Creeping formwork inner formwork hanging bracket for bridge high pier construction

By designing an automatic lifting and climbing mold inner mold hanger in bridge construction, the automatic rise of the construction platform is achieved using screws, pulleys and rotating drive components, the troublesome problem of tower crane lifting inner mold hanger in the existing technology is solved, and the construction is improved Efficiency and convenience.

CN221972108UActive Publication Date: 2024-11-08CHONGQING YUXIANG DOUBLE TRACK EXPRESSWAY CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420286198.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-11-08
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

In the prior art, after the concrete construction of one section is completed, it is necessary to use a tower crane to lift the inner mold hanger, which is more troublesome when lifting the inner mold hanger.

Method used

A bridge high pier construction climbing mold inner mold hanger is designed, including a climbing mold, a load-bearing plate, a construction platform installed on the outside of the hollow thin-walled pier, and a driving mechanism for driving the lifting and lowering of the construction platform. The driving mechanism is carried out through a screw, a pulley and The rotating drive assembly realizes automatic rise of the construction platform, avoiding dependence on tower cranes.

Benefits of technology

The overall increase of the internal mold hanger of the bridge high pier construction can be achieved without the help of tower cranes, improving construction efficiency and convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972108U_ABST
    Figure CN221972108U_ABST
Patent Text Reader

Abstract

The utility model relates to a creeping formwork inner formwork hanging bracket for bridge high pier construction, which is used for constructing a hollow thin-wall pier. Comprising a creeping formwork arranged on the outer side of the hollow thin-wall pier, a bearing plate arranged over the creeping formwork, a connecting part used for connecting the bearing plate and the creeping formwork, a construction platform arranged in an inner cavity of the hollow thin-wall pier and a driving mechanism arranged on the bearing plate and used for driving the construction platform to ascend and descend. Due to the adoption of the technical scheme, the creeping formwork inner formwork hanging bracket for the high pier construction of the bridge is very convenient to lift.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a climbing formwork inner formwork hanger for high pier construction of bridges. Background Art

[0002] At present, the construction of hollow thin-walled pier bridges mainly adopts the climbing formwork construction method. The climbing formwork construction method refers to pouring concrete using a climbing bracket, pouring it upward section by section until the designed height is reached. The Chinese utility model patent with patent number CN201320227054.2 discloses a climbing formwork inner formwork hanger for high pier construction of bridges, including at least two rows of longitudinal main rods arranged in the pier body, and a cross bar welded on three sides with the upper part of each row of longitudinal main rods, the two ends of adjacent cross bars are connected by connecting rods, and the main rods and the cross bars are movably inserted below the intersection of the cross bars, and the two ends are respectively erected on the rigid skeleton of the pier body. A concrete pouring construction platform and at least one layer of steel formwork construction platform are arranged from top to bottom along the main rods, and a ladder is arranged between adjacent platforms. Although when using this technical solution, construction workers can stand on each platform of the inner formwork hanger to tie steel bars and construct formwork, which can achieve the effect of saving construction time and cost. However, after the concrete construction of a section is completed, it is necessary to use a tower crane to lift the inner formwork hanger to lift the inner formwork hanger, which is more troublesome when lifting the inner formwork hanger. Utility Model Content

[0003] In view of this, the purpose of the utility model is to provide a climbing formwork inner formwork hanger for high pier construction of bridges, so as to solve the technical problem in the prior art that after the concrete construction of a section is completed, it is necessary to use a tower crane to lift the inner formwork hanger to lift the inner formwork hanger, which is quite troublesome.

[0004] The utility model is realized by the following technical solutions:

[0005] A climbing formwork inner formwork hanger for high pier construction of a bridge is used for constructing a hollow thin-walled pier, comprising a climbing formwork arranged on the outside of the hollow thin-walled pier, a load-bearing plate arranged directly above the climbing formwork, a connecting portion for connecting the load-bearing plate and the climbing formwork, a construction platform arranged in the inner cavity of the hollow thin-walled pier, and a driving mechanism arranged on the load-bearing plate and used for driving the construction platform to rise and fall.

[0006] Furthermore, the driving mechanism includes at least two driving parts; a screw hole is formed on the load-bearing plate at a position corresponding to each of the driving parts, and the screw hole vertically penetrates the upper and lower side surfaces of the load-bearing plate, and the driving part includes a first screw rod screwed into the screw hole, a rotating part for rotatably connecting the first screw rod to the construction platform, and a rotating drive assembly provided on the load-bearing plate and used to drive the first screw rod to rotate.

