Comprehensive pipe gallery foundation collapse reduction method combining foundation expansion pressure reduction and light backfilling
By using the expanded pressure reduction and lightweight backfill methods in the comprehensive pipeline foundation in the trapped loess area, combining the bearing plate and lightweight materials, the wet deformation problem of the foundation is solved and the stability and safety of the pipeline structure is improved. It realizes simplicity, efficiency and environmental protection and energy saving of construction.
Patent Information
- Application Number
- CN202411494619.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2024-12-03
AI Technical Summary
In the wet loess area, the existing comprehensive pipeline foundation treatment methods lack scientific basis, resulting in damage to the loess structure and deterioration of strength, affecting the foundation bearing capacity, and compaction backfilling has problems such as small space, increased load, long construction period and environmental impact. , a new method of wet sink reduction is urgently needed.
By combining the expansion pressure reduction and light backfill, the foundation surface base stress is calculated and the minimum wet sink start pressure is used to compare the foundation surface base area and light backfill materials to replace traditional compacted soil to reduce foundation load. , ensure that the stress does not exceed the minimum value of the wet sink starting pressure, thereby reducing wet sink deformation.
It effectively avoids wet deformation of the foundation, improves the stability and safety of the pipeline structure, is simple and efficient, reduces construction costs and environmental impact, and is suitable for adjustment and optimization of different engineering conditions.
Smart Images

Figure CN119061866A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of shallow buried open-cut integrated pipeline corridor construction engineering in collapsible loess areas, and specifically relates to a method for reducing foundation collapsibility of an integrated pipeline corridor by combining base expansion and decompression with lightweight backfill. Background Art
[0002] The integrated pipe corridor integrates water, heating, gas, electricity, and communications pipelines into the corridor for unified management. It is a modern municipal project that solves the problem of "zipper roads" in cities and improves urban security and disaster response capabilities. The design life of the integrated pipe corridor is mostly 100 years. Excessive settlement of its foundation will affect the safe operation of the pipelines in the corridor, and excavation and repair are extremely difficult. The Q2 loess in many areas still has a strong self-weight collapsible property, and the sites are mostly level III and IV self-weight collapsible sites. The pipe corridors in these areas mostly adopt open-cut shallow-buried linear projects. During the operation of the pipe corridor, leakage of water supply and drainage pipelines and lateral seepage of sponge city LID facilities into the loess layer under the foundation of the pipe corridor are very likely to induce loess collapse and endanger the stability of the pipe corridor foundation. The current "Technical Specifications for Urban Integrated Pipeline Corridor Engineering" (GB50838-2015) and "Building Standards for Collapsible Loess Areas" (GB50025-2018) do not provide any measures for the treatment of pipeline corridor foundations. Currently, the foundation treatment is mostly based on the compaction piles and replacement cushion layers of municipal engineering. The design parameters lack experience and scientific basis, and conventional vibration compaction can cause structural damage and strength degradation of the underlying original loess, which in turn affects the bearing capacity of the foundation.
[0003] In order to ensure the smooth surface after the tunnel is backfilled and avoid the formation of waterlogging in depressions, part of the top surface must also meet the requirements of road use. At present, loess is mostly compacted and backfilled, with a compaction degree of no less than 90% under the green belt and no less than 95% under the roadbed. There are the following problems with compacted loess backfill: 1) The space of the fertilizer troughs on both sides of the tunnel is small, which is not convenient for compaction construction; 2) The dry density of compacted loess is greater than that of the original loess, which may increase the foundation load of the tunnel; 3) Compacted loess has requirements for the moisture content of the soil sample, and the compaction process takes a long time; 4) Vibration or tamping compaction affects the surrounding environment. Since the conditions for loess collapsible deformation are overburden load and water immersion, both of which are indispensable, the immersion of the collapsible loess layer under the tunnel foundation is inevitable and difficult to predict, and the foundation treatment lacks scientific basis and normative guidance.
[0004] The existing foundation treatment methods for integrated pipeline corridors lack scientific basis and normative guidance, which leads to damage and strength degradation of loess structure, affecting the bearing capacity of the foundation. In addition, the compaction backfill construction has problems such as narrow space, possible increase in foundation load, requirements on soil moisture content, long construction period and impact on the surrounding environment. It is urgent to find a new method to reduce the collapse of the foundation of the integrated pipeline corridor to reduce the foundation pressure of the pipeline corridor and weaken the collapse deformation of the foundation. Summary of the invention
[0005] In order to overcome the shortcomings of the above-mentioned prior art, the purpose of the present invention is to provide a comprehensive pipeline corridor foundation collapse reduction method combining base expansion and decompression with lightweight backfill, so as to solve the technical problem of severe foundation collapse deformation caused by increased base pressure in pipeline corridors in collapsible loess areas.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions: The invention discloses a method for reducing the collapse of a comprehensive pipe gallery foundation by combining base expansion and decompression with lightweight backfill, comprising the following steps: 1) Determine the type of pipe gallery and the depth of the foundation pit, drill holes for sampling, obtain the initial collapsible pressure of each soil layer under the pipe gallery, and select the minimum initial collapsible pressure P shm ; 2) Calculate the self-weight pressure of the lightweight backfill on the upper part of the tunnel foundation surface and the additional load on the upper part of the tunnel foundation surface, and then calculate the foundation surface base stress P ; 3) The foundation surface stress P Minimum collapsibility starting pressure P shm For comparison; if P Greater than P shm , the collapse deformation can be reduced by light backfill or base expansion and decompression until P No more than P shm , complete the reduction of collapse deformation of the foundation of the comprehensive pipeline corridor; The expansion of base and pressure reduction is achieved by setting a bearing plate at the bottom of the corridor without expanding the excavation area of the foundation pit and increasing the foundation surface and foundation area of the corridor, and expanding the width of the bearing plate to achieve the expansion of base and pressure reduction.
