Portable assembly and disassembly type tunnel foot-lock steel pipe angle positioning tool
Through the portable and disassembled tunnel lock foot steel pipe angle positioning tooling, the combined design of I-shaped channel steel, fixed units and positioning parts, the problem of difficulty in fixing the channel steel in the existing technology is solved, and tunnel construction is realized Improves security and practicality.
Patent Information
- Application Number
- CN202420644971.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing tunnel locking steel pipe positioning device is poor in practicality, and the welding and fixing methods of the guide groove and channel steel are prone to wear, causing the drill rod to fall off and affect the construction progress.
A portable and disassembled tunnel lock foot steel pipe angle positioning tool is designed, including I-shaped channel steel, fixing units and positioning parts. The fixing and angle adjustment of channel steel of different sizes is achieved through removable fixing units and extrusion devices. , ensure accurate guidance and stable fixation of the drill pipe.
The quality of locking foot support is improved, the difficulty of on-site angle control is solved, the safety and practicality of tunnel construction is enhanced, and the channel steel of different sizes can be adapted to different sizes, reducing wear and shedding problems.
Smart Images

Figure CN221957591U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction, in particular to a portable and detachable tunnel foot locking steel pipe angle positioning tool. Background Art
[0002] In the construction of tunnel projects with soft surrounding rocks, in order to improve the support strength and stability, a certain number of locking anchor rods (tubes) are often set at the I-beam feet of the steel arch frame to control the initial support settlement of the tunnel. The positioning device of the locking anchor rod (tube) is used to determine the driving length, angle and height of the locking anchor rod (tube) to meet the design requirements.
[0003] The existing equipment has the following disadvantages: the existing positioning device is only suitable for I-beams of fixed specifications and has poor practicality. The guide groove is fixed to the channel steel by welding. Wear will occur between the drill rod and the guide groove during operation. Severe wear during long-term use will cause the drill rod to fall off easily during use, affecting the construction progress.
[0004] Therefore, the present application now proposes a portable and detachable tunnel locking foot steel pipe angle positioning tool to solve the above-mentioned problems. Utility Model Content
[0005] The purpose of the utility model is to provide a portable and detachable tunnel locking foot steel pipe angle positioning tool to solve the above-mentioned problem of poor practicality. The guide groove and the channel steel are fixed by welding, and wear will occur between the drill rod and the guide groove when the drill rod is working. Severe wear during long-term use will make the drill rod easy to fall off during use.
[0006] To achieve the above purpose, the utility model provides the following technical solutions: a portable and detachable tunnel locking foot steel pipe angle positioning tool, including an I-shaped channel steel, and also including:
[0007] A fixing unit, which is detachably arranged on the channel steel and is used to fix the channel steel;
[0008] The positioning member is obliquely arranged on the fixing unit and is used for guiding the driving angle of the drill rod.
[0009] Among them, the fixing unit includes a first splint, a second splint, a fixing device arranged on one side of the first splint and the second splint for fixing the first splint and the second splint, and an extrusion device arranged on the first splint and the second splint for fixing the channel steels of different sizes, and the other side of the first splint and the second splint is provided with a hinge for connecting the first splint and the second splint.
[0010] Wherein, the extrusion device comprises an extrusion plate disposed between the first clamping plate and the second clamping plate and a screw rotatably disposed on the extrusion plate and passing through the first clamping plate and the second clamping plate;
[0011] The first clamping plate and the second clamping plate are provided with placement grooves for placing the extrusion plates at positions corresponding to the extrusion plates.
[0012] Wherein, a guide rod for guiding the extrusion plate is provided on the extrusion plate, and the guide rod is penetrated through the first clamping plate and the second clamping plate;
[0013] A rotating block is arranged on one side of the screw rod located outside the first clamping plate and the second clamping plate.
[0014] Wherein, a wear-resistant block is fixed on one side of the extruded plate close to the channel steel.
[0015] Wherein, the fixing device includes a fixing frame arranged on the first clamping plate, a toggle frame rotatably arranged on the fixing frame, a push rod fixed on the toggle frame, a ring arranged on the push rod and a fixing buckle arranged on the second clamping plate, and the ring is sleeved on the fixing buckle.