[0007] Furthermore, the rotating part includes a fixed block fixed on the construction platform, a cylindrical cavity formed in the fixed block, a rotating block rotatably fitted in the cavity, and a connecting rod fixed to the upper end of the rotating block and arranged coaxially with the rotating block, a through hole is formed on the fixed block at a position corresponding to the connecting rod, and the upper end of the connecting rod is fixedly connected to the first screw rod after passing through the through hole.

[0008] Furthermore, the outer surface of the screw is recessed inward to form a vertically arranged strip groove; the rotation drive assembly includes a first pulley arranged above the load-bearing plate and rotatably connected to the load-bearing plate, a first through hole arranged in the middle of the first pulley and adapted to the first screw, a convex tooth fixed on the hole wall of the first through hole and slidably fitted in the strip groove, a rotating motor fixed on the load-bearing plate, a second pulley arranged on the output shaft of the rotating motor, and a transmission belt arranged on the first pulley and the second pulley and used to link the first pulley and the second pulley.

[0009] Furthermore, the rotation drive assembly also includes a cylinder fixedly mounted on the side surface of the load-bearing plate and arranged around the first screw, an annular groove with a small mouth and a large cavity formed by being recessed downward from the upper side surface of the cylinder, and an annular slide rail slidably fitted in the annular groove, the annular slide rail is fixedly connected to the lower side surface of the first pulley, and the annular slide rail is arranged coaxially with the first pulley.

[0010] Furthermore, it also includes a plurality of safety parts arranged in sequence along the edge of the construction platform; the safety part includes a safety rope with one end fixedly connected to the construction platform and a carabiner fixedly connected to the other end of the safety rope.

[0011] Furthermore, the connecting part includes at least two connecting frames arranged on the outside of the hollow thin-walled pier, and the connecting frames are used to connect the load-bearing plate and the climbing formwork; the connecting frame includes a seat plate welded and fixed on the climbing formwork, a connecting plate detachably fixed on the seat plate, and a vertical plate with an upper end welded and fixed to the load-bearing plate and a lower end welded and fixed to the connecting plate.

[0012] Furthermore, a plurality of second screws are welded and fixed on the seat plate, and a second through hole is formed on the connecting plate at a position corresponding to each of the second screws, the second through hole is adapted to the second screw, and a nut is screwed on the upper end of each of the second screws after passing through the corresponding second through hole.

[0013] The beneficial effects of the utility model are:

[0014] The climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model does not need to be lifted by a tower crane. The overall lifting of the climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model can be achieved by simply raising the climbing formwork. It is very convenient to raise the climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model.

[0015] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and will be apparent to those skilled in the art based on the following examination and research, or can be taught from the practice of the present invention to some extent. The objectives and other advantages of the present invention can be achieved and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a structural schematic diagram of the climbing formwork inner formwork hanger for high pier construction of bridges of the utility model;

[0017] Figure 2 for Figure 1 Enlarged view of a in the middle;

[0018] Figure 3 for Figure 1 Enlarged view of middle b;

[0019] Figure 4 It is a front view of the combined structure of the fixed block, the rotating block and the connecting rod in the inner formwork hanger of the climbing formwork for high pier construction of bridges of the utility model;

[0020] Figure 5 Book Figure 4 AA section view;

[0021] Figure 6 It is a front view of the combined structure of the first pulley, the convex teeth, the cylinder and the annular slide rail in the climbing formwork inner formwork hanger for high pier construction of bridges of the utility model;

[0022] Figure 7 for Figure 6 BB cross-sectional view.

[0023] The meanings of the numbers in the accompanying drawings are:

[0024] Hollow thin-walled pier-1; climbing formwork-2; load-bearing plate-3; construction platform-4; first screw-5; fixed block-6; cavity-7; rotating block-8; connecting rod-9; strip groove-10; first pulley-11; convex tooth-12; rotating motor-13; second pulley-14; transmission belt-15; cylinder-16; annular slide groove-17; annular slide rail-18; safety rope-19; mountaineering buckle-20; steel bar-21; seat plate-22; connecting plate-23; vertical plate-24; second screw-25; nut-26. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0026] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0028] In the above description of the utility model, it should be noted that the terms "one side", "the other side", etc. indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0029] In addition, the term "same" does not mean that the parts must be absolutely the same, but slight differences are allowed. The term "vertical" only means that the positional relationship between the parts is more vertical than "parallel", and does not mean that the structure must be completely vertical, but can be slightly tilted.

