MBR membrane cleaning device

By designing an MBR membrane cleaning device, automated cleaning of MBR membrane modules was achieved, solving the performance degradation problem caused by membrane blockage, simplifying the cleaning process, improving membrane flux recovery efficiency, and reducing operating costs.

CN221964963UActive Publication Date: 2024-11-08BEIJING ZHONGDI HONGKE ENVIRONMENT SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420573942.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-08
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

Existing MBR membranes are easily clogged by contaminants during operation, leading to a decline in membrane element performance. The cleaning process is complex, incomplete, and consumes a lot of chemicals, resulting in a large investment of management resources.

Method used

An MBR membrane cleaning device was designed, including a dosing tank, a clean water tank, a cleaning dosing pump, a cleaning membrane tank, and a blower. The cleaning is automated through a sprayer and a transmission reducer. Combined with the rapid replacement of the filter membrane, the cleaning process is simplified and efficiency is improved.

Benefits of technology

It simplifies the membrane module cleaning process, improves membrane flux recovery efficiency, reduces operating costs, and reduces human resource consumption through automation, while ensuring cleaning quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221964963U_ABST
    Figure CN221964963U_ABST
Patent Text Reader

Abstract

The utility model discloses an MBR membrane cleaning device which comprises a dosing tank, a clear water tank, a cleaning dosing pump, a cleaning membrane tank and an air blower, a dosing pipeline is arranged between the dosing tank and the cleaning dosing pump, a clear water pipeline is arranged between the clear water tank and the cleaning dosing pump, a rotating pedestal is arranged on the inner bottom side of the cleaning membrane tank, an MBR membrane assembly is arranged on the rotating pedestal, and the air blower is arranged on the rotating pedestal. A sprayer guide rail is arranged on the inner side of the membrane cleaning box, a sprayer is arranged on the sprayer guide rail in a drivable mode, and a transmission speed reducer is arranged at one end of the sprayer; according to the utility model, the membrane component cleaning process is simple and convenient, and the membrane flux is recovered more; the efficiency of each cleaning stage is improved, and the operation cost is effectively reduced; the device is programmed, automatic cleaning is achieved, the expenditure of human resources is reduced, and the problems that in the off-line cleaning process of the membrane assembly, too many human resources are consumed, the using amount of chemicals is too large, and the cleaning process is too tedious are mainly solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sewage treatment devices, in particular to an MBR membrane cleaning device. Background Art

[0002] In sewage treatment, MBR, also known as membrane bioreactor, is a new water treatment technology that combines a membrane separation unit with a biological treatment unit. It can be divided into flat membrane, tubular membrane and hollow fiber membrane according to the structure of the membrane, and can be divided into microfiltration membrane, ultrafiltration membrane, nanofiltration membrane, reverse osmosis membrane, etc. according to the pore size of the membrane. Because there are various pollutants in the water quality of the MBR membrane inlet that may contaminate the MBR membrane, such as calcium-containing precipitates, metal oxides, dirt, impurities, etc., the MBR membrane will be blocked by membrane fiber surface pollution during operation, resulting in a decrease in membrane element performance, such as a decrease in water production flow rate and a decrease in water quality standards. In order to ensure the water quality of the MBR membrane assembly, the pollutants on the membrane fiber surface must be regularly cleaned offline.

[0003] The main problems with offline cleaning are: the membrane component cleaning procedure is complicated; the cleaning process is not thorough; the cleaning process has high drug consumption; and the management resource investment is large. Utility Model Content

[0004] The utility model aims to provide an MBR membrane cleaning device to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an MBR membrane cleaning device, comprising a dosing box, a clean water tank, a cleaning dosing pump, a cleaning membrane box and a blower, a dosing pipeline is arranged between the dosing box and the cleaning dosing pump, a clean water pipeline is arranged between the clean water tank and the cleaning dosing pump, a rotating pedestal is arranged on the inner bottom side of the cleaning membrane box, an MBR membrane assembly is arranged on the rotating pedestal, a sprayer guide rail is arranged on the inner side of the cleaning membrane box, a sprayer can be drivably arranged on the sprayer guide rail, a transmission reducer is arranged at one end of the sprayer, a transmission hinge is arranged between the transmission reducer and the sprayer, one end of the dosing pipeline is connected to the clean water pipeline, and a replacement component that is easy to install is arranged on the clean water pipeline.

