Concrete broken line type roof truss prefabricated steel mould

By performing blocked belly rod casting and splicing casting in the factory, combined with steel molds, the problems of long construction time of folding line roof structures and short mold use cycles in the existing technology are solved, and the effects of rapid construction and efficient utilization are achieved.

CN221968404UActive Publication Date: 2024-11-08ZHEJIANG ZHUJI ZHENGTONG PRECAST CONCRETE ELEMENTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420007884.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-11-08
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

The on-site construction process of existing folding-line roof struments is complex, resulting in long construction time and large labor consumption, and the wooden mold has a short service life, low recycling rate and high consumption cost.

Method used

Concrete line-shaped roof squad prefabricated steel molds, including roof squad prefabricated molds and belly rod prefabricated molds, are used to blocked belly rods and spliced ​​pouring in the factory to shorten the on-site construction time and use steel molds to improve recycling rate.

Benefits of technology

The sub-module construction of the folded-line roof structure is realized, which shortens the on-site construction time, saves manpower and time, and improves the mold usage cycle and recycling rate, reducing consumption costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221968404U_ABST
    Figure CN221968404U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of broken line type roof truss prefabricating molds, in particular to a concrete broken line type roof truss prefabricating steel mold which comprises a roof truss prefabricating mold and a web member prefabricating mold, and the roof truss prefabricating mold comprises a first bottom mold, an outer mold assembly and an inner mold assembly. The outer mold assembly and the inner mold assembly are both installed on the first bottom mold, a roof truss pouring space is formed between the outer mold assembly and the inner mold assembly, the web member prefabricating mold comprises a second bottom mold, two web member side molds and two web member end molds, and the two web member side molds are installed on the second bottom mold in parallel; the two web member end molds are installed on the second bottom mold in parallel, and a web member pouring space is formed between the two web member side molds and the two web member end molds. The on-site construction time of the broken line type roof truss is shortened through submodule construction, and manpower and time are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of prefabricated moulds for zigzag roof trusses, and in particular to a prefabricated steel mould for concrete zigzag roof trusses. Background Art

[0002] Reinforced concrete zigzag roof trusses are the main load-bearing structural components of industrial plants. Reinforced concrete zigzag roof trusses are divided into various spans, but the structural types are roughly the same. Since the single span of prefabricated components (reinforced concrete zigzag roof trusses) is long and inconvenient to transport, the processing of components is basically prefabricated on site.

[0003] The specific construction process flow of the existing mansard roof truss on site is: making a bottom formwork → applying an isolation agent → pre-embedding embedded parts and tying steel bars to install side formwork → pouring concrete → curing and removing the formwork → turning over, straightening, and lifting. In the above technology, wooden formwork is used for the bottom formwork and the side formwork. The wooden formwork is difficult to handle at the nodes and the appearance is easily deformed. The installation period of the bottom formwork and the side formwork is long. The installation of the web position is cumbersome, the production efficiency is low, and a large amount of manpower is required during on-site construction.

[0004] With regard to the above-mentioned related technologies, the inventors also found that the current manifold roof trusses need to be completed within a specified time during on-site construction because the concrete is a high-strength type. The installation and demoulding operations of the current prefabricated molds for the manifold roof trusses are cumbersome. Among them, due to the large number of webs, the installation of the mold at the webs is cumbersome. If the construction is to be completed within the specified time, a lot of manpower needs to be wasted. Utility Model Content

[0005] In order to shorten the on-site construction time of the manifold roof truss, thereby saving manpower and time, the present application provides a prefabricated steel formwork for a concrete manifold roof truss.

