Prefabricated UHPC (Ultra High Performance Concrete) surface protection structure for water delivery gallery of ship lock and construction method
The prefabricated UHPC face structure for ship lock water delivery galleries simplifies construction by using prefabricated panels with docking mechanisms, improving durability and reducing costs and maintenance.
Patent Information
- Application Number
- CN202411326674.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-23
AI Technical Summary
The construction of ship lock water transfer corridors using impact-resistant and wear-resistant concrete is challenging due to high thickness requirements and complex casting processes, which complicates organization and increases maintenance costs.
A prefabricated UHPC face structure for ship lock water delivery galleries, comprising prefabricated UHPC side panels and top plates, with vertical and transverse docking mechanisms, and a construction method that involves pre-fabrication and in-situ casting to simplify installation and reduce material volume.
The prefabricated UHPC structure enhances durability and reduces construction complexity, lowering material costs and maintenance requirements while maintaining high mechanical properties and impact resistance.
Smart Images

Figure CN119061859A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of ship lock construction, and in particular to a prefabricated UHPC face protection structure for a ship lock water delivery gallery and a construction method. Background Art
[0002] Inland waterway transportation is an important part of the modern integrated transportation system, with the advantages of low investment, large capacity, low cost and low energy consumption. Ship locks are key nodes in inland waterway transportation. By filling or draining water into the waterway controlled by gates at both ends to raise or lower the water level, ships can overcome the concentrated water level difference on the waterway, so that ships can safely and smoothly pass through waters that were originally unable to pass directly due to water level differences, greatly improving the coverage of inland waterway transportation, which is of great significance to promoting regional economic development.
[0003] The water transfer corridor plays a vital role in the ship lock system. When the gate is closed, the water transfer corridor is responsible for adjusting the water level difference inside and outside the ship lock. By accurately controlling the water level changes in the ship lock, the water flow environment is relatively stable, ensuring that ships can enter and exit the ship lock smoothly and safely. In order to ensure the navigation efficiency of the ship lock, the water flow velocity in the water transfer corridor is relatively large, usually reaching more than 15m / s, and the water body is turbulent, which is easily affected by factors such as sand-carrying water scouring, cavitation erosion, etc., causing surface wear, deteriorating the water flow state and berthing conditions in the lock chamber, and affecting the navigation efficiency and safety of the ship lock. Due to the limited cross-sectional size of the water transfer corridor, the later inspection and maintenance require suspension of navigation, and the maintenance cost is high. In order to improve the durability and anti-scouring ability of the water transfer corridor, special anti-scouring and wear-resistant concrete is usually used as the main construction material of the water transfer corridor. However, during construction, the thickness of the impact-resistant and wear-resistant concrete reaches more than 1m, and it needs to be cast and formed at the same time as ordinary concrete, which makes the construction organization difficult; the impact-resistant and wear-resistant concrete has high requirements on the mix design level and concrete production conditions, and large-volume impact-resistant and wear-resistant concrete has high requirements for crack resistance. Therefore, a prefabricated UHPC face structure and construction method for the lock water transfer corridor are proposed to solve the above problems. Summary of the invention
[0004] The main purpose of the present invention is to provide a prefabricated UHPC face structure and construction method for a ship lock water delivery gallery, so as to solve the problem that the existing casting method is difficult to organize the construction.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a prefabricated UHPC face structure and construction method for a ship lock water delivery gallery, comprising: The corridor bottom wall protection structure is located at the bottom wall of the water conveyance corridor and is a cast-in-place UHPC concrete structure; There are two side wall protection structures of the corridor, which are respectively arranged on the two side wall surfaces of the water conveyance corridor. The side wall protection structures of the corridor are composed of multiple prefabricated UHPC side panels; The gallery top wall protection structure is located at the top wall of the water delivery gallery and is composed of a plurality of prefabricated UHPC top plates, which are erected above the two gallery side wall protection structures; A water delivery gallery structure is formed inside the gallery through the combination of the gallery bottom wall protection structure, the gallery side wall protection structure and the gallery top wall protection structure.
[0006] In the preferred embodiment, corresponding grooves and protrusions are respectively provided at the upper and lower ends of the prefabricated UHPC side panels for vertical docking of the prefabricated UHPC side panels, and two groups of connectors distributed at the upper and lower edges are symmetrically provided on the back of the prefabricated UHPC side panels for fixing the vertical docking of the prefabricated UHPC side panels. A plurality of anchor bars for combining with cast-in-place concrete are also provided on the back of the prefabricated UHPC side panels, and corresponding transverse sealing docking structures are provided on the left and right sides of the prefabricated UHPC side panels for transverse docking of the prefabricated UHPC side panels.
[0007] In the preferred embodiment, the transverse sealing docking structure is a semicircular trough body, and a grouting hole communicating with the semicircular trough body is provided at the lower part of one side of the semicircular trough body; When the two prefabricated UHPC side panels are butt-jointed, the two semicircular troughs form a cylindrical cavity into which grouting material can be injected through the grouting holes.
[0008] In the preferred embodiment, the transverse sealing docking structure includes an inserted docking structure arranged on the side of the prefabricated UHPC side panel. When two prefabricated UHPC side panels are transversely docked, the two inserted docking structures at the docking point are plugged into each other, and a reinforced sealing cavity is formed between the two, and a reinforced sealing structure is plugged into the reinforced sealing cavity.
[0009] In a preferred embodiment, the insertion docking structure includes a Z-shaped docking portion provided on the side of the prefabricated UHPC side plate and a slot adapted to the end of the Z-shaped docking portion; The reinforced sealing cavity comprises a Z-shaped reinforced cavity located between two Z-shaped butt joints at the butt joint, the Z-shaped reinforced cavity is composed of a reinforcement groove located in the middle and sealing grooves located on both sides of the reinforcement groove, and locking grooves connected to the reinforcement grooves are also arranged on opposite sides of the two Z-shaped butt joints, the cross-sections of the locking groove and the slot are cross-shaped, and the sealing groove is used to fill the sealant; The reinforcement sealing structure includes an insertion locking rod adapted to the reinforcement groove and the locking groove; The insertion locking rod is also provided with an expansion glue injection structure for injecting glue into the two sealing grooves; The expansion glue injection structure includes a accommodating cavity which is arranged in the insertion locking rod and has an open top. A plurality of slurry outlet holes which are connected to the accommodating cavity are arranged on the two side wall surfaces of the insertion locking rod. When the insertion locking rod is inserted into the reinforcement groove and the locking groove, the slurry outlet holes can be connected with the relative sealing grooves. Two slurry storage capsules are symmetrically arranged in the accommodating cavity. The slurry storage capsules store sealant. The two slurry storage capsules are respectively fitted with the slurry outlet holes on both sides, and an easy-to-open folding line is arranged on the side close to the slurry outlet hole. The outside of the slurry storage capsule is covered with an extruded rubber layer whose two ends are connected to the inner wall of the accommodating cavity. An inflatable bag is arranged between the two extruded rubber layers. The two sides of the inflatable bag are connected to the inner wall of the accommodating cavity, and an inflation port is arranged on the top of the inflatable bag.