[0016] Wherein, the positioning member includes an arc-shaped positioning frame and a connecting plate arranged on one side of the positioning frame close to the first clamping plate and the second clamping plate, and the connecting plate is fixedly connected to the first clamping plate and the second clamping plate by bolts.
[0017] Compared with the prior art, the beneficial effects of the utility model are:
[0018] 1. The utility model sets and fixes the fixing unit on the channel steel, then places the positioning pieces on both sides of the fixing unit, and adjusts the installation angle of the positioning pieces so that the positioning pieces form an angle of degrees with the horizontal plane, and then fixes the positioning pieces on the fixing unit. When drilling with a drilling rig, the drill rod is placed on the positioning piece, and the drill bit of the drilling equipment is introduced along the length direction of the positioning piece to achieve drilling, which effectively and quickly controls the angle of the tunnel lock foot anchor pipe construction, solves the difficulty of on-site angle control, strengthens the quality of lock foot support, and ensures the safety of tunnel construction.
[0019] 2. The utility model does not need to consider the fit degree of the gap between the outer wall of the channel steel and the first clamping plate and the second clamping plate. After the first clamping plate and the second clamping plate are sleeved on the channel steel, they are fixed by a fixing device, and then the screw is rotated to move the extrusion plate to the side close to the channel steel to extrude and fix the channel steel. When the size of the channel steel changes, the distance between the extrusion plate and the channel steel is adjusted by the screw so that the extrusion plate and the channel steel are abutted and fixed, so that the positioning tooling is fixed on channel steels of different sizes, thereby improving the practicality of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of fixing the fixing unit and the channel steel in one embodiment of the utility model;
[0021] Figure 2 This is a schematic diagram of the main structure in one embodiment of the utility model;
[0022] Figure 3 This is a structural schematic diagram of one side of a hinge in one embodiment of the utility model;
[0023] Figure 4 This is a structural schematic diagram of the installation position of the extrusion plate in one embodiment of the utility model;
[0024] Figure 5 This is a schematic diagram of a top view of a structure in one embodiment of the utility model;
[0025] Figure 6 This is a schematic diagram of the structure of an embodiment of the utility model when viewed from above;
[0026] Figure 7 This is a structural schematic diagram of the left side of an embodiment of the utility model;
[0027] Figure 8 This is a schematic diagram of the structure on the right side of an embodiment of the utility model;
[0028] Fig. 9 It is a schematic diagram of the structure of explosion in one embodiment of the utility model.
[0029] In the figure: 1. channel steel; 2. fixing unit; 21. first clamping plate; 22. second clamping plate; 23. fixing device; 231. fixing frame; 232. toggle frame; 233. push rod; 234. collar; 235. fixing buckle; 24. hinge; 25. extrusion device; 251. extrusion plate; 2511. wear-resistant block; 252. screw; 253. rotating block; 254. guide rod; 26. placement groove; 3. positioning member; 31. positioning frame; 32. connecting plate; 33. bolt. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0031] Embodiment 1
[0032] See also Figure 1-3 The utility model provides a technical solution: a portable and detachable tunnel locking foot steel pipe angle positioning tool, including an I-shaped channel steel 1, and also includes:
[0033] The fixing unit 2 is detachably arranged on the channel steel 1 and is used to fix the channel steel 1;
[0034] The positioning member 3 is obliquely arranged on the fixing unit 2 and is used to guide the driving angle of the drill rod.
[0035] It should be noted that, during operation, the fixing unit 2 is sleeved and fixed on the channel steel 1, and then the positioning piece 3 is placed on both sides of the fixing unit 2, and the installation angle of the positioning piece 3 is adjusted so that the positioning piece 3 forms an angle of 45 degrees with the horizontal plane, and then the positioning piece 3 is fixed on the fixing unit 2. When drilling with a drilling rig, the drill rod is placed on the positioning piece 3, and the drill bit of the drilling equipment is introduced along the length direction of the positioning piece 3 to realize drilling, which effectively and quickly controls the angle of the tunnel lock foot anchor pipe construction, solves the difficulty of on-site angle control, strengthens the quality of lock foot support, and ensures the safety of tunnel construction.
