Assembled measuring device for improving perforation of steel structure bolt
The assembled bolt hole measuring device can quickly locate and correct bolt hole positions, solving the problem of poor bolt hole accuracy in steel structure buildings, improving hoisting efficiency and reducing safety risks.
Patent Information
- Application Number
- CN202420424180.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2034-03-05
AI Technical Summary
In existing technologies, the high-strength bolts at beam-column joints in steel structures have poor drilling accuracy, resulting in low hoisting efficiency and increased safety risks associated with high-altitude operations.
An assembled bolt hole measuring device was designed, including a main body for bolt hole measuring, a nut positioning device, and replaceable bolts. It achieves rapid positioning and correction of bolt hole positions through sliding and bolt connection, and is suitable for bolts of different specifications.
It improves the accuracy of bolt drilling and hoisting efficiency, reduces the time spent working at height, and lowers safety risks.
Smart Images

Figure CN221945109U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bolt hole hoisting, in particular to an assembled steel structure bolt penetration measuring device. Background Art
[0002] With the country's vigorous development of green and energy-saving buildings, steel structure construction, as a new type of construction technology, has the advantages of fast construction speed, strict quality control, excellent seismic performance, strong plasticity, energy saving and environmental protection. Therefore, the steel structure construction industry has been vigorously developed in recent years. At present, most of the components between the columns and the beam-column nodes of steel structure buildings are connected by high-strength bolts for perforation and fixing. The existing technology is (beam-column node): before the steel beam is lifted, the connecting plate and the temporary bolts are fixed at the bolt holes of the steel beam, and then the steel column bracket is lifted and installed. After the temporary bolts are adjusted and tightened so that there is no gap between the friction surface of the connecting plate and the steel beam, the high-strength bolts are installed. Due to the errors in the component processing process and the deviations in the installation process of the on-site workers, high-strength bolts are often unable to penetrate freely, which leads to the need for workers to expand the bolt holes by simple methods such as reaming at high altitude during installation. If components with very poor perforation accuracy are encountered, the hoisting efficiency will be seriously delayed. Utility Model Content
[0003] The purpose of the utility model is to provide an assembled device for measuring the penetration of bolts in steel structures, and to solve the technical problem of affecting the accuracy of the penetration rate of high-strength bolts when connecting steel components in the existing process. A device is designed that can easily and quickly measure the deviation of the bolt holes between the connecting plate and the steel component, and optimize the process of correcting the deviation of the hole position during the hoisting of the steel structure. This will improve the hoisting efficiency of the components, reduce the time of workers working at high altitudes, and reduce safety risks.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0005] An assembled steel structure bolt penetration measuring device comprises a bolt penetration measuring device trunk, a plurality of nut positioning devices and a plurality of replaceable bolts, wherein the plurality of nut positioning devices are arranged at intervals on the bolt penetration measuring device trunk and can be slidably arranged, the plurality of replaceable bolts are arranged at intervals on the bolt penetration measuring device trunk and the bottom of the plurality of nut positioning devices, and a replaceable bolt is arranged at the bottom of a nut positioning device.
[0006] Furthermore, the main body of the bolt penetration measuring device includes a main body, a head plate and end connecting bolts, the head plate is arranged at one end of the main body, the end connecting bolts are arranged at the bottom of the head plate, and a slide groove is arranged on the main body.
[0007] Furthermore, the nut positioning device includes a C-shaped fixing piece, a connecting bolt, a fixing bolt and a fixing nut. The connecting bolt is arranged at the bottom of the C-shaped fixing piece, the fixing bolt passes through the C-shaped fixing piece, and the fixing nut is threadedly connected to the fixing bolt.
[0008] Further, the replaceable bolt includes a bolt and a connecting bolt hole, the connecting bolt hole is arranged on the top of the bolt, and the connecting bolt is connected to the connecting bolt hole.
[0009] Furthermore, the upper and lower ends of the inner side of the C-shaped fixing piece are both provided with trunk slots, and the width of the front end opening of the C-shaped fixing piece is smaller than the height of the trunk.
[0010] The utility model has the following beneficial effects due to the adoption of the above technical solution:
[0011] The utility model discloses a bolt hole measuring device with a keyway on its main body, and a nut positioning device uses a bolt and a nut to achieve fixation through the keyway. The device has a simple structure, and each device can be assembled only by bolt connection. The device can replace bolts and can be formed by drilling holes of bolt threads of various specifications, and is suitable for different types of bolt hole conditions. The device is used to check the bolt hole spacing and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the line structure of the perforation measuring device of the utility model;
[0013] Figure 2 It is a three-dimensional stereogram of the perforation measuring device of the utility model;
[0014] Figure 3 This is a schematic diagram of the main structure of the bolt penetration measuring device of the utility model;
[0015] Figure 4 This is a schematic diagram of the line structure of the nut positioning device of the utility model;
[0016] Figure 5 It is a three-dimensional stereogram of the nut positioning device of the utility model;
[0017] Figure 6 This is a schematic diagram of the replaceable bolt line structure of the utility model;
[0018] Figure 7 It is a three-dimensional stereogram of the replaceable bolt of the utility model.