[0006] The present application provides a prefabricated steel formwork for a concrete folding-line roof truss, which adopts the following technical solution:

[0007] A concrete zigzag roof truss prefabricated steel mold, comprising a roof truss prefabricated mold and a web bar prefabricated mold, the roof truss prefabricated mold comprising a first bottom mold, an outer mold assembly and an inner mold assembly, the outer mold assembly and the inner mold assembly are both installed on the first bottom mold, and a roof truss casting space is formed between the outer mold assembly and the inner mold assembly, the web bar prefabricated mold comprises a second bottom mold, two web bar side molds and two web bar end molds, the two web bar side molds are installed in parallel on the second bottom mold, the two web bar end molds are installed in parallel on the second bottom mold, and a web bar casting space is formed between the two web bar side molds and the two web bar end molds.

[0008] By adopting the above technical scheme, the manifold roof truss can be constructed in blocks, and the webs can be cast in the factory through the web casting space of the web prefabricated mold to form the webs, and then the cast multiple webs are transported to the construction site, and the first bottom mold, outer mold assembly and inner mold assembly are built on site to form the roof truss casting space, and the prefabricated webs are placed in the roof truss casting space for splicing and casting, thereby realizing modular construction, thereby shortening the on-site construction time of the manifold roof truss, saving manpower and time.

[0009] Preferably, the outer mold assembly includes a plurality of outer molds, the plurality of outer molds are connected end to end in pairs via a plurality of first locking members, and the plurality of outer molds are connected to the first bottom mold via a plurality of second locking members.

[0010] By adopting the above technical solution, the plurality of outer molds are first locked and connected to the first bottom mold by the second locking member, and then the plurality of outer molds are locked and connected one by one by the first locking member, thereby improving the connection stability between the outer molds and between them and the first bottom mold, thereby preventing the outer molds from expanding during molding to separate from each other or from the first bottom mold.

[0011] Preferably, the first locking piece includes a first locking bolt and a first locking nut, a plurality of first locking holes are provided at both ends of the outer mold in the length direction, the first locking bolt passes through the first locking holes of the two outer molds and is threadedly connected to the first locking nut, the second locking piece includes a second locking bolt, a plurality of second locking holes are provided at the bottom end of the outer mold, a plurality of fixing holes are provided on the first bottom mold, the second locking bolt passes through the second locking hole and is threadedly connected to the fixing hole.

[0012] By adopting the above technical solution, when it is necessary to fix the outer mold and the outer mold or the first bottom mold, first pass the first locking bolt through the two first locking holes, then screw on the first locking nut, and then pass the second locking bolt through the second locking hole and threadedly connect it to the fixing hole, so that the outer mold and the outer mold or the first bottom mold can be fixed, with a simple structure and easy operation.

[0013] Preferably, the inner mold assembly includes a plurality of inner molds and a plurality of supplementary side molds, the inner molds are detachably connected to the first bottom mold, the supplementary side molds are located between every two webs and the two ends of the supplementary side molds are respectively used to abut against the side walls of the two webs, and the supplementary side molds are connected to the inner molds via a third locking piece.

[0014] By adopting the above technical solution, supplementary side molds are set to facilitate the splicing and pouring of the web members and the roof trusses, thereby realizing modular construction, shortening the on-site construction time of the manifold roof trusses, and saving manpower and time.

[0015] Preferably, the third locking member includes a locking seat, a locking rod and a third locking nut, the locking seat is used to be placed on one end of the web, both ends of the supplementary side mold are provided with supplementary holes, the inner mold is provided with a third locking hole, and both ends of the locking rod are respectively passed through the supplementary hole and the third locking hole and are threadedly connected to the third locking nut.

[0016] By adopting the above technical solution, during splicing and pouring, the staff only needs to place one end of the web between the inner mold and the supplementary side mold, and then place the locking seat on one end of the web. At this time, the locking rod is passed through the two supplementary holes and the two third locking holes, and then the third locking nut is screwed on, so as to fix the supplementary side mold and reduce the gap between the supplementary side mold and the side wall of the web or the inner mold and the side wall of the web, thereby reducing the leakage of concrete.

[0017] Preferably, a fastener is provided between the outer mold and the inner mold, and the fastener includes a mounting rod and two fastening rods. The mounting rod is located at the top of the outer mold and the inner mold, and the two fastening rods are respectively connected to the two ends of the mounting rod, and the two fastening rods are respectively abutted against the outer mold and the inner mold.