[0010] In the preferred embodiment, the prefabricated UHPC top plate includes a top plate, both ends of which are connected with diagonal braces for being erected on the corridor side wall protective structure, the bottom end of the diagonal brace is provided with a docking tenon, and a group of docking parts are provided at the connection, and top anchor bars are provided at the top of the top plate and the diagonal brace.
[0011] In the preferred embodiment, L-shaped butt joints are provided at the joints of adjacent prefabricated UHPC top panels. When adjacent prefabricated UHPC top panels are butt jointed, the two L-shaped butt joints form an inverted U-shaped butt joint. A butt joint connector is installed in the inverted U-shaped butt joint. A fitting groove matching the middle protrusion of the inverted U-shaped butt joint is provided at the bottom of the butt joint, and cutouts are provided at both edges of the top of the butt joint.
[0012] The method includes: S1. Complete the prefabrication of prefabricated UHPC side panels and prefabricated UHPC top panels in the factory and transport them to the construction site one after another; S2. Cast the concrete bottom plate and reserve a casting space for the gallery bottom wall protection structure at the top. During the casting process, pre-embed the bottom plate anchor bars at the casting position of the gallery bottom wall protection structure, and pre-embed the supporting fixings corresponding to the connectors of the bottom prefabricated UHPC side plate at the edges on both sides of the casting position of the gallery bottom wall protection structure; S3, pouring the gallery bottom wall protection structure, pouring UHPC concrete at the pouring position of the gallery bottom wall protection structure to form the bottom wall protection structure, and using a steel mold to press out a bottom groove that matches the bottom convex block of the prefabricated UHPC side plate at the joint between the gallery bottom wall protection structure and the prefabricated UHPC side plate, and performing concrete curing after the pouring is completed; S4. Install the prefabricated UHPC side panels on both sides. First, grind and clean the bottom groove to ensure assembly accuracy, and set waterproof mortar in the bottom groove. Then, use the lifting equipment to lift the first layer of prefabricated UHPC side panels in sequence, and then connect the corresponding supporting fixtures and connecting parts with bolts. At the same time, when the adjacent prefabricated UHPC side panels are butt-jointed, the connection is completed through the transverse sealing butt joint structure. The rear of each prefabricated UHPC side panel is tightened by a tie rod to bear the lateral force during concrete pouring. S5. Install the conventional formwork for other parts of the warehouse surface of this layer, and then pour the concrete of this layer. The top elevation of the concrete pouring is lower than the prefabricated UHPC side plate of this layer to facilitate the connection with the prefabricated UHPC side plate of the upper layer. After the pouring is completed, the concrete is cured; S6. Repeat steps S4-S5 to complete all prefabricated UHPC side panels and corresponding concrete pouring work; S7, install the prefabricated UHPC top plate, grind and clean the groove on the top of the uppermost prefabricated UHPC side plate to ensure assembly accuracy, and set waterproof mortar in it, then use the lifting equipment to lift the UHPC top plate in turn, and connect the butt joints with the corresponding connectors by bolts, and install butt joint connectors between adjacent prefabricated UHPC top plates, and inject waterproof mortar into the incision; S8, pouring of upper concrete: setting support components for supporting the prefabricated UHPC top plate on the bottom wall protection structure of the corridor, and installing the conventional formwork required for the upper concrete layer, pouring this layer of concrete, and removing the support components after the concrete has a certain strength, completing the construction of the water supply corridor.
[0013] In the preferred embodiment, before pouring concrete in step S5, a crossbeam is arranged between the connecting pieces of the prefabricated UHPC side panels on both sides, and both ends of the crossbeam are connected to the corresponding connecting pieces by bolts to support the lateral force on the prefabricated UHPC side panels during pouring. At the same time, the crossbeam needs to be removed before installing the superstructure.
[0014] In the preferred embodiment, the support assembly includes four support uprights arranged in a rectangular shape, the top ends of the support uprights are telescopically provided with telescopic uprights, a top plate support platform is provided on the tops of the four telescopic uprights, both sides of the top plate support platform are hinged with diagonal support plate support frames, the external sliding sleeve of the support uprights is provided with a lifting seat, both sides of the lifting seat are hinged with a plurality of push rods whose other ends are hinged with the diagonal support plate support frames, a plurality of telescopic elastic connecting rods are provided between the lifting seat and the top plate support platform, a reinforcement frame is also provided below the four support uprights, and a lifting hydraulic cylinder whose telescopic end is connected to the lifting seat is provided in the reinforcement frame; A cavity for the telescopic pole to be telescoped is arranged at the top of the supporting pole, first limiting grooves are arranged on the inner walls on both sides of the cavity, and first limiting blocks slidably connected to the corresponding first limiting grooves are arranged on both sides of the bottom end of the telescopic pole; The telescopic elastic connecting rod comprises an outer sleeve, a telescopic inner tube is telescopically inserted in the outer sleeve, second limiting grooves are arranged on the inner wall surfaces on both sides of the opposite sides of the outer sleeve, second sliding blocks slidably connected with the corresponding second limiting grooves are arranged on both sides of the bottom end of the telescopic inner tube, and a contact plate is arranged on the bottom end of the outer sleeve and the top end of the telescopic inner tube, and a telescopic spring is arranged between the two contact plates and is sleeved on the outside of the outer sleeve and the telescopic inner tube; The lifting seat comprises a lifting frame and a lifting platform which are movably mounted on four supporting uprights in sequence, a plurality of connecting blocks are arranged between the lifting frame and the lifting platform, a top push rod is hinged to the lifting frame, and the bottom end of the retractable elastic connecting rod is arranged on the lifting platform; The reinforcement frame includes two reinforcement plates symmetrically mounted on four supporting uprights, X-shaped reinforcement pieces are arranged between the four sides of the two reinforcement plates, and the lifting hydraulic cylinder is arranged on the reinforcement plate located at the bottom and passes through the reinforcement plate located at the top.
