Biogas slurry fertilizer preparation system

By designing a multi-layer filtration system, the problems of low irrigation efficiency and incomplete residue filtration are solved, and the efficient filtration of the irrigation fertilizer and the normal operation of the irrigation system are achieved, ensuring the normal operation and efficiency of the irrigation system.

CN221955990UInactive Publication Date: 2024-11-05GUIZHOU LUODIAN ZHAOFENG AGRI TECH PROMOTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420282040.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the irrigation method of the worm fluid is inefficient and the residue cannot be filtered effectively, resulting in blockage of the irrigation system pipelines and unable to meet the filtration requirements of irrigation.

Method used

A liquid fertilizer preparation system was designed, including a fermentation tank, a front-end sedimentation tank, a first-level grid sedimentation tank, a sand and gravel sedimentation filter tank, a second-level grid sedimentation tank, a dispensing tank and a terminal filtration device, and passed through a multi-layer filter grid The residue in the worm liquid is gradually filtered to ensure the normal operation of the irrigation system.

Benefits of technology

The worm liquid fertilizer after multiple filtering meets the irrigation requirements, improves irrigation efficiency, avoids pipeline blockage, and meets the filtration requirements of the irrigation system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221955990U_ABST
    Figure CN221955990U_ABST
Patent Text Reader

Abstract

The utility model discloses a biogas slurry fertilizer preparation system, which belongs to the technical field of organic fertilizers and comprises a fermentation tank, a terminal batching tank and the like. The fermentation tank is connected with the front-end sedimentation tank through a pipeline, and a primary filtering grid is arranged between the front-end sedimentation tank and the primary grid sedimentation tank; a second-stage filtering grid is arranged between the first-stage grid settling pond and the gravel settling and filtering pond, and the gravel settling and filtering pond is communicated with the second-stage grid settling pond through a pipeline; the secondary grid sedimentation tank is communicated with the blending tank; the blending pool is connected with a terminal filtering device through a pipeline, and after the terminal filtering device carries out terminal filtering on the biogas slurry, filtrate is conveyed to a terminal blending pool through a pipeline; a stirring device is arranged in the terminal batching pool, and the terminal batching pool uniformly mixes water and biogas slurry in proportion to prepare the biogas slurry fertilizer. According to the utility model, residues and biogas slurry prepared in the fermentation tank can be filtered layer by layer and then fed into the terminal blending tank to be mixed with water to prepare a biogas slurry fertilizer, and the biogas slurry filtered for multiple times meets the irrigation requirement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of organic fertilizers, in particular to a biogas slurry fertilizer preparation system. Background Art

[0002] Biogas manure is composed of biogas slurry and biogas residue. Biogas slurry and biogas residue are collectively called biogas manure, which is the product of anaerobic fermentation of biomass in biogas tanks. The comprehensive utilization technology of biogas slurry and biogas residue is playing an increasingly important role in promoting farmers' income and realizing pollution-free agricultural production.

[0003] In particular, biogas slurry is often used for fruit tree planting. The conventional method of use is to manually add water to it and then irrigate it to the roots of the trees. This irrigation method requires a lot of manpower and material resources and is not very efficient. With the popularization of automated irrigation equipment, traditional irrigation methods have been gradually eliminated. Integrated irrigation equipment has high requirements for the filtration of impurities. Since the biogas extracted from the fermentation tank contains a lot of residues, if these residues are not filtered out, they will enter the irrigation system and cause pipe blockage. Therefore, it is necessary to gradually filter the residues in the biogas fertilizer to meet the irrigation requirements, and thus it is necessary to provide a biogas fertilizer preparation device. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a biogas slurry fertilizer preparation system in view of the defects of the prior art. The system can filter the residue and biogas slurry prepared in the fermentation tank layer by layer to meet the requirements of irrigation.

[0005] In order to solve the above technical problems, the technical scheme of the utility model is as follows: a biogas slurry fertilizer preparation system, comprising a fermentation tank, a front-end sedimentation tank, a primary grid sedimentation tank, a gravel sedimentation and filtration tank, a secondary grid sedimentation tank, a blending tank, a terminal filtering device and a terminal batching tank; the fermentation tank is an anaerobic fermentation tank for preparing biogas slurry; the fermentation tank is connected to the front-end sedimentation tank through a pipeline; the front-end sedimentation tank is used for the primary precipitation of biogas slurry, and a primary filtering grid is provided between the front-end sedimentation tank and the primary grid sedimentation tank; the primary grid sedimentation tank is used for the secondary precipitation of biogas slurry, and a secondary filtering grid is provided between the primary grid sedimentation tank and the gravel sedimentation and filtration tank; the gravel sedimentation and filtration tank precipitates and filters the biogas slurry, and the gravel sedimentation and filtration tank is connected to the secondary grid sedimentation tank through a pipeline; the secondary grid sedimentation tank is connected to the blending tank; the blending tank is connected to the terminal filtering device through a pipeline, and the terminal filtering device performs terminal filtration on the biogas slurry and then transports the filtrate to the terminal batching tank through a pipeline; a stirring device is provided in the terminal batching tank, and the terminal batching tank mixes water and biogas slurry in proportion to prepare biogas slurry fertilizer.