[0036] In one embodiment, the fixing unit 2 includes a first clamping plate 21, a second clamping plate 22, a fixing device 23 arranged on one side of the first clamping plate 21 and the second clamping plate 22 for fixing the first clamping plate 21 and the second clamping plate 22, and an extrusion device 25 arranged on the first clamping plate 21 and the second clamping plate 22 for fixing channel steels 1 of different sizes. The other side of the first clamping plate 21 and the second clamping plate 22 is provided with a hinge 24 for connecting the first clamping plate 21 and the second clamping plate 22.
[0037] In this design, the gap between the first splint 21 and the second splint 22 is set according to the size of the channel steel 1, so that the gap between the first splint 21 and the second splint 22 fits with the outer wall of the channel steel 1, and the fixing device 23 is opened to open the first splint 21 and the second splint 22 along the hinge 24, and then the first splint 21 and the second splint 22 are put on the channel steel 1. After adjusting the installation height of the positioning piece 3, the first splint 21 and the second splint 22 are fixed by the fixing device 23, so that the first splint 21 and the second splint 22 are clamped and fixed to the channel steel 1.
[0038] Embodiment 2
[0039] See also Figure 4-9 ,
[0040] In one embodiment, the extrusion device 25 includes an extrusion plate 251 disposed between the first clamping plate 21 and the second clamping plate 22 and a screw 252 rotatably disposed on the extrusion plate 251 and passing through the first clamping plate 21 and the second clamping plate 22;
[0041] Positions of the first clamping plate 21 and the second clamping plate 22 corresponding to the positions of the compression plate 251 are provided with placement grooves 26 for placing the compression plate 251 .
[0042] With this design, there is no need to consider the degree of fit of the gap between the outer wall of the channel steel 1 and the first clamping plate 21 and the second clamping plate 22. After the first clamping plate 21 and the second clamping plate 22 are sleeved on the channel steel 1, they are fixed by the fixing device 23, and then the screw 252 is rotated to move the extrusion plate 251 to the side close to the channel steel 1 to extrude and fix the channel steel 1. When the size of the channel steel 1 changes, the distance between the extrusion plate 251 and the channel steel 1 is adjusted by the screw 252, so that the extrusion plate 251 is abutted and fixed to the channel steel 1, so that the positioning tooling is fixed on channel steels 1 of different sizes, thereby improving the practicality of the entire device.
[0043] In one embodiment, a guide rod 254 for guiding the extrusion plate 251 is provided on the extrusion plate 251, and the guide rod 254 is penetrated through the first clamping plate 21 and the second clamping plate 22;
[0044] The screw rod 252 is provided with a rotating block 253 on one side outside the first clamping plate 21 and the second clamping plate 22. With this design, the guide rod 254 can limit the movement state of the extrusion plate 251, so that the extrusion plate 251 can translate inside the first clamping plate 21 and the second clamping plate 22, thereby improving the stability of the extrusion plate 251 fixed to the channel steel 1.
[0045] In one embodiment, a wear-resistant block 2511 is fixed to one side of the extrusion plate 251 close to the channel steel 1 .
[0046] With this design, the wear-resistant block 2511 can further increase the friction between the extrusion plate 251 and the channel steel 1 , and reduce the sliding distance of the first clamping plate 21 and the second clamping plate 22 on the channel steel 1 .
[0047] In one embodiment, the fixing device 23 includes a fixing frame 231 arranged on the first clamping plate 21, a toggle frame 232 rotatably arranged on the fixing frame 231, a push rod 233 fixed on the toggle frame 232, a ring 234 arranged on the push rod 233 and a fixing buckle 235 arranged on the second clamping plate 22, and the ring 234 is sleeved on the fixing buckle 235.
