Tunnel drainage system
By placing the central drainage pipeline under the curb drainage pipeline in the tunnel drainage system, and connecting the curb drainage pipeline and the sand sinking well through the communication pipe in the maintenance well, the problem of mixing and construction of the water system is solved, and the groundwater is realized Efficient utilization and sewage treatment improve construction efficiency and safety.
Patent Information
- Application Number
- CN202420651701.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-04-01
AI Technical Summary
The existing tunnel drainage system can easily lead to traffic congestion and construction difficulty when repairing or cleaning the central drainage structure, and the water system of the central drainage structure and the curb drainage structure is prone to mix flow, affecting the reuse of groundwater.
A tunnel drainage system was designed, in which the central drainage pipe is located below the curb drainage pipe. The curb drainage pipe and the sand sinking well are connected through the communication pipe in the maintenance well, so as to achieve independent operation of the water system, avoid mixed flow of the water system, and do not damage the pavement structure. Quickly repair the central drainage pipe in the case of
The independent operation of the water system of the tunnel drainage system has been achieved, which has promoted the reuse of underground clean water and the treatment of sewage, reduced pollution to the ecosystem and waste of water resources, and improved construction efficiency and reduced costs.
Smart Images

Figure CN221957639U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road construction, in particular to a tunnel drainage system. Background Art
[0002] The tunnel drainage system is an important part of ensuring that highway tunnels remain dry, safe and unobstructed under various operating conditions. Tunnel drainage systems usually follow the design concept of combining "prevention, drainage, interception and blocking" and taking local conditions into consideration for comprehensive management. This concept emphasizes that when designing tunnel drainage systems, it is necessary to comprehensively consider geological characteristics, climatic conditions and natural environment, so as to ensure the efficient operation of tunnel drainage systems, ensure the safety and smoothness of roads and protect the environment.
[0003] At present, central drainage structures are mostly arranged within the range of driving lanes. When inspecting or cleaning the central drainage structure, strict safety measures are usually required, and part or all of the driving lanes need to be closed, which will seriously limit the traffic capacity of the driving lanes, leading to traffic jams and driving delays. In order to ensure the safety and effective construction of the construction site, it is also necessary to destroy part or all of the driving lane surface in order to carry out drainage ditch maintenance work and break up the road surface structure, resulting in a long construction time, high cost, and greater difficulty in implementation.
[0004] The central drainage structure is arranged within the range of the curb, which can effectively avoid the need to close the lane and damage the pavement structure when repairs or cleaning work is carried out in the center of the lane. The curb has a curb drainage structure, which is usually used for the drainage of rainwater and other liquid road sewage on the road; the central drainage structure is usually used for the discharge of groundwater purification, and the two water systems flowing through the central drainage structure and the curb drainage structure operate independently. During the operation of the central drainage structure, it is easy to cause blockage due to crystallization, accumulation of debris, etc. In order to ensure the normal operation of the central drainage structure, a maintenance well needs to be set up for maintenance; because the central drainage structure and the curb drainage structure belong to the same facade, there is a facade conflict between the maintenance well and the curb drainage structure, which is easy to cause the water system flowing through the central drainage structure and the water system flowing through the curb drainage structure in the tunnel drainage system to mix, which is not conducive to the reuse of groundwater. Utility Model Content
[0005] The purpose of the utility model is to provide a tunnel drainage system to avoid mixing of water flowing through a central drainage structure and water flowing through a curb drainage structure in the tunnel drainage system, thereby facilitating the reuse of underground clean water and the re-treatment of sewage after collection, and enabling rapid maintenance of the central drainage pipe without damaging the overall structure of the road surface and the curb drainage pipe.
[0006] To achieve this purpose, the utility model adopts the following technical solutions:
[0007] The tunnel drainage system comprises: a central drainage pipe and a curb drainage pipe, wherein the central drainage pipe and the curb drainage pipe are extended along a first direction, and the central drainage pipe is located below the curb drainage pipe;
[0008] A sand trap, at least one of which is arranged along the first direction, and the sand trap passes through and is connected to the curb drainage pipe along the second direction;
[0009] A maintenance well, at least one of which is arranged along the first direction, and the maintenance well passes through and connects the central drainage pipe and the curb drainage pipe along the second direction;
[0010] A connecting pipe is arranged in the inspection well, and both ends of the connecting pipe penetrate the side wall of the inspection well to connect the curb drainage pipes and / or the sand settling well located on both sides of the inspection well;
[0011] The first direction is an extending direction of the road, and the first direction is perpendicular to the second direction.
