Combustion engine and waste heat hot water boiler combined heat supply and water supplementing system

Through the combined heating system of the combustion engine and waste heat hot water boiler, the discharged water and flash steam are used for heating, which solves the energy waste and system complexity of the cogeneration unit during heating season, and achieves more efficient energy Utilized and simplified system operation, suitable for small and medium-sized heating projects.

CN221958835UActive Publication Date: 2024-11-05POWERCHINA HEBEI ELECTRIC POWER SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420514841.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-05
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The existing cogeneration units have energy waste and system complexity during heating during the heating season, and have a long construction cycle and high investment, making it difficult to effectively utilize the heat of waste heat and hot water boilers.

Method used

Design a joint heating system for the combustion engine and waste heat hot water boiler and its water replenishment system. The internal circulating water system of the boiler is heated by using sewage and flash steam to form a circulating water system, combining the combustion engine air/flue gas system and boiler water circulation Sewage discharge system and water replenishment heating system realize the effective coupling between the combustion engine and the hot water boiler and improve energy utilization.

Benefits of technology

Provide more heat load at low power supply ratio, reduce energy consumption, simplify system operation, is suitable for small and medium-sized heating projects, shorten construction cycle and investment, and improves the comprehensive utilization rate of energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221958835U_ABST
    Figure CN221958835U_ABST
Patent Text Reader

Abstract

The utility model discloses a gas turbine and waste heat hot water boiler combined heat supply and water replenishing system, which is used in the field of gas turbine power generation and heat supply and comprises a combined heat supply system consisting of a gas turbine compressor, a gas turbine and a waste heat hot water boiler, and a set of boiler internal circulating water system is arranged between the waste heat hot water boiler and a heat supply network heat exchanger. Sewage of a circulating water system in the boiler is used for heating replenished water. The system is safe and reliable, effective coupling of the gas turbine and the hot water waste heat boiler is achieved, electrical load and thermal load are provided, heat of sewage is used for heating replenished water, the comprehensive utilization rate of energy is increased, and energy consumption is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of gas turbine power generation and heating, and specifically relates to a combined heating of a gas turbine and a waste heat hot water boiler and a water replenishment system thereof. Background Art

[0002] In recent years, cogeneration units have gradually replaced regional hot water boiler rooms in the heating field and become the main source of heat.

[0003] Cogeneration units are composed of large-capacity coal-fired heating units or gas-steam combined cycle units, and provide electrical load and thermal load to the outside at a certain ratio. Cogeneration units have a long construction period, high investment, and complex system operation. Heating is usually achieved by steam extraction heating from steam turbines. In the heating season, the heating load ratio is lower than the power supply ratio.

[0004] The tube bundle of the waste heat hot water boiler installed in the system exchanges heat with the high-temperature flue gas, and oxide scale is generated on the inner wall, which needs to be discharged according to the operating conditions. Conventional boiler blowdown is discharged to the atmosphere through the expansion tank, and the drain is discharged by mixing water to cool it, resulting in energy waste. Utility Model Content

[0005] The utility model aims to provide a combined heating system of a gas engine and a waste heat hot water boiler and a water replenishment system thereof, which can provide more heating load and less power supply load in the heating season.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A combined heating system of a gas engine and a waste heat hot water boiler and its water replenishment system comprises a combined heating system consisting of a gas engine compressor, a gas engine turbine and a waste heat hot water boiler, wherein a boiler internal circulating water system is arranged between the waste heat hot water boiler and the heat network heat exchanger, and the wastewater of the boiler internal circulating water system is used for heating the replenishment water.

[0008] A further improvement of the technical solution of the utility model is that the system includes a gas turbine air / flue gas system, a boiler internal water circulation system, a boiler water circulation sewage system and a make-up water heating system. The gas turbine air / flue gas system includes a gas turbine compressor, a gas turbine turbine and a waste heat hot water boiler connected by pipelines. The boiler internal water circulation system includes a waste heat hot water boiler, a heat network circulating water pump and a heat network heat exchanger connected in series by pipelines. The boiler water circulation sewage system includes a sewage vapor-liquid separator, a sewage pump and a make-up water heat exchanger connected by pipelines. The make-up water heating system includes a make-up water heat exchanger, a make-up water deaerator and a make-up water pump connected by pipelines.

[0009] A further improvement of the technical solution of the utility model is that the gas turbine compressor is connected to the gas turbine, the gas turbine is connected to the generator, the gas turbine is connected to the waste heat hot water boiler, and the waste heat hot water boiler is connected to the heat network circulating water pump and the heat network heat exchanger to form a circulation.