[0007] Preferably, in step 2), when calculating the self-weight pressure of the lightweight backfill body on the upper part of the tunnel foundation surface, for the inverted trapezoidal backfill body, the self-weight pressure is calculated according to the overall self-weight of the inverted trapezoidal block; for the loose, lightweight and easily compacted material, the self-weight pressure is calculated according to the columnar body on the bottom surface of the tunnel foundation pit; The additional load on the upper part of the tunnel foundation surface includes the deadweight of the tunnel and the pipelines in the tunnel; if the top of the tunnel is used as a road after backfilling, it also includes the deadweight of each layer of the road surface and the traffic load; Foundation surface base stress P It includes the sum of the self-weight pressure of the first lightweight material and the self-weight pressure of the second lightweight material, the self-weight of the bearing plate, the self-weight of the original soil above the extension section of the bearing plate, and the additional load on the upper part of the tunnel foundation surface.
[0008] Preferably, in step 3), the lightweight backfill is replaced with a lighter backfill material; the lighter backfill material includes a foam lightweight block material, a loose lightweight easily compacted material and a lightweight gelled composite material.
[0009] Further preferably, in step 3), when the foam lightweight block material is an EPS / XPS block, the density is not less than 20 kg / m 3 ; EPS / XPS blocks are inverted trapezoidal blocks with a longitudinal length of 1~3m; The EPS / XPS block filling method includes: after the pouring of the pipe gallery on the bearing plate is completed and reaches the curing age, the bottom surface of the fertilizer trough is cleared and the side walls of the foundation pit are leveled; a sand cushion layer is laid on the bottom surface of the fertilizer trough for leveling; the prefabricated foamed EPS / XPS blocks are filled into the fertilizer trough to ensure that the top surface of the EPS / XPS blocks does not exceed the top surface of the pipe gallery, and the longitudinal joints of the EPS / XPS blocks are staggered with the joints of the pipe gallery; after the EPS / XPS blocks are filled and pressed, sand is used to fill the gap between the EPS / XPS blocks and the foundation pit, and a sand cushion layer is laid on the top surface of the EPS / XPS blocks to form a drainage channel composed of drainage holes, sand cushion layers and sand in the side wall gaps.
[0010] Further preferably, in step 3), the loose, lightweight and easily compacted materials include construction waste, gravel, expanded clay and lightweight soil, the maximum particle size does not exceed 1 / 3 of the backfill thickness, and the content of particles larger than 40 mm is not less than 30%; when backfilling the fertilizer troughs on both sides of the corridor, they are layered and filled in sections at the same time; the compaction degree is not less than 95%; the two sides of the geotextile anti-seepage cloth extend beyond the edge of the foundation pit by not less than 1m; and a cultivated soil or compacted loess layer is laid above the geotextile anti-seepage cloth, and the top surface of the cultivated soil or compacted loess layer is higher than the surrounding original ground to form a slightly raised surface.
[0011] Further preferably, in step 3), the lightweight cementitious composite material is foamed concrete, using silicate cement with a strength grade of 42.5 or above, and the foaming agent is an environmentally friendly synthetic polymer surfactant; the diameter is less than 1.0 mm, and the dilution multiple of the foaming agent is not less than 60 times; Before backfilling, the bottom surface of the fertilizer trough is simply leveled, and then backfilling is carried out. The backfilling is completed in two times, including the backfilling of the fertilizer trough and the backfilling of the upper part of the corridor, and finally the top soil is backfilled. During the backfilling, several templates are set longitudinally, and expansion joints and settlement joints are reserved. The templates should span the joints of the corridor. When backfilling the fertilizer trough, both sides are poured in layers at the same time. When pouring to the top surface of the corridor, maintenance is carried out. After the maintenance is completed, a sand cushion layer is laid to separate the upper and lower concrete bodies. When the top of the corridor is backfilled and poured close to the ground, multiple anti-rust lifting rings are buried when pouring the hub section or important section of the corridor. After pouring and maintenance, geotextile anti-seepage cloth is laid and extended to the original soil of the extension section on both sides of the foundation pit; then the top soil is backfilled.
[0012] Preferably, in step 3), after the lightweight backfill, if the top is used for road use, loess is used for compaction backfill; if the top is used for green space, the bottom is compacted and the upper loess is backfilled with self-compacting soil.
[0013] Preferably, in step 3), the carrying plate implementation process includes: 31) Foundation surface base stress P Not greater than the minimum initial collapse pressure of the underlying loess layer P shm , it is only necessary to level the foundation pit and set the bearing plate within the width of the foundation pit on the original loess. P Greater than P shm , the bearing plate extends to both sides; 32) For unsaturated undisturbed loess, horizontal grooves are opened symmetrically on both sides of the bottom of the foundation pit, and the height of the groove is slightly greater than the thickness of the bearing plate; 33) The process of setting the bearing plate includes two methods: prefabrication and cast-in-place. After the horizontal groove is opened, the internal soil is removed and the sand or loess cushion layer is used for paving and leveling; 34) After the cast-in-place maintenance or prefabricated assembly of the pipeline corridor is completed, the fertilizer trough and the upper part shall be backfilled.
[0014] Further preferably, in step 3), if a prefabricated bearing plate is used, after it is accurately hoisted to a suitable position, sand is used to densely fill the gap between the bearing plate and the horizontal groove; If cast-in-place bearing plate is used, formwork, cast-in-place, and curing are carried out, and then sand or loess is used to fill the upper gap of the horizontal groove; Prefabricated load-bearing plates need to be equipped with several anti-corrosion lifting rings, while cast-in-place load-bearing plates do not need to be equipped with such rings.
[0015] Further preferably, in step 3), the bearing plate spans the pipe gallery interface with a longitudinal length of 5 to 10 m; 2 to 3 cm is reserved between the plates as settlement joints and expansion joints; The bearing plate is a reinforced concrete plate or a high-strength foam concrete plate with a thickness of 20~30cm; Horizontal grooves are symmetrically opened on both sides of the bottom of the foundation pit. The height of the horizontal grooves is 25~35cm, slightly larger than the thickness of the bearing plate; the width of the extension section of the bearing plate of the single warehouse pipe gallery is 0~200cm; The bearing plate is provided with a row of perforations at the fertilizer tank position for draining the accumulated water in the fertilizer tank during operation.