[0012] Preferably, at least one supporting structure is provided in the inspection well, one end of the supporting structure abuts against the connecting pipe, and the other end of the supporting structure abuts against the bottom of the inspection well.
[0013] Preferably, a shielding cover is provided on the inspection well.
[0014] Preferably, multiple inspection wells are provided, with adjacent inspection wells spaced 100-200 meters apart.
[0015] Preferably, a sand settling well is arranged on one side of each inspection well, one end of a connecting pipe is connected to the sand settling well, and the other end of the connecting pipe is connected to a curb drainage pipe.
[0016] Preferably, the inner diameter of the curb drainage pipe is equal to the inner diameter of the connecting pipe.
[0017] Preferably, two grit wells are adjacently arranged on both sides of each inspection well, and both ends of the connecting pipe are respectively connected to the grit wells on the corresponding side.
[0018] Preferably, the connecting pipe is a galvanized steel pipe.
[0019] Preferably, the upper cover of the sand settling well is provided with a well cover with an open hole structure.
[0020] Preferably, a gravel layer is laid between the central drainage pipe and the curb drainage pipe.
[0021] Beneficial effects of the utility model:
[0022] The central drainage pipe is laid below the curb drainage pipe along the extension direction of the road. A connecting pipe is set at the inspection well and runs through both sides of the inspection well. Both sides of the connecting pipe are connected to the curb drainage pipe and / or the sand settling well respectively, so that the water system of the tunnel drainage system can be operated independently, and the mixing of the water flowing through the central drainage structure and the water flowing through the curb drainage structure can be prevented. This is conducive to the reuse of underground clean water and the re-treatment of sewage after collection, protecting the stability and health of the surrounding ecosystem, and reducing the waste and pollution of water resources. At the same time, the facade conflict between the inspection well and the curb drainage pipe is eliminated. Without damaging the pavement structure of the carriageway and the curb drainage pipe, the central drainage pipe can be quickly inspected, which has little impact on road operation, improves construction efficiency, and saves manpower and material costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a plan view of a tunnel drainage system provided by a specific embodiment of the utility model;
[0024] Figure 2 yes Figure 1 Sectional view at II in the middle;
[0025] Figure 3 yes Figure 1 Sectional view at II-II;
[0026] Figure 4 yes Figure 1 Sectional view at III-III;
[0027] Figure 5 yes Figure 1 Cross-sectional view at IV-IV in the middle.
[0028] In the figure:
[0029] 1. Central drainage pipe; 2. Curb drainage pipe; 3. Inspection well; 4. Connecting pipe; 5. Sand well;
[0030] 6. Shelter cover; 7. Manhole cover with open structure; 8. Support structure; 9. Gravel layer. DETAILED DESCRIPTION
[0031] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only the parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0032] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0034] In the description of this embodiment, the terms "upper", "lower", "left", "right", etc., and the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of description and simplified operation, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0035] See also Figures 1 to 5As shown, the present application provides a tunnel drainage system, which includes a central drainage pipe 1, a curb drainage pipe 2, a maintenance well 3, a connecting pipe 4 and a sand settling well 5; the central drainage pipe 1 and the curb drainage pipe 2 are extended along a first direction, and the central drainage pipe 1 is located below the curb drainage pipe 2, so that the central drainage pipe 1 is arranged within the curb, which can effectively avoid the central drainage pipe 1 being arranged within the range of the driving lane. When the central drainage channel 1 is blocked due to crystallization, accumulation of debris and the like and needs to be repaired, there is no need to destroy the overall pavement structure for maintenance. Avoid causing traffic jams and construction difficulties; at least one grit pit 5 is set along the first direction, and the grit pit 5 penetrates and connects the curb drainage pipe 2 along the second direction, which can ensure that road sewage flows into the curb drainage channel 2 through the grit pit 5; at least one inspection pit 3 is set along the first direction, and the inspection pit 3 penetrates and connects the central drainage pipe 1 and the curb drainage pipe 2 along the second direction; a connecting pipe 4 is set in the inspection pit 3, and both ends of the connecting pipe 4 penetrate the side wall of the inspection pit 3 to connect the curb drainage pipe 2 and / or the grit pit 5 located on both sides of the inspection pit 3. It should be noted that, in this embodiment, the first direction refers to the extension direction of the road; the second direction refers to the direction perpendicular to the road surface.