[0010] A further improvement of the technical solution of the utility model is that the water makeup heat exchanger is connected to the external water makeup system and water treatment system, the water makeup heat exchanger is connected to the water makeup deaerator and the sewage pump, the sewage pump is connected to the sewage gas-liquid separator, and the sewage gas-liquid separator is connected to the water makeup deaerator.

[0011] A further improvement of the technical solution of the utility model is that the water supply deaerator is connected to the water supply pump, and the water supply pump is connected to the heat network circulating water pump.

[0012] A further improvement of the technical solution of the utility model is that the sewage gas-liquid separator is connected to the internal water circulation system of the boiler.

[0013] A further improvement of the technical solution of the utility model is that it also includes an external heat network system, including a heat network water supply, a heat network heat exchanger and a water-heat network return water connected by pipelines.

[0014] Due to the adoption of the above technical solution, the technical progress achieved by the utility model is:

[0015] The system of the present application utilizes wastewater and flash steam to heat the make-up water, which is beneficial to improving the comprehensive utilization rate of energy and reducing energy consumption. The system can provide more heat load at a low power supply ratio.

[0016] The system of the present application is safe and reliable, realizing the effective coupling of the gas turbine and the hot water waste heat boiler, providing electrical load and thermal load; the main engine of the system is modularly arranged, and compared with conventional cogeneration units, the construction period is short, the investment is small, and the system operation is simple; the system utilizes the heat of the sewage to heat the make-up water, thereby improving the comprehensive utilization rate of energy and reducing energy consumption; the system is suitable for small and medium-sized heating projects, especially those with relatively small power demand and large heating demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of a combined heating system of a gas engine and a waste heat hot water boiler and its water replenishment system of the utility model;

[0018] Among them, 1. gas turbine compressor, 2. gas turbine, 3. waste heat hot water boiler, 4. heat network circulating water pump, 5. sewage vapor-liquid separator, 6. feed water heat exchanger, 7. feed water deaerator, 8. feed water pump, 9. heat network heat exchanger, 10. sewage pump. DETAILED DESCRIPTION

[0019] The present invention is further described in detail below in conjunction with the embodiments:

[0020] like Figure 1 As shown, a combined heating system of a gas engine and a waste heat hot water boiler and its make-up water system includes a combined heating system composed of a gas engine compressor 1, a gas engine turbine 2 and a waste heat hot water boiler 3. A set of boiler internal circulating water system is arranged between the waste heat hot water boiler 3 and the heat network heat exchanger 9, and the sewage of the boiler internal circulating water system is used for heating the make-up water.

[0021] The combined heating of the gas turbine and waste heat hot water boiler and its make-up water system specifically include a gas turbine air / flue gas system, a boiler internal water circulation system, a boiler water circulation sewage system and a make-up water heating system. The gas turbine air / flue gas system includes a gas turbine compressor 1, a gas turbine 2, and a waste heat hot water boiler 3 connected by pipelines. The boiler internal water circulation system includes a waste heat hot water boiler 3, a heat network circulating water pump 4, and a heat network heat exchanger 9 connected in series by pipelines. The boiler water circulation sewage system includes a sewage vapor-liquid separator 5, a sewage pump 10, and a make-up water heat exchanger 6 connected by pipelines. The make-up water heating system includes a make-up water heat exchanger 6, a make-up water deaerator 7, and a make-up water pump 8 connected by pipelines.

[0022] In the system, the gas turbine compressor 1 is connected to the gas turbine 2, the gas turbine 2 is connected to the generator, the gas turbine 2 is connected to the waste heat hot water boiler 3, the waste heat hot water boiler 3 is connected to the heat network circulating water pump 4 and the heat network heat exchanger 9 to form a boiler internal water circulation system.

[0023] The water supply heat exchanger 6 is connected to the external water supply system and water treatment system, the water supply heat exchanger 6 is connected to the water supply deaerator 7 and the sewage pump 10, the sewage pump 10 is connected to the sewage vapor-liquid separator 5, and the sewage vapor-liquid separator 5 is connected to the water supply deaerator 7. The water supply deaerator 7 is connected to the water supply pump 8, and the water supply pump 8 is connected to the heat network circulating water pump 4. The sewage vapor-liquid separator 5 is connected to the internal water circulation system of the boiler.

[0024] The combined heating system of the gas turbine and the waste heat hot water boiler and its water replenishment system include an external heat network system, including a heat network water supply, a heat network heat exchanger 9 and a water-heat network return water connected by pipelines.

