Constructional engineering foundation settlement monitoring equipment
By designing an adjustable lateral link and marking cylinder structure, the problem that settlement monitoring equipment cannot be adjusted horizontally is solved, and the equipment is conveniently installed and accurate settlement height measurement in the built environment is achieved.
Patent Information
- Application Number
- CN202420454422.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-11
AI Technical Summary
The existing settlement monitoring equipment cannot adapt to the horizontal horizontal adjustment of the foundation, resulting in inconvenient installation and use in building field environments.
A construction engineering foundation settlement monitoring equipment including mounting orifice plate, vertical support rod, transverse connecting rod, winding roller, adjusting cross rod, marking cylinder, grounding cone and electromagnet was designed. By adjusting cross rod and winding roller Drive the hanging lanyard for horizontal adjustment and use the ruler to calculate the settlement height.
It realizes convenient lateral adjustment of the equipment and accurate settlement height measurement, simplifies the installation and use process, and overcomes the inconvenience of installation and use of existing equipment in the built environment.
Smart Images

Figure CN221956684U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of settlement monitoring equipment, in particular to a settlement monitoring equipment for a foundation of a construction project. Background Art
[0002] The foundation refers to the expanded part of the house or column buried underground based on the foundation. The design and inspection of the foundation is an important part of the work of construction engineers. Under the action of the building load, the foundation soil will be compressed and cause vertical deformation or sinking. Therefore, it is necessary to use settlement monitoring equipment to monitor the settlement height of the foundation.
[0003] For example, the announcement number is: CN220356358U (named as a kind of construction engineering foundation settlement monitoring equipment), which includes a long board frame, a spring arc, a link contact plate, a depth gauge cylinder, a telescopic round pedal, a power-on board, a loudspeaker, a pressure cylinder, a side extension leg and an angle depth mechanism. The upper and middle sides of the left and right parts of the long board frame are slidably connected with spring arcs, the middle part of the long board frame is slidably connected with a link contact plate, the spring arcs are all clamped with the link contact plate, the upper part of the link contact plate is slidably connected with the depth gauge cylinder, the bottom of the depth gauge cylinder is slidably connected with a telescopic round pedal, the top of the depth gauge cylinder is connected with the power-on board, the link contact plate can contact with the upper motor board, the top of the power-on board is connected with a loudspeaker, the upper sides of the left and right parts of the long board frame are connected with pressure cylinders, the left and right sides of the long board frame are slidably connected with side extension legs, and the side extension legs are provided with an angle depth mechanism for connecting and fixing with the ground. The pressure cylinder performs a preliminary squeezing operation on the monitored ground, which can achieve a quick and preliminary settlement detection of the engineering foundation surface and improve the settlement monitoring efficiency.
[0004] The above-mentioned settlement monitoring equipment detects the settlement height by means of a depth gauge, but the main body of the equipment cannot be adjusted laterally to adapt to the location of the foundation, which leads to the problem that it is inconvenient to install and use in the actual construction environment. For this reason, we provide a construction engineering foundation settlement monitoring equipment. Utility Model Content
[0005] The purpose of the utility model is to provide a construction engineering foundation settlement monitoring device to solve the problem that the existing settlement monitoring device proposed in the above background technology detects the settlement height by setting a depth gauge tube, but the device body cannot adapt to the location of the foundation for lateral level adjustment, resulting in inconvenience in installation and use in the actual construction environment.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering foundation settlement monitoring device, comprising a mounting hole plate, a vertical support rod is welded on the upper end of the mounting hole plate, a transverse connecting rod is welded on one side outer wall of the vertical support rod, a winding drum is arranged on the upper end of the transverse connecting rod, and a distribution box is arranged on the front end surface of the vertical support rod;
[0007] Also includes:
[0008] A movable inner groove is arranged inside the transverse connecting rod, and an adjusting cross bar is arranged inside the movable inner groove, a round frame is arranged below the adjusting cross bar, a marking tube is arranged below the round frame, and a grounding cone is arranged at the bottom of the marking tube;
[0009] A rope threading groove is arranged at the inner center position of the adjusting cross bar, and a hanging rope is threaded inside the rope threading groove, a rope inlet is arranged at the threading position of the hanging rope and the transverse connecting rod, and the hanging rope is wound on the winding drum;
[0010] An electromagnet is arranged on an inner wall of one side of the movable inner groove, and a switch is arranged on the front end surface of the transverse connecting rod, the output end of the distribution box is electrically connected to the input end of the switch, and the output end of the switch is electrically connected to the input end of the electromagnet;
[0011] The central slot is arranged at the inner center position of the marking tube. The central slot and the marking tube are an integrated structure, and a scale rod is inserted into the inner part of the central slot.