[0006] Preferably, a pump outlet pipeline is provided between the cleaning and dosing pump and the sprayer, an aeration pipeline is provided at one end of the blower, a resupply pipeline is provided on one side of the cleaning membrane box, and a tap water replenishment valve is provided on the resupply pipeline.

[0007] Preferably, a dosing valve is provided on the dosing pipeline, a clean water valve is provided on the clean water pipeline, and a drain valve is provided on one side of the membrane box for cleaning.

[0008] Preferably, the replacement component includes a filter membrane, and a mounting opening is provided on the upper side of the clean water pipeline, and an arc block is plugged into the mounting opening.

[0009] Preferably, overlapping blocks are provided on both the front and rear sides of the arc block, and sealing blocks are provided on both sides of the arc block.

[0010] Preferably, a predetermined slot is provided on the clean water pipeline, the overlapping block and the predetermined slot match each other, the inner side of the sealing block is a rubber layer structure, and is overlapped at the installation opening of the clean water pipeline.

[0011] Preferably, docking blocks are provided on both sides of the installation opening of the clean water pipeline, a fixing screw is provided between the docking block and the overlapping block, and one end of the fixing screw passes through the overlapping block and is screwed on the docking block.

[0012] Preferably, an arc groove is provided on the inner side of the arc block, and the filter membrane is clamped on the arc groove.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. The utility model simplifies the membrane component cleaning process and recovers more membrane flux; improves the efficiency of each cleaning stage and effectively reduces operating costs; programs the device to achieve automated cleaning and reduce human resource expenses, mainly to solve the problems of excessive human resource consumption, excessive use of chemicals and overly complicated cleaning process during offline cleaning of membrane components.

[0015] 2. The utility model can filter impurities in clean water by installing a filter membrane. A replacement component is provided on the clean water pipeline. The replacement component can realize rapid replacement of the filter membrane, thereby ensuring the quality of clean water and facilitating the quality of subsequent MBR membrane cleaning work. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a working principle diagram of the MBR membrane cleaning device of the utility model.

[0017] Figure 2 It is a schematic diagram of the structure of a part of the clean water pipeline of the utility model.

[0018] Figure 3 It is a schematic diagram of the structure inside the clean water pipeline of the utility model.

[0019] Figure 4 It is a structural schematic diagram of the arc block of the utility model.

[0020] In the figure: dosing box 1; dosing pipeline 11; clean water tank 2; clean water pipeline 21; docking block 22; cleaning dosing pump 3; pump outlet pipeline 31; cleaning membrane box 4; rotating base 41; sprayer 42; sprayer guide rail 43; transmission reducer 44; transmission hinge 45; blower 5; aeration pipeline 51; re-water pipeline 61; venting and draining valve 71; clean water valve 72; dosing valve 73; tap water replenishment valve 74; arc block 81; overlap block 82; fixing screw 83; arc groove 84; sealing block 85; filter membrane 9. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figures 1 to 4 The utility model provides a technical solution: an MBR membrane cleaning device, comprising a dosing box 1, a clean water tank 2, a cleaning dosing pump 3, a cleaning membrane box 4 and a blower 5, a dosing pipeline 11 is connected between the dosing box 1 and the cleaning dosing pump 3, a clean water pipeline 21 is connected between the clean water tank 2 and the cleaning dosing pump 3, the clean water tank 2 is set to store clean water for preliminary cleaning of the MBR membrane assembly, the cleaning dosing pump 3 is set to clean the MBR membrane assembly through the pressurization of the pump and add medicine during the drug washing process.

[0023] A rotating pedestal 41 is installed on the inner bottom side of the cleaning membrane box 4, and an MBR membrane assembly is arranged on the rotating pedestal 41. The rotating pedestal 41 is fixed to the bottom of the cleaning membrane box 4 for fixing the MBR membrane assembly and can rotate at the same time, so that the membrane assembly can be cleaned more thoroughly.