[0025] Working principle:

[0026] 1. Gas turbine air / flue gas system:

[0027] After passing through the gas turbine compressor 1, the air is heated and pressurized, mixed with the natural gas introduced into the combustion chamber and burned, and then discharged into the gas turbine 2 to perform work. The flue gas after the gas turbine turbine 2 enters the waste heat hot water boiler 3, exchanges heat with the circulating water inside the boiler, and is discharged into the atmosphere after cooling.

[0028] 2. Boiler internal water circulation system:

[0029] A water circulation system is arranged inside the boiler. The heat network circulating water pump 4 pumps 100°C hot water to the waste heat hot water boiler 3 for heat exchange with the high-temperature flue gas discharged by the gas turbine 2. After the heat exchange, the temperature is raised to 185°C, and then the heat network heat exchanger 9 is used for heat exchange with the circulating water of the external heat network. The return water of the heat network is heated from 70°C to 136°C and then supplied to the heat users.

[0030] 3. Boiler water circulation sewage system:

[0031] According to the actual operation situation, the boiler internal circulation produces wastewater, which is discharged to the wastewater vapor-liquid separator 5 to produce vapor-liquid separation. The liquid phase is pressurized by the wastewater pump 10, and heat is exchanged with the make-up water through the make-up water heat exchanger 6, and then discharged to the water treatment area after cooling. The vapor phase is connected to the make-up water deaerator 7 to heat the incoming water.

[0032] 4. Water supply and heating system:

[0033] The system's make-up water passes through the make-up water heat exchanger 6, absorbs the heat of the wastewater and is heated, then supplied to the make-up water deaerator 7, and is heated by the vapor phase medium of the wastewater vapor-liquid separator 5 to achieve the deoxygenation effect, and then is pressurized by the make-up water pump 8 and supplied to the boiler's internal water circulation system.

Claims

1. A combined heating system of a gas turbine and a waste heat hot water boiler and a water replenishment system, characterized in that: The invention comprises a combined heating system composed of a gas engine compressor (1), a gas engine turbine (2) and a waste heat hot water boiler (3), wherein a boiler internal circulating water system is arranged between the waste heat hot water boiler (3) and a heat network heat exchanger (9), and waste water of the boiler internal circulating water system is used for heating replenishment water.

2. A combined heating system of a gas turbine and a waste heat hot water boiler and its water replenishment system according to claim 1, characterized in that: The system comprises a gas turbine air / flue gas system, a boiler internal water circulation system, a boiler water circulation sewage system and a feed water heating system. The gas turbine air / flue gas system comprises a gas turbine compressor (1), a gas turbine (2) and a waste heat hot water boiler (3) connected by pipelines. The boiler internal water circulation system comprises a waste heat hot water boiler (3), a heat network circulation water pump (4) and a heat network heat exchanger (9) connected in series by pipelines. The boiler water circulation sewage system comprises a sewage vapor-liquid separator (5), a sewage pump (10) and a feed water heat exchanger (6) connected by pipelines. The feed water heating system comprises a feed water heat exchanger (6), a feed water deaerator (7) and a feed water pump (8) connected by pipelines.

3. A combined heating system of a gas turbine and a waste heat hot water boiler and its water replenishment system according to claim 2, characterized in that: The gas engine compressor (1) is connected to the gas engine turbine (2), the gas engine turbine (2) is connected to the generator, the gas engine turbine (2) is connected to the waste heat hot water boiler (3), and the waste heat hot water boiler (3) is connected to the heat network circulating water pump (4) and the heat network heat exchanger (9) to form a circulation.

4. A combined heating system of a gas turbine and a waste heat hot water boiler and a water replenishment system according to claim 3, characterized in that: The water replenishment heat exchanger (6) is connected to an external water replenishment system and a water treatment system, the water replenishment heat exchanger (6) is connected to a water replenishment deaerator (7) and a sewage pump (10), the sewage pump (10) is connected to a sewage gas-liquid separator (5), and the sewage gas-liquid separator (5) is connected to the water replenishment deaerator (7).

5. A combined heating system of a gas turbine and a waste heat hot water boiler and a water replenishment system according to claim 4, characterized in that: The water supply deaerator (7) is connected to the water supply pump (8), and the water supply pump (8) is connected to the heat network circulating water pump (4).

6. A combined heating system of a gas turbine and a waste heat hot water boiler and a water replenishment system according to claim 5, characterized in that: The waste gas-liquid separator (5) is connected to the internal water circulation system of the boiler.

7. A combined heating system of a gas turbine and a waste heat hot water boiler and a water replenishment system according to claim 2, characterized in that: It also includes an external heat network system, including a heat network water supply, a heat network heat exchanger (9) and a water-heat network return water connected by pipelines.