[0015] The present invention provides a prefabricated UHPC face armor structure for a ship lock water conveyance gallery and a construction method. The UHPC material has high durability, high mechanical properties and good impact and wear resistance, and the UHPC prefabricated panels are used as the inner surface of the water conveyance gallery, which greatly improves the structural durability of the ship lock water conveyance gallery. UHPC is used to replace impact and wear-resistant concrete for water conveyance gallery protection, and the volume is about one twentieth of that of impact and wear-resistant concrete, and the cost is about one fifth of that of impact and wear-resistant concrete. At the same time, when constructing the water conveyance gallery, the bottom plate is cast in situ using UHPC, which is convenient for construction; the side plates and top plates are made of UHPC prefabricated panels, which can be used as templates at the same time, reducing the amount of steel templates, and do not need to be removed later, simplifying the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the prefabricated UHPC side panel of the present invention; Figure 3 It is a schematic diagram of the groove structure of the present invention; Figure 4 It is a schematic diagram of the structure of the bump of the present invention; Figure 5 It is a schematic diagram of a first embodiment of a transverse sealing butt joint structure of the present invention; Figure 6 Schematic diagram of the grouting hole of the first embodiment of the transverse sealing docking structure of the present invention; Figure 7This is a structural diagram of a second embodiment of the transverse sealing butt joint structure of the present invention; Figure 8 The present invention Figure 7 Insert the docking structure and reinforce the sealing cavity connection structure diagram; Fig. 9 The present invention Figure 5 A top view of the structure; Fig.10 This is a structural diagram of the connection between the insertion docking structure of the present invention and the standard parts of the UHPC board; Fig.11 The present invention Figure 7 A top view of the structure; Fig.12 It is a structural diagram of the reinforced sealing structure of the present invention; Fig.13 The present invention Fig. 9 Half-section structure diagram; Fig.14 The present invention Fig.10 Look at the structural diagram; Fig.15 It is a schematic diagram of the structure of the prefabricated UHPC top plate of the present invention; Fig.16 is a side view of the prefabricated UHPC top plate structure of the present invention; Fig.17 It is a schematic diagram of the exploded structure of the L-shaped docking groove and the docking connector of the present invention; Fig.18 It is a schematic diagram of the connection structure of the L-shaped docking groove and the docking connector of the present invention; Fig.19 is a top view of the butt connector structure of the present invention; Fig. 20 It is a schematic diagram of the connection structure of the concrete bottom plate, bottom plate anchor bars and supporting fixings of the present invention; Fig.21 It is a schematic diagram of the connection structure between the concrete bottom plate and the corridor bottom wall protection structure of the present invention; Fig. 22 It is a schematic diagram of a partially enlarged structure of the bottom groove of the present invention; Fig.23 This is a schematic diagram of the installation structure of the first layer of prefabricated UHPC side panels of the present invention; Fig.24 It is an enlarged schematic diagram of the structure of the crossbeam part of the present invention; Fig.25 This is a schematic diagram of the installation structure of the second layer of prefabricated UHPC side panels of the present invention; Fig.26 This is a schematic diagram of the installation structure of the prefabricated UHPC top plate of the present invention; Fig. 27 It is a schematic diagram of the expanded structure of the support assembly of the present invention; Fig.28It is a schematic diagram of the support assembly retraction structure of the present invention; Fig.29 It is a schematic diagram of the structure of the upper half of the support assembly of the present invention; Fig.30 It is a schematic diagram of the structure of the lower half of the support assembly of the present invention; Fig.31 It is a half-section schematic diagram of the connection structure between the supporting upright pole and the telescopic upright pole of the present invention; Fig.32 This is a schematic diagram of a half-section structure of a telescopic elastic connecting rod of the present invention; In the figure: prefabricated UHPC side plate 1; connecting piece 3; groove 4; protrusion 5; anchor 6; transverse sealing docking structure 7; semicircular groove 701; grouting hole 702; insertion docking structure 71; Z-shaped docking part 710; slot 711; spring piece 712; reinforcement sealing cavity 72; reinforcement groove 720; sealing groove 721; locking groove 722; reinforcement sealing structure 73; insertion locking rod 730; accommodating cavity 731; slurry outlet hole 732; slurry storage capsule 733; extruded rubber layer 734; inflatable bag 735; inflation port 736; tapered end 737; prefabricated UHPC top plate 8; top plate 801; diagonal support plate 802; L-shaped docking groove 803; top anchor 9; docking piece 10; concrete bottom plate 12; support fixing piece 13; bottom groove 14; corridor bottom wall protection structure 15; tie rod 16; crossbeam 17; support assembly 18; support pole 180; first limiting groove 1801; telescopic pole 181; first limiting block 1810; top plate support platform 182; lifting seat 183; lifting platform 1830; connecting block 1831; lifting frame 1832; telescopic elastic connecting rod 184; outer sleeve 1840; telescopic inner tube 1841; second limiting groove 1842; second sliding block 1843; telescopic spring 1844; contact plate 1845; diagonal support plate support frame 185; push rod 186; lifting hydraulic cylinder 187; reinforcement frame 188; reinforcement plate 1880; X-shaped reinforcement member 1881; docking connector 19; fitting groove 190; incision 191; bottom plate anchor 20. DETAILED DESCRIPTION
[0017] Example 1 like Figure 1-26 As shown, a prefabricated UHPC face structure and construction method for a lock water delivery gallery includes: The corridor bottom wall protection structure 15 is located at the bottom wall of the water conveyance corridor and is a cast-in-place UHPC concrete structure; The corridor side wall protection structure has two structures, which are respectively arranged at two side wall surfaces of the water conveyance corridor, and the corridor side wall protection structure is composed of a plurality of prefabricated UHPC side panels 1; The gallery top wall protection structure is located at the top wall of the water delivery gallery and is composed of a plurality of prefabricated UHPC top plates 8, and the prefabricated UHPC top plates 8 are erected above the two gallery side wall protection structures; A water delivery gallery structure is formed inside the gallery through the combination of the gallery bottom wall protection structure 15, the gallery side wall protection structure and the gallery top wall protection structure.