[0016] Compared with the prior art, the present invention has the following beneficial effects: The invention discloses a comprehensive tunnel foundation collapsibility reduction method combining foundation expansion and decompression with lightweight backfilling. By calculating the foundation surface base stress and comparing it with the minimum collapsibility starting pressure, it is ensured that the foundation surface base stress is not greater than the minimum value of the collapsibility starting pressure of the underlying loess layer, thereby effectively avoiding the occurrence of foundation collapsibility deformation. The method of combining the arrangement of a wider bearing plate under the tunnel (base expansion and decompression) and the backfilling of a foundation pit with a lightweight material that is easy to compact or does not require compaction (lightweight backfilling) is adopted to reduce the load at the tunnel foundation surface to below the collapsibility starting pressure of the underlying loess layer, which is an effective means to reduce foundation collapsibility deformation. The foundation expansion and decompression technology disperses the foundation pressure of the tunnel foundation by increasing the width of the bearing plate; while the lightweight backfill technology uses lightweight materials to replace traditional compacted soil, further reducing the foundation load. The combination of the two effectively controls the foundation surface base pressure. Even if the loess under the foundation is completely saturated with water, as long as the backfill load above the foundation surface does not exceed the minimum value of the collapsibility starting pressure, the foundation will not collapse and deform. The method for reducing the foundation collapse of the integrated pipeline corridor combined with base expansion and decompression and lightweight backfill provided by the present invention has the advantages of simple construction, economical and efficient, environmental protection and energy saving, and can effectively solve the problem of foundation collapse deformation of the integrated pipeline corridor in the collapsible loess area, and promote the rapid development of the construction of the integrated pipeline corridor. The reduction of foundation collapse deformation directly improves the stability and safety of the pipeline corridor structure. As an important urban infrastructure, the stability and safety of the pipeline corridor are of vital importance. The method reduces the risk of foundation collapse, ensures the long-term stable operation of the pipeline corridor structure, and reduces the structural damage and maintenance costs caused by foundation collapse. It can be comprehensively compared according to the loess engineering geological conditions, pipeline corridor types, foundation pit depths and engineering economics of different sites, and select the most suitable parameters and schemes. At the same time, the method also has a certain flexibility and can be adjusted and optimized according to actual conditions to meet the needs of different projects.
[0017] Furthermore, by rationally selecting lightweight backfill materials and load-bearing board types, as well as scientific construction steps, construction efficiency is improved and construction costs are reduced. The use of prefabricated load-bearing boards can reduce on-site construction time and environmental pollution; the use of lightweight backfill materials can reduce the transportation and compaction costs of backfill earthwork.
[0018] Furthermore, lightweight environmentally friendly materials such as foam lightweight block materials, loose lightweight and easy-to-compact materials, and lightweight gelled composite materials are used to replace traditional compacted soil for backfilling. These materials have the characteristics of low density, light weight, and easy compaction, which can effectively reduce the pressure on the base of the bearing plate and meet the requirements of the backfill of the tunnel foundation pit.
[0019] Furthermore, the anti-corrosion lifting rings and drainage holes provided on the bearing plate facilitate the later inspection or replacement of the pipe gallery structure, thereby improving the convenience of maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a flow chart of the method for reducing collapsible deformation of the comprehensive pipe gallery "base expansion and pressure reduction + lightweight backfill" disclosed in the present invention; Figure 2 This is a schematic diagram of the "base expansion and pressure reduction + lightweight backfill" structure of a single-warehouse pipe gallery disclosed in the present invention; Figure 3 It is a schematic structural diagram of the optimal solution for base expansion, decompression and lightweight backfilling of a single-warehouse pipe gallery disclosed in the present invention (Scheme ①); Figure 4 This is a schematic structural diagram of the optimal solution for base expansion, decompression and lightweight backfilling of the double-warehouse corridor disclosed in the present invention (Scheme ⑥).
[0021] Among them: 1-bearing plate; 2-drainage hole; 3-pipe gallery; 4-first lightweight material; 5-sand cushion layer; 6-original soil of extension section; 7-second lightweight material; 8-geotextile impermeable cloth; 9-cultivated soil or compacted loess layer. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0024] The present invention is further described in detail below in conjunction with the accompanying drawings: The basic idea of the method for reducing the subsidence of the foundation of the comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill disclosed in the present invention includes: Based on a comprehensive comparison of the site's loess engineering geological conditions, pipe gallery type, foundation pit depth, and engineering economics, the material, size, and other parameters and solutions for the lightweight backfill of the bearing plate 1 are selected.
[0025] (1) After the type of pipeline corridor and the depth of foundation pit are determined, the initial collapsible pressure of each loess layer under the pipeline corridor is obtained through drilling and sampling, and the minimum initial collapsible pressure is selected. P shm .
[0026] (2) Calculation of the self-weight pressure of the lightweight backfill body on the upper part of the tunnel foundation surface. For the inverted trapezoidal backfill body, the original loess bodies on both sides are fully saturated under extreme working conditions. The self-weight pressure of the block lightweight materials (foam concrete, EPS, XPS, etc.) is calculated according to the overall self-weight of the inverted trapezoidal block, while the self-weight pressure of the loose, lightweight and easily compacted materials (construction waste, lightweight soil, crushed gravel, etc.) is calculated according to the columnar body at the bottom of the tunnel foundation pit.
[0027] (3) Calculation of additional load on the upper part of the tunnel foundation surface. This part includes the self-weight of tunnel 3 and the pipelines in the tunnel. In addition, if the top of tunnel 3 is used as a road after backfilling, the compacted soil backfill must meet the compaction requirements for road use, taking into account the self-weight of each layer of the road surface and the traffic load.