[0048] With this design, the toggle frame 232 is rotated to rotate along the fixed frame 231, and then the push rod 233 drives the ring 234 to move to the side close to the fixed buckle 235. Then, after the ring 234 is buckled on the fixed buckle 235, the toggle frame 232 is pulled back, so that the push rod 233 drives the ring 234 to move back and buckle and fix on the fixed buckle 235, thereby completing the fixing work of the first clamping plate 21 and the second clamping plate 22.
[0049] In one embodiment, the positioning member 3 includes an arc-shaped positioning frame 31 and a connecting plate 32 disposed on one side of the positioning frame 31 close to the first clamping plate 21 and the second clamping plate 22 . The connecting plate 32 is fixedly connected to the first clamping plate 21 and the second clamping plate 22 by bolts 33 .
[0050] With such a design, when the positioning frame 31 is seriously damaged, the bolts 33 on the connecting plate 32 can be screwed off, and then the positioning frame 31 can be removed from the first clamping plate 21 and the second clamping plate 22 for replacement.
[0051] In addition, if there are descriptions involving "first", "second", etc. in the embodiments, the descriptions of "first", "second", etc. are only for descriptive purposes and cannot be understood as indicating or implying the importance of the relative description or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.
Claims
1. A portable and detachable tunnel locking steel pipe angle positioning tool, comprising an I-shaped channel steel (1), characterized in that: Also includes: A fixing unit (2) is detachably arranged on the channel steel (1) and is used to fix the channel steel (1); The fixing unit (2) comprises a first clamping plate (21), a second clamping plate (22), a fixing device (23) arranged on one side of the first clamping plate (21) and the second clamping plate (22) for fixing the first clamping plate (21) and the second clamping plate (22), and a squeezing device (25) arranged on the first clamping plate (21) and the second clamping plate (22) for fixing the channel steels (1) of different sizes, and a hinge (24) for connecting the first clamping plate (21) and the second clamping plate (22) is arranged on the other side of the first clamping plate (21) and the second clamping plate (22); The positioning member (3) is arranged obliquely on the fixing unit (2) and is used to guide the driving angle of the drill rod.
2. A portable and detachable tunnel locking foot steel pipe angle positioning tool according to claim 1, characterized in that: The extrusion device (25) comprises an extrusion plate (251) arranged between the first clamping plate (21) and the second clamping plate (22) and a screw (252) rotatably arranged on the extrusion plate (251) and passing through the first clamping plate (21) and the second clamping plate (22); The first clamping plate (21) and the second clamping plate (22) are provided with placement grooves (26) for placing the extrusion plate (251) at positions corresponding to the extrusion plate (251).
3. A portable and detachable tunnel locking foot steel pipe angle positioning tool as described in claim 2, characterized in that: The extrusion plate (251) is provided with a guide rod (254) for guiding the extrusion plate (251), and the guide rod (254) is passed through the first clamping plate (21) and the second clamping plate (22); A rotating block (253) is provided on one side of the screw rod (252) located outside the first clamping plate (21) and the second clamping plate (22).
4. A portable and detachable tunnel locking foot steel pipe angle positioning tool as described in claim 3, characterized in that: A wear-resistant block (2511) is fixed on one side of the extrusion plate (251) close to the channel steel (1).
5. The portable and detachable tunnel locking foot steel pipe angle positioning tool according to claim 1, characterized in that: The fixing device (23) comprises a fixing frame (231) arranged on the first clamping plate (21), a toggle frame (232) rotatably arranged on the fixing frame (231), a push rod (233) fixed on the toggle frame (232), a sleeve ring (234) arranged on the push rod (233) and a fixing buckle (235) arranged on the second clamping plate (22), wherein the sleeve ring (234) is sleeved on the fixing buckle (235).
6. The portable and detachable tunnel locking foot steel pipe angle positioning tool according to claim 1, characterized in that: The positioning member (3) comprises a positioning frame (31) with an arc-shaped design and a connecting plate (32) arranged on one side of the positioning frame (31) close to the first clamping plate (21) and the second clamping plate (22); the connecting plate (32) is fixedly connected to the first clamping plate (21) and the second clamping plate (22) by bolts (33).