[0019] In the attached drawings, 1-main body of the bolt penetration measuring device, 2-nut positioning device, 3-replaceable bolts, 1-1-main body, 1-2-head plate, 1-3-end connecting bolts, 2-1-C-type fixing part, 2-2-connecting bolts, 2-3-fixing bolts, 2-4-fixing nut, 3-1-bolt, 3-2-connecting bolt holes. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are only for the purpose of enabling readers to have a thorough understanding of one or more aspects of the utility model, and these aspects of the utility model can be realized even without these specific details.
[0021] like Figure 1-2 As shown, an assembled steel structure bolt penetration measuring device includes a bolt penetration measuring device trunk 1, a plurality of nut positioning devices 2 and a plurality of replaceable bolts 3, wherein the plurality of nut positioning devices 2 are arranged at intervals on the bolt penetration measuring device trunk 1 and can be slidably arranged, and the plurality of replaceable bolts 3 are arranged at intervals at the bottom of the bolt penetration measuring device trunk 1 and the plurality of nut positioning devices 2, and a replaceable bolt 3 is arranged at the bottom of a nut positioning device 2.
[0022] The number of nut positioning devices 2 and replaceable bolts 3 required to be installed is determined according to the number of single-row bolt connection holes of the steel member to be installed. After the replaceable bolts 3 are installed on the nut positioning device 2, they are installed as a whole on the main body 1 of the bolt penetration measurement device. The spacing of the replaceable bolts 3 is determined according to the spacing of the single-row bolt connection holes of the steel member, and then used to simulate the spacing of the bolt holes on the connecting plate to check whether the replaceable bolts 3 installed on the device can pass through the bolt holes of the connecting plate as a whole. The penetration of high-strength bolts passing through steel members and connecting plates during hoisting is simulated.
[0023] In the embodiment of the utility model, Figure 3 As shown, the main body 1 of the bolt penetration measuring device includes a main body 1-1, a head plate 1-2 and an end connecting bolt 1-3. The head plate 1-2 is arranged at one end of the main body 1-1, and the end connecting bolt 1-3 is arranged at the bottom of the head plate 1-2. A slide groove is arranged on the main body 1-1. Main body slots are arranged at the upper and lower ends of the inner side of the C-type fixing part 2-1, and the width of the front end opening of the C-type fixing part 2-1 is smaller than the height of the main body 1-1. The main body 1-1 is provided with a keyway for bolt fixing of the nut positioning device 2. The size of the head plate 1-2 is slightly larger than the main body 1-1 to prevent the nut positioning device 2 from slipping out. The connecting bolt 1-3 is welded to the head plate 1-2 and is used to connect the replaceable bolt 3.
[0024] In the embodiment of the utility model, Figure 4-5The nut positioning device 2 shown includes a C-shaped fixing part 2-1, a connecting bolt 2-2, a fixing bolt 2-3 and a fixing nut 2-4. The connecting bolt 2-2 is arranged at the bottom of the C-shaped fixing part 2-1, the fixing bolt 2-3 is arranged through the C-shaped fixing part 2-1, and the fixing nut 2-4 is threadedly connected with the fixing bolt 2-3. The C-shaped fixing part 2-1 is cut from a metal square tube, and its internal size is slightly larger than the main trunk 1-1 of the bolt perforation measuring device main trunk 1 so that it can slide freely. The connecting bolt 2-2 is welded to the C-shaped fixing part 2-1 and is used to connect the replaceable bolt 3. The fixing bolt 2-3 and the fixing nut 2-4 are used to fix the C-shaped fixing part 2-1 at any position where a keyway is opened on the main trunk 1-1 of the bolt perforation measuring device main trunk 1.
[0025] In the embodiment of the utility model, the replaceable bolt 3 includes a bolt 3-1 and a connecting bolt hole 3-2, the connecting bolt hole 3-2 is arranged at the top of the bolt 3-1, and the connecting bolt 2-2 is connected to the connecting bolt hole 3-2. The specification of the replaceable bolt is determined according to the bolt specification used in the steel structure engineering design. The bolt 3-1 is provided with a connecting bolt hole 3-2, and the hole diameter of the connecting bolt hole 3-2 is consistent with the connecting bolt 1-3 of the main body 1 of the bolt perforation measuring device and the connecting bolt 2-2 of the nut positioning device 2.