[0028] (4) Calculation of foundation surface base stress. The foundation surface pressure is the sum of the self-weight pressure of the lightweight backfill, the self-weight of the bearing plate 1, the saturated self-weight of the overlying soil on the extension section of the bearing plate 1 in the original loess, and the additional load on the upper part of the tunnel foundation surface. The foundation surface base stress is calculated by combining the length of the bearing plate 1. P .
[0029] (5) Determination of foundation collapse deformation. The calculated foundation surface stress P Minimum collapsibility starting pressure P shm For comparison. P No more than P shm , then the current design has the effect of reducing the collapse deformation. P Greater than P shm , then the foundation will be fully immersed in water and will undergo collapse. This collapse should be reduced by replacing lighter backfill materials or increasing the width of the bearing plate 1 until P No more than P shm .
[0030] Key technical indicators and implementation process of pipe gallery base expansion and pressure reduction disclosed in the present invention The purpose of reducing pressure by expanding the foundation is to set a thin layer of rigid bearing plate (such as reinforced concrete plate or high-strength foam concrete plate, etc.) at the bottom of the tunnel 3 without expanding the excavation area of the foundation pit and increasing the foundation and base area of the tunnel. If necessary, horizontal grooves are opened on both sides of the foundation pit to expand the tunnel foundation area by increasing the width of the bearing plate 1, so as to disperse the base pressure of the tunnel foundation. The commonly used reinforced concrete plate is used as an example for explanation.
[0031] When using C20 reinforced concrete slabs, the slab thickness is controlled at 20~30cm. Prefabrication and cast-in-place can be selected according to the environment of the implementation site. Prefabricated slabs have the advantages of easy quality control, high degree of standardization, low dust and noise pollution, little impact on the construction environment, and high construction efficiency. However, 4 anti-corrosion-treated lifting rings must be set for lifting, transportation and installation, and the transportation cost is relatively high. Cast-in-place slabs do not need to be equipped with anti-corrosion lifting rings. During on-site cast-in-place construction, they have a high degree of fit with the bottom surface of the side trough, the pipe gallery 3 structure and its foundation surface, but the on-site construction and maintenance costs are high, the environmental impact is large, the construction period is long, and quality control is difficult.
[0032] Implementation process of carrier board 1: (1) After the implementation of this method, the base pressure of the bearing plate 1 is not greater than the minimum value of the initial collapse pressure of the underlying loess layer, that is, even if the loess of the entire site is saturated with water, the loess layer under the pipe gallery 3 will not collapse and deform. Therefore, there is no need to perform foundation treatment. It is only necessary to level the foundation pit and set the bearing plate 1 on the original loess. It is preferred to set the bearing plate 1 within the width of the foundation pit. If this requirement cannot be met, the bearing plate 1 should be extended to both sides.
[0033] (2) The higher strength of unsaturated undisturbed loess is conducive to lateral slotting. A horizontal slotting machine is used to symmetrically open horizontal slots on both sides of the bottom of the foundation pit. The height of the slot is slightly greater than the thickness of the bearing plate 1 and can be controlled between 25 and 35 cm. The width of the extended section of the bearing plate is L 2 According to the comprehensive calculation, the width of the extension section of the single warehouse corridor bearing plate is L 2 It should be controlled within 0~200cm.
[0034] (3) Installation / cast-in-place of bearing plate 1. After the horizontal groove is opened, remove the internal soil and spread the sand (or loess) cushion layer for leveling. If a prefabricated bearing plate 1 is used, after accurately hoisting it to the appropriate position, use sand to densely fill the gap between the bearing plate 1 and the horizontal groove. If a cast-in-place bearing plate 1 is used, formwork, cast-in-place, and curing are carried out for 28 days, and then sand or loess is densely filled in the upper gap of the horizontal groove. The longitudinal length of the bearing plate 1 is controlled to be 5~10m, and 2~3cm is reserved between the bearing plates 1 as settlement joints and expansion joints. The bearing plate 1 must cross the interface of the pipe gallery 3. In addition, a row of 5cm diameter perforations are set at the fertilizer trough of the bearing plate 1, and the perforation spacing is 100cm, which is used to discharge the accumulated water in the fertilizer trough during operation.
[0035] (4) After the cast-in-place maintenance or prefabrication assembly of the integrated pipeline corridor 3 is completed, the fertilizer trough and the upper part are backfilled.
[0036] Key technical indicators and implementation process of lightweight backfill of pipe gallery foundation pit disclosed in the present invention Select lightweight materials for backfilling the tunnel foundation pit based on the construction environment and economic and technical comparison. Lightweight backfill is to use lightweight environmentally friendly materials such as foam lightweight block materials, loose lightweight and easy-to-compact materials, and lightweight cementitious composite materials to replace the compacted soil (compaction degree not less than 95%) required in the "Technical Specifications for Urban Integrated Tube Corridor Engineering" (GB50838-2015), backfill the tunnel 3 fertilizer trough and foundation pit to achieve the purpose of reducing the base pressure of the bearing plate 1. After backfilling, ensure that the top surface is slightly raised without water accumulation, and meet the requirements of road foundation when necessary. Selection and implementation steps of the first lightweight material 4 and the second lightweight material 7: (1) Foam lightweight block material The foam lightweight block material takes EPS / XPS as an example to introduce the fertilizer tank backfill. The density of the selected EPS / XPS material is not less than 20kg / m 3 , to ensure sufficient modulus, shape and size according to the size of the fertilizer tank foaming preparation, generally inverted trapezoidal blocks, the longitudinal size is controlled at 1~3m. EPS / XPS block filling steps and related technical points are as follows: 1) After the pouring of the pipe gallery 3 on the bearing plate 1 is completed and reaches the curing age, the surface of the bearing plate 1 (the bottom of the fertilizer trough) is cleaned to ensure that it is flat and free of water accumulation. At the same time, the side walls of the foundation pit are leveled to retain the foundation pit spray layer and reduce the demolition workload.
[0037] 2) A 3~5cm thick sand cushion layer 5 is laid on the surface of the bearing plate 1 (bottom of the fertilizer trough) for leveling. The flatness error of the fertilizer trough base surface is ±10mm.