[0018] In the preferred embodiment, corresponding grooves 4 and protrusions 5 are respectively provided at the upper and lower ends of the prefabricated UHPC side panels 1 for vertical docking of the prefabricated UHPC side panels 1. The vertical fit of the upper and lower UHPC side panels 1 can be achieved through the docking of the grooves 4 and the protrusions 5. In the present embodiment, the grooves 4 and the protrusions 5 are both trapezoidal structures.
[0019] The back side of the prefabricated UHPC side panel 1 is symmetrically provided with two groups of connectors 3 distributed at the upper and lower edges. The connectors 3 are preset during the prefabrication process of the prefabricated UHPC side panel 1 and are used to fix the vertical docking of the prefabricated UHPC side panel 1. In this embodiment, the number of each group of connectors 3 is two.
[0020] The back of the prefabricated UHPC side panel 1 is also provided with a plurality of anchor bars 6 for combining with cast-in-place concrete. The anchor bars 6 are distributed on the back of the prefabricated UHPC side panel 1 in an array manner, and like the connecting piece 3, are preset during the prefabrication process of the prefabricated UHPC side panel 1.
[0021] It should be noted that, in the present embodiment, the connecting member 3 is an L-shaped steel member, a plurality of stiffening plates are arranged between the vertical plate and the horizontal plate, and the horizontal plate is provided with holes for bolts to pass through during connection.
[0022] In addition, corresponding transverse sealing butt joint structures 7 are provided on the left and right sides of the prefabricated UHPC side panels 1 for transverse butt joint of the prefabricated UHPC side panels 1 .
[0023] With such a design, a plurality of prefabricated UHPC side panels 1 can be assembled to form an integral protective surface on the facade of the water side of the water conveyance corridor, and at the same time, it can be formed into an integrated structure with the cast-in-place structure of the water conveyance corridor to avoid falling off. The setting of the anchor bar 6 effectively improves the connection between the two parts. At the same time, during the casting process of the water conveyance corridor, it can play the role of an inner mold and reduce the use of the template.
[0024] In the preferred solution, a first embodiment of the transverse sealing docking structure 7 is proposed. The transverse sealing docking structure 7 is a semicircular trough 701, and a grouting hole 702 connected to the semicircular trough 701 is provided at the lower part of one side of the semicircular trough 701. When two prefabricated UHPC side panels 1 are butt-jointed, the two semicircular troughs 701 form a cylindrical cavity, into which grouting material can be injected through the grouting holes 702, thereby achieving connection of the prefabricated UHPC side panels 1 and sealing of the gaps through the grouting material.
[0025] In the preferred embodiment, a second embodiment of the transverse sealing docking structure 7 is proposed, such as Figure 7-14 As shown, the transverse sealing docking structure 7 includes an insertion docking structure 71 arranged on the side of the UHPC board standard part 1. When two UHPC board standard parts 1 are transversely docked, the two insertion docking structures 71 at the docking point are plugged into each other, and a reinforced sealing cavity 72 is formed therebetween, and a reinforced sealing structure 73 is plugged into the reinforced sealing cavity 72.
[0026] In this embodiment, the docking stability and sealing effect of the UHPC board standard parts 1 can be effectively improved by inserting the docking structure 71 and inserting the reinforced sealing structure 73 into the reinforced sealing cavity 72.
[0027] In the preferred embodiment, the insertion docking structure 71 includes a Z-shaped docking portion 710 arranged on the side of the UHPC board standard part 1 and a slot 711 adapted to the end of the Z-shaped docking portion 710. The Z-shaped docking portion 710 and the slot 711 are integrally formed with the UHPC board standard part 1 during the prefabrication process. When two UHPC board standard parts 1 are docked, the Z-shaped docking portion 710 and the slot 711 can be docked to achieve the function of installation guidance and achieve preliminary connection.
[0028] The reinforced sealing cavity 72 includes a Z-shaped reinforced cavity located between two Z-shaped docking parts 710 at the docking position. The Z-shaped reinforced cavity is composed of a reinforcement groove 720 located in the middle and sealing grooves 721 located on both sides of the reinforcement groove 720. The two sealing grooves 721 are respectively located at the upper and lower ends of both sides of the reinforcement groove 720. Figure 6 As shown, locking grooves 722 communicating with the reinforcement grooves 720 are further provided on opposite sides of the two Z-shaped docking portions 710 . The cross-sections of the locking grooves 722 and the slots 711 are cross-shaped. The sealing grooves 721 are used to fill sealant.
[0029] The reinforcement sealing structure 73 includes an insertion locking rod 730 adapted to the reinforcement groove 720 and the locking groove 722. When the insertion locking rod 730 is inserted into the reinforcement groove 720 and the locking groove 722, it can cooperate with the docking of the two Z-shaped docking parts 710 to form a cross fastening structure to complete the connection between two adjacent UHPC board standard parts 1. Such a design can make the connection between the two adjacent UHPC board standard parts 1 stable. At the same time, the multi-fold line connection design can effectively improve the sealing of the connection. In addition, by filling the reserved sealing groove 721 with sealant, the sealing and bonding effect can be further achieved.
[0030] The insertion locking rod 730 is also provided with an expansion glue injection structure for injecting glue into the two sealing grooves 721. The sealant can be set in the insertion locking rod 730 in advance without adding corresponding glue injection equipment on site.
[0031] The expansion glue injection structure includes a accommodating cavity 731 which is arranged in the insertion locking rod 730 and has an open top. A plurality of slurry outlet holes 732 which are connected to the accommodating cavity 731 are arranged on both side wall surfaces of the insertion locking rod 730. When the insertion locking rod 730 is inserted into the reinforcement groove 720 and the locking groove 722, the slurry outlet holes 732 can be connected to the relative sealing groove 721. Two slurry storage capsules 733 are symmetrically arranged in the accommodating cavity 731. The slurry storage capsules 733 store sealant. The two slurry storage capsules 733 are respectively fitted with the slurry outlet holes 732 on both sides, and an easy-to-open folding line is arranged on the side close to the slurry outlet holes 732. The outside of the slurry storage capsule 733 is covered with an extruded rubber layer 734 whose two ends are connected to the inner wall of the accommodating cavity 731. An inflatable bag 735 is arranged between the two extruded rubber layers 734. The two sides of the inflatable bag 735 are connected to the inner wall of the accommodating cavity 731, and an inflation port 736 is arranged on the top of the inflatable bag 735.
