steel nozzles. Combined with an electric regulating valve and temperature control, the distribution of hot air is optimized.

Benefits of technology

It effectively increases the temperature of the waste bin, ensures the fermentation effect of domestic waste, saves a portion of the steam extraction, reduces the overpressure of the deaerator, increases power generation and reduces operating costs, and improves the safety and stability of the deaerator.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221944213U_ABST
    Figure CN221944213U_ABST
Patent Text Reader

Abstract

The utility model discloses an energy-saving garbage bin heating system which comprises a fin type heat exchanger, a heat source inlet of the fin type heat exchanger is connected with a primary air steam preheater flash tank through a heating steam pipe, and a heat source outlet of the fin type heat exchanger is sequentially connected with a drain pipe and a drain tank. A cold source inlet of the fin type heat exchanger is sequentially connected with an anti-corrosion anti-explosion centrifugal fan and a cold air pipe, the other end of the cold air pipe is connected to the top of the garbage bin, a cold source outlet of the fin type heat exchanger is provided with a hot air pipe, the hot air pipe is provided with multiple air conveying pipes distributed in parallel, and every two adjacent air conveying pipes are located on the two sides of the discharging door. The air conveying pipe is provided with a stainless steel nozzle inclining downwards, and the stainless steel nozzle is located in the garbage bin. The waste bin heating system can effectively overcome the defect that the generating capacity of a steam turbine generator unit is reduced due to an existing waste bin heating system; unreasonable hot air inlet arrangement causes heat waste; and a heat source of the deaerator exceeds the standard, so that the deaerator is overheated and overpressurized, and a large amount of heat is wasted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a garbage bin used in a domestic garbage power plant, in particular to an energy-saving garbage bin heating system. Background Art

[0002] In order to ensure the normal operation of the domestic waste incinerator, the domestic waste power plant must ferment the domestic waste to a qualified level; and temperature is the most important factor affecting the fermentation speed of domestic waste, so the temperature of the garbage bin must be maintained above 25°C. However, in the winter in the north, the ambient temperature is below 0°C, which makes the temperature in the garbage bin below 10°C for a long time, and the domestic waste cannot ferment normally. In this way, the incinerator needs to be frequently added with oil for combustion, which greatly increases the operating cost and increases the environmental risk.

[0003] In order to solve the above problems, a garbage bin heating system that uses a stage of steam extraction to increase the temperature of the garbage bin came into being. However, since this system uses a stage of steam extraction, this will cause a decrease in the power generation of the steam turbine generator; at the same time, the hot air inlet is arranged horizontally. According to the principles of thermodynamics, hot air flows upward, and the hot air cannot effectively heat the domestic garbage in the garbage bin, resulting in heat waste; in addition, it will also cause the heat source of the deaerator to exceed the standard, causing the deaerator to overheat and overpressure, wasting a lot of heat.

[0004] Therefore, it is urgent to develop a new garbage bin heating system to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to provide an energy-saving garbage bin heating system. The utility model can effectively overcome the problems of the existing garbage bin heating system causing the reduction of power generation of the steam turbine generator set; the unreasonable layout of the hot air inlet causing heat waste; the excessive heat source of the deaerator causing the deaerator to overheat and overpressure, wasting a lot of heat.

[0006] The technical solution of the utility model: an energy-saving garbage bin heating system, comprising a fin heat exchanger, a heat source inlet of the fin heat exchanger connected to a primary air steam preheater flash tank via a heating steam pipe, a heat source outlet of the fin heat exchanger connected in sequence to a drain pipe and a drain box, a cold source inlet of the fin heat exchanger connected in sequence to an anti-corrosion and explosion-proof centrifugal fan and a cold air duct, the other end of the cold air duct being connected to the top of the garbage bin, a hot air duct being provided at the cold source outlet of the fin heat exchanger, a multi-channel air supply duct distributed in parallel being provided on the hot air duct, and two adjacent air supply ducts being located on both sides of the unloading door; the air supply duct is provided with a downwardly inclined stainless steel nozzle, and the stainless steel nozzle is located in the garbage bin.

[0007] In the aforementioned energy-saving garbage bin heating system, an electric regulating valve is provided on the heating steam pipe.

[0008] In the aforementioned energy-saving garbage bin heating system, the drain pipe is provided with a second on-site temperature gauge and a bell-type drain valve in sequence from top to bottom.