[0036] The above method sets a connecting pipe 4 running through both sides of the inspection well 3 at the inspection well 3, and the two sides of the connecting pipe 4 are respectively connected to the curb drainage pipe 2 and / or the sand settling well 5, so that the water system of the tunnel drainage system operates independently, and the mixing of the water system flowing through the central drainage structure and the water system flowing through the curb drainage structure is prevented, which is conducive to the reuse of underground clean water flowing through the central drainage pipe 1 and the collection and re-treatment of sewage flowing through the curb drainage pipe 2, thereby protecting the stability and health of the surrounding ecosystem and reducing the waste and pollution of water resources; at the same time, the facade conflict between the inspection well 3 and the curb drainage pipe 2 is eliminated, so that the central drainage pipe 1 can be quickly repaired without damaging the pavement structure of the carriageway and the curb drainage pipe 2, which has little impact on road operation, improves construction efficiency, and saves manpower and material costs.
[0037] like Figure 2 He Ru Figure 3 As shown, in some embodiments, at least one support structure 8 is provided in the inspection well 3, one end of the support structure 8 abuts against the connecting pipe 4, and the other end of the support structure 8 abuts against the bottom of the inspection well 3, so as to support the connecting pipe 4, make it more stable, and further extend its service life. It should be noted here that the number of support structures 8 can be set according to the length of the connecting pipe 4, and is not specifically limited. For example, the support structure can be, but is not limited to, a column or a support rod.
[0038] In some embodiments, a shielding cover 6 is provided on the inspection well 3, and the shielding cover 6 generally refers to a cover plate with sealing performance. The shielding cover 6 can effectively prevent debris, garbage, other foreign matter or sewage on the road surface from mixing into the inspection well 3 and causing pollution of the groundwater system, which is beneficial to protecting the quality of groundwater and reducing water pollution and environmental damage; illustratively, the shielding cover 6 can be but is not limited to a cast iron well cover of equal thickness, a steel plate well cover of equal thickness or a concrete well cover, etc.
[0039] In some embodiments, multiple inspection wells 3 can be set up, and adjacent inspection wells 3 are spaced 100-200 meters apart. In the above manner, maintenance personnel can more quickly locate the area of the central drainage pipe 1 that needs maintenance, and can perform maintenance work in multiple areas at the same time, thereby improving maintenance efficiency; at the same time, in the event of an unexpected event or emergency, the provision of multiple inspection wells 3 can make it easier for maintenance personnel to respond and solve problems quickly, reducing the risk of dealing with emergencies.
[0040] In some embodiments, a siltation well 5 is arranged on one side of each inspection well 3, one end of the connecting pipe 4 is connected to the siltation well 5, and the other end is connected to the curb drainage pipe 2. It can be understood that since road rainwater and sewage can only flow into the road drainage pipe 2 through the siltation well 5, when a siltation well 5 is arranged on one side of each inspection well 3, it can ensure that road rainwater and sewage within a certain range of road sections can flow smoothly into the tunnel drainage system through the siltation well 5, avoiding road rainwater and sewage from polluting soil and clean water bodies; by connecting one end of the connecting pipe 4 to the siltation well 5 and the other end to the curb drainage pipe 2, it can effectively prevent the water system flowing through the central drainage structure and the water system flowing through the curb drainage structure from mixing; in the current embodiment, the inner diameter of the curb drainage pipe 2 is equal to the inner diameter of the connecting pipe 4, which can make it easier to connect the curb drainage pipe 2 and the connecting pipe 4, reduce the risk of leakage of road rainwater and sewage and pipe damage, and can effectively protect the soil environment and ecological environment; preferably, the material of the connecting pipe 4 can be but not limited to the same concrete pipe as the curb drainage pipe 2.