[0006] Preferably, the apertures of the primary filter mesh and the secondary filter mesh decrease in sequence.

[0007] Preferably, the blending tank is divided into a plurality of sub-blending tanks of the same volume by partition walls.

[0008] Preferably, the terminal filtering device comprises a filter box, a central filter tube and a terminal water outlet pipe; a chassis is provided at the bottom of the filter box, a plurality of mounting holes are provided on the chassis, and the mounting holes are connected to the bottom of the filter box; the terminal water outlet pipe is installed at the bottom of the filter box; the central filter tube is installed in the mounting hole, a plurality of micropores are opened on the central filter tube, and a mesh tube is mounted on the outside of the central filter tube.

[0009] Preferably, the number of the central filter tubes is 5-10.

[0010] More preferably, the number of the central filter tubes is 8.

[0011] Compared with the prior art, the utility model has the beneficial effect that the residue and biogas slurry prepared in the fermentation tank can be filtered layer by layer, and then sent into the terminal mixing tank to be mixed with water to prepare biogas slurry fertilizer, and the biogas slurry after multiple filtration meets the irrigation requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of the utility model;

[0013] Figure 2 It is a schematic structural diagram of the terminal filtering device of the utility model, wherein the net cylinder and the central tube are in a separated state. DETAILED DESCRIPTION

[0014] The specific implementation methods of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these implementation methods is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in each implementation method of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0015] like Figure 1 to Figure 2As shown, the utility model is a biogas slurry fertilizer preparation system, comprising a fermentation tank 1, a front-end sedimentation tank 2, a first-level grid sedimentation tank 3, a gravel sedimentation filter tank 4, a second-level grid sedimentation tank 5, a blending tank 6, a terminal filtering device 7 and a terminal batching tank 8; wherein the fermentation tank 1 is an anaerobic fermentation tank for preparing biogas slurry; the fermentation tank 1 is connected to the front-end sedimentation tank 2 through a pipeline; the front-end sedimentation tank 2 is used for the initial sedimentation of the biogas slurry, and a primary filtering grid 23 is provided between the front-end sedimentation tank 2 and the first-level grid sedimentation tank 3 to intercept larger residues; the first-level grid sedimentation tank 3 is used for the secondary sedimentation of the biogas slurry, and a second-level filtering grid 34 is provided between the first-level grid sedimentation tank 3 and the gravel sedimentation filter tank 4 to intercept smaller residues; the gravel sedimentation filter tank 4 precipitates and filters the biogas slurry, and the gravel sedimentation filter tank 4 is connected to the second-level grid sedimentation tank 5 through a pipeline; the second-level grid sedimentation tank 5 is connected to the blending tank 6; the blending tank 6 is connected to the terminal filtering device 7 through a pipeline, as shown in FIG. Figure 2 As shown, the terminal filter device 7 of the utility model includes a filter box 71, a central filter pipe 72 and a terminal outlet pipe 73; a bottom of the filter box 71 is provided with a chassis 74, and a plurality of mounting holes 75 are provided on the chassis 74, and the mounting holes 75 are connected to the bottom of the filter box 71; the terminal outlet pipe 73 is installed at the bottom of the filter box 71; the central filter pipe 72 is installed in the mounting hole 75, and a plurality of micropores 721 are opened on the central filter pipe 72, and a net tube 76 is set on the outside thereof. The number of the central filter pipes 72 of the utility model is 5-10, and the number of the central filter pipes 72 selected by the utility model is 8. The net tube 76 is set on the central filter pipe 72 to filter out finer residues well, so that the biogas liquid entering the subsequent equipment meets the requirements of irrigation. After the terminal filter device 7 filters the biogas liquid into the terminal, the filtrate is transported to the terminal batching tank 8 through a pipeline; a stirring device is provided in the terminal batching tank 8, and the terminal batching tank 8 mixes water and biogas liquid in proportion to prepare biogas liquid fertilizer.

[0016] In order to filter out the residue in the biogas manure layer by layer, the apertures of the primary filter mesh 23 and the secondary filter mesh 34 of the utility model are successively reduced, so that the residue in the biogas manure is filtered out layer by layer.