[0009] In the aforementioned energy-saving garbage bin heating system, a first manual damper is provided on the cold air duct.

[0010] In the aforementioned energy-saving garbage bin heating system, the hot air pipe is provided with a first local temperature gauge and a second manual air damper.

[0011] In the aforementioned energy-saving garbage bin heating system, the fin heat exchanger is located on the unloading door control platform; the elevation of the unloading door control platform is 15m.

[0012] In the aforementioned energy-saving garbage bin heating system, the height of the unloading door is 8m.

[0013] In the aforementioned energy-saving garbage bin heating system, the inclination angle of the stainless steel nozzle is 60 degrees downward.

[0014] Compared with the prior art, the utility model uses the flash steam in the flash tank of the primary air steam preheater to heat the cold air drawn from the upper part of the garbage bin, and blows the hot air downward at a 60° angle from the position between the two discharge doors at an elevation of 12 meters into the garbage pit, ensuring that the hot air fully heats the domestic garbage and avoids heat waste; at the same time, the heat source entering the deaerator is reduced, ensuring the safe and stable operation of the deaerator. The use of the utility model technology in a domestic garbage power plant can effectively increase the temperature in the garbage bin in winter and ensure the fermentation effect of domestic garbage.

[0015] The adoption of this technology can not only save 3t / h of steam extraction, but also reduce the steam discharged by the deaerator overpressure safety valve, increase the online power by 300kw.h per hour, and increase the online power by 860,000kw.h in one winter, equivalent to RMB 560,000. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural view of the utility model;

[0017] Figure 2 It is a schematic diagram of the equipment installation position of the utility model.

[0018] Explanation of the marks in the accompanying drawings: 1-heating steam pipe, 2-drain pipe, 3-cold air pipe, 4-hot air pipe, 5-air supply pipe, 6-stainless steel nozzle, T1-first on-site temperature gauge, T2-second on-site temperature gauge, A-finned heat exchanger, B-corrosion-proof and explosion-proof centrifugal fan, C-electric regulating valve, D-inverted bell-type drain trap, E-drain tank, F-garbage bin, G-unloading door control platform, H-unloading door. DETAILED DESCRIPTION

[0019] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0020] Embodiment. An energy-saving garbage bin heating system is composed of Figure 1-2 As shown, it includes a fin heat exchanger A, the heat source inlet of the fin heat exchanger A is connected to the flash tank of the primary air steam preheater through a heating steam pipe 1, the heat source outlet of the fin heat exchanger A is connected to the drain pipe 2 and the drain box E in sequence, the cold source inlet of the fin heat exchanger A is connected to the anti-corrosion and explosion-proof centrifugal fan B and the cold air pipe 3 in sequence, the other end of the cold air pipe 3 is connected to the top of the garbage bin F, the cold source outlet of the fin heat exchanger A is provided with a hot air pipe 4, and the hot air pipe 4 is provided with a plurality of air supply pipes 5 distributed in parallel, and two adjacent air supply pipes 5 are located on both sides of the unloading door H; the air supply pipe 5 is provided with a downwardly inclined stainless steel nozzle 6, and the stainless steel nozzle 6 is located in the garbage bin F.

[0021] The heating steam pipe 1 is provided with an electric regulating valve C.

[0022] The drain pipe 2 is provided with a second local temperature gauge T2 and a bell-type drain trap D in sequence from top to bottom.

[0023] The cold air duct 3 is provided with a first manual air door.

[0024] The hot air pipe 4 is provided with a first local temperature gauge T1 and a second manual air door.

[0025] The fin heat exchanger A is located on the discharge door control platform G; the elevation of the discharge door control platform G is 15m.

[0026] The elevation of the discharge door H is 8m. That is, the garbage bin discharge door is installed on a platform 8 meters high, and the bottom height of the garbage bin discharge door is 8 meters.

[0027] The stainless steel nozzle 6 has an inclination angle of 60 degrees downward.