[0041] like Figure 2As shown, in some embodiments, two sand wells 5 are arranged on both sides of each inspection well 3, and the two ends of the connecting pipe 4 are respectively connected to the sand wells 5 on the corresponding side; in the above manner, since two sand wells 5 are arranged on both sides of the inspection well 3 and connected by the connecting pipe 4, it is possible to effectively block the sewage from flowing into the inspection well 3, thereby protecting the groundwater system in the inspection well 3 from pollution. In other embodiments, the connecting pipe 4 is a galvanized steel pipe, and the outer diameter of the galvanized steel pipe is smaller than the outer diameter of the curb drainage pipe 2, which makes it easier to pass through the inside of the inspection well 3, suitable for the narrow inspection well 3 layout environment, and leaves a larger inspection space for maintenance personnel during maintenance operations; at the same time, the surface of the galvanized steel pipe is covered with a layer of zinc, which has a higher corrosion resistance, is more suitable for a humid and dark underground environment, and is conducive to extending the service life of the connecting pipe 4.
[0042] like Figure 2 and Figure 4 As shown, in some embodiments, the upper cover of the sand trap 5 is provided with a manhole cover 7 with an open hole structure, and road sewage can flow into the sand trap 5 through the manhole cover 7 with an open hole structure. Exemplarily, the manhole cover 7 with an open hole structure can be, but not limited to, a grate manhole cover, a single-hole manhole cover, or a multi-hole manhole cover, etc.; preferably, a grate manhole cover is used, which can prevent large solid objects, such as leaves or plastic bags, from entering the sand trap 5, effectively preventing blockage from occurring, and keeping the sand trap 5 unobstructed.
[0043] like Figure 5 As shown, in some embodiments, a crushed stone layer is laid between the central drainage pipe 1 and the curb drainage pipe 2. The material selection and laying method of the crushed stone layer should have good water permeability. The crushed stone layer is laid between the central drainage pipe 1 and the pavement structure layer so that groundwater can smoothly penetrate into the central drainage pipe 1. Exemplarily, the crushed stone layer can be, but is not limited to, a graded crushed stone layer or a permeable crushed stone layer.
[0044] The construction process of the tunnel drainage system provided by this embodiment is described in detail below:
[0045] For the convenience of construction, the tunnel drainage system in this embodiment is divided into a conventional section (excluding the sand settling well and the inspection well), a sand settling well section (including the sand settling well) and an inspection well section (including the inspection well);
[0046] The construction process of the conventional section: first, the trench excavation work of the central drainage pipe 1 and the curb drainage pipe 2 and the surrounding rock work at the secondary lining of the tunnel are carried out simultaneously, so that multiple engineering tasks can be completed at the same time, improving work efficiency; secondly, when constructing the trench, plain concrete is used as the basic material. It should be noted that plain concrete is a kind of ordinary concrete, usually made of cement, sand, gravel and water mixed in a certain ratio, without adding any special additives or materials; again, the central drainage pipe 1 is installed on the trench based on plain concrete; then the central drainage pipe 1 is backfilled under the curb drainage pipe 2 with graded crushed stone. The graded crushed stone has good water permeability, so that groundwater can penetrate smoothly into the central drainage pipe 1; finally, the prefabricated curb drainage pipe 2 is buried, and the top of the curb drainage pipe 2 is 2-5 cm away from the road surface, and the preferred distance is 4 cm. After the subsequent asphalt pavement is laid on the road surface, it is ensured that the conventional road section is flush with the overall road surface height, reducing vehicle damage and improving road safety.
[0047] The construction process of the sand settling well section: first, the trench excavation work of the central drainage pipe 1 and the curb drainage pipe 2 and the surrounding rock work at the secondary lining of the tunnel are carried out simultaneously; secondly, when constructing the trench, plain concrete is used as the basic material; thirdly, the central drainage pipe 1 is installed on the trench based on plain concrete; then the central drainage pipe 1 is backfilled with graded crushed stone to the bottom of the curb drainage pipe 2; then the sand settling well 5 is built by integral casting, which can ensure the integrity and stability of the foundation, thereby improving the bearing capacity and durability of the sand settling well 5; finally, the sand settling well 5 is covered with a manhole cover 7 with an open structure, which can ensure that road sewage can flow into the sand settling well 5 through the manhole cover 7 with an open structure, and finally flow into the curb drainage pipe 2. At the same time, the manhole cover 7 with an open structure can prevent large pieces of solid matter from entering the sand settling well 5.