[0017] The blending pool 6 of the utility model is divided into a plurality of sub-blending pools of the same volume by partition walls. The blending pool 6 is used for temporarily storing filtered biogas slurry, which is distributed into a plurality of pools, so as to facilitate the addition of a certain amount of water according to the amount of biogas slurry.

[0018] The principle of the utility model is as follows: fruit and vegetable waste residues are put into a fermentation tank 1, and the biogas slurry produced by anaerobic fermentation is transported to a front-end sedimentation tank 2 by a delivery pump. The front-end sedimentation tank 2 is provided with a primary filtering grid 23, which can intercept larger residues. Finally, the filtrate passes through the primary filtering grid 23 and enters a primary grid sedimentation tank 3. The residue intercepted in the front-end sedimentation tank 2 is salvaged for further treatment. Similarly, the primary grid sedimentation tank 3 further filters the biogas slurry, and the filtered biogas slurry enters a gravel sedimentation filter tank 4. After the gravel sedimentation filter tank 4 further precipitates and filters the biogas slurry, it enters a secondary grid sedimentation tank 5 for further precipitation, and is finally sent to a blending tank 6. Finally, it enters a terminal filtering device 7 from the blending tank 6 for further filtration, and is finally sent to a terminal batching tank 8. A certain amount of water is input into the terminal batching tank 8 according to the amount of biogas slurry. After the stirring device is started, the biogas slurry and the water are evenly mixed to obtain biogas slurry fertilizer.

[0019] The above is a detailed description of the implementation methods of the utility model in conjunction with the accompanying drawings, but the utility model is not limited to the described implementation methods. For those skilled in the art, without departing from the principle and spirit of the utility model, various changes, modifications, substitutions and variations are made to these implementation methods, which still fall within the scope of protection of the utility model. Finally, it should be noted that the contents not described in detail in the specification belong to the prior art known to professional and technical personnel in the field, and those skilled in the art can realize them without creative work, so they will not be repeated here.

Claims

1. A biogas slurry fertilizer preparation system, comprising a fermentation tank (1), a front-end sedimentation tank (2), a primary grid sedimentation tank (3), a sand and gravel sedimentation and filtration tank (4), a secondary grid sedimentation tank (5), a blending tank (6), a terminal filtration device (7) and a terminal batching tank (8); characterized in that: The fermentation tank (1) is an anaerobic fermentation tank for preparing biogas slurry; the fermentation tank (1) is connected to a front-end sedimentation tank (2) through a pipeline; the front-end sedimentation tank (2) is used for primary sedimentation of biogas slurry, and a primary filtering grid (23) is provided between the front-end sedimentation tank (2) and the first-level grid sedimentation tank (3); the first-level grid sedimentation tank (3) is used for secondary sedimentation of biogas slurry, and a secondary filtering grid (34) is provided between the first-level grid sedimentation tank (3) and the gravel sedimentation and filtration tank (4); the gravel sedimentation and filtration tank (4) is used for secondary sedimentation of biogas slurry. The liquid enters the form of sedimentation and filtration, the sand and gravel sedimentation and filtration tank (4) is connected to the secondary grid sedimentation tank (5) through a pipeline; the secondary grid sedimentation tank (5) is connected to the blending tank (6); the blending tank (6) is connected to the terminal filtration device (7) through a pipeline, the terminal filtration device (7) performs terminal filtration on the biogas slurry and then transports the filtrate to the terminal batching tank (8) through a pipeline; the terminal batching tank (8) is provided with a stirring device, and the terminal batching tank (8) mixes water and biogas slurry in a proportion to prepare biogas slurry fertilizer.

2. The biogas slurry fertilizer preparation system according to claim 1, characterized in that: The apertures of the primary filtering mesh (23) and the secondary filtering mesh (34) decrease in sequence.

3. The biogas slurry fertilizer preparation system according to claim 1, characterized in that: The blending tank (6) is divided into a plurality of sub-blending tanks of the same volume by partition walls.

4. The biogas slurry fertilizer preparation system according to claim 1, characterized in that: The terminal filtering device (7) comprises a filtering box (71), a central filtering pipe (72) and a terminal water outlet pipe (73); a bottom plate (74) is provided at the bottom of the filtering box (71), a plurality of mounting holes (75) are provided on the bottom plate (74), and the mounting holes (75) are connected to the bottom of the filtering box (71); the terminal water outlet pipe (73) is installed at the bottom of the filtering box (71); the central filtering pipe (72) is installed in the mounting hole (75), a plurality of micropores (721) are opened on the central filtering pipe (72), and a net cylinder (76) is sleeved on the outside of the central filtering pipe (72).

5. The biogas slurry fertilizer preparation system according to claim 4, characterized in that: The number of the central filter tubes (72) is 5-10.

6. The biogas slurry fertilizer preparation system according to claim 5, characterized in that: The number of the central filter tubes (72) is 8.