[0038] 3) Fill the prefabricated EPS / XPS blocks into the fertilizer trough, ensuring that the top surface of the blocks does not exceed the top surface of the pipe gallery 3. The longitudinal joints of the EPS / XPS blocks should be staggered with the joints of the pipe gallery 3 when necessary.
[0039] 4) After the block is filled and compacted, sand is used to fill the gap between the block and the foundation pit. At the same time, a 3-5 cm thick sand cushion layer 5 is laid on the top surface of the block to form a drainage channel composed of the drainage holes 2 of the bearing plate, the sand cushion layer 5, and the sand in the side wall gaps to prevent the accumulation of water from generating top buoyancy on the block.
[0040] 5) To maintain the stability of the performance, EPS / XPS blocks should not be exposed to organic solvents before being buried, and should not be near open flames or exposed to the sun. They should be handled with care during transportation, and the stacking site should be flat and free of water, and stacked neatly to avoid damage to the edges of the blocks. Cutting should be handled with electric heating wires provided by the manufacturer.
[0041] (2) Loose, lightweight and easily compacted materials According to local objective conditions, construction waste, gravel, ceramsite and lightweight soil are used for backfilling in an economically effective manner to control costs to the greatest extent. The loose, lightweight and easily compacted materials take construction waste as an example to introduce the specific construction process and key technical indicators.
[0042] 1) Raw material quality control: The maximum particle size of construction waste filler shall not exceed 1 / 3 of the backfill thickness, the content of particles larger than 40 mm shall not be less than 30%, the content of particles larger than 10 mm shall be between 35% and 85%, and the content of particles smaller than 0.075 mm shall not be greater than 5%. The content of organic building materials shall not exceed 1%.
[0043] 2) Fertilizer trough backfilling: When backfilling the fertilizer troughs on both sides of the tunnel 3, the backfilling should be done in layers and sections at the same time to avoid a single-sided backfill causing a large lateral pressure on the side wall of the tunnel 3, causing the tunnel 3 structure to shift or be damaged.
[0044] 3) After the fertilizer trough is backfilled once, a light frog-type rammer should be used for light tamping to avoid damage to the foundation loess caused by tamping vibration. The compaction degree should be no less than 95%.
[0045] 4) Upper backfill: Continue to backfill the upper foundation pit. The backfill can be self-compacted by layered paving fillers. After backfilling to about 0.5m from the ground, use a light roller for static compaction to ensure that the compaction degree is not less than 95%. After the backfill is completed, lay a two-cloth-one-film geomembrane, and the two sides of the geomembrane extend at least 1m beyond the edge of the foundation pit.
[0046] 5) Top backfill: backfill according to the use requirements of the top surface of the pipe gallery 3. If the top is used as a road, loess is compacted and backfilled according to the requirements of the roadbed, and the compaction degree is not less than 98%. If the top is used as a green space, the compaction degree of the bottom 0.5m is not less than 95%, and the upper loess is self-compacted backfill (dry density is controlled to be 1.2~1.3g / cm 3 Regardless of the later use, the top surface should be about 0.2m higher than the surrounding original ground, and form a slightly raised surface to prevent water accumulation.
[0047] (3) Lightweight cementitious composite materials The lightweight gel composite material is preferably foam concrete, which is currently widely used and technologically mature. When backfilling with foam concrete, low-density, low-water absorption and high-strength foam concrete should be selected to backfill the fertilizer trough and foundation pit in layers. According to the requirements for road use or greening on the top of the tunnel 3, key technical indicators involved in the processes of foam concrete proportioning, backfill pouring and maintenance are selected.
[0048] 1) Foam concrete configuration requirements Foamed concrete shall use silicate cement with a strength grade of 42.5 or above, and an environmentally friendly synthetic polymer surfactant shall be used as the foaming agent. The foamed foam shall be uniform and fine in size, with a diameter of less than 1.0 mm. The dilution multiple of the foaming agent shall be no less than 60 times. Early strength agent and water repellent agent may be added, and antifreeze agent may be added during winter construction. When the top surface of the tunnel 3 is greened, A03 type foamed concrete may be used for the entire section of the fertilizer trough and the foundation pit. When the top surface of the tunnel 3 is used as a road, A05 type foamed concrete may be used for the foundation pit above the fertilizer trough. See Table 1 for specific indicators.
[0049] Table 1 Main parameters of foamed concrete for backfilling of tunnel foundation pit
[0050] 2) Technical requirements for backfilling and pouring of tunnel foundation pit Before backfilling, the top surface of the bearing plate 1 (bottom surface of the fertilizer trough) is simply leveled, and then pumped concrete is used for backfilling. Backfilling is completed in two steps, namely, backfilling the fertilizer trough, backfilling the upper part of the pipe gallery 3, and finally backfilling the top soil. When backfilling, formwork is set every 5m in the longitudinal direction, and 2~3cm expansion joints and settlement joints are reserved. The formwork should cross the joints of the pipe gallery 3. When backfilling the fertilizer trough, both sides are poured in layers at the same time. When pouring to the top surface of the pipe gallery 3, it is cured for 7d. After the curing is completed, a 3~5cm sand cushion layer 5 is laid to separate the upper and lower poured concrete bodies. The top of the pipe gallery 3 is backfilled and poured to about 0.5m from the ground. When pouring the hub section or important section of the pipe gallery 3, multiple anti-rust lifting rings are buried to facilitate the later maintenance or replacement of the pipe gallery 3 structure. After pouring is completed and cured for 28d, an anti-seepage geomembrane is laid and extended to the original soil on both sides of the foundation pit. Subsequently, backfilling is carried out according to the requirements for greening and road use, where the backfilling requirements are consistent with the relevant requirements of “(ii) Loose, lightweight and easily compacted materials”.