[0032] In this embodiment, the sealant may be epoxy resin, and the pulp storage capsule 733 may be made of soft plastic, with a thin aluminum foil for retaining the sealant attached to the inner wall.
[0033] With such a design, when the inflatable bag 735 is inflated, its own expansion can be used to squeeze the pulp storage capsule 733, and at the same time, the easy-open fold line set thereon can cause it to crack, so that the sealant inside can be squeezed out and then flow out through the pulp outlet hole 732.
[0034] In the preferred embodiment, spring sheets 712 perpendicular to the sealing groove 721 are provided on the two opposite inner wall surfaces of the reinforcement groove 720, and a conical end head 737 is provided at the bottom end of the insertion locking rod 730. The conical end head 737 and the insertion locking rod 730 are integrally formed. One end of the spring sheet 712 is fixedly connected to the side wall of the reinforcement groove 720, and the other end is free. The two spring sheets 712 can limit the insertion locking rod 730 to a certain extent, and at the same time, the spacing difference between the two can be sealed. The setting of the conical end head 737 facilitates the insertion of the insertion locking rod 730.
[0035] It should be noted that when the spring sheet 712 is compressed and stretched, care should be taken not to block the sealing groove 721 .
[0036] In the preferred solution, the method for butting two laterally adjacent UHPC board standard parts 1 is as follows: S1, hoisting the UHPC board standard component 1 to be installed to the side of the installed UHPC board standard component 1, and aligning the Z-shaped docking parts 710 of the two UHPC board standard components 1 with the corresponding slots 711, and then lowering the UHPC board standard component 1 to be installed to the installation position; S2. After the UHPC board standard part 1 to be installed is vertically fixed, the insertion locking rod 730 is inserted into the reinforcement groove 720 and the locking groove 722; S3. Inflate the inflation port 736 of the inflation bag 735 using an inflation device to expand it, and then use the extrusion rubber layers 734 on both sides to squeeze the two pulp storage capsules 733 respectively, so that the pulp storage capsules 733 are cracked from the easy-to-open fold line side, so that the sealant inside it flows from the pulp outlet hole 732 on the side wall of the inserted locking rod 730 into its side and the sealing groove 721.
[0037] It should be noted that, in this embodiment, waterproof mortar needs to be provided at the joints of the transverse sealing joint structures 7 of the upper and lower prefabricated UHPC side panels 1 in order to improve the sealing at the joints without the grooves 4 and the protrusions 5 .
[0038] In the preferred embodiment, the prefabricated UHPC top plate 8 includes a top plate 801, both ends of which are connected with diagonal brace plates 802 for being erected on the corridor side wall protective structure, the top plate 801 and the diagonal brace plates 802 are cast as one piece, the bottom end of the diagonal brace plates 802 is provided with a docking tenon 11, and a group of docking parts 10 are provided at the connection, the docking tenon 11 is used to match the groove 4 at the top of the prefabricated UHPC side plate 1, the top of the top plate 801 and the diagonal brace plates 802 are both provided with top anchor bars 9, and the top anchor bars 9 are arranged in an array to improve the adhesion with the cast-in-place concrete.
[0039] In the preferred embodiment, an L-shaped docking groove 803 is provided at the joint of adjacent prefabricated UHPC top plates 8. When adjacent prefabricated UHPC top plates 8 are docked, the two L-shaped docking grooves 803 form an inverted U-shaped docking groove, in which a docking connector 19 is installed. The shape of the docking connector 19 is adapted to the shape of the prefabricated UHPC top plate 8. The bottom of the docking connector 19 is provided with a fitting groove 190 adapted to the middle protrusion of the inverted U-shaped docking groove. Notches 191 are provided at the two edges of the top of the docking connector 19. The notches 191 are used to inject waterproof mortar after the installation is completed. In this embodiment, when the docking connector 19 is installed, its top surface height is parallel to the top surface of the prefabricated UHPC top plate 8.
[0040] Example 2 Further illustrate with reference to Example 1, Figure 1-26 The structure shown is a construction method for a prefabricated UHPC face structure of a lock water delivery gallery, the method comprising: S1. Complete the prefabrication of the prefabricated UHPC side panels 1 and the prefabricated UHPC top panels 8 in the factory, and transport them to the construction site one after another.
[0041] S2. Cast the concrete bottom plate 12, and reserve casting space for the gallery bottom wall protection structure 15 at the top. During the casting process, the bottom plate anchor bars 20 are embedded at the casting position of the gallery bottom wall protection structure 15, and the supporting fixing parts 13 corresponding to the connecting parts 3 of the lowest prefabricated UHPC side panels 1 are embedded at the edges on both sides of the casting position of the gallery bottom wall protection structure 15.
[0042] S3, pouring the corridor bottom wall protection structure 15, pouring UHPC concrete at the pouring position of the corridor bottom wall protection structure 15 to form the bottom wall protection structure, and using a steel mold to press out a bottom groove 14 that matches the bottom protrusion 5 of the prefabricated UHPC side panel 1 at the joint between the corridor bottom wall protection structure 15 and the prefabricated UHPC side panel 1, and performing concrete curing after the pouring is completed.
[0043] S4. Install the prefabricated UHPC side panels 1 on both sides, first grind and clean the bottom groove 14 to ensure assembly accuracy, and set waterproof mortar in the bottom groove 14, then use the lifting equipment to lift the first layer of prefabricated UHPC side panels 1 in sequence, and then connect the corresponding supporting fixings 13 with the connecting members 3 by bolts. At the same time, when the adjacent prefabricated UHPC side panels 1 are butt-jointed, the connection is completed through the transverse sealing butt joint structure 7. The rear of each prefabricated UHPC side panel 1 is tightened by the tie rod 16 to bear the lateral force during concrete pouring. The transverse sealing butt joint structure 7 can adopt any one of the above two embodiments.