[0030] See also Figure 1-7The utility model provides a technical solution: a climbing formwork inner formwork hanger for high pier construction of bridges, which is used for constructing hollow thin-walled piers 1, and includes a climbing formwork 2, a bearing plate 3, a connecting portion, a construction platform 4, and a driving mechanism. The climbing formwork 2 is a mature existing technology, and the specific structure of the climbing formwork 2 is not described in detail in this solution. The climbing formwork 2 is arranged on the outside of the hollow thin-walled pier 1, the bearing plate 3 is arranged directly above the climbing formwork 2, the connecting portion is used to connect the bearing plate 3 and the climbing formwork 2, the construction platform 4 is arranged in the inner cavity of the hollow thin-walled pier 1, and the driving mechanism is arranged on the bearing plate 3 and is used to drive the construction platform 4 to rise and fall.

[0031] When the climbing formwork inner formwork hanger for high bridge pier construction described in the utility model is in an initial state, the construction platform 4 is located at the lower side of the section to be constructed of the hollow thin-walled pier 1.

[0032] When it is necessary to construct the section to be constructed, the construction platform 4 can be driven by the driving mechanism to move up and down in the section to be constructed, so as to facilitate the construction of the steel bars and formwork of the section to be constructed. After the steel bars and formwork of the section to be constructed are constructed, the concrete of the section is poured. After the concrete pouring is completed and reaches the demolding strength, the construction platform 4 can be driven by the driving mechanism to rise and fall in the section to remove the inner formwork of the section, and the construction of the section is completed at this time. When it is necessary to construct the next section of the hollow thin-walled pier 1, the climbing formwork 2 is raised to the height of one section, and the connecting part, the load-bearing plate 3, the driving mechanism and the construction platform 4 can all be driven by the climbing formwork 2 to rise to the height of one section. The climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model does not need to be lifted by a tower crane. It only needs to raise the climbing formwork 2 to achieve the overall lifting of the climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model. It is very convenient to lift the climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model.

[0033] In this embodiment, the driving mechanism includes two driving parts. It can be understood that in other embodiments, the driving parts can be more than two. Screw holes are formed on the load-bearing plate 3 at positions corresponding to each of the driving parts, and the screw holes vertically penetrate the upper and lower sides of the load-bearing plate 3. The driving part includes a first screw rod 5, a rotating part and a rotating driving assembly. The first screw rod 5 is screwed into the screw hole. The rotating part is used to rotatably connect the first screw rod 5 to the construction platform 4. The rotating driving assembly is arranged on the load-bearing plate 3, and the rotating driving assembly is used to drive the first screw rod 5 to rotate.

[0034] The first screw rod 5 is driven to rotate forward or reversely by the rotation drive assembly. Under the threaded cooperation between the first screw rod 5 and the screw hole, the first screw rod 5 can rise or fall on the load-bearing plate 3. The first screw rod 5 is connected to the construction platform 4 through the rotating part. The first screw rod 5 can drive the construction platform 4 to rise or fall through the rotating part. With this structure, the driving mechanism can drive the construction platform 4 to rise and fall. During the construction process, the construction personnel can put the carabiner on the construction safety rope worn on the body on the first screw rod 5 to ensure the safety of the construction.

[0035] In this embodiment, the rotating part includes a fixed block 6, a cavity 7, a rotating block 8 and a connecting rod 9. The fixed block 6 is fixed on the construction platform 4. The cavity 7 is cylindrical. The cavity 7 is formed in the fixed block 6. The rotating block 8 is rotatably fitted in the cavity 7. The connecting rod 9 is fixed to the upper end of the rotating block 8. The connecting rod 9 is coaxially arranged with the rotating block 8. A through hole is formed on the fixed block 6 at a position corresponding to the connecting rod 9. The diameter of the through hole is smaller than the diameter of the cavity 7. The upper end of the connecting rod 9 passes through the through hole and is fixedly connected to the first screw rod 5. The connecting rod 9 is coaxially arranged with the first screw rod 5.

[0036] When the first screw rod 5 rotates, the first screw rod 5 can drive the connecting rod 9 to rotate, and the connecting rod 9 can drive the rotating block 8 to rotate in the cavity 7, and the fixed block 6 is fixedly connected to the construction platform 4. With this structure, the rotating part can rotatably connect the first screw rod 5 to the construction platform 4.