[0051] See also Figure 1 This is a flow chart of the method for reducing collapsible deformation of the comprehensive pipe gallery "base expansion and decompression + lightweight backfill" disclosed in the present invention; as can be seen from the figure, when the type and burial depth of the pipe gallery are determined, the method obtains the minimum collapsible starting pressure by sampling the loess lying under the foundation in layers P shm , and then select a reasonable backfilling scheme and the size of the load-bearing plate 1 according to the actual situation, and calculate the base pressure of the load-bearing plate 1 P , when the base pressure P Not greater than the minimum collapsible initial pressure P shm , it is considered that the current solution is a reasonable solution to reduce the collapse deformation.
[0052] Figure 2This is a schematic diagram of the "base expansion and pressure reduction + lightweight backfill" structure of a single-warehouse pipe gallery disclosed in the present invention. Anti-corrosion lifting rings are added as needed according to the type of bearing plate. It can be seen from the figure that the pipe gallery 3 achieves base expansion and pressure reduction by placing a bearing plate 1 at the bottom. The total length of the bearing plate 1 is L , by the width of the foundation pit L 1 and the extension length of the carrier plate 1 L 2 components, the length of the extension section of the load-bearing plate L 2 According to the comprehensive calculation, the extension length of the single warehouse corridor load-bearing plate is determined. L 2 should be controlled within 0~200cm. A drainage hole 2 with a diameter of 5cm is set at the edge of the foundation pit for draining the accumulated water. If the bearing plate 1 within the width of the foundation pit meets the requirements, it does not need to be extended ( L 2=0). The backfill area of the foundation pit of the tunnel 3 is divided into the fertilizer trough backfill area on both sides of the tunnel 3 and the upper backfill area of the tunnel 3, which are backfilled with the first lightweight material 4 and the second lightweight material 7 respectively. When the fertilizer trough is filled with foam blocks such as EPS / XPS, a sand cushion layer 5 needs to be added at the boundary of the backfill area to level and quickly drain water. The upper part of the extension section of the bearing plate 1 to the cut-and-fill interface is the original soil 6 of the extension section, and its deadweight needs to be considered when calculating the foundation surface pressure. A geotextile anti-seepage cloth 8 is laid at the boundary of the upper backfill area for anti-seepage, and the top is backfilled with cultivated soil according to the requirements of later greening, or compacted loess is used for road use to form cultivated soil or compacted loess layer 9.
[0053] Figure 3 This is a schematic diagram of the optimal scheme for the expansion and decompression of the base of a single warehouse pipe gallery and lightweight backfilling disclosed in the present invention (Scheme ①); it can be seen from the figure that the total length of the bottom bearing plate 1 L 3.9m, including the bottom of the foundation pit L 1 3.5m wide, extension L 2 is 0.2m, the thickness of the bearing plate 1 is 0.2m, and the bottom of the pipe gallery 3 is 5.6m to the ground surface. As the optimal solution for base expansion and decompression and lightweight backfilling in this working condition, the fertilizer tank backfill area is backfilled with EPS blocks, and the upper backfill area is backfilled with A05 type foam concrete. After calculation, the total load of the bearing plate 1 and the upper part is 394.7kN, and the base stress of the bearing plate 1 is 111.2kPa, which is not greater than the minimum value of the initial pressure of the underlying loess layer. P shm (112kPa), which can achieve the purpose of reducing the collapse and deformation of the tunnel foundation.
[0054] Figure 4 This is a schematic diagram of the optimal solution for the double-warehouse pipe gallery expansion, decompression and lightweight backfilling disclosed in the present invention (Scheme ⑥); as can be seen from the figure, the total length of the bottom bearing plate 1 LThe base is 5.25m, and no base expansion treatment is performed. The thickness of the bearing plate is 0.2m, and the bottom of the tunnel 3 is 5.6m from the ground surface. As the optimal solution for base expansion and decompression and lightweight backfilling in this working condition, EPS blocks are used for backfilling the fertilizer trough backfill area, and A05 type foam concrete is used for backfilling the upper backfill area. According to calculations, the total load of the bearing plate 1 and the upper part is 496kN, and the base stress of the bearing plate 1 is 104.47kPa, which is not greater than the minimum value of the initial pressure of the underlying loess layer. P shm (112kPa), which can achieve the purpose of reducing the collapse and deformation of the tunnel foundation.
[0055] Implementation Cases The planned pipeline corridor 3 of the Airport New City in Xixian New Area, Shaanxi Province is 34.34 km long. The self-weight collapsible loess of levels III and IV in the area is widely distributed and thick, which has become a problem restricting construction. At the same time, as one of the first pilot cities for sponge city construction in the country, Xixian New Area plans to build a large number of infiltration, storage and water retention facilities such as ecological filter ditches, sunken green spaces and rainwater gardens, which are extremely unfavorable to the stability of the foundation of the pipeline corridor in the later stage.
[0056] The Airport New City is located in the Xianyang Plateau between the watersheds of the Jinghe River and the Weihe River. The typical site strata from top to bottom are: Q4 cultivated soil (1~2m), Q3 Malan loess (2~10m), Q2 Lishi loess, with multiple layers of brown ancient soil in between. There is no groundwater within 30m, and the average natural gravity of the site is 16.27KN / m 3 The average natural gravity above the depth of 5.6m (the bottom of the tunnel) is 15.03 KN / m 3 , saturated density: 18.6KN / m 3 The natural self-weight stress here is P z is 84.17 kPa.
[0057] According to the "Building Standards for Collapsible Loess Areas" (GB50025-2018), through drilling sampling and indoor collapsible test results, it can be calculated that the collapsible amount and self-weight collapsible amount of the site in the depth range of 0-24m are 958.59 and 279.9mm respectively, which can be judged that the site belongs to the Class III (serious) self-weight collapsible site. The initial collapsible pressure of each layer of loess below the bottom of the tunnel (at a depth of 5.6m) P sh Between 112kPa and 150kPa. Even if the loess under the foundation is completely saturated with water, as long as the backfill load above the foundation surface does not exceed the minimum value of the initial pressure of wet collapse ( P shm is 112 kPa), the foundation will not undergo collapse and deformation, and this is used as the threshold for the design of the corridor foundation pit backfill and the bearing plate 1.