[0026] The material selection of the device is reasonable, and it is an improvement on common materials in steel structure processing, such as steel plates, metal square tubes, bolts, etc. It is low-cost, easy to make, and the materials are easy to obtain. The structural design of the device is ingenious. The keyway opened on the main body 1 of the bolt perforation measuring device allows the nut positioning device 2 to move freely, which can realize the flexibility of bolt spacing positioning, and the number of nut positioning devices 2 can be increased or decreased at will according to actual conditions to meet the actual needs in construction. The structure of the device is simple, and the connection and assembly principle of the entire device is only bolt connection, without other complex assembly methods. The replaceable bolts 3 used in the device are threaded and drilled according to bolts of different specifications and models, so it can meet the application of all bolt holes. The device is used for bolt hole spacing control, similar to the measuring device, so the entire device can be reused without material loss.
[0027] The device installation process is:
[0028] Steel column hoisting: device assembly → simulated insertion into the bolt hole at the bottom of the steel column → check and calibrate the anchor bolts → calibrate the bolt hole at the bottom of the steel column → hoisting preparation is complete
[0029] Steel beam hoisting: draw the distribution diagram of the bolt holes of the corbel connection → assemble the device → simulate the insertion of the corbel and the bolt holes of the steel beam connection → check and correct the bolt holes of the connection plate → correct the bolt holes of the corbel and the steel beam connection → hoisting preparation is completed
[0030] Steel column hoisting:
[0031] 1. Device Assembly
[0032] (1) Determine the bolt specifications used in the device based on the designed bolt hole diameter at the bottom of the steel column;
[0033] (2) Determine the number of bolts used in the device based on the number of bolt holes at the bottom of the designed steel column;
[0034] (3) Determine the spacing between the installation bolts based on the designed single-row spacing of the bolt holes at the bottom of the steel column;
[0035] (4) Assemble the components of the device according to the determined conditions.
[0036] 2. Simulate the penetration of the bolt hole at the bottom of the steel column
[0037] (1) After the device is assembled as a whole according to the design drawing, simulate passing through the bolt holes at the bottom of the corresponding steel column. If it is impossible to pass through freely, the bolt spacing of the device should be adjusted according to the actual situation of the bolt holes at the bottom of the steel column;
[0038] (2) Adjust the bolt spacing of the device until the bolts can freely penetrate the bolt holes at the bottom of the steel column. At this time, it can be determined that the bolts of the device have the optimal spacing that meets the actual situation.
[0039] 3. Check and calibrate the anchor bolts
[0040] (1) Compare the adjusted installation bolts with the corresponding anchor bolts of the steel column hoisting;
[0041] (2) Align the top of the installation bolt with the top of the anchor bolt, and comprehensively determine the adjustment strategy for the anchor bolt, taking into account the verticality of the anchor bolt and human error;
[0042] (3) If the anchor bolt is not misaligned, the bolt can be corrected using a steel casing while protecting the bolt thread.
[0043] 4. Correct the bolt holes at the bottom of the steel column
[0044] (1) If the anchor bolt is too offset and the installation bolt cannot be freely inserted into the bolt hole after adjustment, the bolt hole at the bottom of the steel column can be appropriately enlarged, and the enlarged hole must meet the corresponding specification requirements.
[0045] 5. Lifting preparation is completed
[0046] (1) When the longitudinal and transverse anchor bolts and the bolt holes at the bottom of the steel column are adjusted to allow the bolts of the device to penetrate freely, it can be considered that the anchor bolts have met the penetration conditions of the bolt holes at the bottom of the steel column, and the preparation work before lifting has been completed;
[0047] (2) Since the bolt hole correction work has been completed before lifting, the lifting time of the steel column can be greatly reduced.
[0048] Steel beam lifting:
[0049] 1. Draw the distribution diagram of the bolt holes of the corbel connection
[0050] (1) Due to the limited material site of some steel structure projects, the steel columns and steel beams cannot be stored at one time. As a result, after the steel beams arrive at the site, the steel columns have been hoisted and the corbels are already in the air, resulting in the installation bolts being unable to simulate the distribution of the corbel connection bolt holes. Therefore, it is necessary to copy and draw the bolt holes at the corbels of the steel columns during the period between the arrival of the steel columns and their hoisting.
[0051] (2) Use ink to paint the edges of all bolt holes and the edges of the corbel. Before the ink dries, use a piece of cardboard that can cover all the ink-coated areas of the corbel and press it on the corbel. Finally, you will get a distribution map of all bolt holes and their edges on the corbel.
[0052] (3) Mark the obtained corbel bolt holes and their edge distribution diagram with the corresponding column corbels to facilitate subsequent search work.