[0044] S5. Install the conventional formwork for other parts of the warehouse surface of this layer, and then pour the concrete of this layer. The top surface elevation of the concrete pouring is lower than the prefabricated UHPC side plate 1 of this layer to facilitate the connection with the prefabricated UHPC side plate 1 of the upper layer. After the pouring is completed, the concrete is cured.
[0045] S6. Repeat steps S4-S5 to complete all prefabricated UHPC side panels 1 and corresponding concrete pouring work. In this embodiment, the prefabricated UHPC side panels 1 are installed in two layers in total.
[0046] S7, install the prefabricated UHPC top plate 8, grind and clean the groove 4 on the top of the uppermost prefabricated UHPC side plate 1 to ensure assembly accuracy, and set waterproof mortar therein, then use the lifting equipment to lift the UHPC top plates 8 in sequence, and connect the docking parts 10 with the corresponding connecting parts 3 by bolts, and at the same time install the docking connectors 19 between adjacent prefabricated UHPC top plates 8, and inject waterproof mortar into the incision 191.
[0047] S8, pouring of upper concrete: a support assembly 18 for supporting the prefabricated UHPC top plate 8 is arranged on the corridor bottom wall protection structure 15, and after the conventional formwork required for the upper concrete is installed, this layer of concrete is poured. After the concrete has a certain strength, the support assembly 18 is removed to complete the construction of the water delivery corridor.
[0048] In the preferred embodiment, before pouring concrete in step S5, a crossbeam 17 is arranged between the connecting members 3 opposite to each other of the prefabricated UHPC side panels 1 on both sides, and both ends of the crossbeam 17 are connected to the corresponding connecting members 3 by bolts. Both ends of the crossbeam 17 are provided with fixing holes for the bolts to pass through, so as to support the lateral force exerted on the prefabricated UHPC side panels 1 during pouring. At the same time, the crossbeam 17 needs to be removed before installing the superstructure.
[0049] In the preferred embodiment, the support assembly 18 includes four support uprights 180 arranged in a rectangular shape, and the top ends of the support uprights 180 are telescopically provided with telescopic uprights 181, and the tops of the four telescopic uprights 181 are provided with a top plate support platform 182, so that the top plate support platform 182 can be raised and lowered on the four support uprights 180, and both sides of the top plate support platform 182 are hinged with diagonal support plate support frames 185, and the external sliding sleeve of the support uprights 180 is provided with a lifting seat 183, and both sides of the lifting seat 183 are hinged with multiple push rods 186 whose other ends are hinged to the diagonal support frame 185, and multiple telescopic elastic connecting rods 184 are provided between the lifting seat 183 and the top plate support platform 182. In this embodiment, the number of the telescopic elastic connecting rods 184 is four, which are arranged in a rectangular shape, and a reinforcement frame 188 is also provided below the four support uprights 180, and a lifting hydraulic cylinder 187 whose telescopic end is connected to the lifting seat 183 is provided in the reinforcement frame 188.
[0050] When in use, the lifting seat 183 can be lifted and lowered on the four supporting uprights 180 by telescopically controlling the lifting hydraulic cylinder 187, and then the four telescopic elastic connecting rods 184 can be used to push the top plate support platform 182 to the bottom of the prefabricated UHPC top plate 8, thereby supporting the top plate 801. At the same time, the telescopic elastic connecting rods 184 can be compressed by continuing to push, so that the two diagonal support plate support frames 185 are opened under the action of the pushing rods 186 until they conflict with the diagonal support plates 802, thereby supporting the diagonal support plates 802. At the same time, with such a design, when the lifting seat 183 is lowered, the diagonal support plate support frames 185 are first retracted and then the top plate support platform 182 is lowered, thereby supporting the prefabricated UHPC top plate 8 and facilitating its removal.
[0051] A cavity is provided at the top of the supporting rod 180 for the telescopic rod 181 to be telescoped, and first limiting grooves 1801 are provided on the inner walls on both sides of the cavity. First limiting blocks 1810 slidably connected to the corresponding first limiting grooves 1801 are provided on both sides of the bottom end of the telescopic rod 181, and the first limiting blocks 1810 and the first limiting grooves 1801 play the role of telescopic limiting.
[0052] The telescopic elastic connecting rod 184 includes an outer sleeve 1840, in which a telescopic inner tube 1841 is telescopically inserted, and second limiting grooves 1842 are arranged on the inner wall surfaces on both sides of the opposite sides of the outer sleeve 1840, and second sliding blocks 1843 slidably connected to the corresponding second limiting grooves 1842 are arranged on both sides of the bottom end of the telescopic inner tube 1841, and a contact plate 1845 is arranged at the bottom end of the outer sleeve 1840 and the top end of the telescopic inner tube 1841, and a telescopic spring 1844 is arranged between the two contact plates 1845 and is sleeved on the outside of the outer sleeve 1840 and the telescopic inner tube 1841.
[0053] With such a design, after the top plate support platform 182 is pushed to the bottom of the prefabricated UHPC top plate 8, the telescopic spring 1844 can be used to further compress it, thereby achieving the above-mentioned effect.
[0054] The lifting seat 183 includes a lifting frame 1832 and a lifting platform 1830 which are movably mounted on four supporting uprights 180 in sequence. A plurality of connecting blocks 1831 are arranged between the lifting frame 1832 and the lifting platform 1830. In this embodiment, there are eight connecting blocks 1831 which are arranged around them respectively. The push rod 186 is hinged to the lifting frame 1832, and the bottom end of the retractable elastic connecting rod 184 is arranged on the lifting platform 1830.
[0055] The reinforcement frame 188 includes two reinforcement plates 1880 symmetrically mounted on four supporting uprights 180, and X-shaped reinforcement members 1881 are arranged between the four sides of the two reinforcement plates 1880. The lifting hydraulic cylinder 187 is arranged on the reinforcement plate 1880 located below and passes through the reinforcement plate 1880 located above. The overall structural strength can be effectively enhanced through the reinforcement plates 1880.
[0056] It should be noted that the support assembly 18 can be moved by providing a pulley at the bottom thereof, or it can be moved by a forklift.