[0012] Preferably, guide inner grooves are provided on both sides of the central slot, the two guide inner grooves are an integral structure with the marking tube, connecting springs are provided inside the two guide inner grooves, and the scale rod and the grounding cone are an integral structure.
[0013] Preferably, an inner connecting rod is provided at one end of the connecting spring, the inner connecting rod and the grounding cone are an integral structure, and the two ends of the connecting spring are respectively fixedly connected to the inner connecting rod and the guide inner groove by nail-free glue.
[0014] Preferably, a turning handle is provided at the front end of the winding drum, a magnet is adsorbed and installed between the turning handle and the winding drum, and the turning handle is adsorbed and positioned with the winding drum via the magnet.
[0015] Preferably, a support block is welded to one end of the adjusting cross bar, and the hanging rope is connected to the adjusting cross bar through the support block.
[0016] Preferably, a wire through hole is provided at the inner center position of the circular frame, and the hanging rope is connected to the circular frame guide through the wire through hole.
[0017] Preferably, a connecting rod is provided between the circular frame and the adjusting cross bar, and two ends of the connecting rod are respectively welded to the circular frame and the adjusting cross bar.
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] 1. The utility model drives the falling position of the marking tube to be adjusted horizontally by pulling the adjusting cross bar inside the movable inner groove, so that the marking tube is moved to the settlement monitoring position of the foundation. When the adjusting cross bar is lengthened and shortened, the winding drum is driven to rotate by the forward and reverse turning handle to retract and release the hanging rope, so as to achieve the purpose of easy adjustment and use. It overcomes the problem that the existing settlement monitoring equipment detects the settlement height through the set depth gauge tube, but the main body of the equipment cannot adapt to the location of the foundation for horizontal adjustment, resulting in inconvenience in installation and use in the actual construction environment.
[0020] 2. Before settlement monitoring, place the grounding cone against the upper surface of the foundation. After the foundation project is completed, pull the grounding cone back to the upper surface of the foundation. The settlement height of the foundation can be calculated by the scale on the pulled-out scale rod. The operation is simple and the reading is convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the overall structure of the construction engineering foundation settlement monitoring equipment of the utility model;
[0022] Figure 2 This is a schematic diagram of the marking tube structure of the utility model;
[0023] Figure 3 This is a schematic diagram of the internal structure of the transverse connecting rod of the utility model;
[0024] Figure 4 This is a schematic diagram of the transverse connecting rod structure of the utility model;
[0025] In the figure: 1. Mounting hole plate; 2. Vertical support rod; 3. Distribution box; 4. Horizontal connecting rod; 5. Adjustment cross bar; 6. Winding drum; 7. Switch; 8. Hanging rope; 9. Support block; 10. Round frame; 11. Connecting rod; 12. Wire penetration hole; 13. Marking tube; 14. Grounding cone; 15. Center slot; 16. Scale rod; 17. Guide inner groove; 18. Connecting spring; 19. Inner connecting rod; 20. Movable inner groove; 21. Rope inlet; 22. Rope threading groove; 23. Electromagnet; 24. Turning handle; 25. Magnet. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0027] See also Figure 1-4The utility model provides an embodiment: a construction engineering foundation settlement monitoring device, comprising a mounting hole plate 1, a vertical support rod 2 is welded on the upper end of the mounting hole plate 1, a transverse connecting rod 4 is welded on one side of the outer wall of the vertical support rod 2, a winding drum 6 is arranged on the upper end of the transverse connecting rod 4, and a distribution box 3 is arranged on the front end surface of the vertical support rod 2;
[0028] Also includes:
[0029] The movable inner groove 20 is arranged inside the transverse connecting rod 4, and an adjusting cross bar 5 is arranged inside the movable inner groove 20, a round frame 10 is arranged below the adjusting cross bar 5, a marking tube 13 is arranged below the round frame 10, and a grounding cone 14 is arranged at the bottom of the marking tube 13;
[0030] A rope threading groove 22 is arranged at the inner center of the adjusting cross bar 5, and a hanging rope 8 is threaded inside the rope threading groove 22, and a rope inlet 21 is arranged at the threading position of the hanging rope 8 and the transverse connecting rod 4, and the hanging rope 8 is wound on the winding drum 6;
[0031] The electromagnet 23 is arranged on the inner wall of one side of the movable inner groove 20, and the front end surface of the transverse connecting rod 4 is provided with a switch 7, the output end of the distribution box 3 is electrically connected to the input end of the switch 7, and the output end of the switch 7 is electrically connected to the input end of the electromagnet 23;
[0032] The central slot 15 is disposed at the inner center of the marking tube 13 . The central slot 15 and the marking tube 13 are an integral structure, and a scale rod 16 is inserted into the inner part of the central slot 15 .