[0028] A DN600 carbon steel seamless steel pipe is installed on the top side of the garbage bin as a cold air duct 3 to draw air from the garbage bin and lead it to the unloading door control platform at an elevation of 15m. Through a DN600 first manual air door, the air enters the corrosion-proof and explosion-proof centrifugal fan B with an air volume of 22,000m3 / h, an air pressure of 2,000pa, and a power of 18.5kw. After the finned heat exchanger A absorbs heat and the temperature rises to about 100°C, a DN600 carbon steel seamless steel pipe is installed as the hot air pipe 4, which passes through the first local temperature gauge T1 and a DN600 second manual damper, is divided into 4 DN600 carbon steel seamless steel pipes and then reduced to DN250 carbon steel seamless steel pipes as air pipes to both sides of the unloading door, and is replaced by a DN250 stainless steel seamless steel pipe connected to the garbage bin, and a DN250*200 stainless steel nozzle 6 is installed at a downward tilt of 60° to increase the hot air flow rate and ensure that the hot air can be blown to the bottom of the garbage bin to fully heat the domestic garbage.

[0029] A DN50*4.5 carbon steel tee is opened on the flash pipe at the top of the flash tank of the primary air steam preheater, and a Ф57*4 carbon steel seamless steel pipe is installed as the heating steam pipe 1 to connect to the discharge door control platform with an elevation of 15m. After passing through an electric regulating valve C, it enters the finned heat exchanger A, releases heat and cools to about 60℃. A Ф57*4 carbon steel seamless steel pipe is installed as the drain pipe 2, and enters the drain tank E through the second local temperature gauge T2 and a DN50 inverted bell-type drain D.

[0030] The adoption of this technology can not only save 3t / h of steam extraction, but also reduce the steam discharged by the deaerator overpressure safety valve, increase the online power by 300kw.h per hour, and increase the online power by 860,000kw.h in one winter, equivalent to RMB 560,000.

[0031] After the system is installed, the centrifugal fan is started and no obvious leakage points are found. After heating steam is introduced for 24 hours, there is no water leakage in the system and the system installation is qualified.

[0032] Before starting the system, first check that the insulation of centrifugal fan B is qualified. Start centrifugal fan B, keep the wind side running normally, open the front and rear manual doors and bypass manual doors of inverted bell-shaped steam trap D, open the front and rear manual doors of electric control valve C, slowly open the electric control valve C, and when the temperature of the second local temperature gauge T2 rises to 40℃, close the bypass manual door of inverted bell-shaped steam trap D. Adjust the opening of the electric control valve C to keep the temperature of the first local temperature gauge T1 stable at around 100℃.

[0033] As the system runs, the dust accumulation in finned heat exchanger A increases. When the temperature of the second local temperature gauge T2 rises to 80°C, the system is exited and the dust accumulation on the air side of finned heat exchanger A is cleaned to ensure efficient operation of finned heat exchanger A.

Claims

1. Energy-saving garbage bin heating system, characterized by: The invention comprises a fin heat exchanger (A), wherein the heat source inlet of the fin heat exchanger (A) is connected to a flash tank of a primary air steam preheater via a heating steam pipe (1), the heat source outlet of the fin heat exchanger (A) is connected to a drain pipe (2) and a drain box (E) in sequence, the cold source inlet of the fin heat exchanger (A) is connected to an anti-corrosion and explosion-proof centrifugal fan (B) and a cold air pipe (3) in sequence, the other end of the cold air pipe (3) is connected to the top of a garbage bin (F), the cold source outlet of the fin heat exchanger (A) is provided with a hot air pipe (4), the hot air pipe (4) is provided with a plurality of air delivery pipes (5) distributed in parallel, and two adjacent air delivery pipes (5) are located on both sides of a discharge door (H); the air delivery pipe (5) is provided with a downwardly inclined stainless steel nozzle (6), and the stainless steel nozzle (6) is located in the garbage bin (F).

2. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The heating steam pipe (1) is provided with an electric regulating valve (C).

3. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The drain pipe (2) is provided with a second local temperature gauge (T2) and a bell-shaped drain trap (D) in sequence from top to bottom.

4. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The cold air duct (3) is provided with a first manual air door.

5. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The hot air pipe (4) is provided with a first local temperature gauge (T1) and a second manual air door.

6. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The fin heat exchanger (A) is located on the discharge door control platform (G); the elevation of the discharge door control platform (G) is 15m.

7. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The elevation of the unloading door (H) is 8m.

8. The energy-saving garbage bin heating system according to claim 1 is characterized in that: The inclination angle of the stainless steel nozzle (6) is 60 degrees downward.