[0057] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A prefabricated UHPC face structure for a lock water delivery gallery, characterized in that: include: The corridor bottom wall protection structure (15) is located at the bottom wall of the water conveyance corridor and is a cast-in-place UHPC concrete structure; Two corridor side wall protection structures are provided respectively on two side wall surfaces of the water conveyance corridor, and the corridor side wall protection structures are composed of a plurality of prefabricated UHPC side panels (1); The corridor top wall protection structure is located at the top wall of the water delivery corridor and is composed of a plurality of prefabricated UHPC top plates (8). The prefabricated UHPC top plates (8) are erected above the two corridor side wall protection structures; A water delivery gallery structure is formed inside the gallery through the combination of the gallery bottom wall protection structure (15), the gallery side wall protection structure and the gallery top wall protection structure.
2. According to claim 1, a prefabricated UHPC face structure for a ship lock water delivery gallery is characterized by: The upper and lower ends of the prefabricated UHPC side panels (1) are respectively provided with corresponding grooves (4) and protrusions (5) for vertically butting the prefabricated UHPC side panels (1); the back of the prefabricated UHPC side panels (1) is symmetrically provided with two groups of connecting pieces (3) distributed at the upper and lower edges for fixing the vertical butt joint of the prefabricated UHPC side panels (1); the back of the prefabricated UHPC side panels (1) is also provided with a plurality of anchor bars (6) for combining with cast-in-place concrete; and the left and right sides of the prefabricated UHPC side panels (1) are provided with corresponding transverse sealing butt joint structures (7) for transversely butt joint of the prefabricated UHPC side panels (1).
3. According to claim 2, a prefabricated UHPC face structure for a lock water delivery gallery is characterized by: The transverse sealing docking structure (7) is a semicircular groove body (701), and a grouting hole (702) communicating with the semicircular groove body (701) is provided at the lower part of one side of the semicircular groove body (701); When the two prefabricated UHPC side panels (1) are butt-jointed, the two semicircular trough bodies (701) form a cylindrical cavity into which grouting material can be injected through the grouting holes (702).
4. According to claim 2, a prefabricated UHPC face structure for a lock water delivery gallery is characterized by: The transverse sealing docking structure (7) comprises an insertion docking structure (71) arranged on the side of the prefabricated UHPC side plate (1); when two prefabricated UHPC side plates (1) are transversely docked, the two insertion docking structures (71) at the docking position are plugged into each other, and a reinforcement sealing cavity (72) is formed between the two, and a reinforcement sealing structure (73) is plugged into the reinforcement sealing cavity (72).
5. According to claim 4, a prefabricated UHPC face structure for a lock water delivery gallery is characterized by: The insertion docking structure (71) comprises a Z-shaped docking portion (710) arranged on the side of the prefabricated UHPC side plate (1) and a slot (711) adapted to the end of the Z-shaped docking portion (710); The reinforced sealing cavity (72) comprises a Z-shaped reinforced cavity located between two Z-shaped butt joints (710) at the butt joint, the Z-shaped reinforced cavity comprising a reinforcing groove (720) located in the middle, and sealing grooves (721) located on both sides of the reinforcing groove (720), and locking grooves (722) connected to the reinforcing grooves (720) are further provided on opposite sides of the two Z-shaped butt joints (710), the locking grooves (722) and the slots (711) having a cross-shaped cross section, and the sealing grooves (721) are used to fill the sealant; The reinforcement sealing structure (73) comprises an insertion locking rod (730) adapted to the reinforcement groove (720) and the locking groove (722); The insertion locking rod (730) is also provided with an expansion glue injection structure for injecting glue into the two sealing grooves (721); The expansion glue injection structure comprises a receiving cavity (731) which is arranged in the insertion locking rod (730) and has an open top. A plurality of slurry outlet holes (732) which are connected to the receiving cavity (731) are arranged on two side wall surfaces of the insertion locking rod (730). When the insertion locking rod (730) is inserted into the reinforcement groove (720) and the locking groove (722), the slurry outlet holes (732) can be connected to the corresponding sealing groove (721). Two slurry storage capsules (733) are symmetrically arranged in the receiving cavity (731). The sealant is stored therein, and the two pulp storage capsules (733) are respectively fitted with the pulp outlet holes (732) on both sides, and an easy-to-open folding line is provided on the side close to the pulp outlet hole (732). The outside of the pulp storage capsule (733) is provided with an extruded rubber layer (734) whose two ends are connected to the inner wall of the accommodating cavity (731), and an inflatable bag (735) is provided between the two extruded rubber layers (734). The two sides of the inflatable bag (735) are connected to the inner wall of the accommodating cavity (731), and the top of the inflatable bag (735) is provided with an inflation port (736).
6. A prefabricated UHPC face structure for a lock water delivery gallery according to any one of claims 2 to 5, characterized in that: The prefabricated UHPC top plate (8) comprises a top plate (801), both ends of the top plate (801) are connected to diagonal bracing plates (802) for being erected on the corridor side wall protective structure, the bottom end of the diagonal bracing plate (802) is provided with a butt joint (11), and a group of butt joint pieces (10) are provided at the connection, and top anchor bars (9) are provided at the top of the top plate (801) and the diagonal bracing plate (802).
7. The prefabricated UHPC face structure for a lock water delivery gallery according to claim 6 is characterized by: An L-shaped butt joint groove (803) is provided at the butt joint of adjacent prefabricated UHPC top plates (8); when adjacent prefabricated UHPC top plates (8) are butt jointed, the two L-shaped butt joint grooves (803) form an inverted U-shaped butt joint groove, a butt joint connector (19) is installed in the inverted U-shaped butt joint groove, a fitting groove (190) adapted to the middle protrusion of the inverted U-shaped butt joint groove is provided at the bottom of the butt joint connector (19), and notches (191) are provided at both edges of the top of the butt joint connector (19).