[0024] A sprayer guide rail 43 is installed on the inner side of the cleaning membrane box 4, and a sprayer 42 can be driven on the sprayer guide rail 43. A transmission reducer 44 is installed at one end of the sprayer 42. A transmission hinge 45 is connected between the transmission reducer 44 and the sprayer 42. The sprayer 42 is a ring-shaped device with an inner diameter greater than the length of the membrane component by 50 cm. The inner side of the ring is fully covered. After the pressurization of the cleaning and dosing pump 3, the membrane component is cleaned through the water discharged from the sprayer 42. The sprayer guide rail 43 is connected to the ring outside the sprayer 42 and can move up and down. The transmission reducer 44 is the power drive device of the sprayer 42, which provides power for the movement of the sprayer 42. The transmission hinge 45 is a connecting device between the sprayer 42 and the transmission reducer 44, which is used to transmit and control the transmission range of the sprayer.

[0025] A pump outlet pipeline 31 is connected between the cleaning and dosing pump 3 and the sprayer 42. One end of the blower 5 is connected to an aeration pipeline 51. The blower 5 restores the flux of the membrane assembly through aeration flushing. The part of the pump outlet pipeline 31 connected to the sprayer 42 is a hose, which is convenient for the sprayer 42 to move up and down. One side of the cleaning membrane box 4 is connected to a re-water pipeline 61, and a tap water replenishment valve 74 is installed on the re-water pipeline 61. A dosing valve 73 is installed on the dosing pipeline 11, and a clean water valve 72 is installed on the clean water pipeline 21. A drain valve 71 is installed on one side of the cleaning membrane box 4, and one end of the dosing pipeline 11 is connected to the clean water pipeline 21.

[0026] A replacement component that is easy to install is provided on the clean water pipeline 21, and the replacement component includes a filter membrane 9. An installation port is opened on the upper side of the clean water pipeline 21, and an arc block 81 is inserted into the installation port. Both sides of the front and rear sides of the arc block 81 are fixed with overlapping blocks 82, and both sides of the arc block 81 are fixed with sealing blocks 85. A predetermined slot is opened on the clean water pipeline 21, and the overlapping block 82 matches the predetermined slot. The inner side of the sealing block 85 is a rubber layer structure and is overlapped at the installation port on the clean water pipeline 21.

[0027] The clean water pipeline 21 is fixed with docking blocks 22 on both sides of the installation port, and a fixing screw 83 is inserted between the docking block 22 and the lap block 82. One end of the fixing screw 83 passes through the lap block 82 and is screwed on the docking block 22. An arc groove 84 is provided on the inner side of the arc block 81, and the filter membrane 9 is clamped on the arc groove 84. The filter membrane 9 is made of polyethersulfone filter membrane material. The arc block 81 can be disassembled by reversely twisting the fixing screw 83 and then separating the docking block 22 from the lap block 82, so as to facilitate timely replacement of the filter membrane 9.

[0028] In actual use, the pipeline is removed from the membrane pool, the MBR membrane assembly is hoisted into the cleaning membrane box 4 and fixed to the rotating pedestal 41, the drain valve 71 and the clean water valve 72 are kept open, the dosing valve 73 and the tap water replenishment valve 74 are kept closed, the clean water tank 2 is filled with water, the cleaning dosing pump 3 is turned on, and the pressure cleaning is started to the outside of the membrane assembly. The transmission reducer 44 is linked with the cleaning dosing pump 3, and the sprayer 42 starts to move up and down for cleaning. The large pieces of hardened sludge flushed from the membrane assembly are discharged from the drain pipe at the drain valve 71. At this stage, the sprayer works up and down for 3 rounds. After the first stage is completed, the transmission reducer 44 and the cleaning dosing pump 3 are kept open, and the rotating pedestal 41 is rotated to clean the membrane assembly 360 degrees without angles, so as to better restore the membrane flux. At this stage, the sprayer works up and down for 3 rounds;