[0033] When in use, the falling position of the marking tube is adjusted horizontally by pulling the adjusting cross bar inside the movable inner groove, so that the marking tube is moved to the settlement monitoring position of the foundation. When the adjusting cross bar is lengthened or shortened, the winding drum is driven to rotate by the forward and reverse turning handle to retract and release the hanging rope.
[0034] See also Figure 2 , guide inner grooves 17 are provided on both sides of the central slot 15, and the two guide inner grooves 17 are integrated with the marking tube 13. Connecting springs 18 are provided inside the two guide inner grooves 17. The scale rod 16 and the grounding cone 14 are integrated. The guide inner grooves 17 provided on both sides of the central slot 15 serve to facilitate the vertical guiding movement of the inner connecting rod 19.
[0035] See also Figure 2An inner connecting rod 19 is provided at one end of the connecting spring 18. The inner connecting rod 19 and the grounding cone 14 are an integral structure. The two ends of the connecting spring 18 are respectively glued and fixedly connected with the inner connecting rod 19 and the guide inner groove 17 by nail-free glue. The inner connecting rod 19 provided at one end of the connecting spring 18 plays a role of corresponding connection with the guide inner groove 17.
[0036] See also Figure 4 A turning handle 24 is provided at the front end of the winding drum 6, and a magnet 25 is adsorbed and installed between the turning handle 24 and the winding drum 6. The turning handle 24 is adsorbed and positioned with the winding drum 6 through the magnet 25. The turning handle 24 provided at the front end of the winding drum 6 plays a role in driving the winding drum 6 to rotate.
[0037] See also Figure 1 A support block 9 is welded at one end of the adjusting cross bar 5, and the hanging rope 8 is supported and connected to the adjusting cross bar 5 through the support block 9. The support block 9 welded at one end of the adjusting cross bar 5 plays the role of supporting the hanging rope 8.
[0038] See also Figure 1 A wire through hole 12 is provided at the inner center of the circular frame 10, and the hanging rope 8 is guided and connected with the circular frame 10 through the wire through hole 12. The wire through hole 12 provided at the inner center of the circular frame 10 serves to facilitate the guiding and connection of the hanging rope 8.
[0039] See also Figure 1 A connecting rod 11 is arranged between the circular frame 10 and the adjusting cross bar 5. The two ends of the connecting rod 11 are respectively welded to the circular frame 10 and the adjusting cross bar 5. The connecting rod 11 arranged between the circular frame 10 and the adjusting cross bar 5 plays the role of connecting the circular frame 10 and the adjusting cross bar 5.