[0058] The weight parameters of the integrated pipe gallery bearing plate and lightweight backfill material are selected according to the most unfavorable (maximum) working conditions, see Table 2.
[0059] Table 2 Comprehensive pipe gallery bearing plate and lightweight backfill materials and their weights Unit: KN / m 3
[0060] (1) Single warehouse corridor The calculation table of the bearing plate base stress of six schemes for single-warehouse pipeline corridor is shown in Table 3.
[0061] Table 3 Calculation table of the "base expansion, decompression and lightweight backfill" scheme for a single-warehouse pipeline corridor
[0062] From the six "base expansion, decompression and lightweight backfill" schemes of the single-storehouse pipeline corridor in Table 3, it can be seen that the base pressure of the bearing plate in schemes ①, ② and ⑤ is less than the minimum value of the initial pressure of the underlying loess layer. P shm (112kPa), which can achieve the purpose of reducing the deformation of the tunnel foundation. When construction waste is difficult to obtain, the price of reinforced concrete is high, or construction waste is not economical compared with foam concrete, it is more appropriate to choose plan ① and plan ⑤, which have less grooving workload and less construction difficulty on both sides. Otherwise, plan ② is adopted.
[0063] The stress on the base of the bearing plates in Plan ③ and Plan ④ is too large, which means that using construction waste on the upper part of the fertilizer trough and the pipe gallery cannot achieve the purpose of reducing collapse deformation.
[0064] The difference between Scheme ⑥ and Scheme ① lies in whether the base is expanded, that is, after opening a horizontal groove on the basis of Scheme ⑥, adding a 0.2m bearing plate 1 on both sides can also achieve the requirement of weakening the collapse deformation.
[0065] (2) Dual-storage Pipeline Corridor The calculation table of the base stress of the bearing plate for the six schemes of the double-warehouse pipeline corridor is shown in Table 4.
[0066] Table 4 Calculation table of the "base expansion, decompression and lightweight backfill" scheme for the double-warehouse pipeline corridor
[0067] From the six "base expansion, decompression and lightweight backfill" schemes of the double warehouse corridor in Table 4, it can be seen that the base pressure of the bearing plate of schemes ①, ②, ⑤ and ⑥ is less than the minimum value of the initial pressure of the underlying loess layer. P shm (112kPa), which can achieve the purpose of reducing the collapse and deformation of the tunnel foundation.
[0068] Comparison between Scheme ① and Scheme ⑥ shows that the requirement can be met without adding horizontal grooves, that is, without increasing the width of the bearing plate 1, so Scheme ⑥ is better.
[0069] The comparison between Scheme ② and Scheme ⑤ shows that when the cost of construction waste is lower than that of foam concrete and the cost of reinforced concrete is not high, Scheme ② can be selected, otherwise Scheme ⑤ can be selected.
[0070] In view of the special loess engineering geological conditions of the Airport New City in Xixian New Area, Shaanxi Province, an economically reasonable "base expansion, pressure reduction and lightweight backfill" plan should be determined based on a comprehensive comparison of local building materials prices, economic transportation distances, labor costs, etc.
[0071] The above contents are only for explaining the technical idea of the present invention and cannot be used to limit the protection scope of the present invention. Any changes made on the basis of the technical solution in accordance with the technical idea proposed by the present invention shall fall within the protection scope of the claims of the present invention.
Claims
1. A method for reducing the collapse of a comprehensive pipe gallery foundation by combining base expansion and decompression with lightweight backfill, characterized in that: The following steps are involved: 1) Determine the type of pipe gallery (3) and the depth of the foundation pit, drill holes for sampling, obtain the initial collapsible pressure of each soil layer under the pipe gallery (3), and select the minimum initial collapsible pressure. P shm ; 2) Calculate the self-weight pressure of the lightweight backfill on the upper part of the tunnel foundation surface and the additional load on the upper part of the tunnel foundation surface, and then calculate the foundation surface base stress P ; 3) The foundation surface stress P Minimum collapsibility starting pressure P shm For comparison; if P Greater than P shm , the collapse deformation can be reduced by light backfill or base expansion and decompression until P No more than P shm , complete the reduction of collapse deformation of the foundation of the comprehensive pipeline corridor; The base expansion and pressure reduction is achieved by arranging a bearing plate (1) at the bottom of the pipe gallery (3) without expanding the excavation area of the foundation pit and without increasing the foundation surface and foundation area of the pipe gallery (3), and by expanding the width of the bearing plate (1).
2. According to the method for reducing the subsidence of the foundation of the comprehensive pipe gallery by combining base expansion and decompression with lightweight backfilling as described in claim 1, it is characterized in that: In step 2), when calculating the self-weight pressure of the lightweight backfill body on the upper part of the tunnel foundation surface, for the inverted trapezoidal backfill body, the self-weight pressure is calculated according to the overall self-weight of the inverted trapezoidal block; for the loose, lightweight and easily compacted material, the self-weight pressure is calculated according to the columnar body at the bottom of the tunnel foundation pit; The additional load on the upper part of the tunnel foundation surface includes the deadweight of the tunnel (3) and the pipelines in the tunnel; if the top of the tunnel (3) is used as a road after backfilling, it also includes the deadweight of each layer of the road surface and the traffic load; The foundation surface base stress P It includes the sum of the self-weight pressure of the first lightweight material (4), the self-weight pressure of the second lightweight material (7), the self-weight of the bearing plate (1), the self-weight of the original soil (6) above the extension section of the bearing plate (1), and the additional load on the upper part of the tunnel foundation surface.
3. According to claim 1, the method for reducing the subsidence of the foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfilling is characterized in that: In step 3), the lightweight backfill is replaced with a lighter backfill material; the lighter backfill material includes foam lightweight block material, loose lightweight easily compacted material and lightweight gelled composite material.