[0037] In this embodiment, the outer surface of the screw is recessed inward to form a vertically arranged strip groove 10; the rotation drive assembly includes a first pulley 11, a first through hole, a convex tooth 12, a rotating motor 13, a second pulley 14 and a transmission belt 15, the first pulley 11 is arranged above the load-bearing plate 3, the first pulley 11 is rotatably connected to the load-bearing plate 3, the first through hole is arranged in the middle of the first pulley 11, the first through hole is adapted to the first screw 5, the first screw 5 is located in the first through hole, the convex tooth 12 is fixed on the hole wall of the first through hole, the convex tooth 12 is slidably fitted in the strip groove 10, the rotating motor 13 is fixed on the load-bearing plate 3, the second pulley 14 is arranged on the output shaft of the rotating motor 13, the transmission belt 15 is arranged on the first pulley 11 and the second pulley 14, and the transmission belt 15 is used to make the first pulley 11 and the second pulley 14 linked.

[0038] Since the protruding teeth 12 are fixed on the hole wall of the first through hole, and the protruding teeth 12 are slidably matched in the strip groove 10, when the first pulley 11 rotates, the first pulley 11 can drive the first screw 5 to rotate, and the first pulley 11 can also slide relative to the first screw 5. By the rotation of the rotating motor 13 and driving the second pulley 14 to rotate, the first pulley 11 can be linked with the second pulley 14 through the transmission belt 15, and the first pulley 11 can drive the first screw 5 to rotate in the screw hole. With this structure, the rotation drive component can drive the first screw 5 to rotate. By making the rotating motor 13 rotate forward or reverse, the rotation drive component can drive the first screw 5 to rotate forward or reverse.

[0039] In this embodiment, the rotary drive assembly further includes a cylinder 16, an annular groove 17 and an annular slide rail 18. The cylinder 16 can be fixedly mounted on the upper side of the load-bearing plate 3. The cylinder 16 can be arranged around the first screw rod 5. The annular groove 17 is formed by being recessed downward from the upper side of the cylinder 16. The annular slide rail 18 is slidably fitted in the annular groove 17. The annular groove 17 has a small mouth and a large cavity. In this embodiment, the cross section of the annular groove is dovetail-shaped. The annular groove 17 can be a structure with a small mouth and a large cavity. The annular slide rail 18 is fixedly connected to the lower side of the first pulley 11. The annular slide rail 18 is arranged coaxially with the first pulley 11. It can be understood that in other embodiments, the cross section of the annular groove 17 can also be in an inverted T shape.

[0040] Since the annular chute 17 has a small opening and a large cavity, the annular slide rail 18 can only slide in the annular chute 17, that is, the annular chute 17 can rotate with the vertical line passing through the center of the annular chute 17 as the rotation center line, and the annular slide rail 18 cannot escape upward from the annular chute 17. With this structure, the first pulley 11 can be rotatably connected to the load-bearing plate 3.

[0041] In this embodiment, the climbing formwork inner formwork hanger for high pier construction of bridge described in the utility model also includes a plurality of safety parts arranged in sequence along the edge of the construction platform 4; the safety part includes a safety rope 19 and a climbing buckle 20, one end of the safety rope 19 is fixedly connected to the construction platform 4, and the climbing buckle 20 is fixedly connected to the other end of the safety rope 19.

[0042] During the construction process, the mountaineering buckle 20 can be put on the steel bar 21 of the hollow thin-walled pier 1. When the screw rod breaks accidentally, the safety rope 19 and the mountaineering buckle 20 can hold the construction platform 4 on the steel bar 21 of the hollow thin-walled pier 1, thereby improving the safety of the climbing formwork inner formwork hanger for high pier construction of bridges described in the utility model.

[0043] In this embodiment, the connection portion includes two connection frames arranged on the outside of the hollow thin-walled pier 1, and the connection frames are used to connect the load-bearing plate 3 and the climbing formwork 2. It can be understood that in other embodiments, the connection frames can also be more than two. The connection frame includes a seat plate 22, a connection plate 23 and a vertical plate 24. The seat plate 22 is welded and fixed to the climbing formwork 2. Specifically, the seat plate 2 is welded to the end of the tripod crossbeam of the climbing formwork 2 that faces away from the hollow thin-walled pier 1. The connection plate 23 is detachably fixed to the seat plate 22. The upper end of the vertical plate 24 is welded and fixed to the load-bearing plate 3, and the lower end of the vertical plate 24 is welded and fixed to the connection plate 23.

[0044] With this structure, the connection part can connect the bearing plate 3 and the climbing formwork 2. After the construction of the hollow thin-walled pier 1 is completed, the connection plate 23 can be removed from the seat plate 22 first, and then the combined structure of the bearing plate 3, the construction platform 4, the driving mechanism, the vertical plate 24 and the connection plate 23 can be suspended by a tower crane, and then the climbing formwork 2 can be disassembled. The combined structure of the bearing plate 3, the construction platform 4, the driving mechanism, the vertical plate 24 and the connection plate 23 will not affect the disassembly of the climbing formwork 2.