8. A construction method for a prefabricated UHPC face structure for a ship lock water delivery gallery according to claim 7, characterized in that: The method includes: S1. Prefabrication of the prefabricated UHPC side panels (1) and the prefabricated UHPC top panels (8) is completed in the factory, and they are transported to the construction site one after another; S2, pouring a concrete bottom plate (12), and reserving a pouring space for the gallery bottom wall protection structure (15) at the top, and at the same time, during the pouring process, pre-embedding bottom plate anchor bars (20) at the pouring position of the gallery bottom wall protection structure (15), and pre-embedding supporting fixing parts (13) corresponding to the connecting parts (3) of the bottom prefabricated UHPC side plate (1) at the edges on both sides of the pouring position of the gallery bottom wall protection structure (15); S3, pouring the gallery bottom wall protection structure (15), pouring UHPC concrete at the pouring position of the gallery bottom wall protection structure (15) to form the bottom wall protection structure, and using a steel mold to press out a bottom groove (14) that matches the bottom protrusion (5) of the prefabricated UHPC side panel (1) at the joint between the gallery bottom wall protection structure (15) and the prefabricated UHPC side panel (1), and performing concrete curing after the pouring is completed; S4, installing the prefabricated UHPC side panels (1) on both sides, first grinding and cleaning the bottom groove (14) to ensure assembly accuracy, and setting waterproof mortar in the bottom groove (14), then using a lifting device to sequentially hoist the first layer of prefabricated UHPC side panels (1), and then connecting the corresponding supporting fixings (13) and the connecting members (3) by bolts. At the same time, when adjacent prefabricated UHPC side panels (1) are butt-jointed, the connection is completed by a transverse sealing butt joint structure (7), and the rear of each prefabricated UHPC side panel (1) is tightened by a tie rod (16) to bear the lateral force during concrete pouring; S5, installing conventional formwork for other parts of the warehouse surface of this layer, and then pouring concrete for this layer, wherein the top surface elevation of the concrete pouring is lower than the prefabricated UHPC side panels (1) of this layer, so as to facilitate connection with the prefabricated UHPC side panels (1) of the upper layer, and after the pouring is completed, performing concrete curing; S6, repeating steps S4-S5 to complete all prefabricated UHPC side panels (1) and corresponding concrete pouring work; S7, installing the prefabricated UHPC top plate (8), grinding and cleaning the groove (4) at the top of the uppermost prefabricated UHPC side plate (1) to ensure assembly accuracy, and placing waterproof mortar therein, then using a lifting device to sequentially hoist the UHPC top plates (8), and connecting the butt joints (10) to the corresponding connectors (3) by bolts, and at the same time installing butt joint connectors (19) between adjacent prefabricated UHPC top plates (8), and injecting waterproof mortar into the cutouts (191); S8, pouring the upper layer of concrete. A support assembly (18) for supporting the prefabricated UHPC top plate (8) is arranged on the corridor bottom wall protection structure (15), and after the conventional formwork required for the upper layer of concrete is installed, the concrete of this layer is poured. After the concrete has a certain strength, the support assembly (18) is removed, and the construction of the water delivery corridor is completed.
9. The construction method of a prefabricated UHPC face structure for a ship lock water delivery gallery according to claim 8 is characterized by: Before pouring concrete in step S5, a crossbeam (17) is arranged between the connecting pieces (3) on the two sides of the prefabricated UHPC side panels (1) that are opposite to each other. Both ends of the crossbeam (17) are connected to the corresponding connecting pieces (3) by bolts to support the lateral force on the prefabricated UHPC side panels (1) during pouring. At the same time, before installing the superstructure, the crossbeam (17) needs to be removed.
10. The construction method of a prefabricated UHPC face structure for a lock water delivery gallery according to claim 9, characterized in that: The support assembly (18) comprises four support vertical rods (180) arranged in a rectangular shape, the top of the support vertical rods (180) being telescopically provided with a telescopic vertical rod (181), the top of the four telescopic vertical rods (181) being provided with a top plate support platform (182), both sides of the top plate support platform (182) being hinged with an inclined support plate support frame (185), the outer sliding sleeve of the support vertical rod (180) being provided with a lifting seat (183), both sides of the lifting seat (183) being hinged with a plurality of push rods (186) whose other ends are hinged to the inclined support plate support frame (185), a plurality of telescopic elastic connecting rods (184) being provided between the lifting seat (183) and the top plate support platform (182), and a reinforcement frame (188) being provided below the four support vertical rods (180), and a lifting hydraulic cylinder (187) whose telescopic end is connected to the lifting seat (183); A cavity for the telescopic upright rod (181) to be telescoped is provided at the top of the supporting upright rod (180), first limiting grooves (1801) are provided on the inner walls on both sides of the cavity, and first limiting blocks (1810) slidably connected to the corresponding first limiting grooves (1801) are provided on both sides of the bottom end of the telescopic upright rod (181); The telescopic elastic connecting rod (184) comprises an outer sleeve (1840), a telescopic inner tube (1841) is telescopically inserted in the outer sleeve (1840), second limiting grooves (1842) are arranged on the inner wall surfaces of the two opposite sides of the outer sleeve (1840), second sliding blocks (1843) slidably connected to the corresponding second limiting grooves (1842) are arranged on both sides of the bottom end of the telescopic inner tube (1841), a contact plate (1845) is arranged at the bottom end of the outer sleeve (1840) and the top end of the telescopic inner tube (1841), and a telescopic spring (1844) is arranged between the two contact plates (1845) and is sleeved on the outside of the outer sleeve (1840) and the telescopic inner tube (1841); The lifting seat (183) comprises a lifting frame (1832) and a lifting platform (1830) which are movably mounted on four supporting uprights (180) in sequence, a plurality of connecting blocks (1831) are arranged between the lifting frame (1832) and the lifting platform (1830), a push rod (186) is hingedly connected to the lifting frame (1832), and the bottom end of the retractable elastic connecting rod (184) is arranged on the lifting platform (1830); The reinforcement frame (188) comprises two reinforcement plates (1880) symmetrically mounted on four support poles (180), X-shaped reinforcement members (1881) are arranged between the four sides of the two reinforcement plates (1880), and the lifting hydraulic cylinder (187) is arranged on the reinforcement plate (1880) located at the bottom and passes through the reinforcement plate (1880) located at the top.
Citation Information
Patent Citations
Pre-assembled single-compartment municipal tunnel and construction method thereof
CN104947709A
Dual-pipe prefabricated waterproof integrated pipe rack and installation method
CN110158646A
Ship lock water delivery gallery structure
CN117905035A
Sheet bolt type prefabricated assembly comprehensive pipe gallery and pipe gallery unit thereof
CN209686448U
Cited By
Production method of prefabricated vestibule of ship lock water delivery gallery
CN118181504A
Method for the production of prefabricated passageways for the lock filling corridors
CN118181504B
Anti-abrasion solid waste-based concrete for canal ship lock gallery and preparation method of anti-abrasion solid waste-based concrete
CN121990796A