[0040] Working principle: When in use, the installation hole plate 1 is installed on the cement roadbed outside the foundation through the expansion bolts, and then the falling position of the marking tube 13 is adjusted horizontally by pulling the adjusting cross bar 5 inside the movable inner groove 20, so that the marking tube 13 is moved to the settlement monitoring position of the foundation. After the horizontal adjustment is in place, the switch 7 is pressed to make the distribution box 3 supply power to the electromagnet 23. After the electromagnet 23 is powered, it generates magnetic force to adsorb and fix the adjusting cross bar 5. When the adjusting cross bar 5 is lengthened and shortened, the winding drum 6 is driven by the forward and reverse turning handle 24. Rotate to retract and extend the hanging rope 8. After the retracting and extending operation, install a magnet 25 between the turning handle 24 and the winding drum 6 to adsorb and fix the turning handle 24 to prevent the hanging rope 8 from loosening. Before settlement monitoring, the grounding cone 14 is abutted against the upper surface of the foundation. After the foundation project is completed, pull the grounding cone 14 to abut against the upper surface of the foundation again, and calculate the settlement height of the foundation through the scale on the pulled out ruler rod 16. The operation is simple and the reading is convenient, and the use of the construction project foundation settlement monitoring equipment is completed.
[0041] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A construction engineering foundation settlement monitoring device, comprising a mounting plate (1), a vertical support rod (2) welded to the upper end of the mounting plate (1), a transverse connecting rod (4) welded to one side outer wall of the vertical support rod (2), a winding drum (6) disposed at the upper end of the transverse connecting rod (4), and a distribution box (3) disposed on the front end surface of the vertical support rod (2); Features: Also includes: A movable inner groove (20) is arranged inside the transverse connecting rod (4), and an adjusting cross bar (5) is arranged inside the movable inner groove (20), a circular frame (10) is arranged below the adjusting cross bar (5), a marking tube (13) is arranged below the circular frame (10), and a grounding cone (14) is arranged at the bottom of the marking tube (13); A rope threading groove (22) is arranged at the inner center position of the adjusting cross bar (5), and a hanging rope (8) is threaded inside the rope threading groove (22), a rope inlet (21) is arranged at the threading position of the hanging rope (8) and the transverse connecting rod (4), and the hanging rope (8) is wound on the winding drum (6); An electromagnet (23) is arranged on an inner wall of one side of the movable inner groove (20), and a switch (7) is arranged on the front end surface of the transverse connecting rod (4), the output end of the distribution box (3) is electrically connected to the input end of the switch (7), and the output end of the switch (7) is electrically connected to the input end of the electromagnet (23); The central slot (15) is arranged at the inner center position of the marking tube (13); the central slot (15) and the marking tube (13) are an integral structure, and a scale rod (16) is inserted into the inner part of the central slot (15).
2. The construction engineering foundation settlement monitoring device according to claim 1 is characterized by: Both sides of the central slot (15) are provided with guide inner grooves (17), the two guide inner grooves (17) are an integral structure with the marking tube (13), the interiors of the two guide inner grooves (17) are provided with connecting springs (18), and the scale rod (16) and the grounding cone (14) are an integral structure.
3. The construction engineering foundation settlement monitoring device according to claim 2 is characterized by: An inner connecting rod (19) is provided at one end of the connecting spring (18), and the inner connecting rod (19) and the grounding cone (14) are an integral structure. The two ends of the connecting spring (18) are respectively glued and fixedly connected to the inner connecting rod (19) and the guide inner groove (17) by nail-free glue.
4. The construction engineering foundation settlement monitoring device according to claim 1, characterized in that: A turning handle (24) is arranged at the front end of the winding drum (6), and a magnet (25) is adsorbed and installed between the turning handle (24) and the winding drum (6). The turning handle (24) is adsorbed and positioned and connected to the winding drum (6) through the magnet (25).
5. The construction engineering foundation settlement monitoring device according to claim 1 is characterized by: A support block (9) is welded to one end of the adjusting cross bar (5), and the hanging rope (8) is supported and connected to the adjusting cross bar (5) via the support block (9).
6. The construction engineering foundation settlement monitoring device according to claim 1, characterized in that: A wire through hole (12) is provided at the inner center position of the circular frame (10), and the hanging rope (8) is guided and connected with the circular frame (10) through the wire through hole (12).
7. The construction engineering foundation settlement monitoring device according to claim 1 is characterized by: A connecting rod (11) is provided between the circular frame (10) and the adjusting cross bar (5), and two ends of the connecting rod (11) are respectively welded to the circular frame (10) and the adjusting cross bar (5).
Citation Information
Cited By
Foundation settlement monitoring equipment for engineering detection
CN223782543U