[0029] The dosing valve 73 is kept open, the drain valve 71, the clean water valve 72 and the tap water replenishment valve 74 are kept closed, the membrane module cleaning agent is prepared in the dosing box 1, the cleaning dosing pump 3 is turned on, the amount of the sprayer 42 is reduced, the transmission reducer 44 and the transfer stand 41 are linked with the cleaning dosing pump 3, and the three work together to continue the flushing effect in the previous stage of the box and make the agent evenly enter the membrane or the membrane wire spacing, and stop when the dosing amount exceeds the bottom of the membrane module top;

[0030] Keep all valves closed, connect the blower 5 and the aeration pipeline 51, and control the operation time of the blower 5 to achieve a pulse cleaning process, which can effectively promote the friction between the membrane fibers, restore the flux better, and also make the agent play a better role;

[0031] After the above three stages are completed, the drain valve 71 is opened to drain the sewage in the box. At the same time, the tap water replenishment valve 74 is opened to inject clean water to clean the remaining reagents left in the membrane assembly. After soaking for a period of time, the membrane assembly is emptied, and the membrane assembly is hoisted into the original membrane pool, and the pipelines of each component are installed. The entire cleaning process is completed.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An MBR membrane cleaning device, comprising a dosing box (1), a clean water tank (2), a cleaning dosing pump (3), a cleaning membrane box (4) and a blower (5), characterized in that: A dosing pipeline (11) is arranged between the dosing box (1) and the cleaning dosing pump (3), a clean water pipeline (21) is arranged between the clean water box (2) and the cleaning dosing pump (3), a rotating pedestal (41) is arranged on the inner bottom side of the cleaning membrane box (4), an MBR membrane assembly is arranged on the rotating pedestal (41), a sprayer guide rail (43) is arranged on the inner side of the cleaning membrane box (4), a sprayer (42) is drivably arranged on the sprayer guide rail (43), a transmission reducer (44) is arranged at one end of the sprayer (42), a transmission hinge (45) is arranged between the transmission reducer (44) and the sprayer (42), one end of the dosing pipeline (11) is connected to the clean water pipeline (21), and a replacement component that is easy to install is arranged on the clean water pipeline (21).

2. The MBR membrane cleaning device according to claim 1, characterized in that: A pump outlet pipeline (31) is provided between the cleaning and dosing pump (3) and the sprayer (42), an aeration pipeline (51) is provided at one end of the blower (5), a resupply pipeline (61) is provided on one side of the cleaning membrane box (4), and a tap water replenishment valve (74) is provided on the resupply pipeline (61).

3. The MBR membrane cleaning device according to claim 1, characterized in that: The dosing line (11) is provided with a dosing valve (73), the clean water line (21) is provided with a clean water valve (72), and a drain valve (71) is provided on one side of the cleaning membrane box (4).

4. The MBR membrane cleaning device according to claim 1, characterized in that: The replacement assembly comprises a filter membrane (9), and a mounting opening is provided on the upper side of the clean water pipeline (21), and a circular arc block (81) is plugged into the mounting opening.

5. The MBR membrane cleaning device according to claim 4, characterized in that: Both the front and rear sides of the circular arc block (81) are provided with overlapping blocks (82), and both sides of the circular arc block (81) are provided with sealing blocks (85).

6. The MBR membrane cleaning device according to claim 5, characterized in that: The clean water pipeline (21) is provided with a predetermined slot, the overlap block (82) matches the predetermined slot, the inner side of the sealing block (85) is a rubber layer structure, and overlaps the installation opening on the clean water pipeline (21).

7. The MBR membrane cleaning device according to claim 1, characterized in that: The clean water pipeline (21) is provided with docking blocks (22) on both sides of the installation opening, and a fixing screw (83) is provided between the docking block (22) and the overlapping block (82), and one end of the fixing screw (83) passes through the overlapping block (82) and is screwed on the docking block (22).

8. The MBR membrane cleaning device according to claim 4, characterized in that: The inner side of the arc block (81) is provided with an arc groove (84), and the filter membrane (9) is clamped on the arc groove (84).