[0018] By adopting the above technical solution and setting fasteners, the influence of cement expansion on the positions of the outer and inner molds is offset, and the shape change of the broken-line roof truss due to the change in the position of the outer mold is reduced, thereby improving the finished product quality of the cast parts.

[0019] Preferably, reinforcing ribs are provided on the side wall of the outer mold away from the prefabricated roof truss and the side wall of the inner mold away from the prefabricated roof truss.

[0020] By adopting the above technical solution, the deformation resistance of the outer mold and the inner mold is improved by setting reinforcing ribs, thereby reducing the deformation of the outer mold and the inner mold caused by cement expansion, and reducing the impact of cement pouring and subsequent cement vibration.

[0021] Preferably, two through holes are provided at both ends of the web member end form for the steel bars to pass through.

[0022] By adopting the above technical solution, the through holes facilitate the construction of steel bars during the prefabrication of the web members, and the structure is simple.

[0023] Preferably, the roof truss prefabricated mold and the web bar prefabricated mold are both made of steel.

[0024] By adopting the above technical solution, the existing broken-line roof truss wooden mold has a certain use cycle, its recycling rate is low and its consumption cost is high. After adopting the steel mold, the use cycle can be extended, thereby improving the recycling rate and reducing the consumption cost.

[0025] In summary, the present application includes at least one of the following beneficial technical effects:

[0026] 1. The mansard roof truss can be constructed in blocks. The webs can be cast in the factory through the web casting space of the web prefabrication mold to form the webs. Then, the cast webs are transported to the construction site. The first bottom mold, outer mold assembly and inner mold assembly are built on site to form the roof truss casting space. The prefabricated webs are placed in the roof truss casting space for splicing and casting, thereby realizing modular construction, thereby shortening the on-site construction time of the mansard roof truss and saving manpower and time.

[0027] 2. During splicing and pouring, the staff only needs to place one end of the web between the inner mold and the supplementary side mold, and then place the locking seat on one end of the web. At this time, the locking rod is passed through the two supplementary holes and the two third locking holes, and then the third locking nut is screwed on, so as to fix the supplementary side mold and reduce the gap between the supplementary side mold and the side wall of the web or the inner mold and the side wall of the web, thereby reducing the leakage of concrete;

[0028] 3. The existing broken-line roof truss wooden formwork has a certain use cycle, low recycling rate and high consumption cost. The use of steel molds can increase the use cycle, thereby improving the recycling rate and reducing consumption costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the partial structure of the prefabricated steel mold of the concrete zigzag roof truss according to the embodiment of the present application, mainly showing the prefabricated mold for the web member.

[0030] Figure 2 It is a schematic diagram of the structure of the concrete zigzag roof truss prefabricated steel mold part of the embodiment of the present application, mainly showing the roof truss prefabricated mold.

[0031] Figure 3 It is another partial structural schematic diagram of the concrete zigzag roof truss prefabricated steel mold in the embodiment of the present application, mainly showing the roof truss prefabricated mold.

[0032] Figure 4 yes Figure 3 A local enlarged schematic diagram of point A in the middle.

[0033] Figure 5 yes Figure 3 A local enlarged schematic diagram of point B in the middle.

[0034] Explanation of the reference numerals: 1. first bottom mold; 2. outer mold; 21. first locking bolt; 22. first locking nut; 23. second locking bolt; 24. reinforcing rib; 3. inner mold; 4. supplementary side mold; 41. locking seat; 42. locking rod; 43. third locking nut; 51. mounting rod; 52. tightening rod; 6. second bottom mold; 7. web member side mold; 8. web member end mold; 81. through hole; 91. fourth locking bolt; 92. fifth locking bolt; 93. fifth locking nut; 10. roof truss casting space; 11. web member casting space; 12. web member. DETAILED DESCRIPTION

[0035] The present application is further described in detail below in conjunction with all the accompanying drawings.