[0045] In this embodiment, a plurality of second screws 25 are welded and fixed on the seat plate 22, and a second through hole is formed on the connecting plate 23 at a position corresponding to each of the second screws 25, and the second through hole is adapted to the second screw 25, and a nut 26 is screwed on the upper end of each of the second screws 25 after passing through the corresponding second through hole.

[0046] The connecting plate 23 is pressed against the seat plate 22 by the nut 26 screwed on the second screw rod 25, thereby realizing the connection between the connecting plate 23 and the seat plate 22. When the connecting plate 23 needs to be removed from the seat plate 22, it is only necessary to unscrew the nut 26 from each of the second screw rods 25, and then move the connecting plate 23 upwards, so that the connecting plate 23 can be removed from the seat plate 22.

[0047] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the technical solution of the utility model can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the utility model, which should be included in the scope of the claims of the utility model.

Claims

1. A climbing formwork inner formwork hanger for high bridge pier construction, used for construction of hollow thin-walled piers, characterized by: The invention comprises a climbing formwork arranged on the outside of the hollow thin-walled pier, a bearing plate arranged just above the climbing formwork, a connecting part for connecting the bearing plate and the climbing formwork, a construction platform arranged in the inner cavity of the hollow thin-walled pier, and a driving mechanism arranged on the bearing plate and used for driving the construction platform to rise and fall; the driving mechanism comprises at least two driving parts; a screw hole is formed on the bearing plate at a position corresponding to each of the driving parts, the screw hole vertically passes through the upper and lower sides of the bearing plate, the driving part comprises a first screw rod screwed into the screw hole, a first screw rod for raising and lowering the first screw rod The screw is rotatably connected to a rotating part on the construction platform and a rotating drive assembly provided on the load-bearing plate and used to drive the first screw to rotate; the rotating part includes a fixed block fixed on the construction platform, a cylindrical cavity formed in the fixed block, a rotating block rotatably fitted in the cavity, and a connecting rod fixed to the upper end of the rotating block and arranged coaxially with the rotating block, a through hole is formed on the fixed block at a position corresponding to the connecting rod, and the upper end of the connecting rod is fixedly connected to the first screw after passing through the through hole.

2. The climbing formwork inner formwork hanger for high pier construction of bridge according to claim 1 is characterized by: The outer surface of the screw is recessed inward to form a vertically arranged strip groove; the rotation drive assembly includes a first pulley arranged above the load-bearing plate and rotatably connected to the load-bearing plate, a first through hole arranged in the middle of the first pulley and adapted to the first screw, a convex tooth fixed on the hole wall of the first through hole and slidably fitted in the strip groove, a rotating motor fixed on the load-bearing plate, a second pulley arranged on the output shaft of the rotating motor, and a transmission belt arranged on the first pulley and the second pulley and used to link the first pulley and the second pulley.

3. The climbing formwork inner formwork hanger for high bridge pier construction according to claim 2 is characterized by: The rotary drive assembly also includes a cylinder fixedly mounted on the side surface of the load-bearing plate and arranged around the first screw rod, an annular groove with a small mouth and a large cavity formed by being recessed downward from the upper side surface of the cylinder, and an annular slide rail slidably fitted in the annular groove, the annular slide rail is fixedly connected to the lower side surface of the first pulley, and the annular slide rail is arranged coaxially with the first pulley.

4. The climbing formwork inner formwork hanger for high pier construction of bridge according to claim 1 is characterized by: It also includes a plurality of safety parts which are arranged in sequence and at intervals along the edge of the construction platform; the safety part includes a safety rope with one end fixedly connected to the construction platform and a carabiner fixedly connected to the other end of the safety rope.

5. The climbing formwork inner formwork hanger for high pier construction of bridge according to claim 1 is characterized by: The connecting part includes at least two connecting frames arranged on the outside of the hollow thin-walled pier, and the connecting frames are used to connect the load-bearing plate and the climbing formwork; the connecting frame includes a seat plate welded and fixed on the climbing formwork, a connecting plate detachably fixed on the seat plate, and a vertical plate whose upper end is welded and fixed to the load-bearing plate and whose lower end is welded and fixed to the connecting plate.

6. The climbing formwork inner formwork hanger for high bridge pier construction according to claim 5 is characterized by: A plurality of second screw rods are welded and fixed on the seat plate, and a second through hole is formed on the connecting plate at a position corresponding to each of the second screw rods, the second through hole is adapted to the second screw rod, and a nut is screwed on the upper end of each of the second screw rods after passing through the corresponding second through hole.