[0053] 2. Device Assembly
[0054] (1) Determine the bolt specifications used in the device based on the designed diameter of the connecting bolt holes of the steel column bracket and the steel beam;
[0055] (2) Determine the number of bolts used in the device based on the number of connecting bolt holes of the designed steel column bracket and steel beam;
[0056] (3) Determine the spacing between the installation bolts based on the designed single-row spacing of the connecting bolt holes of the steel column bracket and the steel beam;
[0057] (4) Assemble the components of the device according to the determined conditions.
[0058] 3. Simulate the penetration of the corbel and the bolt holes of the steel beam connection
[0059] (1) After the device is assembled as a whole according to the design drawing, simulate passing through the bolt hole of the steel beam. If it is impossible to pass through freely, the bolt spacing of the device should be adjusted according to the actual situation of the bolt hole of the steel beam;
[0060] (2) Adjust the bolt spacing of the device until the device bolts can freely penetrate the bolt holes of the steel beam. At this time, it can be determined that the device bolts have the optimal spacing to meet the actual situation;
[0061] (3) The device adjusts the bolt spacing according to the distribution diagram of the corbel connection bolt holes drawn in the previous work, and the arrangement spacing of the corbel connection bolt holes that can be freely inserted can be obtained.
[0062] 4. Check and correct the bolt holes of the connecting plate
[0063] (1) Compare the bolts of the adjusted device with the bolt holes of the connecting plate corresponding to the steel beam corbel;
[0064] (2) Try to pass the installation bolts through the bolt holes of the connecting plate. If the installation bolts can be inserted freely, the bolt holes of the connecting plate are compatible with the bolt holes of the steel beam and the corbel;
[0065] (3) If the installation bolts cannot freely penetrate into the bolt holes of the connecting plate, the bolt holes of the connecting plate can be appropriately enlarged in accordance with relevant specifications.
[0066] 5. Correct the bolt holes of the corbel and steel beam
[0067] (1) If the bolt hole of the connecting plate is too offset and cannot be freely inserted into the bolt hole after hole expansion, it can be recorded and arranged for the processing plant to remake it.
[0068] (2) If the situation is special, the bolt holes of the corbel and steel beam connection can be appropriately enlarged, and the enlarged holes must meet the requirements of the corresponding specifications.
[0069] Lifting preparation completed:
[0070] (1) When the longitudinal and transverse bolt holes of the connecting plates and the bolt holes connecting the bracket and the steel beam are adjusted to allow the bolts of the device to be freely inserted, it can be considered that the bracket, steel beam and connecting plate meet the perforation conditions, and the preparation work before lifting is completed;
[0071] (2) Since the bolt hole correction work has been completed before lifting, the lifting time of the steel beam can be greatly reduced.
[0072] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. An assembled device for measuring the penetration of bolts in steel structures. Features: The invention comprises a main body (1) of a bolt hole measurement device, a plurality of nut positioning devices (2) and a plurality of replaceable bolts (3), wherein the plurality of nut positioning devices (2) are arranged at intervals on the main body (1) of the bolt hole measurement device and are slidably arranged, the plurality of replaceable bolts (3) are arranged at intervals at the bottom of the main body (1) of the bolt hole measurement device and the plurality of nut positioning devices (2), and a replaceable bolt (3) is arranged at the bottom of a nut positioning device (2).
2. An assembled steel structure bolt penetration measuring device according to claim 1, Features: The main body (1) of the bolt penetration measuring device comprises a main body (1-1), a head plate (1-2) and end connecting bolts (1-3); the head plate (1-2) is arranged at one end of the main body (1-1); the end connecting bolts (1-3) are arranged at the bottom of the head plate (1-2); and a slide groove is arranged on the main body (1-1).
3. The assembled steel structure bolt penetration measuring device according to claim 2, Features: The nut positioning device (2) comprises a C-shaped fixing piece (2-1), a connecting bolt (2-2), a fixing bolt (2-3) and a fixing nut (2-4); the connecting bolt (2-2) is arranged at the bottom of the C-shaped fixing piece (2-1); the fixing bolt (2-3) passes through the C-shaped fixing piece (2-1); and the fixing nut (2-4) is threadedly connected to the fixing bolt (2-3).
4. The assembled steel structure bolt penetration measuring device according to claim 3, Features: The replaceable bolt (3) comprises a bolt (3-1) and a connecting bolt hole (3-2), wherein the connecting bolt hole (3-2) is arranged on the top of the bolt (3-1), and the connecting bolt (2-2) is connected to the connecting bolt hole (3-2).
5. The assembled steel structure bolt penetration measuring device according to claim 3, Features: Main trunk slots are provided at the upper and lower ends of the inner side of the C-shaped fixing piece (2-1), and the width of the front end opening of the C-shaped fixing piece (2-1) is smaller than the height of the main trunk (1-1).