[0036] The present application embodiment discloses a prefabricated steel formwork for a concrete folding-line roof truss. Figure 1 , Figure 2 A concrete zigzag roof truss prefabricated steel mold includes a roof truss prefabricated mold and a web member prefabricated mold, wherein the roof truss prefabricated mold and the web member prefabricated mold are both made of steel, the roof truss prefabricated mold includes a first bottom mold 1, an outer mold assembly and an inner mold assembly, the outer mold assembly and the inner mold assembly are both installed on the first bottom mold 1, and a roof truss casting space 10 is formed between the outer mold assembly and the inner mold assembly, the web member prefabricated mold includes a second bottom mold 6, two web member side molds 7 and two web member end molds 8, the two web member side molds 7 are installed in parallel on the second bottom mold 6, the two web member end molds 8 are installed in parallel on the second bottom mold 6, and a web member casting space 11 is formed between the two web member side molds 7 and the two web member end molds 8.

[0037] A plurality of fourth locking holes are provided on the second bottom mold 6, and a plurality of fourth locking bolts 91, a plurality of fifth locking bolts 92 and a plurality of fifth locking nuts 93 are provided on the two web member side molds 7 and the two web member end molds 8. The fourth locking bolts 91 pass through the web member side molds 7 or the web member end molds 8 and are threadedly connected to the fourth locking holes, and each fifth locking bolt 92 passes through the web member end molds 8 and the web member side molds 7 in turn and is threadedly connected to the fifth locking nut 93. In addition, two through holes 81 for the steel bars to pass through are provided at both ends of the web member end molds 8, and the two through holes 81 are arranged in a horizontal direction.

[0038] Reference Figure 3 , Figure 4 as well as Figure 5The outer mold assembly includes a plurality of outer molds 2, which are connected end to end in pairs through a plurality of first locking members, and the plurality of outer molds 2 are connected to the first bottom mold 1 through a plurality of second locking members. The inner mold assembly includes a plurality of inner molds 3 and a plurality of supplementary side molds 4. The inner mold 3 is connected to the first bottom mold 1 through bolts. The supplementary side mold 4 is located between every two web members 12, and the two ends of the supplementary side mold 4 are respectively used to abut against the side walls of the two web members 12. The supplementary side mold 4 is connected to the inner mold 3 through a third locking member. A fastener is provided between the outer mold 2 and the inner mold 3. The fastener includes a mounting rod 51 and two fastening rods 52. The mounting rod 51 is located at the top of the outer mold 2 and the inner mold 3. The two fastening rods 52 are respectively connected to the two ends of the mounting rod 51. The two fastening rods 52 abut against the outer mold 2 and the inner mold 3 respectively. Reinforcing ribs 24 are provided on the side wall of the outer mold 2 away from the prefabricated roof truss and the side wall of the inner mold 3 away from the prefabricated roof truss.

[0039] The first locking piece includes a first locking bolt 21 and a first locking nut 22. A plurality of first locking holes are provided at both ends of the outer mold 2 in the length direction. The first locking bolt 21 passes through the first locking holes of the two outer molds 2 and is threadedly connected to the first locking nut 22. The second locking piece includes a second locking bolt 23. A plurality of second locking holes are provided at the bottom end of the outer mold 2. A plurality of fixing holes are provided on the first bottom mold 1. The second locking bolt 23 passes through the second locking hole and is threadedly connected to the fixing hole.

[0040] The third locking member includes a locking seat 41, a locking rod 42 and a third locking nut 43. The locking seat 41 is used to be placed on one end of the web 12. Supplementary holes are provided at both ends of the supplementary side mold 4. The inner mold 3 is provided with a third locking hole. Both ends of the locking rod 42 pass through the supplementary hole and the third locking hole in sequence and are threadedly connected to the third locking nut 43.