4. The method for reducing subsidence of a comprehensive pipe gallery foundation by combining base expansion and decompression with lightweight backfill according to claim 3 is characterized in that: In step 3), when the foam lightweight block material is an EPS / XPS block, the density is not less than 20kg / m 3 ; EPS / XPS blocks are inverted trapezoidal blocks with a longitudinal length of 1~3m; The EPS / XPS block filling method comprises: after the pipe gallery (3) on the bearing plate (1) is cast and reaches the curing age, the bottom surface of the fertilizer trough is cleaned and the side wall of the foundation pit is leveled; a sand cushion layer (5) is laid on the bottom surface of the fertilizer trough for leveling; the prefabricated EPS / XPS block is filled and pressed into the fertilizer trough to ensure that the top surface of the EPS / XPS block does not exceed the top surface of the pipe gallery (3) and the longitudinal joint of the EPS / XPS block is staggered with the joint of the pipe gallery (3); after the EPS / XPS block is filled and pressed, sand is used to fill the gap between the EPS / XPS block and the foundation pit, and a sand cushion layer (5) is laid on the top surface of the EPS / XPS block to form a drainage channel composed of drainage holes (2), the sand cushion layer (5) and sand in the side wall gap.
5. According to claim 3, the method for reducing the subsidence of the foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfilling is characterized in that: In step 3), the loose, lightweight and easily compacted materials include construction waste, gravel, ceramsite and lightweight soil, the maximum particle size does not exceed 1 / 3 of the backfill thickness, and the content of particles larger than 40 mm is not less than 30%; when the fertilizer troughs on both sides of the pipeline corridor (3) are backfilled, they are layered and filled in sections at the same time; the compaction degree is not less than 95%; the two sides of the geotextile anti-seepage cloth (8) extend not less than 1m beyond the edge of the foundation pit; and a cultivated soil or compacted loess layer (9) is laid above the geotextile anti-seepage cloth (8), and the top surface of the cultivated soil or compacted loess layer (9) is higher than the surrounding original ground surface, forming a slightly raised surface.
6. The method for reducing subsidence of foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill according to claim 3 is characterized in that: In step 3), the lightweight cementitious composite material is foamed concrete, using silicate cement with a strength grade of 42.5 or above, and an environmentally friendly synthetic polymer surfactant as a foaming agent; the diameter is less than 1.0 mm, and the dilution multiple of the foaming agent is not less than 60 times; Before backfilling and pouring, the bottom surface of the fertilizer trough is simply leveled, and then backfilling and pouring are carried out. The backfilling and pouring are completed in two steps, including backfilling and pouring of the fertilizer trough and backfilling and pouring of the upper part of the pipe gallery (3), and finally backfilling of the top soil body. During backfilling and pouring, a plurality of templates are arranged longitudinally, and expansion joints and settlement joints are reserved. The templates should span the joints of the pipe gallery (3). When backfilling the fertilizer trough, both sides are poured in layers at the same time. When pouring to the top surface of the pipe gallery (3), curing is carried out. After curing is completed, a sand cushion layer (5) is laid to separate the upper and lower poured concrete bodies. When the top of the pipe gallery (3) is backfilled and poured to close to the ground, a plurality of anti-rust lifting rings are buried when pouring the hub section or important section of the pipe gallery (3). After pouring and curing are completed, a geotextile anti-seepage cloth (8) is laid and extended to the original soil (6) of the extension section on both sides of the foundation pit; then the top soil body is backfilled.
7. The method for reducing subsidence of foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill according to claim 1 is characterized in that: In step 3), after the lightweight backfill, if the top is used as a road, loess is used for compaction backfill; if the top is used as a green space, the bottom is compacted and the upper loess is used for self-compacting backfill.
8. The method for reducing subsidence of foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill according to claim 1 is characterized in that: In step 3), the implementation process of the support plate (1) includes: 31) Foundation surface base stress P Not greater than the minimum initial collapse pressure of the underlying loess layer P shm , it is only necessary to level the foundation pit and set the bearing plate (1) within the width of the foundation pit on the original loess. P Greater than P shm , the bearing plate (1) extends to both sides; 32) For unsaturated undisturbed loess, horizontal grooves are symmetrically opened on both sides of the bottom of the foundation pit, and the height of the groove is slightly greater than the thickness of the bearing plate (1); 33) The process of setting the bearing plate (1) includes two methods: prefabrication and cast-in-place. After the horizontal groove is opened, the internal soil is removed and the sand or loess cushion layer is used for paving and leveling; 34) After the cast-in-place maintenance or prefabrication assembly of the pipe gallery (3) is completed, the fertilizer trough and the upper part are backfilled.
9. The method for reducing subsidence of foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill according to claim 8 is characterized in that: In step 3), if a prefabricated bearing plate is used, after it is accurately hoisted to a suitable position, sand is used to densely fill the gap between the bearing plate (1) and the horizontal groove; If cast-in-place bearing plate is used, formwork, cast-in-place, and curing are carried out, and then sand or loess is used to fill the upper gap of the horizontal groove; The prefabricated load-bearing plate needs to be provided with a number of anti-corrosion lifting rings, while the cast-in-place load-bearing plate does not need to be provided with such rings.
10. The method for reducing subsidence of foundation of a comprehensive pipe gallery by combining base expansion and decompression with lightweight backfill according to claim 8, characterized in that: In step 3), the bearing plate (1) spans the interface of the pipe gallery (3) with a longitudinal length of 5 to 10 m; 2 to 3 cm is reserved between the plates as settlement joints and expansion joints; The bearing plate (1) is a reinforced concrete plate or a high-strength foam concrete plate with a thickness of 20 to 30 cm; Horizontal grooves are symmetrically opened on both sides of the bottom surface of the foundation pit, and the height of the horizontal grooves is 25-35 cm, which is slightly larger than the thickness of the bearing plate (1); the width of the extension section of the bearing plate (1) of the single warehouse pipe gallery is 0-200 cm; The bearing plate (1) is provided with a row of perforations at the fertilizer tank location for draining water accumulated in the fertilizer tank during operation.