[0048] The construction process of the inspection well section: first, the trench excavation work of the central drainage pipe 1 and the curb drainage pipe 2 and the surrounding rock work at the secondary lining of the tunnel are carried out simultaneously; secondly, when constructing the trench, plain concrete is used as the basic material; thirdly, the central drainage pipe 1 is installed on the trench based on plain concrete; then the inspection well 3 is built by integral casting; then a connecting pipe 4 is arranged in the inspection well 3, and both sides of the connecting pipe 4 penetrate the side wall of the inspection well 3 to connect the curb drainage pipe 2 and / or the sand settling well 5 on both sides of the inspection well 3, so that the water system of the tunnel drainage system operates independently, preventing the water system flowing through the central drainage structure and the water system flowing through the curb drainage structure from mixing, which is helpful for underground cleaning. The reuse of clean water and the re-treatment of sewage after collection protect the stability and health of the surrounding ecosystem and reduce the waste and pollution of water resources. At the same time, the facade conflict between the inspection well 3 and the curb drainage pipe 2 is eliminated, so that the central drainage pipe 1 can be quickly inspected without damaging the pavement structure of the carriageway and the curb drainage pipe 2, which has little impact on road operations, improves construction efficiency, and saves manpower and material costs; finally, the inspection well 3 is covered with a shielding cover 6, which can effectively prevent debris, garbage, other foreign matter or sewage on the road surface from mixing into the inspection well and causing pollution to the groundwater system, which is beneficial to protecting groundwater quality and reducing water pollution and environmental damage.
[0049] Obviously, the above embodiments of the present invention are merely examples for the purpose of clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the scope of protection of the present invention. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. Tunnel drainage system, characterized in that: include: A central drainage pipe (1) and a curb drainage pipe (2), wherein the central drainage pipe (1) and the curb drainage pipe (2) are arranged to extend along a first direction, and the central drainage pipe (1) is located below the curb drainage pipe (2); A sand trap (5), at least one of which is arranged along the first direction, and the sand trap (5) penetrates and communicates with the curb drainage pipe (2) along the second direction; A maintenance well (3), at least one of which is arranged along the first direction, and the maintenance well (3) simultaneously penetrates and connects the central drainage pipe (1) and the curb drainage pipe (2) along the second direction; A connecting pipe (4) is arranged in the inspection well (3), and both ends of the connecting pipe (4) penetrate the side wall of the inspection well (3) to connect the curb drainage pipe (2) and / or the sand settling well (5) located on both sides of the inspection well (3); The first direction is the extending direction of the road, and the second direction is a direction perpendicular to the road surface.
2. The tunnel drainage system according to claim 1, characterized in that: At least one support structure (8) is arranged in the inspection well (3), one end of the support structure (8) abuts against the connecting pipe (4), and the other end of the support structure (8) abuts against the bottom of the inspection well (3).
3. The tunnel drainage system according to claim 1, characterized in that: The inspection well (3) is covered with a shielding cover (6).
4. The tunnel drainage system according to any one of claims 1 to 3, characterized in that: A plurality of the inspection wells (3) are provided, and adjacent inspection wells (3) are spaced 100-200 meters apart.
5. The tunnel drainage system according to claim 4, characterized in that: A sand settling well (5) is arranged on one side of each inspection well (3); one end of the connecting pipe (4) is connected to the sand settling well (5); and the other end of the connecting pipe (4) is connected to the curb drainage pipe (2).
6. The tunnel drainage system according to claim 5, characterized in that: The inner diameter of the curb drainage pipe (2) is equal to the inner diameter of the connecting pipe (4).
7. The tunnel drainage system according to claim 4, characterized in that: Two sand settling wells (5) are adjacently arranged on both sides of each inspection well (3), and the two ends of the connecting pipe (4) are respectively connected to the sand settling wells (5) on the corresponding side.
8. The tunnel drainage system according to claim 7, characterized in that: The connecting pipe (4) is a galvanized steel pipe.
9. The tunnel drainage system according to claim 1, characterized in that: The sand settling well (5) is covered with a well cover (7) with an open hole structure.
10. The tunnel drainage system according to claim 1, characterized in that: A crushed stone layer (9) is laid between the central drainage pipe (1) and the curb drainage pipe (2).