[0041] The implementation principle of a prefabricated steel formwork for a concrete zigzag roof truss in an embodiment of the present application is as follows: the zigzag roof truss can be constructed in blocks, and the webs 12 can be cast in the factory through the web casting space 11 of the web prefabricated mold to form the webs 12, and then the cast multiple webs 12 are transported to the construction site, and a first bottom mold 1, an outer mold assembly and an inner mold assembly are built on site to form a truss casting space 10, and the prefabricated webs 12 are placed in the truss casting space 10 for splicing and casting, thereby realizing modular construction, thereby shortening the on-site construction time of the zigzag roof truss and saving manpower and time.

[0042] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A prefabricated steel formwork for a concrete folding-line roof truss, characterized in that: The invention comprises a roof truss prefabrication mould and a web member prefabrication mould, wherein the roof truss prefabrication mould comprises a first bottom mould (1), an outer mould assembly and an inner mould assembly, wherein the outer mould assembly and the inner mould assembly are both mounted on the first bottom mould (1), and a roof truss casting space (10) is formed between the outer mould assembly and the inner mould assembly, and the web member prefabrication mould comprises a second bottom mould (6), two web member side moulds (7) and two web member end moulds (8), wherein the two web member side moulds (7) are mounted in parallel on the second bottom mould (6), and the two web member end moulds (8) are mounted in parallel on the second bottom mould (6), and a web member casting space (11) is formed between the two web member side moulds (7) and the two web member end moulds (8).

2. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 1, characterized in that: The outer mold assembly comprises a plurality of outer molds (2), the plurality of outer molds (2) being connected end to end in pairs via a plurality of first locking members, and the plurality of outer molds (2) being connected to the first bottom mold (1) via a plurality of second locking members.

3. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 2 is characterized in that: The first locking member comprises a first locking bolt (21) and a first locking nut (22); a plurality of first locking holes are provided at both ends of the outer mold (2) in the length direction; the first locking bolt (21) passes through the first locking holes of the two outer molds (2) and is threadedly connected to the first locking nut (22); the second locking member comprises a second locking bolt (23); a plurality of second locking holes are provided at the bottom end of the outer mold (2); a plurality of fixing holes are provided on the first bottom mold (1); the second locking bolt (23) passes through the second locking holes and is threadedly connected to the fixing holes.

4. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 3 is characterized in that: The inner mold assembly comprises a plurality of inner molds (3) and a plurality of supplementary side molds (4), wherein the inner molds (3) are detachably connected to the first bottom mold (1), the supplementary side molds (4) are located between every two webs (12), and two ends of the supplementary side molds (4) are respectively used to abut against the side walls of the two webs (12), and the supplementary side molds (4) are connected to the inner molds (3) via a third locking member.

5. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 4 is characterized in that: The third locking member comprises a locking seat (41), a locking rod (42) and a third locking nut (43); the locking seat (41) is used to be placed on one end of the web bar (12); both ends of the supplementary side mold (4) are provided with supplementary holes; the inner mold (3) is provided with a third locking hole; and both ends of the locking rod (42) pass through the supplementary hole and the third locking hole in sequence and are threadedly connected to the third locking nut (43).

6. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 4, characterized in that: A fastener is provided between the outer mold (2) and the inner mold (3), the fastener comprising a mounting rod (51) and two fastening rods (52), the mounting rod (51) being located at the top of the outer mold (2) and the inner mold (3), the two fastening rods (52) being respectively connected to two ends of the mounting rod (51), and the two fastening rods (52) being respectively in contact with the outer mold (2) and the inner mold (3).

7. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 4, characterized in that: Reinforcing ribs (24) are provided on the side wall of the outer mold (2) away from the prefabricated roof truss and the side wall of the inner mold (3) away from the prefabricated roof truss.

8. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 1, characterized in that: Two through holes (81) are provided at both ends of the web member end mold (8) for steel bars to pass through.

9. The prefabricated steel formwork for concrete folding-line roof trusses according to claim 1, characterized in that: The roof truss prefabrication mould and the web bar prefabrication mould are both made of steel.